Rencana Denah Lt. 03: KM/WC +3.95 KM/WC +3.95
Rencana Denah Lt. 03: KM/WC +3.95 KM/WC +3.95
DI BUAT OLEH:
DI NILAI OLEH:
CATATAN
NILAI PARAF
Dapur Dapur
+4.00 +4.00
DI BUAT OLEH:
DI NILAI OLEH:
CATATAN
NILAI PARAF
Naik Naik
±0.00 ±0.00
TUGAS BESAR MENEJEMAN KONTRUKSI 1
KM/WC KM/WC
-5.00 -5.00
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
CATATAN
TERAS TERAS
-0,05 -0,05
NILAI PARAF
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
CATATAN
TAMPAK SAMPING
SKALA 1 : 150
NILAI PARAF
SKALA 1 : 100
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
CATATAN
TAMPAK DEPAN
SKALA 1 : 150
NILAI PARAF
SKALA 1 : 100
37
TUGAS BESAR
17
22
17
37
POTONGAN A
SKALA 1 : 20
19 802 802 19
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
A A
1119
1101
CATATAN
NILAI PARAF
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
CATATAN
NILAI PARAF
RENCANA PONDASI
SKALA 1 : 100
SKALA 1 : 100
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
CATATAN
NILAI PARAF
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
ATATA
ILAI A A
SKALA 1 : 100
O O A BA LA A BA
TAIL BALO
(B4)
TUGAS BESAR
237,31
∅8 DI BUAT OLEH:
177,98
2021210146
B1
474,61
∅8
355,96
DI NILAI OLEH:
∅16
∅12
Dyla Midya Octavia, MT
1305,18
CATATAN
177,98
NILAI PARAF
SKALA 1 : 100
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
RB
ATATAN
NILAI ARA
SKALA 1 : 100
NO OR GA BAR LA GA BAR
DETAIL RING BALOK TUGAS BESAR
(RB2)
TUGAS BESAR MENEJEMAN KONTRUKSI 1
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
ATATAN
NILAI ARA
SKALA 1 : 100
NO OR GA BAR LA GA BAR
TUGAS BESAR
DETAIL RING BALOK
(RB1) TUGAS BESAR MENEJEMAN KONTRUKSI 1
DI BUAT OLEH:
2021210146
DI NILAI OLEH:
ATATAN
NILAI ARA
SKALA 1 : 100
NO OR GA BAR LA GA BAR
TUGAS BESAR
+10.85
PLAFOND
+5.00 2021210146
+4.00 +4.00
SKALA 1 : 100
+11.10
DI BUAT OLEH:
DI NILAI OLEH:
+4.00
PLAFOND
CATATAN
-0.30
NILAI PARAF
SKALA 1 : 100
POTONGAN I-I
SKALA 1 : 100
NOMOR GAMBAR JUMLAH GAMBAR
∅6-200
∅10
42
105
TUGAS BESAR
MUKA LANTAI 105
+0,20
SPESIE ∅10-200
70
PAS.DINDING 1/2 BATA
1:5
9
TUGAS BESAR MENEJEMAN KONTRUKSI 1
18
TRANSRAM
25
1:3
PAS. BATA SLOEF S1
TEGEL KERAMIK MUKA LANTAI
PASIR URUG
SPESIE
KM/WC ±0,00 URUGAN TANAH
-0,05
9
∅16-200
18
9
53
18
25
25
53
PASIR URUG LANTAI KERJA
18
URUGAN TANAH 18
350
18 MUHAMMAD ADLAR REYHAN
SLOEF
2021210146
POT. B
PAS.BATU GUNUNG SKALA 1 : 20
280
DI NILAI OLEH:
+0,20
B
35
PASIR URUG
420
350
POT. A CATATAN
SKALA 1 : 20
18 350 18
SKALA 1 : 100