Anda di halaman 1dari 16

TUGAS BESAR

KM/WC KM/WC TUGAS BESAR MENEJEMAN KONTRUKSI 1


+3.95 +3.95

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN


Turun Turun
+8.00 +8.00 2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

CATATAN

NILAI PARAF

RENCANA DENAH LT. 03


SKALA 1 : 100
SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


TUGAS BESAR

+5.00 Naik Naik +5.00


+4.00 +4.00
KM/WC KM/WC TUGAS BESAR MENEJEMAN KONTRUKSI 1
+3.95 +3.95

Dapur Dapur
+4.00 +4.00
DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN


Turun Turun
+4.00 +4.00 2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT


+4.00 +4.00

CATATAN

NILAI PARAF

RENCANA DENAH LT. 02


SKALA 1 : 100
SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


TUGAS BESAR

Naik Naik
±0.00 ±0.00
TUGAS BESAR MENEJEMAN KONTRUKSI 1

KM/WC KM/WC
-5.00 -5.00
DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

RG. KANTOR RG. KANTOR Dyla Midya Octavia, MT


±0,00 ±0,00

CATATAN

TERAS TERAS
-0,05 -0,05

NILAI PARAF

RENCANA DENAH LT. 01


SKALA 1 : 100
SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR

yla Midya Octavia, MT


TUGAS BESAR

TUGAS BESAR MENEJEMAN KONTRUKSI 1

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT


DEPAN

CATATAN

TAMPAK SAMPING
SKALA 1 : 150

NILAI PARAF

SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


TUGAS BESAR

TUGAS BESAR MENEJEMAN KONTRUKSI 1

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

CATATAN

TAMPAK DEPAN
SKALA 1 : 150

NILAI PARAF

SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


131 47 19 802 802 19 47 131

37
TUGAS BESAR
17
22
17
37

TUGAS BESAR MENEJEMAN KONTRUKSI 1


19 802 802 19

POTONGAN A
SKALA 1 : 20

19 802 802 19

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN


19

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

A A

1119
1101

CATATAN

NILAI PARAF

DETAIL P1 SKALA 1 : 100


( 1 UNIT )
SKALA 1 : 20

NOMOR GAMBAR JUMLAH GAMBAR


TUGAS BESAR

TUGAS BESAR MENEJEMAN KONTRUKSI 1

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

CATATAN

NILAI PARAF
RENCANA PONDASI
SKALA 1 : 100

SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


TUGAS BESAR

TUGAS BESAR MENEJEMAN KONTRUKSI 1

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

CATATAN

NILAI PARAF

RENCANA KOLOM LT.01 RENCANA KOLOM LT.02 RENCANA KOLOM LT.03


SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


DETAIL BALOK
(B5) TUGAS BESAR

TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUGAS BESAR MENEJEMAN KONTRUKSI 1

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

ATATA

ILAI A A

SKALA 1 : 100

O O A BA LA A BA
TAIL BALO
(B4)
TUGAS BESAR

237,31

TUGAS BESAR MENEJEMAN KONTRUKSI 1

237,31 237,31 177,98 177,98 118,65 118,65 118,65 118,65

∅8 DI BUAT OLEH:
177,98

MUHAMMAD ADLAR REYHAN

2021210146

B1

474,61
∅8
355,96

DI NILAI OLEH:
∅16
∅12
Dyla Midya Octavia, MT

1305,18
CATATAN

177,98

NILAI PARAF

SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


DETAIL RING BALOK
(RB3) TUGAS BESAR

TUGAS BESAR MENEJEMAN KONTRUKSI 1

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

RB
ATATAN

NILAI ARA

SKALA 1 : 100

NO OR GA BAR LA GA BAR
DETAIL RING BALOK TUGAS BESAR

(RB2)
TUGAS BESAR MENEJEMAN KONTRUKSI 1

TUMPUAN KIRI LAPANGAN TUMPUAN KANAN

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

ATATAN

NILAI ARA

SKALA 1 : 100

NO OR GA BAR LA GA BAR
TUGAS BESAR
DETAIL RING BALOK
(RB1) TUGAS BESAR MENEJEMAN KONTRUKSI 1

TUMPUAN KIRI LAPANGAN TUMPUAN KANAN

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

2021210146

DI NILAI OLEH:

Dyla Midya Octavia, MT

ATATAN

NILAI ARA

SKALA 1 : 100

NO OR GA BAR LA GA BAR
TUGAS BESAR
+10.85

PLAFOND

TUGAS BESAR MENEJEMAN KONTRUKSI 1

PLAT LANTAI T.12 Cm


+7.60 +8.00

PLAFOND DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN

+5.00 2021210146

+4.00 +4.00

CANNOPI T.10 Cm DI NILAI OLEH:


PLAFOND

Dyla Midya Octavia, MT


+1.40

±0.00 ±0.00 MUKA TANAH


-0.30
CATATAN
-0.30

POTONGAN II-II NILAI PARAF


SKALA 1 : 100

SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR


TUGAS BESAR
LAP. ATAP SPANDEK
KUDA-KUDA RANGKA BAJA RINGAN

TUGAS BESAR MENEJEMAN KONTRUKSI 1

+11.10

DI BUAT OLEH:

MUHAMMAD ADLAR REYHAN


PLAT LANTAI T.12 Cm 2021210146
+7.60

DI NILAI OLEH:

Dyla Midya Octavia, MT

+4.00

PLAFOND

CATATAN

±0.00 ±0.00 MUKA TANAH


-0.30

-0.30

NILAI PARAF

SKALA 1 : 100
POTONGAN I-I
SKALA 1 : 100
NOMOR GAMBAR JUMLAH GAMBAR
∅6-200
∅10

42
105

TUGAS BESAR
MUKA LANTAI 105
+0,20
SPESIE ∅10-200

70
PAS.DINDING 1/2 BATA
1:5

9
TUGAS BESAR MENEJEMAN KONTRUKSI 1

18
TRANSRAM

25
1:3
PAS. BATA SLOEF S1
TEGEL KERAMIK MUKA LANTAI
PASIR URUG
SPESIE
KM/WC ±0,00 URUGAN TANAH
-0,05

9
∅16-200

18
9

53
18

25
25

PAS. BATA ∅16-150 DI BUAT OLEH:

53
PASIR URUG LANTAI KERJA

18
URUGAN TANAH 18
350
18 MUHAMMAD ADLAR REYHAN
SLOEF
2021210146
POT. B
PAS.BATU GUNUNG SKALA 1 : 20
280

DI NILAI OLEH:
+0,20

PAS.BATU KALI Dyla Midya Octavia, MT


70

B
35

PASIR URUG

420
350

POT. A CATATAN
SKALA 1 : 20

18 350 18

DET. PONDASI TANGGA


SKALA 1 : 20
NILAI PARAF

SKALA 1 : 100

NOMOR GAMBAR JUMLAH GAMBAR

Anda mungkin juga menyukai