1 3D Delineator 2 Detail 1 Delineator 3 Detail 2 Delineator 4 3D Delineator Reinforcement


1 : 20 1 : 20

BBS Delineator
Bar Jenis Kode Dimensi Bending Pembesian Total Berat per Berat
150 Lokasi Gambar Jarak Jumlah
Diameter Besi Bending A B C D Kait 1 Kait 2 Panjang Besi Meter Besi

Patok 8 mm Plain T1 100 mm 110 mm 90 mm 110 mm 50 mm 50 mm 150 mm 1 x 11 5170 mm 0.40 kg/m 2.07 kg
150

Semua Sudut Dipotong 2x2 cm

Patok 10 mm Plain T2 1410 60 mm 60 mm 2x2 3060 mm 0.62 kg/m 3.79 kg


5 Detail 3 Delineator mm
1 : 10
Patok 12 mm Plain T3 700 mm 1x1 700 mm 0.89 kg/m 0.62 kg

Grand total: 4 6.49 kg

PEKERJAAN : NO. PAKET : MENGETAHUI DISETUJUI DIRENCANAKAN GAMBAR RENCANA


603/47/SPP-PPJ/DPUPR-HS/DAU/2021 KEPALA DINAS PUPR PEJABAT PEMBUAT KOMITMEN CV. PESONA CIPTA CV. PESONA CIPTA TANGGAL SKALA
HALMAHERA SELATAN (PPK) ENGINEERING ENGINEERING
LOKASI :
PEMERINTAH KABUPATEN HALMAHERA SELATAN PERENCANAAN TEKNIS
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PEMBANGUNAN
STR-16
STR-
KOTA LABUHA
KAB. HALMAHERA SELATAN As indicated
PROVINSI MALUKU UTARA JEMBATAN KAWASAN
Jl. Karet Putih Telp. (0927) - 21298 DALAM PERKOTAAN
LABUHA
ALI HASAN, ST WALID SYUKUR ABD. RISDAM TARAJU, SH MAJID LAMASINU, ST
NIP. 19730312 200808 1 001 NIP. 19751015 199703 1 003 DIREKTUR TEAM LEADER

Anda mungkin juga menyukai