Anda di halaman 1dari 48

LAPORAN PIKET JAM

CFPP ANT
BULAN J
No. Hari
Petugas Piket Absen Nama Alat
Urt Tanggal
1 Minggu - Suparman - Screw Feeder 2A
01 Januari 2023 - Jusman - Blowdown Pump 2A/B
- Instrument Air Unit 1
- Standby

2 Senin - Muh. Nurman Arif - Standby


02 Januari 2023 - Anjasmono
- Joko S
- Supardi I

3 Selasa - Jumadhil Adhari - Standby


03 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

4 Rabu - Jusman - Standby


04 Januari 2023 - Peryanto K
- Suparman

5 Kamis - Muh. Nurman Arif - Standby


05 Januari 2023 - Supardi I
- Joko S

6 Jumat - Jumadhil Adhari - Standby


06 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

7 Sabtu - Jusman - Instrument Air unit 1


07 Januari 2023 - Suparman - Standby

8 Minggu - Muh. Nurman Arif - Standby


08 Januari 2023 - Anjasmono
- Joko S

9 Senin - Jumadhil Adhari - Standby


09 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

10 Selasa - Jusman - Standby


10 Januari 2023 - Peryanto K
- Suparman

11 Rabu - Joko S - Standby


11 Januari 2023 - Supardi I
- Fathir Ara'ad
- Aldilla Pradipta

12 Kamis - Jumadhil Adhari - Standby


12 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

13 Jumat - Jusman - Standby


13 Januari 2023 - Aldilla P
- Suparman
- Muh. Risal

14 Sabtu - Joko S - Line ECO Drain IA Unit 2


14 Januari 2023 - Fathir Ara'ad - Standby

15 Minggu - Jumadhil Adhari - Standby


15 Januari 2023 - Fathir Ara'ad
- Muh. Risal

16 Senin - Jusman - Standby


16 Januari 2023 - Peryanto K
- Suparman

17 Selasa - Joko S - Standby


17 Januari 2023 - Supardi I
- Suparman
- Aldilla Pradipta

18 Rabu - Jumadhil Adhari - Standby


18 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

19 Kamis - Jusman - Standby


19 Januari 2023 - Peryanto K
- Suparman

20 Jumat - Anjasmono - Standby


20 Januari 2023 - Joko S
- Supardi I

21 Sabtu - Jumadhil Adhari - Overhaul CFPP Unit 1


21 Januari 2023 - Fathir Ara'ad
- Muh. Risal

22 Minggu - Jusman - Overhaul CFPP Unit 1


22 Januari 2023 - Suparman

23 Senin - Joko S - Overhaul CFPP Unit 1


23 Januari 2023 - Anjasmono
- Muh. Risal
- Suparman

24 Selasa - Jumadhil Adhari - Overhaul CFPP Unit 1


24 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

25 Rabu - Jusman - Standby


25 Januari 2023 - Niko Restu
- Suparman
- Muh. Risal

26 Kamis - Joko S - Standby


26 Januari 2023 - Supardi I
- Anjasmono
- Aldilla Pradipta

27 Jumat - Jumadhil Adhari - Standby


27 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

28 Sabtu - Niko Restu - Limestone Seal RF unit 2, leak


28 Januari 2023 - Jusman - Instrument Air Unit 1, Low level oli
- Muh. Risal - Crusher A/B, Blockage

29 Minggu - Muh. Nurman Arif - HP Blower Unit 1 A,B,C


29 Januari 2023 - Anjasmono - Deaerator System Unit 1
- Muh. Risal - Pompa Celup Intake
- Joko S

30 Senin - Jumadhil Adhari - Instrument Air Unit 1, Low level oli


30 Januari 2023 - Fathir Ara'ad
- Muh. Risal
- Aldilla Pradipta

31 Selasa - Peryanto kasal - Instrument Air Unit 1, Low level oli


31 Januari 2023 - Niko Restu
- Suparman
- Jusman
PORAN PIKET JAM KERUSAKAN PERALATAN
CFPP ANTAM POMALAA
BULAN JANUARI 2023
Tindakan Jam
Nama Alat
Penanggulangan Mulai
2A - Adjust Gland Packing 07.30 AM
mp 2A/B - Adjust Gland Packing
Unit 1 - Top up oli
- Monitoring

- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

unit 1 - Check Level Oli 07.30 AM


- Monitoring

- Monitoring 07.30 AM

- Monitoring 16.30 AM
- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

n IA Unit 2 - Perbaikan jalur pipa Eco Drain 07.30 AM


- Monitoring

- Monitoring 07.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM
- Monitoring 16.30 AM

- Monitoring 16.30 AM

P Unit 1 - Monitoring & Supporting Pekerjaan MK 07.30 AM

P Unit 1 - Monitoring & Supporting Pekerjaan MK 07.30 AM

P Unit 1 - Monitoring & Supporting Pekerjaan MK 07.30 AM

P Unit 1 - Monitoring & Supporting Pekerjaan MK 16.30 AM

- Monitoring 16.30 AM

- Monitoring 16.30 AM

- Monitoring 17.30 AM

l RF unit 2, leak - Adjust Gland Packing 07.30 AM


Unit 1, Low level oli - Top up oli
lockage - Normalisasi Blockage

- Pasang V-Belt dan Alignment 07.30 AM


em Unit 1 - Pengecekan
- Pengecekan dan perbaikan

Unit 1, Low level oli - Ganti Oil Shaft Seal 16.30 AM

Unit 1, Low level oli - Continue Pekerjaan Ganti Oil Shaft Seal 16.30 AM
Jam JML
Keterangan
Selesai Jam
13.30 AM 6:00

19.30 AM 3:00

19.30 AM 3:00

19.30 AM 3:00

19.30 AM 3:00

20.30 AM 4:00

13.30 AM 6:00

13.30 AM 6:00

19.30 AM 3:00
19.30 AM 3:00

19.30 AM 3:00

19.30 AM 3:00

20.30 AM 4:00

13.30 AM 6:00

13.30 AM 6:00

19.30 AM 3:00

19.30 AM 3:00

19.30 AM 3:00
19.30 AM 3:00

20.30 AM 4:00

16.30 AM 9:00

16.30 AM 9:00

16.30 AM 9:00

22.30 AM 6:00

19.30 AM 3:00

19.30 AM 3:00

20.30 AM 3:00

21.00 AM 13:30
17.30 AM 10:00

20.30 AM 4:00

23.30 AM 7:00
LAPORAN PIKET JAM KERUSA
CFPP ANTAM POM
BULAN FEBRUAR
No. Hari
Petugas Piket Absen Nama Alat
Urt Tanggal
1 RABU Nurman
01 Februari 2023 Anjasmono
Joko. S -
Supardi
2 KAMIS Jumadil SF Unit 1
02 Februari 2023 Fathir
Aldilla
Muh. Rizal
3 JUMAT Jusman SF Unit 1
03 Februari 2023 Peryanto kasal

4 SABTU Joko SF Unit 1


04 Februari 2023 Nurman
Anjasmono

5 MINGGU M. Risal - Pompa Celub


05 Februari 2023 Jumadil - Condenser Unit 2
Fathir

6 SENIN Jusman
06 Februari 2023 Suparman Condenser Unit 2
Peryanto Kasal

7 SELASA Nurman
07 Februari 2023 Joko Burner Unit 2
Supardi

8 RABU Jumadil Pompa Celub


08 Februari 2023 Fathir
M. Risal
9 KAMIS Jusman SF Unit 1
09 Februari 2023 Suparman
Peryanto Kasal

10 JUMAT Nurman - Standby


10 Februari 2023 Joko
Supardi

11 SABTU Jumadil Pipa Outlet Net Pond Pum


11 Februari 2023 Fathir Pipa Purging Bag Filter Uni
M. Risal

12 MINGGU Jusman Pompa PHE Pump B


12 Februari 2023 Suparman

13 SENIN Nurman SF Unit 1


13 Februari 2023 Joko
Supardi

14 SELASA Jumadil SF Unit 1


14 Februari 2023 M. Risal
Ardilla
Fathir

15 RABU Niko Pipa Make Up Unit 1


15 Februari 2023 Suparman
Peryanto Kasal

16 KAMIS Fathir Standby


16 Februari 2023 Aldilla
M risal

17 JUMAT Jumadil Pipa Equalizing Bag Filter


17 Februari 2023 Fathir
M. Risal
Aldilla

18 SABTU Joko Air Flo Damper Intrex Unit


18 Februari 2023 Nurman Lean Pipa Make Up Unit 1
Jusman

19 MINGGU Nurman Pipa Make Up Unit 1


19 Februari 2023 Joko
Anjasmono

20 SENIN Jumadil SF Unit 1


20 Februari 2023 Fathir
Ardilla
M. Risal

21 SELASA Niko PHE Pump A


21 Februari 2023 Jusman
Suparman
Supardi

22 RABU Nurman Pump PHE A


22 Februari 2023 Joko
Anjas Mono
Supardi

23 KAMIS Jumadil Tank HCL (Leak)


23 Februari 2023 Fathir
M. Risal
Ardilla

24 JUMAT Suparman Standby


24 Februari 2023 Jusman
Peryanto Kasa

25 SABTU Nurman Burner Unit 2


25 Februari 2023 Joko
Anjasmono

26 MINGGU Jumadil Pipa Hotwel Condenser Uni


26 Februari 2023 M. Risal
Fathir
Ardilla

27 SENIN Niko Compressor Ingersol


27 Februari 2023 Jusman
Suparman
Peryanto Kasal

28 SELASA Nurman Line Pipa Sand dan Limest


28 Februari 2023 Anjasmono
Joko
Supardi
PIKET JAM KERUSAKAN PERALATAN
CFPP ANTAM POMALAA
BULAN FEBRUARI 2023
Tindakan Jam Jam JML
Penanggulangan Mulai Selesai Jam

- 16.30 19.30 3:00

Pergantian Bearing SF Unit 1 16.30 23.00 7:00

Pergantian Bearing SF Unit 1 5:30 PM 8:00 PM 4:00

Pergantian Bearing SF Unit 1 7:30 AM 11:00 PM 16:00

- Perbaikan Pompa Celub 07.30 10.30 3:00


- Open Menhole Condenser Unit 2 11.00 15.00 5:00

Close Menhole Condenser Unit 2 16.30 20.30 4:00

Cleanning Cip Burner 16.30 19.30 3:00

Perbaikan Pompa Celub area Intake 16.30 19.30 3:00

Pasang Bushing SF Unit 1 16.30 11:00 PM 7:00

- Monitoring 17.30 20.30 3:00

Perbaikan Pipa Outlet Pond Pump 07.30 09.30 3:00


Ganti Pipa baru Purging 3:30 PM 7:30 PM 5:00
Adjust Gland Packing PHE 7:30 AM 08.30 2:00

Ganti Bearing SF Unit 1 16.30 11:00 PM 5:00

Isi Oil baru Gearbox SF Unit 1 19.30 21.30 6:00

Pengelasan Pipa Make Up Unit 1 16.30 21.30 5:00

Monitoring 4:30 PM 19.30 3:00

Ganti Pipa Equalizing Bag Filter Unit 1 17.30 20.30 3:00

Perbaikan Damper Intrex Unit 1 07.30 13.30 6:00


Perbaikan Pipa Make Up Unit 1 07.30 13.30 6:00

Perbaikan Pipa Make Up Unit 1 07.30 13.30 6:00

Cek SF Unit 1 A/B (Indikasi Noise) 19.30 20.30 2:00

Ganti Bearing dan Gland Peacking PHE A 19.30 23.30 4:00

Pengantian Bearing PHE A 7:30 PM 22.30 3:00


Perbaikan Plange Tank HCL 19.30 23.30 4:00

Monitoring 17.30 20.30 3:00

Cleaning Burner Unit 2 07.30 13.30 6:00

Perbaikan Pipa Hotwel Condenser Unit 1 07.30 13.30 6:00

Cleaning Compressor Ingersol 19.30 23.30 4:00

Cleaning Pipa Sand dan Limestone Feding 19.30 9:30 PM 4:00


Unit 1 (Ngeblock)
Keterangan
LAPORAN PIKET JAM KERUSA
CFPP ANTAM POM
BULAN MARET 2
No. Hari
Petugas Piket Absen Nama Alat
Urt Tanggal
1 Rabu Jumadil Adhari BTG/BOP
01 Maret 2023 Fatir Ara'ad
Aldilla Pradipta
M. Risal
2 Kamis Niko Restu Pipa Purge Hoorizontal BF U2 - broken
02 Maret 2023 Jusman
Suparman
Peryanto Kasal
3 Jumat M. Nurman Arif Line Drain Cation A - leakage
03 Maret 2023 Anjasmono Dessicant dryer B - alarm right tower
Supardi Iksan Coal Screw Feeder 2B - bushing aus
Joko Susilo
4 Sabtu Jumadil Adhari Coal Screw Feeder 2A - bushing aus
04 Maret 2023 Fatir Ara'ad Dessicant dryer B - after ganti material
Aldilla Pradipta Nozzle band screen U1 - clogged
M. Risal
5 Minggu Jusman Coal Screw Feeder 2A/B - bushing aus
05 Maret 2023 Suparman Dessicant dryer B - after ganti material
Peryanto Kasal
6 Senin M. Nurman Arif Coal Rotary Feeder U2 - Maintenace OH
06 Maret 2023 Anjasmono Check Valve line condensate feed pump
Supardi Iksan
Joko Susilo
7 Selasa Jumadil Adhari Elbow line CBD U2 - leakage/korosif
07 Maret 2023 Fatir Ara'ad Roof plate cyclone for castable
Aldilla Pradipta
M. Risal
8 Rabu Niko Restu BTG/BOP
08 Maret 2023 Jusman
Suparman
9 Kamis M. Nurman Arif Strainer chute furnace U2 - for fabrication
09 Maret 2023 Anjasmono Line Drain Cation A - leakage
Supardi Iksan Coal Crusher A/B - Blockage
Joko Susilo
10 Jumat Jumadil Adhari BTG/BOP
10 Maret 2023 Fatir Ara'ad
Aldilla Pradipta
M. Risal
11 Sabtu Niko Restu MOV butterfly out MCWP U2 - OH
11 Maret 2023 Jusman Gearbox line strainer ball cleaning U2 - OH
Suparman Coal Crusher A/B - Blockage
Peryanto Kasal
12 Minggu M. Nurman Arif CFPP Unit 2 - OH
12 Maret 2023 Anjasmono BTG/BOP
Supardi Iksan
Joko Susilo
13 Senin Jumadil Adhari BTG/BOP
13 Maret 2023 Fatir Ara'ad
Aldilla Pradipta
M. Risal
14 Selasa Niko Restu Coal Crusher A/B - Blockage
14 Maret 2023 Jusman
Suparman
Peryanto Kasal
15 Rabu M. Nurman Arif Sight Glass line udara boiler U2 - dirty
15 Maret 2023 Anjasmono Nozzle spray ducting inlet BF Unit 2 - OH
Supardi Iksan
Joko Susilo
16 Kamis Jumadil Adhari North air flow intrex U2 - abnormal
16 Maret 2023 Fatir Ara'ad area intake - OH
Aldilla Pradipta
M. Risal
17 Jumat Niko Restu Gearbox line strainer ball cleaning U2 - OH
17 Maret 2023 Jusman Roof plate cyclone for castable - OH
Suparman
Peryanto Kasal
18 Sabtu M. Nurman Arif HP Blower U2 A,B,C - After Maint OH
18 Maret 2023 Anjasmono Nozzle spray ducting inlet BF Unit 2 - OH
Supardi Iksan
Joko Susilo
19 Minggu Jumadil Adhari Gearbox line strainer ball cleaning U2 - OH
19 Maret 2023 Fatir Ara'ad
Aldilla Pradipta
M. Risal
20 Senin Niko Restu BTG/BOP
20 Maret 2023 Jusman
Suparman
Peryanto Kasal
21 Selasa M. Nurman Arif BTG/BOP
21 Maret 2023 Anjasmono
Supardi Iksan
Joko Susilo
22 Rabu Jumadil Adhari Coal Rotary Feeder U2 - low level oli
22 Maret 2023 Fatir Ara'ad Burner 2A - leakage
Aldilla Pradipta Boiler U2 start up - refractory drying
M. Risal
23 Kamis Niko Restu BTG/BOP
23 Maret 2023 Jusman
Suparman
Peryanto Kasal
24 Jumat M. Nurman Arif Service Air Compressor U1 - Alarm
24 Maret 2023 Anjasmono Flexible Hose Burner 2A/B - longgar
Supardi Iksan Boiler U2 start up
Joko Susilo
25 Sabtu Jumadil Adhari Service Air Compressor U1 - Alarm
25 Maret 2023 Fatir Ara'ad Coal Rotary Feeder U2 - low level oli
Aldilla Pradipta Coal Crusher A/B - Blockage
M. Risal Blowdown pump 2A/B - overleak
26 Minggu Niko Restu Manual valve venting CFP U2 - broken
26 Maret 2023 Jusman Coal Crusher A/B - Blockage
Suparman Line Drain Cation A - leakage
Peryanto Kasal
27 Senin M. Nurman Arif Manual valve venting CFP U2 - broken
27 Maret 2023 Anjasmono
Supardi Iksan
Joko Susilo
28 Selasa Jumadil Adhari Manual valve inlet sampling - leakage
28 Maret 2023 Fatir Ara'ad Steam trap line unit 2 - leakage
Aldilla Pradipta
M. Risal
29 Rabu Niko Restu BTG/BOP
29 Maret 2023 Jusman
Suparman
Peryanto Kasal
30 Kamis M. Nurman Arif Trash Rake U1 - Abnormal
30 Maret 2023 Anjasmono
Supardi Iksan
Joko Susilo
31 Jumat Jumadil Adhari Manual vlv ECO in Sampling U2 - leakage
31 Maret 2023 Fatir Ara'ad Damper windbox air FCV U2
M. Risal
N PIKET JAM KERUSAKAN PERALATAN
CFPP ANTAM POMALAA
BULAN MARET 2023
Tindakan Jam Jam JML
Nama Alat
Penanggulangan Mulai Selesai Jam
Monitoring/ Standby 16:30 19:30 3:00

izontal BF U2 - broken Drilling Hole 16:30 22:30 6:00

n A - leakage Repair pipe 17:30 23:30 6:00


B - alarm right tower Filling/ganti aluminaoxide material
der 2B - bushing aus Ganti Bushing

der 2A - bushing aus Ganti Bushing 7:30 17:30 10:00


B - after ganti material Instal pipe, running test
een U1 - clogged cleaning

der 2A/B - bushing aus Ganti Bushing, oli, bearing, gp, etc 7:30 23:30 16:00
B - after ganti material Cleaning muffler

der U2 - Maintenace OH Ganti seal, oli, gland packing, etc 16:30 23:30 7:00
e condensate feed pump Check visual disc

U2 - leakage/korosif Ganti elbow 16:30 23:30 7:00


ne for castable Cutting Plate

Monitoring/ Standby 16:30 19:30 3:00

rnace U2 - for fabrication Pengukuran dimensi/ measurement 16:30 4:30 12:00


n A - leakage Repair pipe
B - Blockage Normalisasi/cleaning

Monitoring/ Standby 17:30 19:30 2:00


ut MCWP U2 - OH Perbaikan 7:30 23:30 16:00
ainer ball cleaning U2 - OH Perbaikan
B - Blockage Normalisasi/cleaning

Monitoring OH 7:30 13:30 6:00


Monitoring/ Standby

Monitoring/ Standby 16:30 19:30 3:00

B - Blockage Normalisasi/cleaning 16:30 21:30 5:00

udara boiler U2 - dirty Cleaning 16:30 23:30 7:00


cting inlet BF Unit 2 - OH Instal/ welding Nozzle

rex U2 - abnormal Perbaikan 16:30 23:00 6:30


support instal chain block

ainer ball cleaning U2 - OH Perbaikan 17:30 23:00 5:30


ne for castable - OH Welding plate after castable

,B,C - After Maint OH Monitoring 7:30 13:30 6:00


cting inlet BF Unit 2 - OH Testing Spray

ainer ball cleaning U2 - OH Perbaikan 7:30 17:30 10:00

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00


der U2 - low level oli Top up oli 7:30 21:30 14:00
Perbaikan
p - refractory drying Supporting & Monitoring

Monitoring/ Standby 7:30 13:30 6:00

pressor U1 - Alarm Inspeksi coupling 17:30 4:30 12:00


urner 2A/B - longgar Tightening
Supporting & Monitoring

pressor U1 - Alarm Ganti air filter 7:30 4:30 21:00


der U2 - low level oli Top up oli
B - Blockage Normalisasi/cleaning
2A/B - overleak Adjust gland packing
nting CFP U2 - broken Perbaikan 7:30 6:30 23:00
B - Blockage Normalisasi/cleaning
n A - leakage Repair pipe

nting CFP U2 - broken welding handwheel 16:30 19:30 3:00

et sampling - leakage tightening 16:30 19:30 3:00


unit 2 - leakage tightening & pasang cover isolasi

Monitoring/ Standby 16:30 19:30 3:00

Abnormal Check dan testing 16:30 19:30 3:00

in Sampling U2 - leakage Perbaikan 17:30 2:30 10:00


x air FCV U2 Greasing
Keterangan

Continue

Continue

Finished
LAPORAN PIKET JAM KERUSA
CFPP ANTAM POM
BULAN APRIL 2
No. Hari
Petugas Piket Absen Nama Alat
Urt Tanggal
1 Sabtu Jusman Perbaikan pipa drain valve 3SH unit 2
01 April 2023 Suparman Chip burner unit 2
Peryanto k

2 Minggu Nurman Level oil Wash water


02 April 2023 Anjasmono Line pipa Effluent pump A
Supardi iksan
Joko . S
3 Senin Jumadhil A Pipa Equailizing unit 1
03 April 2023 Fathir A
M risal

4 Selasa Niko R Monitoring


04 April 2023 Jusman
Suparman
Peryanto k
5 Rabu Nurman Monitoring
05 April 2023 Joko s
Anjasmono
6 Kamis Fathir A Monitoring
06 April 2023 M risal
Joko s

7 Jumat Jusman Filter Compressor SA Ui


07 April 2023 M risal BA metering rotary feeder unit 2
Suparman
Peryanto K
8 Sabtu Nurman Monitoring
08 April 2023 Amjasmono
Joko S
9 Minggu Jumadhil A Rotary Feeder unit 2 A
09 April 2023 Fathir A
M risal

10 Senin Niko R Monitoring


10 April 2023 Jusman
Suparman
Supardi iksan
11 Selasa Nurman Monitoring
11 April 2023 Anjasmono
Joko S
Peryanto K
12 Rabu Jumadhil A Rotary Feeder unit 2 A Leak
12 April 2023 Fathir A
Aldilla P
M risal
13 Kamis Jusman Monitoring
13 April 2023 Suparman
Supardi iksan

14 Jumat Joko s Monitoring


14 April 2023 Anjasmono
Peryanto k

15 Sabtu Jumadhil A Crusher A ngeblock


15 April 2023 Fathir A
M risal

16 Minggu Jusman Monitoring


16 April 2023 Supardi iksan
Suparman

17 Senin Anjasmono Line BA tank unit 2 tersumbat


17 April 2023 Joko S
Peryanto k

18 Selasa Jumadhil A Monitoring


18 April 2023 Fathir A
M risal
Aldilla P
19 Rabu Niko R Monitoring
19 April 2023 Jusman
Supardi Iksan
Suparman
20 Kamis Joko S Valve line pipa Fit pump leak
20 April 2023 Supardi Iksan Plat Hopper Grizzly A lepas
Peryanto K

21 Jumat Jumadhil A Blowdown pump A leak


21 April 2023 M risal
Joko S
22 Sabtu Niko R Monitoring
22 April 2023 Jusman
M risal
Supardi iksan
23 Minggu Joko susilo Monitoring
23 April 2023 Peryanto k
M risal

24 Senin Jumadil adhari Pump IDF


24 April 2023 M risal
joko susilo

25 Selasa Niko R Monitoring


25 April 2023 Jusman
Suparman
Supardi iksan
26 Rabu Joko S Monitoring
26 April 2023 Peryanto Kasal
Jumadil Adhari

27 Kamis Jumadil A Monitoring


27 April 2023 M Risal
Joko S
Aldilla
28 Jumat Supardi iksan Monitoring
28 April 2023 Suparman
Peryanto kasal

29 Sabtu Jumadil A Crusher A/B


29 April 2023 Joko S
Peryanto K

30 Minggu Joko S Crusher A & B


30 April 2023 Jumadil A
M Risal
N PIKET JAM KERUSAKAN PERALATAN
CFPP ANTAM POMALAA
BULAN APRIL 2023
Tindakan Jam Jam JML
Nama Alat
Penanggulangan Mulai Selesai Jam
drain valve 3SH unit 2 Penggantian pipa yg Baru 7:30 20:00 12:30
Cleaning chip burner

Penambahan oil pump wash water 7:30 19:30 12:00


Line pipa tersumbat sampah

Pengelasan pipa yg bocor 16:30 19:30 3:00

Monitoring 16:30 19:30 3:00

Monitoring 16:30 19:30 3:00

Monitoring 16:30 19:30 3:00

Cleaning Filter Compressor SA UI 7:30 21:30 14:00


ary feeder unit 2 Penanganan BA tank indikasi
tersumbat kurang lancar turun
material
Monitoring 7:30 13:30 6:00

Penambahan oil RF unit 2A 7:30 13:30 6:00

Monitoring 16:30 19:30 3:00


Monitoring 16:30 19:30 3:00

nit 2 A Leak Adjust RF unit 2A 16:30 19:30 3:00

Monitoring 16:30 19:30 3:00

Monitoring 17:30 20:30 3:00

Cleaning Crusher A 7:30 13:30 6:00

Monitoring 7:30 13:30 6:00

t 2 tersumbat Open /close Flage line BA tank 16:30 21:30 5:00


kurang lancar turun material

Monitoring 16:30 19:30 3:00

Monitoring 7:30 13:30 6:00

Fit pump leak perbaikan packing 7:30 13:30 6:00


zly A lepas Pemotongan Plat yg sdh rusak

Adjust GP 7:30 13:30 6:00


Monitoring 7:30 13:30 6:00

Monitoring 7:30 13:30 6:00

Penambahan oil unit 2 7:30 13:30 6:00

Monitoring 7:30 13:30 6:00

Monitoring 16:30 19:30 3:00

Monitoring 16:30 19:30 3:00

Monitoring 17:30 20:30 3:00

Penanganan Crusher A & B 7:30 20:30 12:00


ngeblock

Penanganan Crusher A & B 7:30 22:30 14:00


Keterangan
Cuti
Bersama

Cuti
Bersama

Cuti
Bersama
Cuti
Bersama

Cuti
Bersama

Cuti
Bersama

Cuti
bersama
LAPORAN PIKET JAM KERUSA
CFPP ANTAM POM
BULAN MEI 20
No. Hari
Petugas Piket Absen Nama Alat
Urt Tanggal
1 Senin Niko Restu Coal Screw Feeder 2B
01 Mei 2023 Suparman Coal Crusher A/B
Supardi Iksan PHE Pump B
Jusman Coal Rotary Feeder 2A
2 Selasa Joko S BTG/BOP Area
02 Mei 2023 Anjasmono
Peryanto K

3 Rabu Jumadhil A BTG/BOP Area


03 Mei 2023 Fathir A
M risal
Aldilla P
4 Kamis Niko R BTG/BOP Area
04 Mei 2023 Jusman
Suparman
Supardi Iksan
5 Jumat Peryanto K BTG/BOP Area
05 Mei 2023 Joko s
Anjasmono
6 Sabtu Fathir A 1DeSH U2 CV
06 Mei 2023 M risal Level Glass/Gauge Steam Drum U2
Jumadhil A
Aldilla P
7 Minggu Niko Restu BTG/BOP Area
07 Mei 2023 Suparman
Supardi Iksan
Jusman
8 Senin Peryanto K BTG/BOP Area
08 Mei 2023 Anjasmono
Joko S
9 Selasa Jumadhil A BTG/BOP Area
09 Mei 2023 Fathir A
M Risal
Aldilla P
10 Rabu Niko R BTG/BOP Area
10 Mei 2023 Supardi Iksan
Suparman
11 Kamis Nurman HP Blower 2C
11 Mei 2023 Anjasmono
Joko S
Peryanto K
12 Jumat Jumadhil A HP Blower 2C
12 Mei 2023 Fathir A Grizzly Hopper A
Aldilla P Unit 1 Start-up
M Risal Chip Burner U1
13 Sabtu Niko restu Flange bag hopper 1A
13 Mei 2023 Suparman Coal Crusher A/B
Supardi iksan Steam drum LCV (Start up) U1
M. Risal
14 Minggu M. Nurman Arif BTG/BOP Area
14 Mei 2023 Anjasmono Coal crusher B
Joko S
15 Senin Aldilla P BFP 1A
15 Mei 2023 Fathir A Coal crusher B
M risal
Suparman
16 Selasa Jusman Steam Trap Turbin Bypass U2
16 Mei 2023 Supardi iksan
Suparman
Niko Restu
17 Rabu Anjasmono Line BA tank unit 2 tersumbat
17 Mei 2023 Joko S
Peryanto k
M. Nurman Arif
18 Kamis Jumadhil A Line PG BFP 1A
18 Mei 2023 Fathir A Turbine U1 Trip
M risal
Aldilla P
19 Jumat Niko R BTG/BOP Area
19 Mei 2023 Jusman
Supardi Iksan
Suparman
20 Sabtu M. Nurman Arif Reflektor Steam Drum Level Glass U1
20 Mei 2023 Joko S
Anjasmono
21 Minggu Jumadhil A 2SH Unit 1 CV
21 Mei 2023 M Risal BA seal RF U1
Fathir
22 Senin Niko R Coal Screw Feeder 2B
22 Mei 2023 Jusman
Supardi Iksan
Suparman
23 Selasa M. Nurman Arif BTG/BOP Area
23 Mei 2023 Joko S
Anjasmono
Peryanto K
24 Rabu Jumadhil A BTG/BOP Area
24 Mei 2023 M Risal
Fathir
25 Kamis Niko R High Pressure Blower 1B
25 Mei 2023 Jusman
Supardi Iksan
Suparman
26 Jumat M. Nurman Arif Turbin Unit 1
26 Mei 2023 Joko S
Anjasmono
27 Sabtu Jumadhil A Dessicant Dryer A
27 Mei 2023 M Risal 3dSH CV unit 2
Fathir Ammonia dosing pump Unit 2
Aldilla P
28 Minggu Niko R Dessicant Dryer B
28 Mei 2023 Jusman PHE pump
Supardi Iksan Crusher B
Suparman
29 Senin M. Nurman Arif BTG/BOP Area
29 Mei 2023 Joko S
Anjasmono
Peryanto K
30 Selasa Fathir BTG/BOP Area
30 Mei 2023 Aldilla P
Joko S
Anjasmono
31 Rabu Niko R BTG/BOP Area
31 Mei 2023 Jusman
Supardi Iksan
Suparman
N PIKET JAM KERUSAKAN PERALATAN
CFPP ANTAM POMALAA
BULAN MEI 2023
Tindakan Jam Jam JML
Nama Alat
Penanggulangan Mulai Selesai Jam
Adjust Gland Packing 7:30 17:00 9:30
Normalisasi Blosckage
Adjust Gland Packing
Adjust Gland Packing
Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 17:30 20:30 3:00

Adjust Packing 7:30 22:30 15:00


ge Steam Drum U2 Ganti Packing & Glass Set

Monitoring/ Standby 7:30 13:30 6:00

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00


Ganti Bearing DE & NDE 16:30 23:30 7:00

Ganti Bearing DE & NDE 17:30 5:00 11:30


Ganti Rubber Spring
Monitoring & Supporting
Cleaning
Perbaikan/pengelasan 7:30 5:00 21:30
Normalisasi Blockage
V (Start up) U1 Adjust Packing

Monitoring/ Standby 7:30 19:30 12:00


Normalisasi Blockage

Pemasangan talang area leak 16:30 19:30 3:00


Normalisasi Blockage

bin Bypass U2 Tightening Bolt 16:30 5:00 12:30

t 2 tersumbat Open /close Flage line BA tank 16:30 21:30 5:00


kurang lancar turun material

Perbaikan line yang leak 7:30 19:30 12:00


Monitoring & Supporting

Monitoring/ Standby 17:30 20:30 3:00

Drum Level Glass U1 Cleaning 7:30 13:30 6:00

Adjust Packing 7:30 13:30 6:00


Normalisasi Blockage

Adjust Gland Packing 16:30 19:30 3:00


Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00

Ganti Air Filter 16:30 19:30 3:00

Lepas lever governoor valve 17:30 5:00 11:30


Verifikasi stroke amplifier
Monitoring start turbin unit 1
Ganti Filter 7:30 20:30 13:00
Adjust Gland Packing
g pump Unit 2 Pengecekan

Ganti Filter 7:30 4:30 21:00


Pengecatan
Normalisasi Blockage

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00

Monitoring/ Standby 16:30 19:30 3:00