Anda di halaman 1dari 1

KEPOLISIAN NEGARA REPUBLIK INDONESIA

DAERAH SUMATERA SELATAN


PEKERJAAN

PENGEMBANGAN GEDUNG MAPOLDA


SUMATERA SELATAN (TAHAP II)
TAHUN ANGGARAN 2021

CATATAN

MENYETUJUI

PEJABAT PEMBUAT KOMITMEN

DWI CITRA AKBAR, ST, SIK, MIK


KOMPOL NRP 80071429

TIM TEKNIS MAPOLDA SUMSEL

RM. BAMBANG SURYANTO, ST.


PENATA TK.I/197101132002121003

TIM PENGELOLA TEKNIS KEGIATAN


DINAS PERKIM PROV. SUMSEL

Dr.KM. AMINUDDIN, ST. MT


NIP. 197203141999031006

DIPERIKSA / MENYETUJUI
KONSULTAN MANAJEMEN KONSTRUKSI

TERAS
+3950
PT. PARAHYANGAN
PUTRA CEMERLANG

DROP OFF
PT. PARAHYANGAN PUTRA CEMERLANG
+2040

LT. DASAR
±0.00

FFL-750 FFL-750
FFL-900 FFL-850
FFL-1000 FFL-900 ISKANDAR, ST., MT.,IAI.
TEAM LEADER
KONTRAKTOR

PT.SURYA MANUNGGAL WISESA-PT.FEBERCO (KSO)


Jl.Cinde Welan RT.010 RW. 003 Kelurahan 24 Ilir Bukit Kecil,
Kota Palembang, Provinsi Sumatera Selatan

SIS RIYADI, ST.


PROJECT MANAGER

AS BUILT DRAWING
Judul Gambar :

TAMPAK A
TAMPAK A
SKALA JUMLAH NOMOR
SIMBOL
LEMBAR GAMBAR

1:150 ARS ABD-ARS-02-01

REFERENSI GAMBAR : ARS-02-01

Anda mungkin juga menyukai