Fiber Intelligences Distribution Antenna System

In-Building Coverage with BTIS FIDAS system


Proposed Design for

Aditya kemang Village, Jakarta, Indonesia


March, 2009
A Leading Provider for Smart Coverage and Enhancement Solutions for the Wireless Communication Industry Worldwide

What is FIDAS In-Building Solution?


Fiber Intelligences Distribution Antenna System
RFSignalsareconvertedbyHostUnits(HU)intolight Sourceandtransportedoverfiberopticalcablesto theRemoteunits. LightSignalsarethenconvertedbackintoRFsignal byRemoteUnits(RU)units. SinglemodeorMutil ModeFiber(toberequested) transmissionforbestperformances FIDAS cancommunicateupto15km betweenHU andRUunits. RUtoDASSystembyexistingCoaxialconnections

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

BTIs Solution FIDAS System


BTISproposed FIDAS systeminbuilding coveragesolutionforAdityakemang Village . ThisisahybridDAS networksystem,a conceptofmaximizingexistingpassive antennasysteminthebuildingwhich needtoupgradeormix&matchactive andpassivesystemfornewbuildings. Achievedcostefficiency,fast&easy installation,flexibilityandnetworks scalability.

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

FIDAS In-Building Coverage Design

AdityakemangVillage
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Proposed Concepts:
TheproposedInbuildingCoveragedesignusingBTIS FIDAS systemforAdityakemangVillage ,usethe existingDASsystemwith100%activesystemto transportoperatorsBTSsignalingtomobileusers

Thefollowingpresentationintendtoprovideanidea tointroducetheFIDAS systemforinbuildingcoverage ,whichsupportsmultioperators,multibandsand multicarriers wirelesscommunicationnetwork services.

Thefiguresusedinthispresentationtodescribethe buildingsallcomefromthirdparty.Aprofessionalsite surveyandsitesstudyshouldbedonebeforedeploy theIBCimplementation.

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

HereisAditya Kemang Village

Nos.ofBuilding:TowerA,B,C,D,E,F,G,Parkia,Pengelola,V.K.Hotel,MALL,Sekolah ,Dehan lantai Parkia,R.serbaguna Nos.ofFloors:Totally298 Nos.ofBasement3 Coveragearea:Around224,074m2


Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential

ZONE Description ---- Buildings Distributing

Tower E PARKER Tower C Tower B HOTEL


PENGELOLA

Tower F

SEKOLAH/ LANTAIPARKIA

L
Tower G

Tower D

Tower A

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

BUILDINGS
PARKIA TOWERA TOWERB TOWERC TOWERD PENGELOLA K.V.MALL DEHANLANTAIPARKIA HOTEL SEKOLAH TOWERE TOWERE TOWERF TOWERG R.SERBAGUNA BASEMENT1 BASEMENT2 BASEMENT3

L(M)
77.6 28.76 33.2 41.6 36.8 26.8 232 160 17.2 24 10.1 22.1 41.6 61.1

W(M)
31.6 36.57 27.6 27.4 32.5 30.5 56 40 70.7 48 72.3 69.3 30 19.1

FLOORS
6.5 43 46 46 41 2 5 9.5 18 6 7 18 21 25 1

AREAperFLOOR
2452.16 1051.7532 916.32 1139.84 1196 817.4 12992 6400 1216.04 1152 730.23 1531.53 1248 1167.01

168 168 112

483 483 248

1 1 1

81144 81144 27776 Confidential

Operators Brief
Therewillbe3bandwireless network(3G,CDMA800, DCS1800)providedby8 operators(Telkomsel, XL,Indosat,HCPT,NTS,FLEXI,ESIA ,DCS1800). Thetotalcarrieswillbe12 currentlyinAditya kemang Village. Morecarrieswillbeusedin future.TheIBCsystemshould beabletosupportthe networkexpanding.
OPERATORS/BRAND
TELKOMSEL XL INDOSAT HCPT NTS FLEXI ESIA DCS1800

BAND
3G 3G 3G 3G 3G CDMA800

CARRIES

2 CDMA800 DCS1800 5

Confidential

Coverage System Overview

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Principle of the FIDAS solution Design

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Principle of the FIDAS solution Design


Theisamultibandwirelessnetwork. The3G(CDMA2000,WCDMA)signalhas thelowestpenetrateability InordertoinsureallbandsCarriescan bereachedataacceptableRXlevelin thebuildings,takethe3Gsignaltobe calculatefactors. TheacceptableRXlevelof3Gsettobe 85dbm
Confidential

Principle of the IBC solution Design


CoverageERPCalculations
ThetargetaveragecoverageRX 85dbm Basedonthespacetransmitmodelformula Ls=32.45+20logRKm+20logFMHz ,wecancalculatethe coverageradiusof3GomniantennaR Po Ls L0=P (1) Po:antennaoutputpower(Withoutantennagain) Basedontheexperience,theinputpowertoomniantennasettobe 7dbm Ls:Powerlossinspace L0:Powerblockinthebuilding P:ThetargetcoverageRX
Confidential

MainKindMaterial Loss
Normalbrickwall Beton &Concretewall Beton &ConcreteFloor TunnelinCeiling Lift Humanbody Woodenfurniture glass 10db~15db 15db~20db 10db~15db 1db~8db 30db 3db 3db~6db 5db~8db

Confidential

Consideringthebuildingstructure features,assumetheLOtobe17 db Bringallthevaluesneededintothe formula(1)


7 32.45 20logR 66.85 17= 85

R 10m,inordertoamore flexiblecalculation,wesetR=8m Sothecoverageareaof1PCS omniantennais3.14*64=200m2 Andwecancalculatethequantity ofantennaseachfloor,forinstance, Floor1ofTowerAis1052m2,the quantityofantennais 1052/200 6


Confidential

Principle of the IBC solution Design


Inordertomakeaeffectivecoveragemargin,wedividethewhole Aditya Kemang Villageinto3zones.

AssumethatthereisoneBTShouseineachZone.TheBTSof operatorslocatedintheBTShouseandprovide3BAND(3G, cdma800,DCS1800)wirelesssignaland12carriesinall.

Confidential

Block Diagram
BTS GROUP 1 BTS GROUP 2 BTS GROUP 3

ZONE 3 ZONE 2 ZONE 1

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

ZONE Description

Zone 1
1. 2. 3. 4. 5.

Zone 2
1. 2. 3. 4. 5.

Zone 3
1.

TowerA TowerB TowerC TowerD PENGELOLA

Basement1 Basement2 Basement3 V.K.Mall PARKIA

DEHANLANTAI PARKIA

2. 3. 4. 5.

HOTEL TowerE,F,G R.serbaguna SEKOLAH


BTS GROUP 3 BTS GROUP 3

BTS GROUP 1 BTS GROUP 1

BTS GROUP 2 BTS GROUP 2

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

ZONE Description

---- Buildings Distributing

ZONE 1 ZONE 3

ZONE 2
Confidential

Architecture of the FIDAS solution

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Architecture of the FIDAS solution

ZONE Zone1 Zone2 Zone3 TOTAL

BTS BTS1 BTS2 BTS3

HU 4 4 4 12

RU 16 15 15 46

OMNIANTENNA 1018 1361 923 3302

Confidential

ZONE

BUILDINGS
TOWERA PENGELOLA

RU
4 4 4 4 4 2 2 3 3 1 4 4 2 1 4

HU
1 1 1 1 1 1 1 1 1 1 1 1

OMNIANTENNA
258 8 230 276 246 304 108 147 172 6 150 36 406 406 139 85 325
Confidential

ZONE1

TOWERB TOWERC TOWERD DEHANLANTAIPARKIA HOTEL TOWERF

ZONE3

TOWERE R.SERBAGUNA TOWERG SEKOLAH BASEMENT1 BASEMENT2

ZONE2

BASEMENT3 PARKIA MALL

Block Diagram ---- ZONE 1

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Equipment list for ZONE 1


ZONE Equipments RU011 HU01*1 RU012 RU013 RU014 RU021 HU02*1 ZONE1 POI*1 RU022 RU023 RU024 RU031 HU03*1 RU032 RU033 RU034 RU041 HU04*1 RU042 RU043 RU044 Estimated Antenna 8 66 66 66 60 50 60 60 60 60 72 72 72 60 60 60 66 L1 L2 L1 L11 L12 L22 L23 L33 L34 L43 L1 L10 L11 L22 L23 L34 L35 L46 L1 L10 L11 L22 L23 L34 L35 L46 L1 L10 L11 L20 L21 L30 L31 L41 Confidential TowerD TowerC TowerB TowerA CoverageArea PENGELOLA

TOTAL

POI*1

HU*4

RU*16

1018

Block Diagram ---- ZONE 2

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Equipment list for ZONE 2


ZONE Equipments RU051 HU05*1 RU052 RU053 RU054 RU061 HU06*1 ZONE2 POI*1 RU062 RU063 RU064 RU071 HU07*1 RU072 RU073 RU081 HU08*1 RU082 RU083 RU084 139 85 65 65 65 130 L1 L2 L3 L4 L5 V.K.MALL BASEMENT3 PARIKA 406 BASEMENT2 406 BASEMENT1 Estimated Antenna CoverageArea

TOTAL

POI*1

HU*4

RU*15

1361

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Block Diagram ---- ZONE 3

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Equipment list for ZONE 3


ZONE Equipments RU091 HU09*1 RU092 RU093 RU094 RU101 HU10*1 RU102 RU103 RU104 RU111 HU11*1 RU112 RU113 RU121 HU12*1 RU122 RU123 RU124 Estimated Antenna 64 96 64 80 60 48 77 70 6 28 72 72 48 48 54 36 P1 P4 P5 P10 P11 P14 P15 F19 L1 L10 L11 L18 L1 L11 L12 L21 L1 L1 L7 L8 L16 L17 L25 L1 L8 L9 L16 L17 L25 L1 L6 SEKOLAH TOWERG TOWERE HOTEL DEHANLANTAIPARKIA CoverageArea

TOWERF R.SERBAGUNA

ZONE3

POI*1

TOTAL

POI*1

HU*4

RU*15

923
Confidential

Block Diagram

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

OMNI Antenna Location

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

BUILDINGS PARKIA

L(M) 77.6

W(M) 31.6

FLOORS 6.5

QUANTITYPER FLOOR 13

QUANTITYIN ALL 85
Confidential

BUILDINGS TOWERA

L(M) 28.76

W(M) 36.57

FLOORS 43

QUANTITYPER FLOOR 6

QUANTITYIN ALL 258


Confidential

BUILDINGS TOWERB

L(M) 33.2

W(M) 27.6

FLOORS 46

QUANTITYPER FLOOR 5

QUANTITYIN ALL 230


Confidential

BUILDINGS TOWERC

L(M) 33.2

W(M) 27.6

FLOORS 46

QUANTITYPER FLOOR 5

QUANTITYIN ALL 230


Confidential

BUILDINGS TOWERD

L(M) 36.8

W(M) 32.5

FLOORS 41

QUANTITYPER FLOOR 6

QUANTITYIN ALL 246


Confidential

BUILDINGS PENGELOLA

L(M) 26.8

W(M) 30.5

FLOORS 2

QUANTITYPER FLOOR 4

QUANTITYIN ALL 8
Confidential

65 PCS

BUILDINGS MALL

L(M) 232

W(M) 56

FLOORS 5

QUANTITYPER FLOOR 65

QUANTITYIN ALL 325


Confidential

BUILDINGS DEHANLANTAI PARKIA

L(M) 160

W(M) 40

FLOORS 9.5

QUANTITYPER FLOOR 32

QUANTITYIN ALL 304


Confidential

BUILDINGS HOTEL

L(M) 17.2

W(M) 70.7

FLOORS 18

QUANTITYPER FLOOR 6

QUANTITYIN ALL 108


Confidential

BUILDINGS SEKOLAH

L(M) 24

W(M) 48

FLOORS 6

QUANTITYPER FLOOR 6

QUANTITYIN ALL 36
Confidential

BUILDINGS TOWERE

L(M) 10.1

W(M) 72.3

FLOORS 7

QUANTITYPER FLOOR 4

QUANTITYIN ALL 28
Confidential

BUILDINGS TOWERE

L(M) 22.1

W(M) 69.3

FLOORS 18

QUANTITYPER FLOOR 8

QUANTITYIN ALL 144


Confidential

BUILDINGS TOWERF

L(M) 41.6

W(M) 30

FLOORS 21

QUANTITYPER FLOOR 7

QUANTITYIN ALL 147


Confidential

BUILDINGS TOWERG

L(M) 61.1

W(M) 19.1

FLOORS 25

QUANTITYPER FLOOR 6

QUANTITYIN ALL 150


Confidential

406 PCS

BUILDINGS BASEMENT1

L(M) 168

W(M) 483

FLOORS 1

QUANTITYPER FLOOR 406

QUANTITYIN ALL 406


Confidential

406 PCS

BUILDINGS BASEMENT2

L(M) 168

W(M) 483

FLOORS 1

QUANTITYPER FLOOR 406

QUANTITYIN ALL 406


Confidential

139 PCS

BUILDINGS BASEMENT3

L(M) 112

W(M) 248

FLOORS 1

QUANTITYPER FLOOR 139

QUANTITYIN ALL 139


Confidential

Management Network

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Management Network

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Comprehensive System Management


Visual Alarm LED Summary major alarms Summary minor alarms Device mapping Device info Troubleshooting Remote control & management via LAN or external dial-up modem Map view API for 3rd parties applications Summary dry contact Web based client Optional Optional Optional Optional GUI based local management (EMS) Client/Server based remote supervision (NMS)

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Aims:BTISFIDASCoverageSolutionaimstoprovides costefficiency,fast&easyinstallation flexibilityandscalability Supportsmultiband,multisystem,multicarrierandmultioperator HybridSystemabletoworkwithbothActiveandPassive components

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential

Proposed by
Headoffice APACSalesandServiceoffice

BravoTechInc.
6185PhyllisDr.UnitD.Cypress,CA90630,USA Tel:+1(714)2308333FAX:+1(714)2308341 www.bravotechinc.com

BravoTechnologies(S)PteLtd.
Blk261,WaterlooCenter,#0206,WaterlooStreet, Singapore180261 Tel:+6563372018FAX:+6563360328 www.bravotechinc.com

Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.

Confidential