Anda di halaman 1dari 7

JOB NO DOC. NO. REV.

EPN-KSO-TQJ-TBBM-PI-003 A
PROJECT REVITALISASI TERMINAL BBM TANJUNG PANDAN - BELITUNG

LAPORAN

Data Sheet of Bottom Loading Arms


s
DOC. NO. EPN-KSO-TQJ-TBBM-PI-003

Proj. ID.

Proj. Tittle :

PROJECT REVITALISASI TERMINAL BBM TANJUNG PANDAN - BELITUNG

Contract No. :

Client :
PT. ELNUSA PETROFIN

Proj. Location :
Tanjung Pandan - Belitung
Indonesia
2022

A 24-10-2022 Issued for Review THF HAN WID


By Date
REV DATE PAGES DESCRIPTION PREP’D CHK’D APP’D
CLIENT
PROCEDURE AUTHORIZATION

CONSULTANT :

PREPARED BY:

THF
NAME SIGNATURE

MECHANICAL ENGINEER 24-10-2022


POSITION DATE

CHECKED BY

HAN
NAME SIGNATURE

MECHANICAL ENGINEER 24-10-2022


POSITION DATE

APPROVED BY:

WID
NAME SIGNATURE

LEAD ENGINEER 24-10-2022


POSITION DATE
This Report prepared by:

PT. ATRYA SWASCIPTA REKAYASA


Engineering Consultant

Address : Jln. Pahlawan No.95


Bandung, West Java, Indonesia
Postal Code : 40123

Phone : +62 - 22 - 2514730,31


Fax : +62 - 22 - 2517432

Email: global@atrya.co.id
Website : www.atrya.co.id
Copyright © by PT. ATRYA SWASCIPTA REKAYASA 2020
REVISION CONTROL SHEET

REV. NO DATE DESCRIPTION


1.0 INTRODUKSI

(TBBM) Tanjung Pandan, Belitung dioperasikan sesuai standar, termasuk di bidang


pemeliharaan. Oleh karena itu sangat penting untuk memastikan bahwa semua
instalasi peralatan tersebut berfungsi sesuai desain untuk mencapai reliability dan
efisiensi.
Terminal Bahan Bakar Minyak (TBBM) Tanjung Pandan, Belitung adalah instalasi milik
PT. Pertamina (Persero) untuk sarana penyimpanan dan filling station bahan bakar
minyak. Instalasi ini berdiri pada tahun 1975 dan berlokasi di Tanjung Batu, Provinsi
Belitung. TBBM Belitung terdiri dari 4 unit tangki horizontal, 8 unit tanki vertical, dan 8
unit centrifugal pump, dan 1 unit filling bay.

2.0 TUJUAN
Dokumen ini bertujuan untuk menyediakan data sheet perpipaan dari existing unloading
jetty sampai dengan existing filling shed.

3.0 ISTILAH, DEFINISI,& SINGKATAN


Istilah dan definisi yang akan digunakan dalam dokumen spesifikasi ini didefinisikan
sebagai berikut:

PERUSAHAAN : PT ELNUSA PETROFIN


KONTRAKTOR :
PT ATRYA SWACIPTA REKAYASA
VENDOR : Pihak yang memproduksi dan / atau memasok
peralatan, material, barang dan / atau jasa
untuk menjalankan tugas yang ditentukan oleh
PERUSAHAAN atau KONTRAKTOR untuk
proyek tersebut.

4.0 REFERENSI

Dokumen Proyek

EPN-KSO-TQJ-TBBM-PR-002 Line Sizing

Dokumen Standard
5.0 DATA SHEET

LOADING ARM DATA


1 Loading Arm Required For
( Iso Container / Road Tangker / Rail Wagon / Drum ) : Road Tangker
2 Type Of Operation
( Top Loading / Top Unloading / Bottom Loading / Bottom Unloading ) : Bottom Loading
3 Size of Loading Arm : 4"
4 Material : Carbon Steel
5 Seal Material : Rubber
PROCESS PARAMETERS
1 Service : Fuel
2 Design Temperature : 59.4 °C
3 Operating Temperature : 29.4 °C
4 Design Pressure : 5.5 bar
5 Operating Pressure : 2 bar
6 Test Pressure : VTS bar
7 Allowable Pressure Drop : VTS bar
8 Corrosion Allowance : VTS mm
9 Desity : 715-819 kg / m3
10 Flow Rate : 90 m3 / hr
11 Viscosity : 0.6-1 cP
ACCESSORIES REQUIRED
1 Vapour return line : Yes (Yes / No)
2 Jacketing : Yes (Yes / No)
3 Balancing system (Pneumatic / Hydraulic / Gas Strut / Counter Weight) : VTS
4 Insulation : Yes (Yes / No)
5 Heat tracing : No (Yes / No)
6 High-level sensor : Yes (Yes / No)
7 Grounding Unit : Yes (Yes / No)
8 Dry disconnect : Yes (Yes / No)
9 Filling sensor and switch : Yes (Yes / No)
10 Emergency release coupling : No (Yes / No)
11 Drain / vent valve : No (Yes / No)
12 Speciality valve : No (Yes / No)
13 Inlet flange size : 4" Class : 150
INSPECTION & TESTING REQUIREMENTS
1 Radiography (Spot / Full) : VTS
2 Penetrant Test : Yes (Yes / No)
3 Painting Specifications : VTS
4 Hydrotest : Yes (Yes / No)

Note :
-
-
-
-
Referensi :
DIMENTIONS FOR ISLAND
1 Filling (Side / Rear End) : Side
2 Height of tanker inlet above ground (a) : N/A mm
3 Centerline distance between tangker connertion & inlet (b) : N/A mm
4 Island elevation (c) : N/A mm
5 Inlet elevation (d1 / d2 / d3) : N/A mm
6 Distance from inlet to island edge (e) : N/A mm
7 Island width (f) : N/A mm
8 Centerline distance between tangker connertion & inlet : mm
(if lading arm is more than one) (h) : N/A mm
9 Length of island (i) : N/A mm
10 Centre distance between tanker connertions :
(If tanker connection is more than one) (j) : N/A mm
SPECIFICATIONS FOR TANKER CONNECTION
1 Connection (If flanged) Size : N/A Class : N/A
If other :
2 Coupling Type : N/A Size : N/A

Note :
-
-
-
-
Referensi :

Anda mungkin juga menyukai