Anda di halaman 1dari 2
RENCANA ANGGARAN BIAYA (RAB) SUB KEGIATAN : PEMELINARAAN / REHABILITASI GEDUNG KANTOR DAN BANGUNAN LAINNYA PEKERIAAN : Belana Pemeliharaan Bangunan Gedung ~ Bangunan Gedung Tempat Kerja ~ Bangunan Gedung Kantor ~ Rehab Kantor Penghubung Pema Kepulauan Mentawal LOKAST in Aaa No 121 Anas Padang TAIN 2023 PENYELENGGARAAN SMK3 ps [suman tap 165 000,00 = a fo 7s37s0 | mm 1162i38[ oma [4.31 | Re 870.00950 | ep 3.748.834,50 | | 2 to __seon00 [mp ieranzzef mm fo 142500 [Rp 1.15035575 a mm | 2492 |» 757500| m 15875700 mf 330 [ro 7.01250 = an = [suntan rT Rp. 8.029.498,08 | 1TH, | PEKERSAAN LANTAT = Peso Ln Keri on ‘Pesan ins Gant Siar 600 on us [re samo] ame 1375 [ro 2670990] 9 0047.3 Soman Taya ‘PEKEROAAN JENDELA ALUMINIUM RUANG TENGAH ‘2 Pek. Kuzen Pinu dan Jena ma Re 9.10683750| Rp .150.75458| Pe Daun en Kaa tS en m2 Fo 703700 | Ro _-2502.20357 a] ‘Pek Daun ri ane “aa Rp 98827500 | R —1.460.38200| pf es ane uri fo Rp 20757000] Rp _5199.62850 Pek Daun Jen Aion aca 8mm o | 1014 [ro 21253600 2.3 A [suman av Tap sara 70076 | ‘PEKERJAAN REHAB RUANGAN BAGIAN DALAM x = ea ‘A. PEKERJAAN PONDAST = = ‘a. _Pekerjaan Galian Tanah Pondast PREF] 2,04 | Rp 95.562,50 | Rp 99.002,75 = | Pa urn Tanah verb Bs Glan freer] 026 [Ro 70.2500| Rp 18.8238 3 eRe jr 030 [Rp 51522500] mp iszs07.78 3 FRE. fener 0,67 [Ro 1.000747,00| Rp 666.457.50, ral |B. PEKERJAAN BETON BERTULANG = Pek. Sloof 15 x20 an Boo 3. Beton KS wa [09 [fe uoramesa|e sumoa0| keting [m2 | 360 [mo isasiesi [mp raLarzae c Pembesian ha | 5286 | Rp 19.167,50 | Rp 1.013.194,05 Rott Fed. Kolom Beton Uk 15x 45 am e z ||. een as fo fo 1072855 mp _2227106| ad >. Bekisting m2 Ro 210.148,47|R _1.92036294| ~e Pebeson . [0 | Ro 1916750 | Rp 1.439287 a | |e Pe ing Balok Banganan Uk. 153% 20 om a ad 2 ben ci : ma | 029 | mp 10ran9s| mao bas Bekising ak m2 Rp 436.555,79 = _ ben = rH fp Lorassos | | _€.PEKERIAAN pxNoING BATA = ail ie {3 Fas. Dring Sta cap. 14 z Fee amest| > eee Pak Plesteran Dining cp, 1:4 ¢_Pekeran can Ondng Rp 8.375.608.9 Ro S.1tt.167.12 za) v1. PEKERIAAN KAP ATAP TAMAN, ' Pek. Kode ha Kay 8 TL a4 | Re 7ee200400/ A 724031572 Pak Gong as Ks mm | 070 |p ssx2sm0 |x asm.10.0 _Peag stp perenne eas a a Pas le ap im | 025 [mo seom0 ‘27198 [| e-Pasran apn Les 2x 25 on 0 | 435 [po momo = ee vit. | PEKEROAAN PLAFOND a Paorg te NCTE me + Rngia low iO Imn, fm a7iat | RS 5HLOTEGO| RES AOLAN roa 80 Me © es Ust hl PVE o [arse | s95ta10 [me saxo7ms2 a | S213 [mo saism0 |e 18mmB6 35 mo [suo |e manor fe navn fe | ss fro 190575 mest 8 [mana fe area] PEKERSAAN KETCHEN SET as el = 2 Pekan chen Set Raga Mk Ping Ace_—| wk | 9,0 |p 2emoonso]| Rp 253670000 —b~Pasrae Me en Ding Gant Dap 6560 mma | 1125 |p 0870090 [ro «512.058 ie aes e SUMLAH x 3a ‘m2 | 95,00 | Rp 2983 = ma | 700 | ma | 500 [Ro na | 2290 [0 a | 7000 |e | 25,00 [Ro na | 00 [ro rm "| PEKERAAN PERLENGKAPAN LUAR. Pa: ow rs Raga es elon et TBR Bon 1s Remeron For Blok waa tel cn ie Heoomna) | m2 Ps Deg Bs Taran co 14 m2 mm mm seeee 1.00 [i 35.90.55 er [a 1315.320.065,05, “Tuan 12204 2023, Pm 6. 004

Anda mungkin juga menyukai