Ee Rehab Bangunan Asrama Upt Diklat 2018
Ee Rehab Bangunan Asrama Upt Diklat 2018
Tahun 2017
ENGINEER ESTIMATE
REKAPITULASI
TOTAL
NO URAIAN PEKERJAAN JUMLAH BIAYA
(RP.)
A. PEKERJAAN STRUKTUR, ARSITEK & MEKANIKAL ELEKTRIKAL 3,837,178,000.00
B. MEUBELAIR 652,524,000.00
C. UNIT HEATING, VENTILATION & AIR CONDITIONER 120,670,000.00
JUMLAH TOTAL 4,610,372,000.00
DIBULATKAN 4,610,372,000.00
Terbilang :
Empat Milyar Enam Ratus Sepuluh Juta Tiga Ratus Tujuh Puluh Dua Ribu Rupiah
TOTAL
NO URAIAN PEKERJAAN JUMLAH BIAYA
(RP.)
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6
A. PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi 509.00 m2 14,300.00 7,278,700.00
2 Pembuatan Papan Nama Proyek 1.00 Ls 350,000.00 350,000.00
3 Pek. Pengukuran dan Pemasangan Bouwplank 119.40 m' 55,873.40 6,671,283.96
4 Pek. Pembongkaran Batu Kali 56.11 m³ 265,650.00 14,906,763.80
5 Pek. Pembongkaran Beton Bertulang 15.85 m³ 885,280.00 14,033,989.73
6 Pek. Pembongkaran Dinding Batu Bata 56.73 m³ 551,237.50 31,269,636.23
2
7 Pek. Pembongkaran Atap + Rangka 54.20 m 7,568.00 410,198.84
2
8 Pek. Pembongkaran Plafond + Rangka 36.15 m 5,720.00 206,778.00
9 Pek. Pembongkaran Lantai Keramik 274.84 m2 9,460.00 2,599,948.56
10 Pek. Pembongkaran Kusen Pintu dan Jendela 2.40 m3 110,550.00 265,651.65
11 Pek. Pembuangan Material Hasil Bongkaran 1.00 Ls 3,000,000.00 3,000,000.00
TOTAL JUMLAH - A 80,992,950.77
B. PEKERJAAN GALIAN & URUGAN
1 Pek. Galian Tanah Poor Plat 152.88 m³ 79,695.00 12,183,771.60
2 Pek. Galian Tanah Pondasi Batu Kali 266.48 m³ 64,900.00 17,294,811.60
3 Pek. Urugan Kembali Bekas Galian 196.72 m³ 47,300.00 9,304,856.00
4 Pek.Urugan Pasir Bawah Lantai, t=10 cm 34.30 m³ 196,240.00 6,730,619.90
5 Pek.Urugan Pasir Bawah Pondasi & Poor Plat, t=10 cm 38.36 m³ 196,240.00 7,527,962.64
6 Pek.Urugan Tanah Bawah Lantai 201.32 m³ 120,538.00 24,266,191.85
TOTAL JUMLAH - B 77,308,213.58
C. PEKERJAAN PONDASI, PASANGAN DAN PLESTERAN
1 Pek. Pasangan Batu Kosong 61.65 m³ 384,684.30 23,717,325.83
2 Pek. Pondasi Batu kali add. 1Pc : 4 Psr 145.66 m³ 737,401.50 107,408,114.29
2
3 Pek. Pasangan Dinding 1/2 bata 1 : 3 219.45 m 141,161.24 30,978,257.60
4 Pek. Plester Dinding Trasram, Kolom & Pondasi 1 : 3 963.51 m2 64,586.24 62,229,774.89
5 Pek. Pasangan Dinding 1/2 bata 1 : 5 1,389.98 m2 135,060.86 187,731,637.57
6 Pek. Plester Dinding 1 : 5 2,779.96 m2 72,774.72 202,310,545.19
8 Pek. Acian Dinding, Kolom & Pondasi 3,743.47 m2 33,484.00 125,346,372.92
9 Pek. Waterproofing 118.86 m2 94,988.85 11,290,137.24
10 Pekerjaan Saluran Air 140.07 m' 232,692.56 32,593,246.98
TOTAL JUMLAH - C 783,605,412.50
D. PEKERJAAN KERAMIK
1 Pek. Granit Tile 60X60 (Lantai Utama) 618.48 m2 270,809.37 167,489,635.48
2 Pek. Granit Tile 60X60 Motif Kasar (Lantai Teras Dan Balkon) 17.08 m2 316,276.03 5,401,994.65
3 Pek. Granit Tile 60X60 (Tangga Utama) 17.36 m2 270,809.37 4,700,708.99
4 Step Nosing Granit 10 x 60 (Tangga Utama) 41.40 m' 58,983.98 2,441,936.77
5 Pek. Plint Granit Tile 10X60 306.04 m' 47,015.37 14,388,583.49
6 Pek. Pasangan Lantai Keramik KM 20X20 Anti Selip 56.14 m2 161,071.24 9,043,022.63
2
7 Pek. Pasangan Keramik Dinding KM 20X40 Motif 178.14 m 389,440.70 69,374,966.30
8 Pek. Pasangan Lantai Keramik 20X20 Anti Selip Tangga Luar 20.61 m2 161,071.24 3,319,678.26
TOTAL JUMLAH - D 276,160,526.56
E. PEKERJAAN BETON
1 Pek. Cor Beton Tumbuk Untuk Lantai, t= 5 cm 23.35 m³ 636,032.10 14,851,339.99
2 Pek. Lantai kerja pondasi telapak t=10 cm 76.44 m2 82,762.38 6,326,356.04
3 Pekerjaan Foor Plat Beton 140 x 140 cm (PF), Mutu Beton K225
a. Pekerjaan Pengecoran Beton K-225 23.99 m³ 1,020,671.84 24,480,814.11
b. Pekerjaan Pembesian 5,482.04 Kg 21,404.35 117,339,395.85
2
c. Pekerjaan Cetakan (Bekisting ) 142.35 m 160,248.00 22,811,302.80
4 Pekerjaan Beton Kolom 30/40 (K1), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 36.50 m³ 1,020,671.84 37,258,604.89
b. Pekerjaan Pembesian 5,453.97 Kg 21,404.35 116,738,639.96
2
c. Pekerjaan Cetakan (Bekisting ) 212.94 m 314,946.50 67,064,707.71
5 Pekerjaan Beton Kolom 30/30 (K2), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 0.95 m³ 1,020,671.84 973,720.94
b. Pekerjaan Pembesian 114.20 Kg 21,404.35 2,444,319.69
2
c. Pekerjaan Cetakan (Bekisting ) 12.72 m 314,946.50 4,006,119.48
6 Pekerjaan Beton Kolom 20/20 (K3), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 0.60 m³ 1,020,671.84 611,178.30
b. Pekerjaan Pembesian 136.66 Kg 21,404.35 2,925,107.06
c. Pekerjaan Cetakan (Bekisting ) 6.48 m2 314,946.50 2,040,853.32
7 Pekerjaan Beton Kolom Praktis 11/11 (K3) 382.00 m' 105,420.70 40,270,707.40
8 Pekerjaan Beton Sloof 25/40 (SL1), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 24.76 m³ 1,020,671.84 25,266,731.43
b. Pekerjaan Pembesian 3,944.57 Kg 21,404.35 84,430,993.74
c. Pekerjaan Cetakan (Bekisting ) 99.02 m2 169,598.00 16,793,593.96
9 Pekerjaan Beton Sloof 20/25 (SL2), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 0.20 m³ 1,020,671.84 204,134.37
b. Pekerjaan Pembesian 46.22 Kg 21,404.35 989,223.44
2
c. Pekerjaan Cetakan (Bekisting ) 2.00 m 169,598.00 339,196.00
10 Pekerjaan Beton Sloof 15/20 (SL3), Mutu Beton K-175
a. Pekerjaan Pengecoran Beton K-175 1.17 m³ 827,623.76 972,044.11
b. Pekerjaan Pembesian 229.33 Kg 21,404.35 4,908,609.29
2
c. Pekerjaan Cetakan (Bekisting ) 15.66 m 169,598.00 2,655,904.68
11 Pekerjaan Beton Balok Lantai 25/40 (BL1), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 16.70 m³ 1,020,671.84 17,042,668.07
b. Pekerjaan Pembesian 2,839.13 Kg 21,404.35 60,769,766.11
2
c. Pekerjaan Cetakan (Bekisting ) 135.25 m 324,021.50 43,823,826.87
12 Pekerjaan Beton Balok Lantai 15/20 (BL2), Mutu Beton K-175
a. Pekerjaan Pengecoran Beton K-175 1.56 m³ 827,623.76 1,287,368.76
b. Pekerjaan Pembesian 303.72 Kg 21,404.35 6,500,929.54
c. Pekerjaan Cetakan (Bekisting ) 20.74 m2 324,021.50 6,720,205.91
13 Pek. Plat Lantai Beton tbl. 12 cm, Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 39.83 m³ 1,020,671.84 40,655,298.71
b. Pekerjaan Pembesian 5,458.45 Kg 21,404.35 116,834,479.13
2
c. Pekerjaan Cetakan (Bekisting ) 268.12 m 363,346.50 97,420,463.58
14 Pek. Beton Ring Balok 25/40 (RB1), Mutu Beton K-225
a. Pekerjaan Pengecoran Beton K-225 16.42 m³ 1,020,671.84 16,756,879.95
b. Pekerjaan Pembesian 2,787.69 Kg 21,404.35 59,668,724.56
c. Pekerjaan Cetakan (Bekisting ) 443.27 m2 169,598.00 75,178,129.46
15 Pek. Beton Ring Balok 15/20 (RB2), Mutu Beton K-175
a. Pekerjaan Pengecoran Beton K-175 1.41 m³ 827,623.76 1,163,225.20
b. Pekerjaan Pembesian 269.98 Kg 21,404.35 5,778,789.22
c. Pekerjaan Cetakan (Bekisting ) 19.21 m2 324,021.50 6,223,966.98
16 Pek. Beton Balok Latei 15/15 (BLT), Mutu Beton K-175
a. Pekerjaan Pengecoran Beton K-175 3.50 m³ 827,623.76 2,897,510.79
b. Pekerjaan Pembesian 494.19 Kg 21,404.35 10,577,721.55
c. Pekerjaan Cetakan (Bekisting ) 46.68 m2 324,021.50 15,125,323.62
17 Pek. Plat Dak Beton
a. Pekerjaan Pengecoran Beton K-225 3.45 m³ 1,020,671.84 3,522,593.69
b. Pekerjaan Pembesian 584.58 Kg 21,404.35 12,512,521.03
2
c. Pekerjaan Cetakan (Bekisting ) 34.51 m 363,346.50 12,539,996.08
18 Pek. Tangga Beton
a. Pekerjaan Pengecoran Beton K-225 6.44 m³ 1,020,671.84 6,572,575.49
b. Pekerjaan Pembesian 828.45 Kg 21,404.35 17,732,365.98
2
c. Pekerjaan Cetakan (Bekisting ) 55.24 m 321,574.00 17,762,139.89
18 Pekerjaan Pasang Besi Stek untuk Balok
a. Pekerjaan Pembesian 393.23 Kg 21,404.35 8,416,725.53
19 Pek. Pembuatan Lubang (Cooring) Untuk Pipa Pembuang Pada Plat Beton 22.00 Bh 100,000.00 2,200,000.00
TOTAL JUMLAH - E 1,262,387,794.26
F. PEKERJAAN KUDA-KUDA, KAP & PLAFOND
1 Pek. Pasang kuda-kuda & Rangka Baja Ringan 470.03 m2 221,478.80 104,101,593.77
2 Pek. Pasang Penutup Atap Genteng Metal 470.03 m2 118,525.00 55,710,258.34
3 Pek. Pasang Bubungan Metal Type Bulat 74.32 m' 68,783.00 5,111,952.56
4 Pek. Talang Jurai Dalam L=60 cm 11.32 m' 116,133.05 1,314,626.13
5 Pek. Pasang Lisplank Wood Plank Elephant 2 x 20 cm 124.36 m' 60,210.09 7,487,727.15
6 Pek. Pas. Rangka Plafond Besi Hollow zingkallum 737.87 m2 88,715.00 65,460,137.05
2
7 Pek. Pas. Plafond Gypsum 9mm 737.87 m 51,279.76 37,837,793.56
8 Pek. Pas. List Plafond Gypsum 628.23 m
2
16,007.20 10,056,203.26
9 Pek. Pasangan Aluminium Composite Panel (ACP) + Rangka 120.97 m2 1,103,118.50 133,438,729.35
10 Pek. Pas. Kalsiboard + Rangka (Penutup Pipa Instalasi) 29.25 m2 128,983.76 3,772,774.86
TOTAL JUMLAH - F 424,291,796.03
G. PEKERJAAN KUSEN, PINTU, JENDELA DAN ALAT PENGGANTUNG
1 Pek. Pas.Pintu Utama Kaca Tempered + Aksesories (Terpasang) 1.00 Set 14,000,000.00 14,000,000.00
2 Pek. Kusen Jendela Alluminium 342.65 m' 127,080.25 43,544,047.66
3 Pek. Jendela Kaca Rangka Alluminium 22.05 m2 706,359.50 15,575,226.98
4 Pek. Kusen Pintu kayu kls II 5/13,5 ( Ukuran terpasang ) 0.91 m³ 8,336,900.00 7,563,235.68
5 Pek. Pintu Panil Kayu kls II 44.04 m2 635,250.00 27,976,410.00
6 Pek. Pas. Kaca Mati 65.83 m2 190,259.30 12,524,769.72
7 Pek. Pas. Kosen & Daun Pintu Alumunium Pada KM/WC + Accessories 20.00 set 1,100,000.00 22,000,000.00
8 Pek. Pas. Handle Pintu Stainless P=60 cm (Pintu Utama) 2.00 Psg 350,000.00 700,000.00
9 Pek. Pas. Kunci Pintu 2 Slaag 27.00 bh 163,350.00 4,410,450.00
10 Pek. Pas. Engsel Pintu 81.00 bh 23,994.30 1,943,538.30
11 Pek. Pas. Grendel Pintu 19.00 psg 139,205.00 2,644,895.00
12 Pek. Pas. Engsel Cesmen Pada Jendela Kaca Aluminium 84.00 bh 151,420.50 12,719,322.00
13 Pek. Pas. Rambunces 22.00 bh 73,205.00 1,610,510.00
TOTAL JUMLAH - G 167,212,405.34
H. PEKERJAAN PLUMBING DAN SANITARY
1 Pembuatan Sumur Dalam (Deep Well Pump) 1.00 Unit 45,148,290.00 45,148,290.00
2 PEMIPAAN AIR KOTOR PADAT, BUANGAN/CAIR
Pengadaan dan pemasangan pipa penyalur air kotor dan air bekas
Pipa PVC klas AW (10 kg/cm2).Termasuk
fiting, tee, elbow, reducer dll. Lengkap dengan accessories yang disyaratkan.
- Instalasi Pipa Air Kotor Cair d= 4" ( Peresapan ) 8.00 m' 121,835.68 974,685.47
- Instalasi Pipa Air Kotor Cair d= 4" (Saluran) 12.60 m' 121,835.68 1,535,129.62
- Instalasi Pipa Air Kotor Padat d= 4" 184.93 m' 74,098.06 13,703,102.89
- Instalasi Pipa Air Kotor Cair KM d= 3" 114.12 m' 74,098.06 8,456,070.89
- Instalasi Pipa Air Kotor Cair Wastafel d= 2" 3.20 m' 53,247.56 170,392.20
- Instalasi Pipa Air Hujan d= 2" 13.50 m' 53,247.56 718,842.09
- Floordrain 23.00 bh 28,985.00 666,655.00
3 PEMIPAAN AIR BERSIH
Pengadaan dan pemasangan pipa penyalur air kotor, air bekas
dan pipa ventilasi. Pipa PVC klas AW (10 kg/cm2). Termasuk
fiting, tee, elbow, reducer dll. Lengkap dengan accessories yang disyaratkan
- Pipa PVC AW ø 1 1/4" 17.80 m' 37,883.88 674,333.06
- Pipa PVC AW ø 3/4" 112.20 m' 21,792.13 2,445,077.48
- Pipa PVC AW ø 1/2" 62.52 m' 21,010.21 1,313,558.09
- Faucet (kran) Standart ø 1/2" 20.00 bh 100,856.25 2,017,125.00
- Stop kran 3/4 4.00 bh 30,071.25 120,285.00
- Radar Otomatis 2.00 Bh 150,000.00 300,000.00
4 Closet duduk Monoblok Standar Merk Toto/Setara 20.00 unit 1,250,000.00 25,000,000.00
Wastafel + Kran Air+Acsessories + Cermin 1.00 Set 1,926,868.24 1,926,868.24
Bathup Kamar Mandi 1.00 unit 3,800,000.00 3,800,000.00
Shower Air+Kran Air Multi (Include Accessories) 1.00 Set 3,750,000.00 3,750,000.00
Thowel Bar KM/WC 1.00 Bh 450,000.00 450,000.00
5 Tangki Air Fiber 1100 ltr 2.00 Bh 2,625,000.00 5,250,000.00
6 Pek. Tower Tandon Air Kapasitas 2 x 1100 ltr 1.00 Unit 18,489,000.00 18,489,000.00
7 Septictank dan Peresapan 2.00 unit 6,037,454.02 12,074,908.04
TOTAL JUMLAH - H 148,984,323.08
I. PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan dinding (Exterior+Interior) 3,743.47 m2 35,086.15 131,343,974.50
2 Pekerjaan pengecatan plafond Gypsum 737.87 m2 35,086.15 25,889,017.50
3 Pekerjaan pengecatan List plafond Gypsum 75.39 m2 35,086.15 2,645,060.64
4 Pekerjaan pengecatan Lisplank 37.31 m2 35,086.15 1,308,994.08
2
5 Pekerjaan pengecatan Kayu 119.66 m 42,964.35 5,141,285.98
TOTAL JUMLAH - I 166,328,332.71
J. PEKERJAAN NON STANDAR LAINNYA
1 Pek. Pas. Railing Balkon (Besi Hollow 20.40.1) 6.50 m2 471,973.03 3,067,824.68
2 Pek. Pas. Susuran Tangga Stainless 2" (Terpasang) 41.53 m' 73,250.00 3,042,072.50
3 Pek. Pas. List Profil Beton 10.60 m' 55,000.00 583,000.00
4 Pek. Pas. Batu Alam 14.40 m2 305,523.00 4,399,531.20
TOTAL JUMLAH - J 11,092,428.38
K. PEKERJAAN ELEKTRIKAL
1 Penambahan Daya Listrik Dari 16000 VA Ke 23000 VA 1.00 Set 15,000,000.00 15,000,000.00
2 Panel Listrik Lengkap dengan Pendukungnya 2.00 Unit 1,245,000.00 2,490,000.00
3 LAMPU PENERANGAN DAN DAYA
Pengadaan dan pemasangan fixture lampu, saklar dan outlet daya, dudukan,
penggantung, inbow dos, termasuk peralatan bantu, bobokan tembok dan
perapihan kembali.
- Pasang Lampu Downlight Led 5 Watt 9.00 bh 125,000.00 1,125,000.00
- Pasang Lampu Kapsul 23 Watt + Fitting 17.00 bh 110,000.00 1,870,000.00
- Pasang Lampu Kapsul 18 Watt + Fitting 33.00 bh 90,000.00 2,970,000.00
- Pasang Lampu Kapsul 5 Watt + Fitting 22.00 bh 43,000.00 946,000.00
- Pasang Saklar Ganda ( dgn Kabel NYM 3 x 2,5 mm ) 28.00 bh 19,800.00 554,400.00
- Pasang Saklar Tunggal ( dgn Kabel NYM 3 x 2,5 mm ) 7.00 bh 12,100.00 84,700.00
- Pasang Saklar + Stop Kontak ( dgn Kabel NYM 3 x 2,5 mm ) 1.00 bh 30,500.00 30,500.00
- Pasang Stop Kontak Kode CP ( dgn Kabel NYM 3 x 2,5 mm ) 43.00 bh 24,200.00 1,040,600.00
- Pasang Stop Kontak Ac 19.00 bh 150,000.00 2,850,000.00
- Instalasi lampu 81.00 Titik 135,000.00 10,935,000.00
- Instalasi Stop Kontak 44.00 Titik 90,950.00 4,001,800.00
- Instalasi Stop Kontak AC 19.00 Titik 125,000.00 2,375,000.00
- Instalasi Exhaust Fan 20.00 Titik 175,000.00 3,500,000.00
- Exhaust Fan 20.00 bh 493,350.00 9,867,000.00
4 Pem. Penangkal Petir Lengkap Dengan Pendukungnya antara lain: 1.00 Ls 24,339,504.75 24,339,504.75
- Splitzen (tombak petir) + dudukan (siap psg) 9 Unit
- Grounding/Pentanahan penangkal petir 2 m
- Kabel BC 50 210 Batang
- pipa Galvanis 1/2" 4 Bh
- Pipa PVC 3/4" 4 Bh
- Klem Kuku Macan 12 Bh
- Besi klem kabel BC 414 Bh
- Klem Pipa 48 Bh
- Material pendukung/perlengkapan (35% dari seluruh bahan)
TOTAL JUMLAH - K 83,979,504.75
L. PEKERJAAN AKHIR
1 Finishing dan Pembersihan Akhir 1.00 Ls 2,500,000.00 2,500,000.00
2 Dokumentasi + Asbuild Drawing + Pelaporan 1.00 Ls 3,500,000.00 3,500,000.00
TOTAL JUMLAH - L 6,000,000.00
ENGINEER ESTIMATE
Daftar Kuantitas & Harga
KEGIATAN : PERENCANAAN PENGEMBANGAN KOMODITAS TANAMAN PANGAN DAN HORTIKULTURA
PEKERJAAN : REHAB BANGUNAN ASRAMA UPT DIKLAT TAHUN 2018
LOKASI : SIDERA - KABUPATEN SIGI
TAHUN ANGGARAN : 2017
I. KAMAR STANDAR
1 Tempat Tidur Bahan HPL, Uk. 200x100x40 Bh 36.00 4,350,000.00 156,600,000.00
2 Headboard Bahan HPL, Uk. 340x100x100 Bh 18.00 6,000,000.00 108,000,000.00
3 Lemari Pakaian Bahan HPL, Uk. 280x100x100 Bh 18.00 5,500,000.00 99,000,000.00
4 Nakas Tempat Tidur Bahan HPL, Uk. 60x50x45 Bh 36.00 1,050,000.00 37,800,000.00
5 Meja Belajar Bahan HPL, Uk. 180x50x80 Bh 18.00 2,550,000.00 45,900,000.00
6 Cermin Kaca 3mm Bingkai HPL, Uk. 180x80 Bh 18.00 1,124,000.00 20,232,000.00
7 Springbed Setara Bigland Uk. 100*200 / No. 3 Bh 36.00 1,300,000.00 46,800,000.00
8 Kursi Belajar Merk Chitose/Setara Bh 36.00 550,000.00 19,800,000.00
534,132,000.00
II. KAMAR VIP
Bigland king pocket paris 180×200 /
1 Tempat Tidur Bh 1.00 6,200,000.00 6,200,000.00
Setara
3 Backdrop Bahan HPL, Uk. 200x340 Bh 1.00 8,500,000.00 8,500,000.00
3 Lemari Pakaian Bahan HPL, Uk. 180x210x50 Bh 1.00 9,400,000.00 9,400,000.00
4 Nakas Tempat Tidur Bahan HPL, Uk. 60x50x45 Bh 1.00 1,050,000.00 1,050,000.00
5 Nakas Televisi Bahan HPL, Uk. 150 Bh 1.00 3,500,000.00 3,500,000.00
6 Meja Rias Bahan HPL, Uk. 135x60x150 + Kaca Set 1.00 5,000,000.00 5,000,000.00
33,650,000.00
III. LOBY
1 Meja Receptionis Bahan HPL, Uk. 350X50X120 Bh 1.00 4,500,000.00 4,500,000.00
2 Sofa Formasi 3.2.1 + Meja Bahan Busa Lapis Kulit Oscar Set 1.00 8,500,000.00 8,500,000.00
3 Backdrop Loby Bahan HPL, Uk. 370x360 Bh 1.00 11,322,000.00 11,322,000.00
4 Kursi Receptionis Merk Chitose/Setara Bh 2.00 550,000.00 1,100,000.00
25,422,000.00
JUMLAH : 593,204,000.00
ENGINEER ESTIMATE
REKAPITULASI PEKERJAAN MEUBELAIR
KEGIATAN : PERENCANAAN PENGEMBANGAN KOMODITAS TANAMAN PANGAN DAN HORTIKULTURA
PEKERJAAN : REHAB BANGUNAN ASRAMA UPT DIKLAT TAHUN 2018
LOKASI : SIDERA - KABUPATEN SIGI
TAHUN ANGGARAN : 2017
JUMLAH HARGA
No. JENIS PEKERJAAN
(RP)
B MEUBELAIR
I. KAMAR STANDAR 534,132,000.00
II. KAMAR VIP 33,650,000.00
III. LOBY 25,422,000.00
JUMLAH Rp 593,204,000
PPN 10% Rp 59,320,400
JUMLAH TOTAL Rp 652,524,400
DIBULATKAN Rp 652,524,000
Terbilang: Enam Ratus Lima Puluh Dua Juta Lima Ratus Dua Puluh Empat Ribu Rupiah
1 Air Conditioner 1,5 PK Merk Panasonic 1250 Watt + 12.700 Btu/h Unit 18.00 5,500,000.00 99,000,000.00
2 Air Conditioner 2 PK Merk Panasonic 2040 Watt + 18.800 Btu/h Unit 1.00 8,500,000.00 8,500,000.00
3 Kipas Angin Gantung Type Klasik 4 Pisau Unit 1.00 2,200,000.00 2,200,000.00
JUMLAH : 109,700,000.00
ENGINEER ESTIMATE
REKAPITULASI PEKERJAAN HEATING, VENTILATION & AIR CONDITIONER
KEGIATAN : PERENCANAAN PENGEMBANGAN KOMODITAS TANAMAN PANGAN DAN HORTIKULTURA
PEKERJAAN : REHAB BANGUNAN ASRAMA UPT DIKLAT TAHUN 2018
LOKASI : SIDERA - KABUPATEN SIGI
TAHUN ANGGARAN : 2017
JUMLAH HARGA
No. JENIS PEKERJAAN
(RP)
JUMLAH Rp 109,700,000
PPN 10% Rp 10,970,000
JUMLAH TOTAL Rp 120,670,000
DIBULATKAN Rp 120,670,000
Terbilang: Seratus Dua Puluh Juta Enam Ratus Tujuh Puluh Ribu Rupiah
Catatan :
Harga Upah Minimum Kota th. 2014 adalah Rp. 1.400.000/bln
DAFTAR HARGA SATUAN BAHAN BANGUNAN
I Bahan Bangunan
1 Tanah dan Pasir
Pasir Urug M3 129,000.00
Pasir Pasang M3 129,000.00
Pasir Beton/Cor M3 129,000.00
Sirtu M3 86,050.00
Pasir Plester M3 129,000.00
Tanah Urug (Pilihan) M3 73,400.00
2 Kerikil
Kerikil Split M3 275,000.00
Kerikil Sungai/Koral M3 120,000.00
3 Batu Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 160,000.00
4 Batu Cetak
Batu Bata Bh 1,000.00
Batu Alam 20 x 40 M2 165,000.00
5 Kapur
Kapur Pasang (Mil) Zak 45,900.00
6 Semen
Semen Tonasa 1 zak = 50 kg Zak 66,000.00
Semen Putih Kg 65,600.00
Semen Warna Kg 13,850.00
Waterproofing Sikatop 107 1 zak = 25 kg Zak 425,600.00
7 Bahan Atap
Seng Gelombang kecil BJLS 0,20 Lbr 60,750.00
Seng Gelombang besar BJLS 0,20 Lbr 60,750.00
Seng Gelombang BJLS 0,20 Lbr 47,300.00
Seng Plat / Seng Talang lebar 60 cm M 51,750.00
Seng plat 3" x 6" BJLS 0,20 Lbr 64,817.00
Seng Plat BJLS 0,20 Uk 40 cm Lbr 28,550.00
Soka Roof Lbr 57,000.00
Genteng Metal ex sakura merpati uk. 80 x 77, t=0,3mm Lbr 60,500.00
Genteng Metal ex sakura merpati uk. 80 x 77, t=0,3mm (1,8 lbr / m2) M2 108,900.00
Genteng Metal Nok ex putri sakura p = 100 cm Bh 23,900.00
Lisplank GRC lebar = 20 cm, p = 4 m Lbr 80,500.00
Lisplank GRC lebar = 30 cm, p = 3,66 m Lbr 85,000.00
Talang PVC Profil U p = 4m Btg 52,000.00
Tutup talang PVC Bh 3,000.00
Gantungan besi utk talang PVC Bh 5,500.00
Corong untuk talang PVC Bh 7,500.00
Knee utk talang PVC Bh 7,500.00
Main Truss (75.75) ex taso , 1 btg = 6 m Btg 105,000.00
Reng (U Type) ex taso , 1 btg = 6 m Btg 62,000.00
Screw Truss Bh 500.00
Screw Reng Bh 500.00
Screw Roofing Bh 500.00
Valley Gutter ex taso , 1 lbr = 6 m Lbr 228,000.00
Dynabolt Bh 2,500.00
Bracket L Bh 5,000.00
No Uraian Spesifikasi Satuan Harga Satuan (Rp)
8 Bahan
Bahan Kayu
Bangunan
Kayu Kelas II Ex. Kamper M3 4,400,000.00
Kayu Kelas III Ex. Meranti M3 2,750,000.00
Kayu Terentang Kelas IV M3 2,200,000.00
Kayu Terentang / Mal M3 1,700,000.00
Dolken (Tiang Perancah) Btg 11,000.00
Minyak bekisting Ltr 34,500.00
11 Bahan Langit-Langit
Tripleks Uk. 120x240x3,0 mm Lbr 55,000.00
Multipleks Uk. 120x240x9 mm Lbr 153,000.00
Gypsum Board Uk. 120x240 t = 9mm, ex Jayaboard Lbr 82,500.00
Calsiboard Uk. 120x240 Lbr 55,000.00
Lis Plafon Gypsum P=4m Btg 20,000.00
Teakwood t = 3mm Lbr 108,000.00
Teakwood t = 4mm Lbr 127,400.00
12 Bahan Finishing
Cat Kayu/besi Kg 51,950.00
Cat Kayu Dasar Kg 51,950.00
Dempul Besi Kg 57,500.00
Dempul Kayu Kg 20,160.00
Tiner ex Sakura Ltr 19,200.00
Tiner ex Impala Ltr 19,200.00
Kuas 4" Bh 15,000.00
Kuas 2" Bh 7,000.00
Kertas Pasir Lbr 4,000.00
Lem Kayu Klg 39,000.00
Sealent 1 tabung = 380 ml Tabung 37,500.00
Sealent ltr 98,600.00
Cat Tembok Finished ex Jotun, 1 Pail = 20 kg Pail 1,200,000.00
Cat Tembok Dasar ex Jotun, 1 Pail = 20 kg Pail 1,200,000.00
No Uraian Spesifikasi Satuan Harga Satuan (Rp)
Plamur Tembok
Bahan Bangunan ex Matek, 1 galon = 4 kg Galon 85,400.00
Cat Meni ex Kansai Kg 25,750.00
Cat Residu Ltr 12,000.00
13 Bahan Penggantung
Kunci Pintu 2 Slaag ex Bremen Set 96,950.00
Engsel (utk pintu) ex Bremen, 4cm x 3cm x 2mm Psg 11,050.00
Engsel (utk jendela) ex Bremen, 3cm x 2,5cm x 2mm Psg 6,500.00
Engsel Cesmen ex Dekson Bh 110,000.00
Grendel Pintu Tanam Psg 75,000.00
Grandel (kunci) jendela ex Solid Bh 4,450.00
Grandel (kunci) jendela ex Dekson Bh 4,450.00
Kait angin Bh 17,850.00
Tarikan Pintu Stainlees 30 cm Bh 97,500.00
Rambunces Jendela Bh 15,000.00
Casement 12" ex Hampton Bh 43,000.00
Casement 12" ex Solid Bh 55,500.00
14 Paku-Pakuan
Paku Beton Dos 13,750.00
Paku Tripleks Kg 24,200.00
Paku Biasa 0.5" - 1.5" Kg 19,700.00
Paku Biasa 3" Kg 20,800.00
Paku Biasa 4" Kg 20,800.00
Paku Biasa 5" - 12" Kg 20,800.00
Paku Tindis Dos 15,561.00
Paku Gypsum Kg 31,936.00
Sekrup Fixer Bh 500.00
Paku Genteng metal Kg 27,450.00
Paku Seng Kg 27,200.00
15 Bahan Kaca
Kaca t = 5 mm (Ryben) M2 137,950.00
Profil Kaca M1 5,000.00
16 Bahan Listrik
Kabel NYM 3 x 2,5 mm Eterna, 1 Roll = 50 m Roll 387,500.00
Kabel NYA 2,5 mm Eterna, 1 Roll = 100 m Roll 275,000.00
Kabel BC 50 mm2 M 50,000.00
Pipa Listrik dia 5/8 p = 4m Btg 23,789.00
Pipa Listrik dia 5/8 ex Clipsal, p = 2,4m Btg 14,000.00
Saklar Single tanam ex Broco Bh 12,100.00
Saklar Double tanam ex Broco Bh 19,800.00
Kotak imbowdus ex schneider Bh 2,000.00
Stop Kontak + Saklar ex Broco Bh 30,500.00
Stop Kontak ex Broco Bh 24,200.00
Stop Kontak Ac ex Panasonic Bh 150,000.00
Lampu 23 watt ex Phillips Essential Bh 95,000.00
Lampu 18 watt ex Phillips Essential Bh 75,000.00
Lampu 5 watt ex Phillips Essential Bh 28,000.00
Lampu Downlight LED 5 Watt Bh 125,000.00
Fitting lampu ex Panasonic Bh 15,000.00
Air Conditioner (AC) 1,5 PK Unit 5,500,000.00
Air Conditioner (AC) 2 PK Unit 8,500,000.00
MCB 6A Schnelder Bh 50,000.00
Box MCB (8 modul) ex Panasonic Bh 95,950.00
Exhaust Fan Type Ceilling 150 CFM Bh 493,350.00
Kipas Angin Gantung Type Klasik Unit 2,200,000.00
17 Bahan Bakar
Solar (subsidi) Ltr 6,930.00
Minyak pelumas Ltr 31,460.00
No Uraian Spesifikasi Satuan Harga Satuan (Rp)
18 Bahan
Bahan Sanitair
Bangunan
Pipa PVC 4" AW, Panjang 4 m Btg 274,260.00
Pipa PVC 3" AW, Panjang 4 m Btg 143,000.00
Pipa PVC 2" AW, Panjang 4 m Btg 87,000.00
Pipa PVC 1 1/4" AW, Panjang 4 m Btg 43,425.00
Pipa PVC 3/4" AW, Panjang 4 m Btg 32,850.00
Pipa PVC 1/2" AW, Panjang 4 m Btg 30,700.00
Floor Drain/Roof Drain Bh 15,000.00
Kran Air Bh 50,000.00
Stop kran 3/4 Bh 30,071.25
Sealtape Bh 7,500.00
Kloset Jongkok ex INA Bh 173,745.00
Kloset Duduk Monoblok Bh 1,250,000.00
Tangki air 1100 ltr ex Exel Bh 2,625,000.00
Tower Tandon Kap. 2 x 1100 liter Unit 18,489,000.00
Mesin Dap 200 Watt ex Panasonik Bh 820,000.00
Mesin Dap 250 Watt Jet Pump Bh 2,818,125.00
Batu Karang M3 120,000.00
Ijuk M3 235,000.00
Pipa Penguapan Bh 27,500.00
Sumur Pantek ( Terpasang ) Unit 3,700,000.00
Wastafel Lengkap Ex. Toto Bh 1,100,000.00
Cermin Wastafel Bh 225,000.00
Bathup Kamar Mandi Bh 3,800,000.00
Shower Kamar Mandi Bh 750,000.00
Kran Wastafel Bh 125,000.00
Thowel Bar Bh 450,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
8 Pembongkaran 1 m² Lantai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.1000 75,000.00 7,500.00
Mandor L. 04 OH 0.0100 110,000.00 1,100.00
JUMLAH TENAGA KERJA 8,600.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
18 Pemasangan 1 m2 dinding bata merah (5 x 11 x 22) cm, tebal 1/2 batu, campuran 1 SP : 3 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.3000 75,000.00 22,500.00
Tukang batu L. 02 OH 0.1000 90,000.00 9,000.00
Kepala tukang L. 03 OH 0.0100 105,000.00 1,050.00
Mandor L. 04 OH 0.0150 110,000.00 1,650.00
JUMLAH TENAGA KERJA 34,200.00
B BAHAN
Bata merah Buah 70.0000 1,000.00 70,000.00
Semen portland Kg 14.3700 1,320.00 18,968.40
Pasir pasang m3 0.0400 129,000.00 5,160.00
JUMLAH HARGA BAHAN 94,128.40
C PERALATAN
-
JUMLAH HARGA ALAT -
19 Pemasangan 1 m2 dinding bata merah (5 x 11 x 22) cm, tebal 1/2 batu, campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.3000 75,000.00 22,500.00
Tukang batu L. 02 OH 0.1000 90,000.00 9,000.00
Kepala tukang L. 03 OH 0.0100 105,000.00 1,050.00
Mandor L. 04 OH 0.0150 110,000.00 1,650.00
JUMLAH TENAGA KERJA 34,200.00
B BAHAN
Bata merah Buah 70.0000 1,000.00 70,000.00
Semen portland Kg 9.6800 1,320.00 12,777.60
Pasir pasang m3 0.0450 129,000.00 5,805.00
JUMLAH HARGA BAHAN 88,582.60
C PERALATAN
-
JUMLAH HARGA ALAT -
22 Pembuatan 1 m2 acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.2000 75,000.00 15,000.00
Tukang batu L. 02 OH 0.1000 90,000.00 9,000.00
Kepala tukang L. 03 OH 0.0100 105,000.00 1,050.00
Mandor L. 04 OH 0.0100 110,000.00 1,100.00
JUMLAH TENAGA KERJA 26,150.00
B BAHAN
Semen PC Kg 3.2500 1,320.00 4,290.00
JUMLAH HARGA BAHAN 4,290.00
C PERALATAN
-
JUMLAH HARGA ALAT -
39 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 1.6500 75,000.00 123,750.00
Tukang batu L. 02 OH 0.2750 90,000.00 24,750.00
Kepala tukang L. 03 OH 0.0280 105,000.00 2,940.00
Mandor L. 04 OH 0.0830 110,000.00 9,130.00
JUMLAH TENAGA KERJA 160,570.00
B BAHAN
Semen portland Kg 276.0000 1,320.00 364,320.00
Pasir beton m3 0.5914 129,000.00 76,294.29
Kerikil (Maks 30 mm) m3 0.7496 120,000.00 89,955.56
Air Liter 215.0000 -
JUMLAH HARGA BAHAN 530,569.84
C PERALATAN
-
JUMLAH HARGA ALAT -
41 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.0200 75,000.00 1,500.00
Tukang cat L. 02 OH 0.0630 90,000.00 5,670.00
Kepala tukang L. 03 OH 0.0063 105,000.00 661.50
Mandor L. 04 OH 0.0030 110,000.00 330.00
JUMLAH TENAGA KERJA 8,161.50
B BAHAN
Plamuur Kg 0.1000 21,350.00 2,135.00
Cat dasar Kg 0.1000 60,000.00 6,000.00
Cat penutup Kg 0.2600 60,000.00 15,600.00
JUMLAH HARGA BAHAN 23,735.00
C PERALATAN
-
JUMLAH HARGA ALAT -
51 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 1.6500 75,000.00 123,750.00
Tukang batu L. 02 OH 0.2750 90,000.00 24,750.00
Kepala tukang L. 03 OH 0.0280 105,000.00 2,940.00
Mandor L. 04 OH 0.0830 110,000.00 9,130.00
JUMLAH TENAGA KERJA 160,570.00
B BAHAN
Semen portland Kg 247.0000 1,320.00 326,040.00
Pasir beton m3 0.6207 129,000.00 80,072.14
Kerikil m3 0.7400 120,000.00 88,800.00
Air Liter 215.0000 -
JUMLAH HARGA BAHAN 494,912.14
C PERALATAN
-
JUMLAH HARGA ALAT -
53 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 1.6500 75,000.00 123,750.00
Tukang batu L. 02 OH 0.2750 90,000.00 24,750.00
Kepala tukang L. 03 OH 0.0280 105,000.00 2,940.00
Mandor L. 04 OH 0.0830 110,000.00 9,130.00
JUMLAH TENAGA KERJA 160,570.00
B BAHAN
Semen portland Kg 371.0000 1,320.00 489,720.00
Pasir beton m3 0.4986 129,000.00 64,315.71
Kerikil m3 0.7756 275,000.00 213,277.78
Air Liter 215.0000 -
JUMLAH HARGA BAHAN 767,313.49
C PERALATAN
-
JUMLAH HARGA ALAT -
65 Pemasangan 1 m' talang 1/2 lingkaran D-15, seng plat BJLS 30 lebar 60 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.1500 75,000.00 11,250.00
Tukang L. 03 OH 0.3000 90,000.00 27,000.00
Kepala tukang L. 03 OH 0.0300 105,000.00 3,150.00
Mandor L. 04 OH 0.00800 110,000.00 880.00
JUMLAH TENAGA KERJA 42,280.00
B BAHAN
Seng plat m' 1.0500 51,750.00 54,337.50
Paku ukuran 1 - 2,5 cm bh 0.0100 20,800.00 208.00
Besi strip kg 0.5000 17,500.00 8,750.00
JUMLAH HARGA BAHAN 63,295.50
C PERALATAN
-
JUMLAH HARGA ALAT -
66 Pemasangan 1 m2 rangka atap baja ringan, jarak kuda2 ± 1,269 m, jarak reng ± 0,385 m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah borong m2 1.0000 55,000.00 55,000.00
JUMLAH TENAGA KERJA 55,000.00
B BAHAN
Main Truss (75.75) btg 0.6594 105,000.00 69,234.38
Reng (U Type) btg 0.9156 62,000.00 56,768.75
Screw Truss bh 13.2250 500.00 6,612.50
Screw Reng bh 12.4813 500.00 6,240.63
Valley Gutter lbr 0.0108 228,000.00 2,464.68
Dynabolt bh 0.6094 2,500.00 1,523.44
Bracket L bh 0.7000 5,000.00 3,500.00
JUMLAH HARGA BAHAN 146,344.37
C PERALATAN
-
JUMLAH HARGA ALAT -
Jumlah 211,538.69
Overhead + Profit 10 %xD 21,153.87
Harga Satuan Pekerjaan (D+E) 232,692.56
Jumlah 5,488,594.56
Overhead + Profit 10 %xD 548,859.46
Harga Satuan Pekerjaan (D+E) 6,037,454.02
77 Pemasangan 1 bh Kran Air diameter 1/2" atau 3/4"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L. 01 OH 0.0100 75,000.00 750.00
Tukang Batu L. 02 OH 0.4000 90,000.00 36,000.00
Kepala tukang L. 03 OH 0.0400 105,000.00 4,200.00
Mandor L. 04 OH 0.0050 110,000.00 550.00
JUMLAH TENAGA KERJA 41,500.00
B BAHAN
Kran Air bh 1.0000 50,000.00 50,000.00
Sealtape bh 0.0250 7,500.00 187.50
JUMLAH HARGA BAHAN 50,187.50
C PERALATAN
-
JUMLAH HARGA ALAT -
D PERALATAN
Submersible Pump 1,5 Hp 220 V Unit 1.0000 5,000,000.00 5,000,000.00
Panel Pompa 2 Hp Unit 1.0000 1,500,000.00 1,500,000.00
Kabel Motor NYY 3 x 2,5 mm m 40.0000 82,000.00 3,280,000.00
JUMLAH HARGA 9,780,000.00
1 Unit sumur dalam (Deep Well Pimp)......
E PENGADAAN & PEMASANGAN
MEKANIKAL ELEKTRIKAL
Pumping Test Ls 1.0000 - -
Pembersihan Bekas Lokasi Kerja Ls 1.0000 250,000.00 250,000.00
JUMLAH HARGA 250,000.00
Catatan :
Sumber Analisa Harga Satuan yang digunakan berasal dari :
1. Peraturan Menteri Pekerjaan Umum dan Perumahaan Rakyat No. 28/PRT/M/2016
Tentang Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum
2. Analisa Praktis yang tetap mengacu pada nomor 1 diatas