52.5
52.5
S17-PL-6
10
10
20 20 KEMENTERIAN PERHUBUNGAN
S17-PL-6 DIREKTORAT JENDERAL PERKERETAAPIAN
257.5 1350 896.5
4 - ø 22 HLS S17-PL-7 B
S17-PL-7
A S17-ANC-1 S17-PL-6 (N/S)
S17-PL-6 (N/S) S17-ANC-1 C
4 - ø 22 HLS GEDUNG KARYA LANTAI 11
10 64 JL.MERDEKA BARAT NO.8 JAKARTA
86.5
100
100
10
87.5
87.5
BALAI TEKNIK PERKERETAAPIAN
37.5
37.5
S17-B5-1 U-200X80X7.5X11 WILAYAH JAWA BAGIAN BARAT
30
30
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
S17-PL-14
SHOP DRAWING
S17-PL-8
MENGETAHUI NAMA TANDA TANGAN
50 50 50 50
A B C PEJABAT PEMBUAT
KOMITMEN
DAVID SUDJITO,ST
NIP.19790506 200502 1 003
1
10 2483 10 PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
1 2503 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
60
87.5
40 50 50
AHLI KONSTRUKSI FERRY SYAMSUL,ST
62.5
AHLI JEMBATAN EDI HERMAWAN,ST
200
KONTRAKTOR:
40 40 S17-PL-8
GIWIN PUTRA KONSTRUKSI,KSO
A-A C-C Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
B-B
DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
BEAM DETAIL
SKALA NOMOR GAMBAR REVISI
20 20
1 S17-PL-6
S17-PL-6
10
10
52.5
52.5
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
S17-PL-7 S17-PL-7
S17-ANC-1
S17-ANC-1
10 10
100
100
86.5 SHOP DRAWING
87.5
87.5
37.5
37.5
30
30
MENGETAHUI NAMA TANDA TANGAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
S17-PL-14
S17-B5-5 U-200X80X7.5X11 S17-PL-8 PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
B A PAKET SBSP
C
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
10 2483 10
1 2503 TGL.KONTRAK 16 SEPTEMBER 2022
KONSULTAN :
3 - ø 18 HLS
S17-ANC-1 DIBUAT NAMA TANDA TANGAN
3 - ø 18 HLS
175
60
46 46 59.5
40 50 50
4
62.5
4
200
KONTRAKTOR:
40
36.5
C-C
DIBUAT NAMA TANDA TANGAN
B-B
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
BEAM DETAIL
SKALA NOMOR GAMBAR REVISI
76.5 123 25
TYP
3
S17-EL-2 S17-SCK-1
KEMENTERIAN PERHUBUNGAN
76
DIREKTORAT JENDERAL PERKERETAAPIAN
S17-PP-7
TYP
0
S17-RA-3 CHS88.9*3.0
928
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
SHOP DRAWING
2164
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
746.5
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5
87.5
S17-PL-10
TGL.KONTRAK 16 SEPTEMBER 2022
175
100
S17
A
366.5
-PP
KONSULTAN :
87.5
37.5
-8
87.5 87.5
DIBUAT NAMA TANDA TANGAN
A-A
S17-EL-3 A TEAM LEADER WISNU PRAHARA,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
1 NOTE : QTY TAMBAH 2 PCS RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
S17-RA-7 CHS88.9*3.0
R 2338
WILAYAH JAWA BAGIAN BARAT
700.5
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
S17-PP-6 1
S17-EL-1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
115.5 3416 55.5 LINTAS BOGOR - SUKABUMI
56 115.5 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
S17-PP-6 (N/S)
S17-EL-1 (N/S) S17-EL-1 (N/S) TEAM LEADER WISNU PRAHARA,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
NOTE : QTY TAMBAH 1 PCS RANGKA ATAP DETAIL
1
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
SHOP DRAWING
S17-TRA-1 CHS88.9*3.0 MENGETAHUI NAMA TANDA TANGAN
.5
R 44 PEJABAT PEMBUAT
.5 DAVID SUDJITO,ST
R 44
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
1350
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1
R 301
1
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1418
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
S18-EL-4
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
S18-EL-4 LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
112 64 5115 64
111.5 TGL.KONTRAK 16 SEPTEMBER 2022
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
1 KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1416.5
S18-RA-2 CHS88.9*3.0 BALAI TEKNIK PERKERETAAPIAN
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
S18-PP-12 S18-EL-3
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
64.5 115.5
TGL.KONTRAK 16 SEPTEMBER 2022
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
KEMENTERIAN PERHUBUNGAN
76 162 DIREKTORAT JENDERAL PERKERETAAPIAN
10 25
S18-EL-2 S18-SCK-1
76
S18-PP-15
SHOP DRAWING
1 PEJABAT PEMBUAT
KOMITMEN
DAVID SUDJITO,ST
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
175
R 2841
747
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5 37.5
100 TGL.KONTRAK 16 SEPTEMBER 2022
50 50 KONSULTAN :
S18-PP-3
KSO SAMAGRAHA - KATALIA
37.5
100
Telp./Fax : (022)-7800141
37.5
S18
-PP
A-A
46.5
S18-PL-9
S18-PP-8 KONTRAKTOR:
A GIWIN PUTRA KONSTRUKSI,KSO
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
149 154 70 10
30 DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
KEMENTERIAN PERHUBUNGAN
76 158.5 DIREKTORAT JENDERAL PERKERETAAPIAN
10 25
S18-EL-2
S18-SCK-1
76
S18-PP-11
SHOP DRAWING
1 PEJABAT PEMBUAT
KOMITMEN
DAVID SUDJITO,ST
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
175
R 2841
747
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5 37.5
100 TGL.KONTRAK 16 SEPTEMBER 2022
50 50 KONSULTAN :
S18-PP-3
KSO SAMAGRAHA - KATALIA
37.5
Telp./Fax : (022)-7800141
100
37.5
S18
-PP
A-A
46.5
S18-PL-9
S18-PP-8 KONTRAKTOR:
A GIWIN PUTRA KONSTRUKSI,KSO
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
149 154 70 10
30 DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
S18-TRA-2 CHS88.9*3.0
TGL.KONTRAK 16 SEPTEMBER 2022
4
R4
4 R4
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
5
R4 DIBUAT NAMA TANDA TANGAN
R
44
.5 TEAM LEADER WISNU PRAHARA,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
S19-RA-1 CHS88.9*3.0
1417.5
JL.MERDEKA BARAT NO.8 JAKARTA
SHOP DRAWING
PROYEK
S19-EL-2 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
S19-PP-6 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
64 112.5
TGL.KONTRAK 16 SEPTEMBER 2022
KONSULTAN :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
25 10
S19-EL-1 KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
76
S19-SCK-1
S19-PP-5
S19-RA-2 CHS88.9*3.0
JL.MERDEKA BARAT NO.8 JAKARTA
928
BALAI TEKNIK PERKERETAAPIAN
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
2164
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
1
R 2841 PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
747
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
175
S19-PP-3 NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
-8
4 - ø 22 HLS
366
Jl.PGSD Lio Warung Gede No.57
-PP
Telp./Fax : (022)-7800141
50 50
175
100
S19
46.5
TEAM LEADER WISNU PRAHARA,ST
S19-PL-10
S19-PP-9 S19-EL-3
A-A S19-PL-10 AHLI KONSTRUKSI FERRY SYAMSUL,ST
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
R4 Telp./Fax : (022)-7800141
R
44
.5 DIBUAT NAMA TANDA TANGAN
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
.5 Telp./Fax : (022)-7800141
R 44
R4
3.5 DIBUAT NAMA TANDA TANGAN
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
1417.5
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
SHOP DRAWING
S20-PP-15
S20-EL-2 MENGETAHUI NAMA TANDA TANGAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
S20-EL-2
S20-PP-15 PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
112 64 5114.5 64 112 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
S20-PP-15 (N/S)
AHLI JEMBATAN EDI HERMAWAN,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
76 162
10
25
S20-SCK-1
S20-EL-3
S20-PP-10 GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
S20-RA-2 CHS88.9*3.0
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
1 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
2164
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
S20-PP-2
175
746.5
37.5 37.5
100 KONSULTAN :
37.5
4 - ø 22 HLS
50 50
DIBUAT NAMA TANDA TANGAN
175
100
S20
37.5
366.5
A
-PP
S20-PL-9
-1 2
KONTRAKTOR:
S20-EL-1
GIWIN PUTRA KONSTRUKSI,KSO
S20-PP-11
A Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
149 154 70 10
30 PROJECT MANAGER Ir. HANMULIO
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
KEMENTERIAN PERHUBUNGAN
25 DIREKTORAT JENDERAL PERKERETAAPIAN
10 S20-EL-3
76
S20-SCK-1
S20-PP-10
S20-RA-3 CHS88.9*3.0
BALAI TEKNIK PERKERETAAPIAN
928
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
2164
1
1
PROYEK
R 2841 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
748
175 NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5
Jl.PGSD Lio Warung Gede No.57
4 - ø 22 HLS Telp./Fax : (022)-7800141
-12
50 50
175
100
365
-PP
37.5
S20
S20-PL-9
A-A AHLI KONSTRUKSI FERRY SYAMSUL,ST
S20-PL-9
A S20-EL-1 AHLI JEMBATAN EDI HERMAWAN,ST
KONTRAKTOR:
10 70 154 149 GIWIN PUTRA KONSTRUKSI,KSO
30 Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
KEMENTERIAN PERHUBUNGAN
25 DIREKTORAT JENDERAL PERKERETAAPIAN
10 S20-EL-3
76
S20-SCK-1
S20-PP-10
S20-RA-4 CHS88.9*3.0
BALAI TEKNIK PERKERETAAPIAN
928
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
2164
1
1
PROYEK
R 2841 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
748
175 NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5
Jl.PGSD Lio Warung Gede No.57
4 - ø 22 HLS Telp./Fax : (022)-7800141
-12
50 50
175
100
365
-PP
37.5
S20
S20-PL-9
A-A AHLI KONSTRUKSI FERRY SYAMSUL,ST
S20-PL-9
A S20-EL-1 AHLI JEMBATAN EDI HERMAWAN,ST
KONTRAKTOR:
10 70 154 149 GIWIN PUTRA KONSTRUKSI,KSO
30 Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1802
BALAI TEKNIK PERKERETAAPIAN
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
47.5 41.5 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
8 5.5
41 AHLI JEMBATAN EDI HERMAWAN,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
43 44 1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
4 38.5 PAKET SBSP
39 6 NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
S20-TRA-4 CHS88.9*3.0
TGL.KONTRAK 16 SEPTEMBER 2022
.5
R 44
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1600
SHOP DRAWING
42.5 MENGETAHUI NAMA TANDA TANGAN
45
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
6 39.5
38.5 5 NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
1 KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 301
1
1417
GEDUNG KARYA LANTAI 11
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
S21-EL-3
PROYEK
S21-PP-23 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
KONSULTAN :
S21-PP-23 (N/S)
AHLI JEMBATAN EDI HERMAWAN,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 30
11
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
S21-RA-2 CHS88.9*3.0
1418
BALAI TEKNIK PERKERETAAPIAN
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PROYEK
S21-PP-23 S21-EL-3 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
KONSULTAN :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 162
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
25
S21-EL-2 S21-SCK-1
76
S21-PP-19
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
S21-PP-2 TERMASUK PEMBANGUNAN STASIUN PALEDANG
1 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
747
R 2841
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
175
37.5 37.5 TGL.KONTRAK 16 SEPTEMBER 2022
100
KONSULTAN :
50 50 KSO SAMAGRAHA - KATALIA
37.5 Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
4 - ø 22 HLS
S21
50 50
175
100
A
366
37.5
-2 1
S21-PL-18
46.5
A-A
S21-EL-1 AHLI JEMBATAN EDI HERMAWAN,ST
S21-PP-10 A
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 162
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
25
S21-EL-2 S21-SCK-1
76
S21-PP-19
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
S21-PP-6 TERMASUK PEMBANGUNAN STASIUN PALEDANG
1 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
747
R 2841
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
175
37.5 37.5 TGL.KONTRAK 16 SEPTEMBER 2022
100
KONSULTAN :
50 50 KSO SAMAGRAHA - KATALIA
37.5 Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
4 - ø 22 HLS
S21
50 50
175
100
A
366
37.5
-2 1
S21-PL-18
46.5
A-A
S21-EL-1 AHLI JEMBATAN EDI HERMAWAN,ST
S21-PP-10 A
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
25
KEMENTERIAN PERHUBUNGAN
10 DIREKTORAT JENDERAL PERKERETAAPIAN
S21-EL-2
76
S21-SCK-1
S21-PP-19
S21-RA-5 CHS88.9*3.0
BALAI TEKNIK PERKERETAAPIAN
928
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
2164
KOMITMEN
1 1
NIP.19790506 200502 1 003
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
R 2841 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
747
PAKET SBSP
175
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5 37.5
S21-PP-7
100 TGL.KONTRAK 16 SEPTEMBER 2022
50 50 KONSULTAN :
37.5
A 4 - ø 22 HLS Jl.PGSD Lio Warung Gede No.57
-21
50 50
Telp./Fax : (022)-7800141
175
100
366
-PP
37.5
S21
S21-PL-18
46.5
TEAM LEADER WISNU PRAHARA,ST
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
25
KEMENTERIAN PERHUBUNGAN
10 DIREKTORAT JENDERAL PERKERETAAPIAN
S21-EL-2
76
S21-SCK-1
S21-PP-19
S21-RA-6 CHS88.9*3.0
BALAI TEKNIK PERKERETAAPIAN
928
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
2164
KOMITMEN
1 1
NIP.19790506 200502 1 003
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
R 2841 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
747
PAKET SBSP
175
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5 37.5
S21-PP-2
100 TGL.KONTRAK 16 SEPTEMBER 2022
50 50 KONSULTAN :
37.5
A 4 - ø 22 HLS Jl.PGSD Lio Warung Gede No.57
50 50
Telp./Fax : (022)-7800141
175
100
S21-PP-21
366
37.5
S21-PP-20 DIBUAT NAMA TANDA TANGAN
S21-PL-18
46.5
TEAM LEADER WISNU PRAHARA,ST
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
25
KEMENTERIAN PERHUBUNGAN
10 DIREKTORAT JENDERAL PERKERETAAPIAN
S21-EL-2
76
S21-SCK-1
S21-PP-19
S21-RA-7 CHS88.9*3.0
BALAI TEKNIK PERKERETAAPIAN
928
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
2164
KOMITMEN
1 1
NIP.19790506 200502 1 003
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
R 2841 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
747
PAKET SBSP
175
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
37.5 37.5
S21-PP-7
100 TGL.KONTRAK 16 SEPTEMBER 2022
50 50 KONSULTAN :
37.5
A 4 - ø 22 HLS Jl.PGSD Lio Warung Gede No.57
50 50
Telp./Fax : (022)-7800141
175
100
S21-PP-21
366
37.5
S21-PP-20 DIBUAT NAMA TANDA TANGAN
S21-PL-18
46.5
TEAM LEADER WISNU PRAHARA,ST
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1
SHOP DRAWING
1425
MENGETAHUI NAMA TANDA TANGAN
S21-TRA-1 CHS88.9*3.0
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
48 44.5
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
13.5
DIBUAT NAMA TANDA TANGAN
.5
R 44 AHLI KONSTRUKSI FERRY SYAMSUL,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
44 44 LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1
BALAI TEKNIK PERKERETAAPIAN
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
1606
SHOP DRAWING
44.5 44.5
MENGETAHUI NAMA TANDA TANGAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
44 39 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
44 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1417.5
BANDUNG 40234
SHOP DRAWING
S22-RA-1 CHS88.9*3.0
MENGETAHUI NAMA TANDA TANGAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
S22-EL-3 S22-PP-6 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
1
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1417.5
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
S22-EL-3 S22-PP-21 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
KONSULTAN :
112 64 5114.5 64 112 KSO SAMAGRAHA - KATALIA
Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
S22-PP-6 KONTRAKTOR:
S22-EL-3 S22-RA-2 CHS88.9*3.0 S22-EL-3 S22-PP-21 GIWIN PUTRA KONSTRUKSI,KSO
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 161.5
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
S22-EL-2 25
S22-SCK-1
76
S22-PP-10
S22-RA-3 CHS88.9*3.0
WILAYAH JAWA BAGIAN BARAT
928
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
1 LINTAS BOGOR - SUKABUMI
PAKET SBSP
S22-PP-3
747
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
R 2841
TGL.KONTRAK 16 SEPTEMBER 2022
175
KONSULTAN :
37.5 37.5
KSO SAMAGRAHA - KATALIA
100 Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
50 50
A
S22
37.5
-PP
50 50 4 - ø 22 HLS
TEAM LEADER WISNU PRAHARA,ST
-8
S22-PL-10
175
100
46.5
37.5
30
DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 162
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
S22-EL-2 25
S22-SCK-1
76
S22-PP-10
S22-RA-4 CHS88.9*3.0
WILAYAH JAWA BAGIAN BARAT
928
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2165
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
1 LINTAS BOGOR - SUKABUMI
PAKET SBSP
S22-PP-5
747
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
R 2841
TGL.KONTRAK 16 SEPTEMBER 2022
175
KONSULTAN :
50 50
A
S22
366
38.5
4 - ø 22 HLS
-8
100
47.5
S22-EL-1
AHLI JEMBATAN EDI HERMAWAN,ST
S22-PL-11 S22-PL-11
S22-PP-9
A-A KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
162 76
KEMENTERIAN PERHUBUNGAN
25 DIREKTORAT JENDERAL PERKERETAAPIAN
10 S22-EL-2
76
S22-SCK-1
S22-PP-10
S22-RA-5 CHS88.9*3.0
928
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
R 2841 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
1
747
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
50.5
-8
366
-PP
38.5
S22-PP-9 4 - ø 22 HLS TEAM LEADER WISNU PRAHARA,ST
51 49
175
46.5
100
AHLI KONSTRUKSI FERRY SYAMSUL,ST
36.5
S22-PL-9
S22-EL-1 AHLI JEMBATAN EDI HERMAWAN,ST
S22-PL-9
10 70 154.5 148.5 A-A KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
44.5 LINTAS BOGOR - SUKABUMI
43 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
S22-TRA-1 CHS88.9*3.0
AHLI JEMBATAN EDI HERMAWAN,ST
45 KONTRAKTOR:
R
GIWIN PUTRA KONSTRUKSI,KSO
R
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
44
Telp : 021-3804556 Email : giwinputrakso@gmail.com
.5
DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
44.5 49.5
SHOP DRAWING
S22-TRA-2 CHS88.9*3.0 MENGETAHUI NAMA TANDA TANGAN
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
R
Telp./Fax : (022)-7800141
45
DIBUAT NAMA TANDA TANGAN
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
44.5
KSO SAMAGRAHA - KATALIA
44.5 Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1418
S23-RA-1 CHS88.9*3.0
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
S23-EL-2 S23-PP-18 1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
S23-PP-18 S23-EL-2 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
111.5 5115.5 64
KONSULTAN :
64.5 111.5
KSO SAMAGRAHA - KATALIA
Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 162
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
25
S23-EL-1 S23-SCK-1
76
S23-PP-14
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2164
1 PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
S23-PP-5 LINTAS BOGOR - SUKABUMI
PAKET SBSP
747
175
R 2841
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
100
KONSULTAN :
50 50
KSO SAMAGRAHA - KATALIA
Jl.PGSD Lio Warung Gede No.57
37.5
100
S23
-PP
37.5
-1 6
S23-PL-9 S23-PL-9
46.5
148.5 154.5 70 10
30 DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
162 76
25
10
S23-EL-1
76
S23-SCK-1
S23-RA-3 CHS88.9*3.0
JL.RAYA GEDEBAGE NO.68
928
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
2164
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
747
TGL.KONTRAK 16 SEPTEMBER 2022
175
A 50 50 Telp./Fax : (022)-7800141
37.5
4 - ø 22 HLS
-16
50 50
366
-PP
175
100
TEAM LEADER WISNU PRAHARA,ST
S23
37.5
S23-PP-15 AHLI KONSTRUKSI FERRY SYAMSUL,ST
46.5
S23-PL-9
A-A
S23-EL-3 KONTRAKTOR:
A GIWIN PUTRA KONSTRUKSI,KSO
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
10 70 154.5 148.5
30 DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 162
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
25
S23-EL-1 S23-SCK-1
76
S23-PP-23
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
S23-PP-5 PAKET SBSP
R 2841
37.5 37.5 TGL.KONTRAK 16 SEPTEMBER 2022
100
KONSULTAN :
50 50
KSO SAMAGRAHA - KATALIA
Jl.PGSD Lio Warung Gede No.57
37.5
100
S23
37.5
-PP
S23-PL-9 S23-PL-9
AHLI KONSTRUKSI FERRY SYAMSUL,ST
46.5
A-A
AHLI JEMBATAN EDI HERMAWAN,ST
S23-EL-3
KONTRAKTOR:
S23-PP-15 A GIWIN PUTRA KONSTRUKSI,KSO
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
148.5 154.5 70 10
DIBUAT NAMA TANDA TANGAN
30
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
1 KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
S23-RA-5 CHS88.9*3.0
1418
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
S23-EL-2 S23-PP-18 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 301
GEDUNG KARYA LANTAI 11
1
JL.MERDEKA BARAT NO.8 JAKARTA
1418
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
S23-EL-2 S23-PP-18 PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
S23-PP-18 S23-EL-2
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
SHOP DRAWING
46 44.5
MENGETAHUI NAMA TANDA TANGAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
46 43.5 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
44.5
KSO SAMAGRAHA - KATALIA
Jl.PGSD Lio Warung Gede No.57
Telp./Fax : (022)-7800141
9
AHLI KONSTRUKSI FERRY SYAMSUL,ST
36.5
AHLI JEMBATAN EDI HERMAWAN,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1
BALAI TEKNIK PERKERETAAPIAN
WILAYAH JAWA BAGIAN BARAT
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
1587
SHOP DRAWING
47.5 42
MENGETAHUI NAMA TANDA TANGAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
44.5 43.5 PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
44.5
DIBUAT NAMA TANDA TANGAN
43.5
TEAM LEADER WISNU PRAHARA,ST
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
44.5 43.5 LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
SHOP DRAWING
1566
MENGETAHUI NAMA TANDA TANGAN
PEJABAT PEMBUAT
45.5 44.5 KOMITMEN
DAVID SUDJITO,ST
NIP.19790506 200502 1 003
1
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
25
10 S24-EL-1
76
S24-SCK-1
S24-PP-9
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
928
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
2164
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
1 ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
R 2841
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
747
TGL.KONTRAK 16 SEPTEMBER 2022
175
S24-PP-17 37.5 37.5 KONSULTAN :
50 50 Telp./Fax : (022)-7800141
37.5
DIBUAT NAMA TANDA TANGAN
4 - ø 22 HLS
-11
366
50 50
-PP
175
100
TEAM LEADER WISNU PRAHARA,ST
S24
S24-PL-9
37.5
AHLI KONSTRUKSI FERRY SYAMSUL,ST
46.5
S24-PL-9
AHLI JEMBATAN EDI HERMAWAN,ST
S24-PP-10 A-A
S24-EL-3 KONTRAKTOR:
A
GIWIN PUTRA KONSTRUKSI,KSO
Jl.Kyai Caringin No.3 Jakarta Pusat - 10150
Telp : 021-3804556 Email : giwinputrakso@gmail.com
10 70 154.5 148.5
30 DIBUAT NAMA TANDA TANGAN
DATE PLOTTED :
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
76 162
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
10
25 S24-SCK-1
S24-EL-1
76
S24-PP-9
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
2164
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
S24-PP-18 ANTARA BOGOR - PALEDANG
1 LINTAS BOGOR - SUKABUMI
PAKET SBSP
747
175
KONSULTAN :
37.5 37.5
KSO SAMAGRAHA - KATALIA
100 Jl.PGSD Lio Warung Gede No.57
50 50 Telp./Fax : (022)-7800141
A
S24
366
-PP
37.5
50 50
S24-PL-9
175
100
37.5
S24-EL-3 S24-PL-9
AHLI JEMBATAN EDI HERMAWAN,ST
S24-PP-10 A-A
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
1
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1418
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
S24-EL-2 S24-PP-4 LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
S24-PP-4 S24-EL-2
TGL.KONTRAK 16 SEPTEMBER 2022
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
R 3011
GEDUNG KARYA LANTAI 11
JL.MERDEKA BARAT NO.8 JAKARTA
1417
JL.RAYA GEDEBAGE NO.68
BANDUNG 40234
SHOP DRAWING
PEJABAT PEMBUAT
DAVID SUDJITO,ST
KOMITMEN
NIP.19790506 200502 1 003
1
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI
REVISI
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
PROYEK
PEMBANGUNAN SKYBRIDGE
TERMASUK PEMBANGUNAN STASIUN PALEDANG
ANTARA BOGOR - PALEDANG
LINTAS BOGOR - SUKABUMI
PAKET SBSP
NO.KONTRAK PL.107/SBSP/PPK1-BS/BTP-JABAR/IX-22
KONSULTAN :
KONTRAKTOR:
NAMA GAMBAR
SKYBRIDGE
RANGKA ATAP DETAIL
SKALA NOMOR GAMBAR REVISI