KM. Karya Niaga - Surat Ukur
KM. Karya Niaga - Surat Ukur
REPUBLIC OF INDONESIA
Dikeluarkan berdasarkan ketentuan-ketentuan Konvensi Internasional Tentang Pengukuran Kapal, 1969, oleh Pemerintah
Republik lndonesia.
Issued under the provision o/ lnlernational Convention on Tonnage Measurernent of Ships 1969, under the aulhority
of the Government o/ the Republic of Indones ia.
KARYA NIAGA
Eks . Dewi Samudera-I YHGJ Jakarta 1988,
i Tanggal peletakan lunas atau pada tahap pembangunan serupa itu (Psl. 2 (6)), atau tanggal dimana kapal mengalami perubahan atau
perombakan besar (Psl. 3 (2) (b)).
* Date on which the keel was laid or the ship was at d similar strqge of construction (article 2 (6)), or date on which the ship
underwenl alterations or modifications ofmqjor chdracter (drticle 3 (2) (b)), as appropriate.
LTKURAN-UKURAN POKOK
MA]N DIMENSIONS
RIS Y
l t
BU I,MM
1 639 /
RUANG-RUANG YANG TERIIIASUK DALAM TONASE
SPACES INCLUDED IN TONNAGE
TONASE KOTOR
GROSS TONNAGE
Nama Ruangan Letak Panjang Isi
No.
Name of Location Lenght Volume
Bawah geladak
1
Underdeck 53,49 2394.84
JUMLAH
Total 2688 ,81
TONASEBERSIH
NETTONNAGE
Nama Ruangan Letak Panjang Isi
No
Name of Space Location Lenghl Volume
JI,\,TLAH
Total 779,07
Ukuran sarat terbesar (Peraruran 4 (2)]-
Mouldad Draughr IRegulation 4 (21] Jumlah Penumpang lPeraturan 4 (l)]
Number ofPassengers (Regulation 4 (l)J
Jumlah Penumpang Kamar dengan tidak tebih dari 8 tempat tidur
Number ofpassengers in cqbins with not more that 8 berlhs