JUMLAH TANGGAL

NO KEGIATAN
PEKERJA 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 PEMBESIAN BALOK BAWAH 2


2 BEKSTING BALOK BAWAH 2
3 COR BALOK BAWAHBAWAH 6
4 URUGAN AREA SALES 3
5 AMPAR PLASTIK COR 3
6 AMPAR WERMESH 4
7 PENGECORAN PLAT LANTAI 7
8 PEMBESIAN KOLOM 2
9 BEKISTING KOLOM 2
10 PENGECORAN KOLOM 4
11 PASANG BATA KELILING 7
12 PLESTER ACI 3
13 PEBESIAN BALOK ATAS 2
14 BEKISTING BALOK ATAS 2
15 PENGECORAN BALOK ATAS 4
16 PEMBESIAN DAK 4
17 BEKISTING DAK 4
18 PENGECORAN DAK 4
19 PENGERJAAN AREA SOPI-SOPI 3
20 PENGERJAAN KAMAR MANDI/TOILET 1
21 PENGERJAAN JANITOR 1
22 PEMASANGAN KERAMIK 5
23 PENGERJAAN KUDA-KUDA 4
24 PEMASANGAN ATAP 4
25 PENGECATAN 2
26 PEMASANGAN PLAFOND DAN PARTISI 3
27 PENGERJAAN BERANGKAS 2
28 PONDASI PAGAR 3
29 PEMBESIAN SLOF PAGAR 2
30 BEKISTING PAGAR 2
31 PENGECORAN BALOK DAN KOLOM PAGAR 2
32 PASANG BATA PAGAR 2
33 PEMBESIAN KOLOM DAN BALOK PAGAR 2
34 PEMASANGAN PAVING 4
35 CAT MARKA 2
36 PEMASANGAN STOPER 2