PROJECT DESCRIPTION:
•
•
•
•
Construct 150-foot concrete pier on pilings at beach area of village at a location
determined based on evaluation of wave/wind directions, shoreline and offshore features,
and village input. Pier designed to accommodate major storm events and small boat
landings at village.
Provide sealed well head and hand pump for village water well. Well is approximately 4
feet in diameter, a depth to water of 5 to 10 feet, has 3 feet of standing water, and
connects to an aboveground water storage tank. Discharge pressure head for pump will be
designed to allow hand pumpage into the aboveground tank.
Project will also include demolition of existing latrine facility and construction of a new
latrine building with three toilets, with new latrines connected into new septic system and
drain field. Sinks for hand washing will be installed adjacent to the new latrines.
FUNDING STATUS:
PROJECT POCS:
ODC: LTC Kenneth Comer, (62-21) 3435-9603, cccomer@san.osd.mil
CA PLANNER: MAJ Steve Lewis, (62-21) 3435-9610
Bitung City Planner: James Romas, cell 08124300872, jamesrompas@yahoo.com
USACE: Mark Schnabel/John Emmerson (808-477-0880 / 808-438-6968)
CH2MHill: Jon Herwig: (cell 808-372-9644, office 808-440-0238))
: