No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) Sub Totoal
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1 unit 1.000 1.000
2 Pek. Laporan & Dokumentasi 4 ls 3.000 12.000
3 Pek. Laporan & 2 2 ls 3.000 6.000
4 Pek. Laporan & 4 3 m3 2.000 6.000
Sub Total A 0 25.000
No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) Sub Totoal
0 0 0 0
A PEKERJAAN PERSIAPAN 0 0
1 Papan Proyek 1 unit 1.100 1.100
2 Pek. Laporan & Dokumentasi 4 ls 3.100 12.400
3 Pek. Laporan & 2 2 ls 3.100 6.200
4 Pek. Laporan & 4 3 m3 2.100 6.300
0 Sub Total A 0 0 26.000
0 0 0 0
0 Total 10 0 9.400 26.000
Page 1
Sheet1
Catatan `
Budget 26,000
Total volume 10
Selisih Harga 1,000
Hasil Bagi 100
Page 2
Sheet01
KOP LEMBAGA
(ALAMAT LENGKAP)
Page 3
Sheet01
Page 4
Sheet01
Page 5
Sheet01
Catatan `
Budget 125,000,000
Total Volime 11,010,939
Selisih Harga -20,703,745
Hasil Bagi -2
Page 6
Sheet02
KOP LEMBAGA
(ALAMAT LENGKAP)
HARGA
JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN
HARGA (Rp.)
(Rp.)
1 2.00 4.00 5.00 6.00
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 unit
2 Pek. Laporan & Dokumentasi 1.00 ls
Sub Total A 0 0
B PEKERJAAN PFONDASI DAN TANAH
1 Pek. Galian Tanah Pondasi 79.84 m3 49,998 3,991,850
2 Pek. Urug Tanah Kemabali 26.61 m3 24,998 665,200
3 Pek. Urug Tanah Peniggian Pell Lantai (1 -10 cm) 22.40 m3
4 Pek. Pasir Urug
- Bawah Fondasi 7.79 m3 29,998 233,685
- Bawah Lantai 11.20 m3 29,998 335,979
5 Pek. Findasi Tepok P1 (90 x 90 x 20)
- Beton K-225 2.59 m3 64,998 168,345
- Pembesian 639.36 kg 10,498 6,712,078
- Bekisting 11.52 m2 24,998 287,978
6 Pek. Fondasi Batu Belah P2 27.51 m3 24,998 687,698
7 Pek. Fondasi Tapak P3 (50 x 50 x 20)
- Beton K-255 0.10 m3 64,998 6,500
- Pembersian 26.64 kg 10,498 279,670
- Bekisting 0.80 m2 24,998 19,998
8 Pek. Sloof Beton S1 (15/30)
- Beton K-255 4.14 m3 64,998 269,092
- Pembesian 752.64 kg 10,498 7,901,305
- Bekisting 55.26 m2 39,998 2,210,296
9 Pek. Sloof Beton S2 (15/25)
- Beton K-255 0.26 m3 64,998 16,900
- Pembesian 53.42 kg 10,498 560,810
- Bekisting 3.40 m2 24,998 84,994
Sub Total B 576,968 24,432,378
C PEKERJAAN STRUKTURAL
C.1 STRUKTUR BETON
1 Pek. Kolam Beton K1 (25/25) T.1,35 m
- Beton K-255 0.17 m3 64,998 11,050
- Pembesian 27.71 kg 10,498 290,903
- Bekisting 2.70 m2 24,998 67,495
2 Pek. Kolam Beton K2 (25/25) T.4,93 m
- Beton K-255 1.85 m3 64,998 120,247
- Pembesian 303.61 kg 10,498 3,187,334
- Bekisting 29.58 m2 39,998 1,183,144