KOP LEMBAGA

(ALAMAT LENGKAP)

RENCANA ANGGARAN BIAYA


PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI : BANTUAN KEMENTRIAN KETENAGA KERJAAN RI
KEJURUAN : ........................ (GRUP B)
TAHUN ANGGARAN : 2023

HARGA
JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN
HARGA (Rp.)
(Rp.)
1 2,00 4,00 5,00 6,00
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1,00 unit 284 284
2 Pek. Laporan & Dokumentasi 1,00 ls 284 284
Sub Total A 567 567
B PEKERJAAN PFONDASI DAN TANAH
1 Pek. Galian Tanah Pondasi 79,84 m3 50.284 4.014.637
2 Pek. Urug Tanah Kemabali 26,61 m3 25.284 672.795
3 Pek. Urug Tanah Peniggian Pell Lantai (1 -10 cm) 22,40 m3 284 6.351
4 Pek. Pasir Urug
- Bawah Fondasi 7,79 m3 30.284 235.909
- Bawah Lantai 11,20 m3 30.284 339.176
5 Pek. Findasi Tepok P1 (90 x 90 x 20)
- Beton K-225 2,59 m3 65.284 169.084
- Pembesian 639,36 kg 10.784 6.894.558
- Bekisting 11,52 m2 25.284 291.266
6 Pek. Fondasi Batu Belah P2 27,51 m3 25.284 695.550
7 Pek. Fondasi Tapak P3 (50 x 50 x 20)
- Beton K-255 0,10 m3 65.284 6.528
- Pembersian 26,64 kg 10.784 287.273
- Bekisting 0,80 m2 25.284 20.227
8 Pek. Sloof Beton S1 (15/30)
- Beton K-255 4,14 m3 65.284 270.274
- Pembesian 752,64 kg 10.784 8.116.116
- Bekisting 55,26 m2 40.284 2.226.068
9 Pek. Sloof Beton S2 (15/25)
- Beton K-255 0,26 m3 65.284 16.974
- Pembesian 53,42 kg 10.784 576.056
- Bekisting 3,40 m2 25.284 85.964
Sub Total B 582.104 24.924.805
C PEKERJAAN STRUKTURAL
C.1 STRUKTUR BETON
1 Pek. Kolam Beton K1 (25/25) T.1,35 m
- Beton K-255 0,17 m3 65.284 11.098
- Pembesian 27,71 kg 10.784 298.812
- Bekisting 2,70 m2 25.284 68.266
2 Pek. Kolam Beton K2 (25/25) T.4,93 m
- Beton K-255 1,85 m3 65.284 120.775
- Pembesian 303,61 kg 10.784 3.273.987
- Bekisting 29,58 m2 40.284 1.191.587
3 Pek. Kolam Beton K3 (25/25) T.4,58 m
- Beton K-255 0,57 m3 65.284 37.212
- Pembesian 94,02 kg 10.784 1.013.867
- Bekisting 9,16 m2 40.284 368.997

Page 1
Sheet2_2
4 Pek. Kolam Beton K4 (25/25) T.4,08 m
- Beton K-255 0,51 m3 65.284 33.295
- Pembesian 83,86 kg 10.784 904.307
- Bekisting 8,17 m2 40.284 329.116
5 Pek. Kolam Beton K5 (25/25) T.3,5 m
- Beton K-255 1,31 m3 65.284 85.521
- Pembesian 215,54 kg 10.784 2.324.282
- Bekisting 21,00 m2 30.284 635.954
6 Pek. Kolam Beton K1 (25/25) T.90 cm
- Beton K-255 1,01 m3 65.284 65.936
- Pembesian 166,28 kg 10.784 1.793.085
- Bekisting 16,20 m2 25.284 409.593
7 Pek. Kolam Praktis K{ (11/11)
- Beton K-175 0,51 m3 65.284 33.295
- Pembesian 341,04 kg 10.784 3.677.615
- Bekisting 18,48 m2 25.284 467.240
8 Pek. Kolam Beton B1, B2 (20/30)
- Beton K-255 2,88 m3 65.284 188.017
- Pembesian 322,18 kg 10.784 3.474.238
- Bekisting 28,40 m2 40.284 1.144.052
9 Pek. Kolam Balok Lintel BL (12/15). RB (12/15)
- Beton K-175 1,65 m3 60.284 99.468
- Pembesian 384,73 kg 10.784 4.148.747
- Bekisting 38,60 m2 25.284 975.944
10 Pek. Ramp Beton T = 10 cm
- Beton K-175 0,46 m3 60.284 27.730
- Pembesian 33,07 kg 10.784 356.611
- Bekisting 0,66 m2 25.284 16.687
11 Pek. Balok B3 dan Balokl Sopi-Sopi (15/20)
- Beton K-175 1,02 m3 60.284 61.489
- Pembesian 195,98 kg 10.784 2.113.356
- Bekisting 18,70 m2 40.284 753.302
12 Pek. Plat Beton Topi-Topi (10/55)
- Beton K-255 0,62 m3 60.284 37.376
- Pembesian 83,33 kg 10.784 898.592
- Bekisting 7,39 m2 25.284 186.845
13 Pek. Kolam pipa besi 3”
- Pipa besi 18,70 m1 55.284 1.033.802
- Ankur Ø 12mm 16,00 bh 50.284 804.536
- Baut 12 m 16,00 bh 30.284 484.536
- Base plate 6 mm uk. 25 x 25 cm 5,89 kg 50.284 296.170
- Plate 6 mm uk. 7,5 x 7,5 cm dudukan rangka atap 1,06 kg 60.284 63.901
C.2 PEKERJAAN ATAP
Rangka Atap
1 L 40.40.4 320,04 kg 284 90.741
2 2 X L 50,50,5 985,50 kg 284 279.419
3 Kuda Kuda 2 x C 100.50.20.2,3 34,44 kg 284 9.765
4 Gording C 100.50.20.2,3 811,80 kg 284 230.169
5 L 50,50,5 dudukan gording 41,45 kg 284 11.752
6 Trekstang Ø 12 94,25 kg 284 26.723
7 Ikat angin Ø 16 187,70 kg 284 53.219
8 Pelat sampin g T 10 mm 339,12 kg 284 96.151
9 Angker Ø 16 x 300 mm 64,00 bh 284 18.146
10 Bout M12 x 30 mm 608,00 bh 284 172.386
11 Cat Sincromat Rangkas baja 101,18 m2 284 28.688
Penutup
1 Atap Spandek t = 0,35 mm 285,12 m2 284 80.840
2 Pasang Alumunium Foil, Glosuol, Roofmesh 140,00 m2 284 39.694

Page 2
Sheet2_2
3 Listplank GRC 82,00 m2 284 23.249
4 Non samping flashing plat 63,20 m1 284 17.919
Sub Total C 1.526.878 35.488.100
D PEKERJAAN PLAFOND
1 Plafond Gipsum 9 mm + Ranka Hollow 4/4; t = 0,35 128,80 m2 30.284 3.900.519
2 Plafond Calsiboard 4,5 mm + Rangka 73,92 m2 20.284 1.499.359
3 Lis Gipsum 5 cm 227,20 m2 10.284 2.336.418
Sub Total D 60.851 7.736.295
E PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 247,60 m2 20.284 5.022.202
2 Plester dan Acian 495,21 m2 10.284 5.092.507
3 Pasang Rolliang Bata 70,30 m2 20.284 1.425.932
4 Pekerjaan Lapis cor Beton t – 5 cm bawah lantai keramik 9,60 m2 80.284 770.722
5 Pekarjaan Meja Beton Wastafel t – 8 cm 0,10 m2 284 28
6 Pasangan Keramik Lantai 40/40 Polished 129,43 m2 55.284 7.155.347
7 Pasangan Keramik Lantai 30/30 UnPolished (rabat) 55,60 m2 30.284 1.683.764
8 Pasangan keramik Lantai 30/30 Unpolished 2,97 m2 50.284 149.342
9 Pasangan Kplint Keramik Lantai 40/10 polished 119,60 m2 25.284 3.023.910
10 Pasangan Keramik meja & dinding wastafel 30/30 Polished 3,99 m2 60.284 240.531
11 Pasangan Keramik Dinding 30/40 Polished 12,20 m2 60.284 735.459
12 Plestran & Acian Kaprot halus Kolam Entrace 5,12 m2 284 1.452
13 Pek. Logo & tulisan plat dinding fln. Cat duco 1,00 ls 284 284
14 Pasang Prasasti granit 40/60 1,00 ls 100.284 100.284
15 Pasang Papan Nama (terpasang) 1,00 ls 284 284
Sub Total E 514.253 25.402.047
F PEKERJAAN KUSEN PINTU DAN JENDELA
1 Kusen/Pintu type P1 1,00 unt 284 284
2 Kusen/Pintu type P2 4,00 unt 284 1.134
3 Kusen/Pintu type P3 1,00 unt 284 284
4 Kusen/Pintu type P4 (Spandrel) 1,00 unt 284 284
5 Kusen/Pintu type J1 9,00 unt 284 2.552
6 Kusen/Pintu type J3 4,00 unt 284 1.134
7 Kusen/Pintu type BV 1,00 unt 284 284
8 Tralis Jendela (Besi begel) 1,00 284 284
Sub Total F 2.268 6.238
G PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 247,60 m2 284 70.202
2 Pek. Pengecatan Dinding Exterior 247,60 m2 284 70.202
3 Pek. Pengecatan Plafond 202,72 m2 284 57.477
4 Pek. Pengecatan Listplank 32,80 m2 284 9.300
Sub Total G 1.134 207.181
H PEKERJAAN PLUMBING DAN SANITER
1 Instalasi Pipa PVC AW 4” 17,00 m2 284 4.820
2 Instalasi Pipa PVC AW 3” 12,00 m2 284 3.402
3 Instalasi Pipa PVC AW 2” 2,00 m2 284 567
4 Instalasi Pipa PVC AW 3/4” 20,00 m2 284 5.671
5 Instalasi Pipa PVC AW 1/2” 10,00 m2 284 2.835
6 Septicktank dan Rembesan 1,00 unt 284 284
7 Pemasangan Closet Jongkok 1,00 bh 284 284
8 Pemasangan Keran Air 2,00 bh 284 567
9 Pemasangan Wastafel dan Keran 2,00 bh 284 567
10 Floor Drain 1,00 bh 284 284
11 Pemasangan Cermin Wastafel 100 x 160 1,00 unt 284 284
Sub Total H 3.119 19.564
I PEKERJAAN LISTRIK
1 Penyambungan Daya Listrik (BP) dan UJL 55.000,00 VA 284 15.594.134
2 Perijinan Sertifikat Layak Operasi (SLO) 55.000,00 VA 284 15.594.134
3 Panel Listrik Indoor (30 x40 x 17) 1,00 unt 284 284

Page 3
Sheet2_2
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2,00 m2 284 567
5 Pek. Instalasi Penerangan dan Power NYM 3 x 2,5 mm2 dan conduit 26,00 ttk 284 7.372
6 Pek. Instalasi Power AC 2 PK (18000 BTU) 2,00 ttk 284 567
7 Pemasangan Lampu TL LED 2 X 18 120 cm KAV V 13,00 bh 284 3.686
8 Pemasangan Lampu Baret/Kap Baret LED 17 Watt Outbow 7,00 bh 284 1.985
9 Pemasangan Lampu Sorot Outdoor 20 Watt 2,00 bh 284 567
10 Pemasangan Lampu Philips Downlight LED 9 Watt Putih 4,00 bh 284 1.134
11 Pemasangan Saklar Tunggal 4,00 bh 284 1.134
12 Pemasangan Sakral Ganda 5,00 bh 284 1.418
13 Pemasangan Stop Kibtak Single 8,00 bh 284 2.268
14 Pemasangan Stop Kontak Ganda 16,00 bh 284 4.536
15 Pemasangan Stop Kontak AC 2,00 bh 284 567
16 Pemasangan AC split wall 2 PK (18.000 BTU) 2,00 unit 284 567
17 Grounding (max 2 Ohm) 1,00 lot 284 284
Sub Total I 4.820 31.215.204
TOTAL 120.907,24 2.691.457 125.000.000