Stripseal SBG-1
Stripseal SBG-1
120 50
SUHARDIANTO IMAM BUKHORI GATOT BUDI LINDUNG SINAGA
Kontraktor Pelaksana :
300
300
PT. WASKITA KARYA (Persero). Tbk
Diajukan Oleh :
175 50 175
D16-200 + 2D13 Tul eksisting I DEWA MADE DIAS SEMARA
Project Manager
DRAFTER QUANT. SURVEYOR HEAD OF ENG.
DETAIL STRIP SEAL JOINT
SKALA 1 : 20 IVAN DAVID FATCHUR NUR ROCHIM
Skala No. Gambar Lbr Ke Jml Lbr
Tanggal :
Ref. Gbr : JW/EXPANSION-STRIPSEAL-01 24 - 08 - 2022
Catatan
150 8000 150
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 Kronologis Gambar
Rev Tgl Uraian Paraf
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
Nama Proyek :
PEMBANGUNAN JALAN TOL
KRIAN-LEGUNDI-BUNDER-MANYAR
STA. 0+000 - STA. 38+290
8000 SHOP DRAWING
Judul Gambar :
DENAH TAMPAK ATAS DENAH TAMPAK ATAS
POTONGAN A-A
SKALA 1 : 50 STRIP SEAL JOINT SBG RAMP 4
Pemilik Proyek :
PT. WASKITA BUMI WIRA
Diketahui Oleh :
Ir. PRABOWO
Pimpinan Proyek
9000 Konsultan Supervisi :
500 3000 4000 1000 500
Diperiksa dan Disetujui Oleh :
Ir. ROEDIONO
Resident Engineer
STR ENG HGW ENG GEO ENG DRN ENG ME ENG
SUHARDIANTO IMAM BUKHORI GATOT BUDI LINDUNG SINAGA
Kontraktor Pelaksana :
3%
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 PT. WASKITA KARYA (Persero). Tbk
Diajukan Oleh :
I DEWA MADE DIAS SEMARA
POTONGAN A-A DRAFTER
Project Manager
QUANT. SURVEYOR HEAD OF ENG.
SKALA 1 : 50
IVAN DAVID FATCHUR NUR ROCHIM
Skala No. Gambar Lbr Ke Jml Lbr
Tanggal :
Ref. Gbr : 24 - 08 - 2022