211051-Uts-1 Fiks
211051-Uts-1 Fiks
10,51
ELV +155
M.A.B +150
9
M.A.N +147
1:
8 3 2.5
1:3 7
.3
1 : 0.
10
1:0
55
6 4 4 ELV +125
25
10
10,51
1:
ELV +115 2 2.1
2.5
1: 10
ELV +105
1:
5 1.5 ELV +100
25,51
KETERANGAN :
0 10 30 50 70 80 M
0 1 3 5 7 8 CM
PROVINSI
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
POLITEKNIK PEKERJAAN UMUM
PROYEK
PRODI TEKNOLOGI KONSTRUKSI BANGUNAN AIR
KABUPATEN
POTONGAN MELINTANG BENDUNGAN
SKALA 1 : 1000
NO. LEMBAR