Anda di halaman 1dari 11

PND

P R O P E R N A S N U S A D U A

Detailed Engineering Design

Pembangunan Rumah Tempat Tinggal


Type 40/96
KETERANGAN

TAMPAK DEPAN
Skala 1 : 100

800 800
KLT 350 150 120 180 300 500
300
182.5

282.5
R.TIDUR
±0.00
TERAS
100

-0.05

KM/WC
150

-0.05
DAPUR

250
±0.00
D R.SERBAGUNA
TANGGAL REVISI PARAF
±0.00
100
100

R.TIDUR
1200

1200
±0.00

225
PND
125

P R O P E R N A S N U S A D U A
100

150
TERAS NAMA PROYEK :
-.0.05
50

KOTA MANDIRI BEKALA


CARPORT
NAMA GAMBAR :
-0.30
DENAH RENCANA
TAMPAK
292.5

292.5
JUMLAH NOMOR
SKALA KODE
LEMBAR LEMBAR

AR
1 : 100 10 01
01
DIGAMBAR
DIPERIKSA DISETUJUI
/ARSITEK
KLT 200 300 300 300 300 200
300
1100 800
DENAH RENCANA PARLINDUNGAN RIZQY ASWARANSYAH
Skala 1 : 100 SIALLAGAN PRATAMA

A B C
KETERANGAN

TAMPAK BELAKANG
Skala 1 : 100

as
88 TANGGAL REVISI PARAF

+4.73

+3.55

+3.30 PND
P R O P E R N A S N U S A D U A
+2.50

NAMA PROYEK :

KOTA MANDIRI BEKALA

NAMA GAMBAR :

TAMPAK

JUMLAH NOMOR
SKALA KODE
LEMBAR LEMBAR
TAMPAK SAMPING KIRI TAMPAK SAMPING KANAN
Skala 1 : 100 Skala 1 : 100 AR
1 : 100 10 02
02
DIGAMBAR
DIPERIKSA DISETUJUI
/ARSITEK

PARLINDUNGAN RIZQY ASWARANSYAH


SIALLAGAN PRATAMA
KETERANGAN

+5.32
19
3
+4.68

9
53 RB.12x15 80
+4.50

133
+3.85
5 23 +4.00 Plat DAK 10cm +3.50
23 5 +3.35

85
+3.00 +3.00 +3.20

90
BG.12x15
+2.60
RB.12x15 BG.12x15 +2.45
80 +2.80 80 80 +2.80
RB.12x15 BG.12x15

125 125

300

300
+1.45

250
+0.80
+0.65
±0.00 (ML) ±0.00 (ML) -0.05 (ML)
±0.00 ±0.00 ±0.00

40

40
40
-0.45 -0.45 -0.45

668.25 250 281.75 182.5 100 475 150 292.5

POTONGAN-A POTONGAN-B
Skala 1 : 100 Skala 1 : 100

TANGGAL REVISI PARAF


420
+5.37

BS.12x15
+4.50
152

+4.52 +4.50

PND
36 +3.85
6
152

150

85

+3.00 +3.00 +3.00 P R O P E R N A S N U S A D U A

+2.80 RB.12x15 +2.80 80 RB.12x15 BG.12x15 RB.12x15


+2.60 NAMA PROYEK :

KOTA MANDIRI BEKALA


300

300

300

NAMA GAMBAR :

±0.00 (ML) ±0.00 (ML) ±0.00 (ML) ±0.00 (ML)


POTONGAN
-0.05 (ML)
±0.00 ±0.00 ±0.00
40
40

40

JUMLAH NOMOR
SKALA KODE
-0.45 -0.45 LEMBAR LEMBAR
-0.45

AR
1 : 100 10 03
282.50 150 325 442.50 500 300 03
DIGAMBAR
POTONGAN-C POTONGAN-D /ARSITEK
DIPERIKSA DISETUJUI
Skala 1 : 100 Skala 1 : 100

PARLINDUNGAN RIZQY ASWARANSYAH


SIALLAGAN PRATAMA
KETERANGAN
800
KLT 350 150 120 180
300
2Ø10
KP KP

12
8-15
Pondasi Rolag 2Ø10
½ Bata

182.5
12

Pondasi Rolag
POT-KP
½ Bata
Skala 1 : 25
100

KP KP KP KP
150

±0.00 (ML)
KP KP KP

10 6
100

KP KP Pondasi Menerus

24
Batu Kali 1:4
-0.45 (MT)
Balok Sloof
100
1200

BS=12x15
Pasangan
½ Batu Bata

40
125

KP KP KP

5 10
100

Pondasi Rolag
½ Bata
10 10 20 10 10
50

KP' KP'
Pondasi Rolag DETAIL KP
½ Bata Skala 1 : 25
292.5

Pondasi Rolag
½ Bata

KLT 200 300 300 Ø8-15


300

PONDASI RENCANA
Skala 1 : 100 TANGGAL REVISI PARAF

2Ø10
15

8-15

2Ø10

12

PND

40
POT-SLOOF
Skala 1 : 25
P R O P E R N A S N U S A D U A

5 10
Bata 1:5
NAMA PROYEK :
Plester 1:5
KOTA MANDIRI BEKALA
Pasangan Lantai
Granit 60x60 Plester Trasram 1:3 T.40Cm
±0.00 (ML) NAMA GAMBAR :
½ Bata Trasram 1:3 T.40Cm
10 6

PONDASI RENCANA & DETAIL

10 10
Pasir+Sirtu Urug

3Ø10 JUMLAH NOMOR


SKALA KODE
24

Tanah Urug LEMBAR LEMBAR

20
-0.45 (MT) 8-15

3Ø10 ST
10 04

10 10
1 : 100
Pasangan Batu Kali 01
40

Menerus 1:4
DIGAMBAR
DIPERIKSA DISETUJUI
/ARSITEK
10 10 35 10 10
5 10

Batu Kali Kosong


Pasir Urug
DETAIL KP'
Skala 1 : 25 PARLINDUNGAN RIZQY ASWARANSYAH
10 10 20 10 10 SIALLAGAN PRATAMA

DETAIL PONDASI MENERUS


Skala 1 : 25
KETERANGAN
+3.85

0 15
15 0
5 BS
x1 i=1
12 2x 2Ø10
B Si= 15

BALOK SOPI

15
8-15

04
+3.00
2Ø10

250 POT-BSi_(01) 12
Skala 1 : 50

DETAIL BSi
Skala 1 : 25
+5.37
8
10
15 16
2x 5
i=1
BS
+4.73 BS
i=1
2x 2Ø10
15 +4.37

15
8-15

2Ø10

12

DETAIL BG
Skala 1 : 25

225 POT-BSi_(02)
Skala 1 : 50

+5.37
8
10
15
2x
i=1
BS 28
+4.73 BS 1
i=1
2x
15

BALOK SOPI
Skala 1 : 100
+3.00

01 02 03 05
BALOK SOPI BALOK SOPI BALOK SOPI BALOK SOPI
325 POT-BSi_(03)
Skala 1 : 50
TANGGAL REVISI PARAF

+4.51

PND
5
2x1
i=1
BS
P R O P E R N A S N U S A D U A

+3.00
NAMA PROYEK :

292.5 POT-BSi_(04) KOTA MANDIRI BEKALA


Skala 1 : 50
NAMA GAMBAR :
516
+4.52
BSi=12x15
BALOK SOPI

JUMLAH NOMOR
SKALA KODE
LEMBAR LEMBAR
4
28
2x
15 ST
BS
i=1 1 : 100 10 05
02
DIGAMBAR
DIPERIKSA DISETUJUI
/ARSITEK
+3.00

750 POT-BSi_(05)
Skala 1 : 50 PARLINDUNGAN RIZQY ASWARANSYAH
SIALLAGAN PRATAMA
KETERANGAN

H C

B
D

C
Besi Hollow Besi Hollow

H B
40.40.1mm 20.40.1mm

60
E A F 100

255

I Detail-I=1unit
Skala 1 : 25

PERLETAKAN KUSEN
Skala 1 : 100

Kayu Kusen Kayu Kusen


(2x6)" 1 (2x6)" 1
5 17 5

5 17 5
Kayu Kusen
(2x6)" 1

5
TANGGAL REVISI PARAF

2 2 2

PND
opening = 237

opening = 237

Pintu Panil Kayu Pintu Panil Kayu Pintu Panil Kayu


Papan Rider Papan Rider Papan Rider

opening = 215

opening = 201
Kunci 2 Slaag
P R O P E R N A S N U S A D U A
210

210

210

200
NAMA PROYEK :

KOTA MANDIRI BEKALA

NAMA GAMBAR :

PERLETAKAN KUSEN & DETAIL

JUMLAH NOMOR
SKALA KODE
LEMBAR LEMBAR

1 : 100 AR
1 : 25 10 06
04
DIGAMBAR
opening = 71 DIPERIKSA DISETUJUI
/ARSITEK

5 80 5 5 80 5 5 80 5 68 PARLINDUNGAN RIZQY ASWARANSYAH


opening = 90 opening = 90 opening = 90 SIALLAGAN PRATAMA

Detail-A=1unit Detail-B=2unit Detail-C=2unit Detail-D=1unit


Skala 1 : 25 Skala 1 : 25 Skala 1 : 25 Skala 1 : 25
KETERANGAN

1 1 1 1
R R R R

4 17 4

4 17 4

4 17 4

4 17 4
S S S S

opening = 157

opening = 157
2 2 2 2

128

128

128

128
Kaca Kaca Kaca Kaca Kaca Kaca
Tebal 5mm Tebal 5mm Tebal 5mm Tebal 5mm Tebal 5mm Tebal 5mm

opening = 215

opening = 215
T T V V
4

4
POT.1 POT.1
Kaca Kaca Kaca
54

54
Tebal 5mm Tebal 5mm Tebal 5mm
POT.2 POT.2
3
4 60 4 60 4 4 60 4
U U
4

4
opening = 132 opening = 68

POT.1 POT.1 Detail-G=1unit Detail-H=2unit


Skala 1 : 25 Skala 1 : 25
POT.2 POT.2

POT.3 POT.3

4 60 4 4 60 4 60 4
opening = 68 opening = 132

Detail-E=1unit Detail-F=1unit
Skala 1 : 25 Skala 1 : 25
TANGGAL REVISI PARAF

PND
Kaca tebal 5mm
6 8 1 Kaca tebal 5mm Ranka Kusen
Ranka Kusen Lem Silent
Kaca tebal 5mm Lem Silent
Rangka Jendela P R O P E R N A S N U S A D U A
Rangka Jendela
4

Lem Silent Karet


Baut Fisher Sponning
Karet
Sponning Sponning NAMA PROYEK :
4

4
Karet
KOTA MANDIRI BEKALA
4

4
Rangka Jendela
Baut Fisher Lem Silent Lem Silent Baut Fisher
NAMA GAMBAR :
Ranka Kusen
Kaca tebal 5mm DETAIL KUSEN
6 8 1 6 8 1 6 8 1 JUMLAH NOMOR
SKALA KODE
LEMBAR LEMBAR
Detail-R Detail-S Detail-S Detail-T Detail-V
AR
Skala 1 : 5 Skala 1 : 5 Skala 1 : 5 Skala 1 : 5 Skala 1 : 5 1 : 25 10 07
05
DIGAMBAR
DIPERIKSA DISETUJUI
/ARSITEK

PARLINDUNGAN RIZQY ASWARANSYAH


SIALLAGAN PRATAMA
KETERANGAN

KK4
(Z)

KK4
+3.85

KK1 KK1 KK1 (X)

KK4

30°
+3.00

80 250 80

Detail KK1=3unit
KK3 KK3 KK3 Skala 1 : 50

KK2 KK2 KK2

(Z)

RENCANA ATAP & KUDA KUDA (X) (Y)


Skala 1 : 100

(Z) 80 325 150

+5.37
Detail KK3=3unit
Skala 1 : 50

(X)
+3.73

+4.45

(X) (Y) (Y)


TANGGAL REVISI PARAF

(X)
30°

+3.00
+3.00

80 250

Detail KK2=3unit
Skala 1 : 50
225 80 292.5

Detail KK4=3unit
Skala 1 : 50
PND
P R O P E R N A S N U S A D U A

NAMA PROYEK :

KOTA MANDIRI BEKALA

NAMA GAMBAR :

X7
5 RENCATA ATAP & DETAIL
lC
na
ca
Reng TR40-60 JUMLAH NOMOR
60 canal CX75 SKALA KODE
LEMBAR LEMBAR
Atap Genteng Metal

X75
Reng TR40-60 Kayu Pengisi Bracket
AR

al C
Wall Plate 1 : 100
Atap Genteng Metal
10 08

c an
Dynabolt 1 : 25
ca
na
lC Celling Batten
06
ca

X7 Furing 0.3+Gypsum 9mm


na

5 +Stepping Screw
Profil Gypsum 2lapis DIGAMBAR
lC

DIPERIKSA DISETUJUI
X7

L5cm dan L7cm canal CX75 /ARSITEK


5

Stepping Screw

Detail Buhul (X) Detail Buhul (X) Detail Buhul (Y)


Skala 1 : 25 Skala 1 : 25 Skala 1 : 25
PARLINDUNGAN RIZQY ASWARANSYAH
SIALLAGAN PRATAMA
KETERANGAN

BK

dw 4"
20w

SK
ST
ft-(12w)

ST
SG
SK

25
ft-(12w)
16 Pipa Hawa Ø1 ½"
dw 3" dw 4" Lubang Kontrol

6
18w 20w SK -0.30 Plat Penutup T.10cm

SG
SK
SG

30
10
SG
Ø10-10cm
20
ft-(12w)
dw 4" Pipa PVC Ø4"
20w Slope 2%
dw 4"
20w
MCB

M ft-(12w)

150
ft-(18w)

10
Potongan-B'
INSTALASI LISTRIK INSTALASI AIR BERSIH & KOTOR Skala 1 : 25
Skala 1 : 100 Skala 1 : 100

10 100 10

TANGGAL REVISI PARAF

10
ST Sakelar Tunggal
= 10 Bh Plester Trasram 1:3
30

SG Sakelar Ganda ½ Bata Trasram 1:3

PND
SK Stop Kontak = 04 Bh
B'
10

sk-AC Sakelar AC = 00 Bh

100
sk-at Sakelar Antena TV = 00 Bh
12 25 12 P R O P E R N A S N U S A D U A
dw-3" Downlight 3"+18w = 01 Bh 5 5
dw-4" Downlight 4"+20w = 04 Bh Potongan-A' NAMA PROYEK :
ft-w Fitting+12w = 03 Bh Skala 1 : 25
KOTA MANDIRI BEKALA
ft-w Fitting+18w = 01 Bh

10
Exhaust fan 10" = 00 Bh NAMA GAMBAR :
12 25 12 INSTALASI LISTRIK, AIR BERSIH
Box MCB = 01 Bh
Detail Septictank & KOTOR
M Meteran 2200VA = 01 Bh
Skala 1 : 25
JUMLAH NOMOR
Plat 1 Lubang = 01 Bh SKALA KODE
12

LEMBAR LEMBAR
Plat 2 Lubang = 01 Bh
A'
1 : 100 ME
25

Plat 3 Lubang = 02 Bh
1 : 25 10 09
01
Plat 4 Lubang = 01 Bh
12

DIGAMBAR
Mangkok Inbow = 06 Bh /ARSITEK
DIPERIKSA DISETUJUI

Detail Bak Kontrol


Skala 1 : 25

PARLINDUNGAN RIZQY ASWARANSYAH


SIALLAGAN PRATAMA
KETERANGAN

250
180

C' Washer
Keran Double

60
Hand Shower Closet

D'

125 125

150
Keramik
25x25

Floor drain 4"

Detail Plat Meja Dapur Detail KM/WC


Skala 1 : 25 Skala 1 : 25

Keramik 25x40
Tinggi 200

TANGGAL REVISI PARAF


Keramik
25x40

Keran ½" 65
80

AMM Wall Tap

200
Granit 60x60
black

PND
10
10

Pipa 1" Pipa PVC P R O P E R N A S N U S A D U A


Lubang Selang 1½"
Ø10-10cm Tabung Gas
10
NAMA PROYEK :
70

Pas Bata ¼ + Plester 1:3


55

KOTA MANDIRI BEKALA

±0.00 (ML) NAMA GAMBAR :


-0.05 (ML)

DETAIL MEJA PLAT & KM/WC


40

40

35
JUMLAH NOMOR
SKALA KODE
LEMBAR LEMBAR

ME
1 : 25 10 10
Pipa PVC 3" dari BK 02
DIGAMBAR
DIPERIKSA DISETUJUI
/ARSITEK

130 120
180 PARLINDUNGAN RIZQY ASWARANSYAH
250 SIALLAGAN PRATAMA

Potongan-D'
Potongan-C' Skala 1 : 25
Skala 1 : 25

Anda mungkin juga menyukai