Anda di halaman 1dari 1

PEKERJAAN REHABILITASI MINOR RUAS JALAN RAYA CIPANAS

( Rangkasbitung )
HASIL PENGUKURAN DI LAPANGAN

Hari : Kamis Lokasi : Ruas Jalan raya CIPANAS Jalur-Lajur : Kanan


Tanggal : 24/11/2022 Lembar : 1

VOLUME PEKERJAAN PATCHING


PANJANG LEBAR TINGGI VOLUME
TIM/ALAT
NO LOKASI / NOMER Aspal
Base KETERANGAN
(m) (m) (m) ( m2 ) ( m3 )
course HAMPAR
( m3 )

1 108 B 7.10 1.05 0.050 7.46 0.37 KCP+Milling Patching ringan


2 108 A 5.80 1.50 0.055 8.70 0.48 KCP+Milling Patching ringan
3 108 2.30 1.40 0.055 3.22 0.18 KCP+Milling Patching ringan
4 106 10.80 1.05 0.200 11.34 0.57 1.701 KCP+Milling Patching berat
5 106 8.80 2.10 0.200 18.48 0.92 2.772 KCP+Milling Patching berat
6 105 8.60 1.50 0.200 12.90 0.65 1.935 KCP+Milling Patching berat
7 104 14.40 1.70 0.200 24.48 1.22 3.672 KCP+Milling Patching berat
8 104 A 5.00 1.05 0.050 5.25 0.26 KCP+Milling Patching ringan
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

TOTAL VOLUME 91.8 4.7 10.1