Anda di halaman 1dari 46

RENCANA ANGGARAN BIAYA

BILL OF QUANTITY

Kegiatan : ……………………………………………
Pekerjaan : ……………………………………………
Lokasi : ……………………………………………
TA : ……………………………………………

NO. URAIAN PEKERJAAN VOLUME KODE AHSP HARGA SATUAN HARGA

1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Mobilisasi & demobilisasi 1.00 Ls 0.00 Rp - Rp -
2 1 M2 Papan Nama Proyek 1.00 Unit 2.1.1.2 Rp - Rp -
3 dst,................. ...... ....... .......... Rp - Rp -
Rp -

II. PEKERJAAN TANAH


1 ............................... ...... ....... .......... Rp - Rp -
2 ............................... ...... ....... .......... Rp - Rp -
3 ............................... ...... ....... .......... Rp - Rp -
Rp -

III. PEKERJAAN PONDASI


1 ............................... ...... ....... .......... Rp - Rp -
2 ............................... ...... ....... .......... Rp - Rp -
3 ............................... ...... ....... .......... Rp - Rp -
4 ............................... ...... ....... .......... Rp - Rp -
5 dst………………………. ...... ....... .......... Rp - Rp -
Rp -

IV. PEKERJAAN BETON


1 ............................... ...... ....... .......... Rp - Rp -
2 ............................... ...... ....... .......... Rp - Rp -
3 ............................... ...... ....... .......... Rp - Rp -
4 ............................... ...... ....... .......... Rp - Rp -
5 ............................... ...... ....... .......... Rp - Rp -
6 ............................... ...... ....... .......... Rp - Rp -
7 ............................... ...... ....... .......... Rp - Rp -
8 ............................... ...... ....... .......... Rp - Rp -
9 dst………………………. ...... ....... .......... Rp - Rp -

Rp -

V. PEKERJAAN Dst……………………..
1 ............................... ...... ....... .......... Rp - Rp -
2 ............................... ...... ....... .......... Rp - Rp -
3 ............................... ...... ....... .......... Rp - Rp -
4 ............................... ...... ....... .......... Rp - Rp -
5 dst………………………. ...... ....... .......... Rp - Rp -
Rp -
TIME SCHEDULE
Kegiatan : Pembangunan / Peningkatan Infrastruktur.
Pekerjaan Pemeliharaan Atap Rumah Jabatan
2,023.00
Lokasi Kota Dumai

JADWAL WAKTU PELAKSANAAN 30 HARI KALENDER


BOBOT BULAN I MASA
NO URAIAN PEKERJAAN KET
% 1 2 3 4 PEMELIHARAAN
% % % %
100.00
1 PEKERJAAN PERSIAPAN 3,379,500.00 #NAME? #NAME? #NAME?
75.00
2 PEKERJAAN TANAH 3,003,292.00 #NAME? #NAME? #NAME? #NAME?
50.00
3 PEKERJAAN STRUKTUR 1,500,000.00 #NAME? #NAME? #NAME? #NAME?
25.00
4 PEKERJAAN AKHIR #NAME? #NAME? #NAME? 0.00

JUMLAH BOBOT PEKERJAAN #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME?
KEMAJUAN KOMULATIF PEKERJAAN #NAME? #NAME? #NAME? #NAME?
REALISASI
DEVIASI

Disetujui oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


KUASA PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS POKMAS BUMI AYU MAJU KONSULTAN
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) KEGIATAN PERENCANAAN
(PPTK)

ISMANI, S.Sos JANNER SUDARTA SIBARANI, S.Kom DEDY MUSTIKA PRIADI DEDEK ZULHAIDI
Nip.19821111 200701 1 003 Nip.19790119 200664 1 003 Ketua Team Leader
PEMERINTAH KOTA DUMAI
SEKRETARIAT DAERAH
KOTA DUMAI

PROGRAM :
Belanja Pemeliharaan Bangunan Gedung - Bangunan Tempat Kerja
Bangunan Gedung Kantor

KEGITAN :
Pemeliharaan Atap Rumah Jabatan

ENGINEER ESTIMATE
( EE )

PEKERJAAN :
Pemeliharaan Atap Rumah Jabatan

TAHUN ANGGARAN 2023


###

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
ENGINEER'S ESTIMATE ( EE )

Kegiatan : Pemeliharaan Atap Rumah Jabatan


Pekerjaan : Pemeliharaan Atap Rumah Jabatan
TA : 2023
Lokasi : Kota Dumai

Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)

I PEKERJAAN PERSIAPAN 3,379,500.00

II PEKERJAAN TANAH 8,607,177.50

III PEKERJAAN BETON 79,806,819.57

IV PEKERJAAN PLAPOND 21,570,208.72

IV PEKERJAAN LANTAI 10,958,400.00

V PEKERJAAN INSTALASI LISTRIK 3,003,292.00

PEKERJAAN FINISHING 1,500,000.00

Jumlah Harga Pekerjaan (termasuk biaya umum dan keuntungan) ( a ) 128,825,397.79


PPN 11% 14,170,793.76
Jumlah Total Harga Pekerjaan = (a) + (b) 142,996,191.54
Dibulatkan 142,990,000.00

Terbilang : Seratus empat puluh dua juta sembilan ratus sembilan puluh ribu rupiah.

Dibuat oleh :
KONSULTAN
PERENCANAAN
CV. GIANDRA PALIKA CONSULTANT

HENDRA KHOSIM, ST
Direktur
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
DINAS PEKERJAAN UMUM KOTA DUMAI
BIDANG CIPTA KARYA
TAHUN 2017

Ket
LEVEL 2

LEVEL 1 HARGA
NO URAIAN PEKERJAAN SATUAN KUANTITAS KODE AHSP
SATUAN (RP)
1 1 2 3 4 5 6 ###

DIVISI 1 Design development

1. Shop drawing dan as-built drawing

2. Dokumentasi proyek

DIVISI 2 Sitework 2.1.1 PEKERJAAN PERSIAPAN

1 Mobilisasi dan demobilisasi Ls 1.00 2.1.1.1 -

2 1 M2 Papan Nama Proyek Unit 1.00 2.1.1.2 #NAME?

3 1 M1 Pagar sementara dari seng gelombang tinggi 2 meter m1 1.00 2.1.1.3 -

4 1 M1 Pengukuran dan Pasang Bouwplank m1 1.00 2.1.1.4 879,500.00

5 Pembuatan 1 m2 kantor sementara lantai plesteran m2 1.00 2.1.1.5 -

6 1 m2 Membersihkan lapangan dan perataan m2 1.00 2.1.1.6 -

7 Pembongkaran 1 m3 beton bertulang m3 1.00 2.1.1.7 -

8 Pembongkaran 1 m3 dinding tembok bata m3 1.00 2.1.1.8 -

2.2.1 PEKERJAAN TANAH

1 Penggalian 1 m3 tanah biasa sedalam 1 m m3 1.00 2.2.1.1 -

2 Penggalian 1 m3 tanah biasa sedalam 2 m m3 1.00 2.2.1.2 -

3 Menggali 1 m3 tanah biasa sedalam 3 m m3 1.00 2.2.1.3 -

4 Menggali 1 m3 tanah lumpur sedalam 1 m m3 1.00 2.2.1.4 -

5 Pengerjaan stripping 1m2 tanah tebing setinggi 1 meter m2 1.00 2.2.1.5 -

6 Pembuangan 1 m3 tanah sejauh 30 meter m3 1.00 2.2.1.6 -

7 Pengurugan Kembali 1 m3 galian tanah biasa sedalam 1 m m3 1.00 2.2.1.7 -

8 Pengurugan Kembali 1 m3 galian tanah biasa sedalam 2 m m3 1.00 2.2.1.8 -

9 Pengurugan Kembali 1 m3 galian tanah biasa sedalam 3 m m3 1.00 2.2.1.9 -

10 Pemadatan tanah 1 m3 tanah (per 20 cm) m3 1.00 2.2.1.10 -

11 Pengurugan 1 m3 dengan pasir urug m3 1.00 2.2.1.11 Err:509

12 Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL m3 1.00 2.2.1.12 -

13 1 m3 Urugan Tanah m3 1.00 2.2.1.13 Err:509

14 1 m2 memasang lapisan ijuk tebal 10 cm, untuk bidang resapan m2 1.00 2.2.1.14 -

15 1 m1 Pasang kayu cerucuk dia. 12 - 15 cm m1 1.00 2.2.1.15 -

16 1 m1 pasang kayu cerucuk dia. 8 - 10 cm m1 1.00 2.2.1.16 -

DIVISI 3 PEKERJAAN STRUKTURAL 3.1 PEKERJAAN STRUKTURAL DIBAWAH TANAH

3.1.1 PEKERJAAN PONDASI

1 1 m1 Pemancangan Tiang Pancang beton bertulang uk. 20 x 20 cm (mekanis) m1 1.00 3.1.1.1 -

2 1 m1 Pemancangan Tiang Pancang beton bertulang uk. 25 x 25 cm (mekanis) m1 1.00 3.1.1.2 -


DIVISI 4 PEKERJAAN ARSITEKTUR 4.1.1 PEKERJAAN BETON

1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (Manual) m3 1.00 4.1.1.1 -

2 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (Molen) m3 1.00 4.1.1.2 -

3 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 (Manual) m3 1.00 4.1.1.3 -

4 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 (Molen) m3 1.00 4.1.1.4 -

5 Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0,72 (Manual) m3 1.00 4.1.1.5 -

6 Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0,72 (Molen) m3 1.00 4.1.1.6 -

7 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3 - 6) cm, w/c = 0,87 m3 1.00 4.1.1.7 -

8 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (Manual) m3 1.00 4.1.1.8 -

9 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (Molen) m3 1.00 4.1.1.9 #REF!

10 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 (Manual) m3 1.00 4.1.1.10 -

11 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 (Molen) m3 1.00 4.1.1.11 -

12 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (Manual) m3 1.00 4.1.1.12 -

13 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (Molen) m3 1.00 4.1.1.13 -

14 Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (Manual) m3 1.00 4.1.1.14 -

15 Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (Molen) m3 1.00 4.1.1.15 -

16 Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53 (Manual) m3 1.00 4.1.1.16 -

17 Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53 (Molen) m3 1.00 4.1.1.17 -

18 Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (Manual) m3 1.00 4.1.1.18 -

19 Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (Molen) m3 1.00 4.1.1.19 -

20 Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 (Manual) m3 1.00 4.1.1.20 -

21 Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 (Molen) m3 1.00 4.1.1.21 -

22 Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 (Manual) m3 1.00 4.1.1.22 -

23 Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 (Manual) m3 1.00 4.1.1.23 -

24 Membuat 1 m3 beton kedap air dengan strorox - 100 m3 1.00 4.1.1.24 -

25 Pemasangan 1 m PVC Waterstop lebar 150 mm m1 1.00 4.1.1.25 -

26 Pemasangan 1 m PVC Waterstop lebar 200 mm m1 1.00 4.1.1.26 -

27 Membuat 1 m PVC Waterstop lebar 230 mm - 320 mm m1 1.00 4.1.1.27 -

28 Pembesian 10 Kg dengan besi polos kg 10.00 4.1.1.28 -

29 Pembesian 1 Kg dengan besi polos kg 1.00 4.1.1.29 -

30 Pembesian 10 Kg dengan besi ulir kg 10.00 4.1.1.30 -

31 Pembesian 1 Kg dengan besi ulir kg 1.00 4.1.1.31 -

32 Pembesian 10 Kg kabel presstressed polos kg 10.00 4.1.1.32 -

33 Pembesian 10 Kg kabel presstressed ulir kg 10.00 4.1.1.33 -

34 Pemasangan 1 m2 bekisting untuk pondasi m2 1.00 4.1.1.34 -

35 Pemasangan 1 m2 bekisting untuk sloof m2 1.00 4.1.1.35 -

36 Pemasangan 1 m2 bekisting untuk kolom m2 1.00 4.1.1.36 -

37 Pemasangan 1 m2 bekisting untuk balok m2 1.00 4.1.1.37 -

38 Pemasangan 1 m2 bekisting untuk lantai m2 1.00 4.1.1.38 -

39 Pemasangan 1 m2 bekisting untuk dinding m2 1.00 4.1.1.39 -

40 Pemasangan 1 m2 bekisting untuk tangga m2 1.00 4.1.1.40 -

41 Pemasangan 1 m2 jembatan untuk pengecoran beton m2 1.00 4.1.1.41 -

42 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) m3 1.00 4.1.1.42 -

43 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) m3 1.00 4.1.1.43 -

44 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) m3 1.00 4.1.1.44 -

45 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) m3 1.00 4.1.1.45 -

46 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) m3 1.00 4.1.1.46 -

47 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m3 1.00 4.1.1.47 -

48 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) m3 1.00 4.1.1.48 -

49 Membuat 1 m kolom praktis beton bertulang (11 x 11) cm m1 1.00 4.1.1.49 -

50 Membuat 1 m ring balok beton bertulang (10 x 15) cm m1 1.00 4.1.1.50 -

51 Pemasangan 10 Kg Jaring Kawat Baja dilas (Wiremesh M-6A) Kg 10.00 4.1.1.51 -

52 Pemasangan 1 Kg Jaring Kawat Baja dilas (Wiremesh M-6A) Kg 1.00 4.1.1.52 -

60 1 M3 Beton K-175 (Ready Mix) m3 1.00 4.1.1.53 -

61 1 M3 Beton K-225 (Ready Mix) m3 1.00 4.1.1.54 -

62 1 M3 Beton K-250 (Ready Mix) m3 1.00 4.1.1.55 Err:509

63 1 M3 Beton K-300 (Ready Mix) m3 1.00 4.1.1.56 -

64 1 M3 Beton K-350 (Ready Mix) m3 1.00 4.1.1.57 -

65 1 M3 Beton K-400 (Ready Mix) m3 1.00 4.1.1.58 -

66 1 M3 Menggunakan peralatan pompa beton m3 1.00 4.1.1.59 -

67 1 M3 Melangsir beton pada setiap penambahan jarak 25 m m3 1.00 4.1.1.60 Err:509

4.1.2 PEKERJAAN BETON PRACETAK


4.2 PEKERJAAN LOGAM

4.2.1 PEKERJAAN BESI DAN ALUMINIUM

` 1 Pemasangan 1 kg besi profil kg 1.00 4.2.1.1 -

2 Pemasangan 1 kg rangka kuda-kuda IWF kg 1.00 4.2.1.2 -

3 Pengerjaan 100 kg pekerjaan perakitan kg 100.00 4.2.1.3 -

4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku m2 1.00 4.2.1.4 -

5 Pengerjaan 10 cm pengelasan dengan las listrik cm 10.00 4.2.1.5 -

6 Pemasangan 1 m2 sunscreen aluminium m2 1.00 4.2.1.6 -

7 Pemasangan 1 m kusen pintu alluminium m1 1.00 4.2.1.7 -

8 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m2 1.00 4.2.1.8 -

9 Pemasangan 1 m2 pintu kaca rangka alluminium m2 1.00 4.2.1.9 -

10 Pemasangan 1 m2 venetions blinds dan Vertical blinds m2 1.00 4.2.1.10 -

11 Pemasangan 1 m2 terali besi strip (2 x 3) mm m2 1.00 4.2.1.11 -

12 Pemasangan 1 m2 kawat nyamuk m2 1.00 4.2.1.12 -

13 Pemasangan 1 m2 jendela nako & tralis m2 1.00 4.2.1.13 -

14 Pemasangan 1 m talang datar / jurai seng bjls 30 lebar 90 cm m1 1.00 4.2.1.14 -

15 Pemasangan 1 m talang 1/2 lingkaran D-15 cm, seng plat Bjls 30 lebar 45 cm m1 1.00 4.2.1.15 -

16 Pemasangan 1 m2 rangka kuda - kuda baja ringan m2 1.00 4.2.1.16 -

17 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, dinding partisi m2 1.00 4.2.1.17 -

18 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafon m2 1.00 4.2.1.18 -

4.3.1 PEKERJAAN KAU DAN PLASTIK

4.4 PASANGAN (MASONRY)

4.4.1 PEKERJAAN DINDING PASANGAN

1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 2 PP m2 1.00 4.4.1.1 -

2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 3 PP m2 1.00 4.4.1.2 -

3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 4 PP m2 1.00 4.4.1.3 -

4 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 5 PP m2 1.00 4.4.1.4 -

5 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 6 PP m2 1.00 4.4.1.5 -

6 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu camp 1 SP : 3 KP : 6 PP m2 1.00 4.4.1.6 -

7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 2 PP m2 1.00 4.4.1.7 -

8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 3 PP m2 1.00 4.4.1.8 -

9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 4 PP m2 1.00 4.4.1.9 -

10 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 5 PP m2 1.00 4.4.1.10 -

11 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 6 PP m2 1.00 4.4.1.11 -

12 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 8 PP m2 1.00 4.4.1.12 -

13 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 3 KP : 10 PP m2 1.00 4.4.1.13 -

14 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SM : 1 KP : 1 PP m2 1.00 4.4.1.14 -

15 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SM : 1 KP : 2 PP m2 1.00 4.4.1.15 -

16 Pemasangan 1 m2 dinding terawang (rooster) ukuran (12 x 11 x 24) cm, campuran 1 SP : 3 PP m2 1.00 4.4.1.16 -

17 Pemasangan 1 m2 dinding terawang (rooster) ukuran (12 x 11 x 24) cm, campuran 1 SP : 4 PP m2 1.00 4.4.1.17 -

4.4.2 PEKERJAAN PLESTERAN

1 Pemasangan 1 m2 plesteran 1 SP : 1 PP tebal 15 mm m2 1.00 4.4.2.1 -

2 Pemasangan 1 m2 plesteran 1 SP : 2 PP tebal 15 mm m2 1.00 4.4.2.2 -

3 Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 15 mm m2 1.00 4.4.2.3 -

4 Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 15 mm m2 1.00 4.4.2.4 -

5 Pemasangan 1 m2 plesteran 1 SP : 5 PP tebal 15 mm m2 1.00 4.4.2.5 -

6 Pemasangan 1 m2 plesteran 1 SP : 6 PP tebal 15 mm m2 1.00 4.4.2.6 -

7 Pemasangan 1 m2 plesteran 1 SP : 7 PP tebal 15 mm m2 1.00 4.4.2.7 -

8 Pemasangan 1 m2 plesteran 1 SP : 8 PP tebal 15 mm m2 1.00 4.4.2.8 -

9 Pemasangan 1 m2 plesteran 1 SP : 1/2 KP : 3 PP tebal 15 mm m2 1.00 4.4.2.9 -

10 Pemasangan 1 m2 plesteran 1 SP : 2 KP : 8 PP tebal 15 mm m2 1.00 4.4.2.10 -

11 Pemasangan 1 m2 plesteran 1 SM : 1KP : 1 PP tebal 15 mm m2 1.00 4.4.2.11 -

12 Pemasangan 1 m2 plesteran 1 SM : 1KP : 2 PP tebal 15 mm m2 1.00 4.4.2.12 -

13 Pemasangan 1 m2 plesteran 1 SP : 1PP tebal 20 mm m2 1.00 4.4.2.13 -

14 Pemasangan 1 m2 plesteran 1 SP : 3PP tebal 20 mm m2 1.00 4.4.2.14 -

15 Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm m2 1.00 4.4.2.15 -

16 Pemasangan 1 m2 plesteran 1 SP : 5 PP tebal 20 mm m2 1.00 4.4.2.16 -

17 Pemasangan 1 m2 plesteran 1 SP : 6 PP tebal 20 mm m2 1.00 4.4.2.17 -

18 Pemasangan 1 m2 plesteran 1 SM : 1 KP : 2 PP tebal 20 mm m2 1.00 4.4.2.18 -

19 Pemasangan 1 m skoning 1 SP : 3 PP tebal 10 cm m2 1.00 4.4.2.19 -

20 Pemasangan 1 m2 plesteran ciprat 1SP : 2 PP m2 1.00 4.4.2.20 -

21 Pemasangan 1 m2 finishing siar pasangan bata merah m2 1.00 4.4.2.21 -

22 Pemasangan 1 m2 finishing siar pasangan conblock ekspose m2 1.00 4.4.2.22 -

23 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1 SP : 2 PP m2 1.00 4.4.2.23 -

24 Pemasangan 1 m2 acian m2 1.00 4.4.2.24 -


4.4.3 PEKERJAAN PENUTUP LANTAI & DINDING

1 Pemasangan 1 m2 lantai ubin granit ukuran 60 cm x 60 cm m2 1.00 4.4.3.1 -

2 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm m2 1.00 4.4.3.2 -

3 Pemasangan 1 m2 lantai ubin granit ukuran 30 cm x 30 cm m2 1.00 4.4.3.3 -

4 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60 cm x 60 cm m2 1.00 4.4.3.4 -

5 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40 cm m2 1.00 4.4.3.5 -

6 Pemasangan 1 m2 lantai ubin teraluk marmer ukuran 30 cm x 30 cm m2 1.00 4.4.3.6 -

7 Pemasangan 1 m' plint ubin granit ukuran 10 cm x 40 cm m1 1.00 4.4.3.7 -

8 Pemasangan 1 m' plint ubin granit ukuran 10 cm x 30 cm m1 1.00 4.4.3.8 -

9 Pemasangan 1 m' plint ubin teralux marmer ukuran 10 cm x 60 cm m1 1.00 4.4.3.9 -

10 Pemasangan 1 m' plint ubin teralux marmer ukuran 10 cm x 40 cm m1 1.00 4.4.3.10 -

11 Pemasangan 1 m' plint ubin teralux marmer ukuran 10 cm x 30 cm m1 1.00 4.4.3.11 -

12 Pemasangan 1 m2 lantai teraso cor di tempat, tebal 3 cm m2 1.00 4.4.3.12 -

13 Pemasangan 1 m2 lantai keramik artistik 10 cm x 20 cm m2 1.00 4.4.3.13 -

14 Pemasangan 1 m2 lantai keramik artistik 10 cm x 10 cm atau 5cm x 20 cm m2 1.00 4.4.3.14 -

15 Pemasangan 1 m2 lantai keramik ukuran 60 cm x 60 cm m2 1.00 4.4.3.15 -

16 Pemasangan 1 m2 lantai keramik ukuran 30 cm x 30 cm m2 1.00 4.4.3.16 -

17 Pemasangan 1 m2 lantai keramik ukuran 25 cm x 25 cm m2 1.00 4.4.3.17 -

18 Pemasangan 1 m2 lantai keramik ukuran 20 cm x 20 cm m2 1.00 4.4.3.18 -

19 Pemasangan 1 m2 lantai keramik 10 cm x 33 cm untuk variasi/border m2 1.00 4.4.3.19 -

20 Pemasangan 1 m2 lantai mozaik ukuran 30 cm x 30 cm m2 1.00 4.4.3.20 -

21 Pemasangan 1 m' plint keramik ukuran 10 cm x 20 cm m1 1.00 4.4.3.21 -

22 Pemasangan 1 m2 plint keramik ukuran 10 cm x 10 cm m2 1.00 4.4.3.22 -

23 Pemasangan 1 m' plint keramik ukuran 5 cm x 20 cm m1 1.00 4.4.3.23 -

24 Pemasangan 1 m' plint internal cove artistik 5 cm x 5 cm x 20 cm m1 1.00 4.4.3.24 -

25 Pemasangan 1 m2 lantai marmer 100 cm x 100 cm m2 1.00 4.4.3.25 -

26 Pemasangan 1 m2 dinding porselen 11 cm x 11 cm m2 1.00 4.4.3.26 -

27 Pemasangan 1 m2 dinding porselen 10 cm x 20 cm m2 1.00 4.4.3.27 -

28 Pemasangan 1 m2 dinding porselen 20 cm x 20 cm m2 1.00 4.4.3.28 -

29 Pemasangan 1 m2 dinding keramik artistik 10cm x 20 cm m2 1.00 4.4.3.29 -

30 Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm m2 1.00 4.4.3.30 -

31 Pemasangan 1 m2 dinding keramik 10 cm x 20 cm m2 1.00 4.4.3.31 -

32 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm m2 1.00 4.4.3.32 -

33 Pemasangan 1 m2 dinding keramik 25 cm x 40 cm m2 1.00 4.4.3.33 -

34 Pemasangan 1 m2 dinding keramik 20 cm x 25 cm m2 1.00 4.4.3.34 -

35 Pemasangan 1 m2 dinding marmer 100 cm x 100 cm m2 1.00 4.4.3.35 -

36 Pemasangan 1 m2 lantai vynil ukuran 30 x 30 cm m2 1.00 4.4.3.36 -

37 Pemasangan 1 m2 wallpaper lebar 50 cm m2 1.00 4.4.3.37 -

4.5 PERLINDUNGAN SUHU DAN KELEMBABAN

4.5.1 PEKERJAAN PLAFOND

1 Pemasangan 1 m2 langit-langit akustik ukuran(30 x 30) cm m2 1.00 4.5.1.1 -

2 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm m2 1.00 4.5.1.2 -


Pemasangan 1 m2 langit-langit akustik ukuran (60
3 m2 1.00 4.5.1.3 -
x 120) cm
4 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm m2 1.00 4.5.1.4 -

5 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm m2 1.00 4.5.1.5 -

6 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm m2 1.00 4.5.1.6 -

7 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm m2 1.00 4.5.1.7 -

8 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)mm, tebal 9 mm m2 1.00 4.5.1.8 -


Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka
9 m2 1.00 4.5.1.9 -
alluminium
10 Pemasangan 1 m1 list langit-langit kayu profil m1 1.00 4.5.1.10 -

11 Pemasangan 1 m1 list langit-langit gypsum m1 1.00 4.5.1.11 -

12 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40 m2 1.00 4.5.1.12 -

13 Pemasangan 1 m2 Rangka langit-langit metal furring ukuran (60 x 60) cm m2 1.00 4.5.1.13 -

4.5.2 PEKERJAAN PENUTUP ATAP

1 Pemasangan 1 m2 genteng metal, tebal 0,4 mm m2 1.00 4.5.2.1 -

2 Pemasangan 1 m2 genteng metal, tebal 0,35 mm m2 1.00 4.5.2.2 -

3 Pemasangan 1 m2 genteng metal, tebal 0,3 mm m2 1.00 4.5.2.3 -

4 Pemasangan 1 m2 genteng metal, tebal 0,25 mm m2 1.00 4.5.2.4 -

5 Pemasangan 1 m1 nok genteng metal m1 1.00 4.5.2.5 -

6 Pemasangan 1 m2 atap seng gelombang m2 1.00 4.5.2.6 -

7 Pemasangan 1 m1nok atap seng m1 1.00 4.5.2.7 -

8 Pemasangan 1 m1 aluminium foil/sisalation m1 1.00 4.5.2.8 -


4.6 BUKAAN (JEDELA, PINTU, KUSEN)

4.6.1 PEKERJAAN KAYU

1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I m3 1.00 4.6.1.1 -

2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II m3 1.00 4.6.1.2 -

3 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas III m3 1.00 4.6.1.3 -

4 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II m2 1.00 4.6.1.4 -

5 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas III m2 1.00 4.6.1.5 -

6 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I m2 1.00 4.6.1.6 -

7 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II m2 1.00 4.6.1.7 -

8 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I m2 1.00 4.6.1.8 -

9 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II m2 1.00 4.6.1.9 -

10 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I m2 1.00 4.6.1.10 -

11 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II m2 1.00 4.6.1.11 -

12 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) m2 1.00 4.6.1.12 -
Pembuatan 1 m2 daun pintu plywood rangkap, rangka expose kayu kelas II tertutup (lebar sampai 90
13 m2 1.00 4.6.1.13 -
cm)
14 Pembuatan 1 m2 Jalusi Kusen, Kayu Kelas I m2 1.00 4.6.1.14 -

15 Pembuatan 1 m2 Jalusi Kusen, Kayu Kelas II m2 1.00 4.6.1.15 -

16 Pembuatan 1 m2 Teakwood Rangkap, Rangka expose Kayu Kelas I m2 1.00 4.6.1.16 -

17 Pembuatan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II m2 1.00 4.6.1.17 -

18 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I bentang 6 meter m3 1.00 4.6.1.18 -

19 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter m3 1.00 4.6.1.19 -

20 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter m3 1.00 4.6.1.20 -

21 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I m3 1.00 4.6.1.21 -

22 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II m3 1.00 4.6.1.22 -

23 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 1.00 4.6.1.23 -

24 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 1.00 4.6.1.24 -

25 Pemasangan 1 m2 rangka atap sirap, kayu kelas II m2 1.00 4.6.1.25 -

26 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II m2 1.00 4.6.1.26 -

27 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III m2 1.00 4.6.1.27 -

28 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II m2 1.00 4.6.1.28 -

29 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III m2 1.00 4.6.1.29 -

30 Pemasangan 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I m1 1.00 4.6.1.30 -

31 Pemasangan 1 m' lisplank ukuran (3 x 30) cm, kayu kelas II m1 1.00 4.6.1.31 -

32 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm, kayu kelas II m2 1.00 4.6.1.32 -

33 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm, kayu kelas III m2 1.00 4.6.1.33 -

34 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II m2 1.00 4.6.1.34 -

35 Pemasangan 1 m2 dinding pemisah Plywood rangkap, rangka kayu kelas II m2 1.00 4.6.1.35 -

36 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I m2 1.00 4.6.1.36 -

37 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m2 1.00 4.6.1.37 -

4.6.2 PEKERJAAN KUNCI DAN KACA

1 Pemasangan 1 buah kunci tanam biasa bh 1.00 4.6.2.1 -


2 Pemasangan 1 buah kunci kamar mandi bh 1.00 4.6.2.2 -

3 Pemasangan 1 Buah Kunci Slinder bh 1.00 4.6.2.3 -

4 Pemasangan 1 Buah Engsel Pintu bh 1.00 4.6.2.4 -

5 Pemasangan 1 Buah Engsel jendela kupu-kupu bh 1.00 4.6.2.5 -

6 Pemasangan 1 Buah Engsel Angin bh 1.00 4.6.2.6 -

7 Pemasangan 1 Buah Spring Knip bh 1.00 4.6.2.7 -

8 Pemasangan 1 Buah kait angin bh 1.00 4.6.2.8 -

9 Pemasangan 1 Buah door closer bh 1.00 4.6.2.9 -

10 Pemasangan 1 Buah kunci slot bh 1.00 4.6.2.10 -

11 Pemasangan 1 Buah door holder bh 1.00 4.6.2.11 -

12 Pemasangan 1 Buah door stop bh 1.00 4.6.2.12 -

13 Pemasangan 1 Buah Rel pintu sorong bh 1.00 4.6.2.13 -

14 Pemasangan 1 Buah Kunci lemari bh 1.00 4.6.2.14 -

15 Pemasangan 1 m2 kaca tebal 3 mm m2 1.00 4.6.2.15 -

16 Pemasangan 1 m2 kaca tebal 5 mm m2 1.00 4.6.2.16 -

17 Pemasangan 1 m2 kaca tebal 8 mm m2 1.00 4.6.2.17 -

18 Pemasangan 1 m2 kaca cermin tebal 5 mm m2 1.00 4.6.2.18 -

19 Pemasangan 1 m2 kaca Wireglassed tebal 5 mm m2 1.00 4.6.2.19 -

20 Pemasangan 1 m2 kaca patri tebal 5 mm m2 1.00 4.6.2.20 -

4.7.1 PEKERJAAN PENGECETAN

1 1 m2 pengikisan/pengerokan permukaan cat lama m2 4.7.1.1 -

2 1 m2 pencucian bidang permukaan tembok yang pernah di cat m2 4.7.1.2 -

3 1 m2 pengerokan karat pada permukaan baja cara normal m2 4.7.1.3 -

4 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup ) m2 4.7.1.4 -

5 1 m2 pengecatan bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup ) m2 4.7.1.5 -

6 1 m2 pelaburan bidang kayu dengan teak oil m2 4.7.1.6 -

7 1 m2 pelaburan bidang kayu dengan cat residu dan ter m2 4.7.1.7 -

8 1 m2 pelaburan bidang kayu dengan vernis m2 4.7.1.8 -

9 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup ) m2 4.7.1.9 -

10 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup ) m2 4.7.1.10 -

11 Pengecatan 1 m2 permukaan baja dengan menie besi m2 4.7.1.11 -

12 Pengecatan 1 m2 plafond eternit / gypsum m2 4.7.1.12 -

13 Pengecatan 1 m2 Genteng m2 4.7.1.13 -

14 Mengecat bidang dengan cat minyak ( 2 lapis cat penutup ) m2 4.7.1.14 -

DIVISI 5 PEKERJAAN MEKANIKAL 5.1.1 PEKERJAAN SANITASI GEDUNG

1 Pemasangan 1 buah closet duduk / monobolck bh 5.1.1.1 -

2 Pemasangan 1 buah closet jongkok porslen bh 5.1.1.2 -

3 Pemasangan 1 buah closet jongkok teraso bh 5.1.1.3 -

4 Pemasangan 1 buah urinoir bh 5.1.1.4 -

5 Pemasangan 1 buah wastafel bh 5.1.1.5 -

6 Pemasangan 1 buah bathcup porselen bh 5.1.1.6 -

7 Pemasangan 1 buah bak fibreglass vol 1 M3 bh 5.1.1.7 -

8 Pemasangan 1 buah bak mandi batu bata vol 0,30 M3 bh 5.1.1.8 -

9 Pemasangan 1 buah bak mandi Fibreglass vol 0,30 M3 bh 5.1.1.9 -

10 Pemasangan 1 buah bak air fibreglass vol 1 M3 bh 5.1.1.10 -

11 Pemasangan 1 buah bak cuci piring stainlessteel bh 5.1.1.11 -

12 Pemasangan 1 buah floor drain bh 5.1.1.12 -

13 Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm bh 5.1.1.13 -

14 Pemasangan 1 buah bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm bh 5.1.1.14 -

15 Pemasangan 1 buah bak kontrol pasangan bata 60cm x 60cm tinggi 65 cm bh 5.1.1.15 -

16 Pemasangan 1 m’ pipa galvanis diameter ½” m1 5.1.1.16 -

17 Pemasangan 1 buah kran diameter ½” atau 3/4” bh 5.1.1.17 -

18 Pemasangan 1 m’ pipa galvanis diameter 3/4” m1 5.1.1.18 -


19 Pemasangan 1 m’ pipa galvanis diameter 1” m1 5.1.1.19 -

20 Pemasangan 1 m’ pipa galvanis diameter 1 ½” m1 5.1.1.20 -

21 Pemasangan 1 m’ pipa galvanis diameter 3” m1 5.1.1.21 -

22 Pemasangan 1 m’ pipa galvanis diameter 4” m1 5.1.1.22 -

23 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” m1 5.1.1.23 -

24 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 5.1.1.24 -

25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m1 5.1.1.25 -

26 Pemasangan 1 m’ pipa PVC tipe AW diameter 1 1/2” m1 5.1.1.26 -

27 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m1 5.1.1.27 -

28 Pemasangan 1 m’ pipa PVC tipe AW diameter 2 1/2” m1 5.1.1.28 -

29 Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m1 5.1.1.29 -

30 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 5.1.1.30 -

31 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 20 cm m1 5.1.1.31 -

32 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm m1 5.1.1.32 -

33 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm m1 5.1.1.33 -

34 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm m1 5.1.1.34 -

DIVISI 6 PEKERJAAN ELEKTRIKAL 6.1.1 PEKERJAAN ELEKTRIKAL

1 1 titik Pasang Stop kontak ttk 6.1.1.1 -

2 1 titik Pasang Saklar tunggal ttk 6.1.1.2 -

3 1 titik Pasang Saklar ganda ttk 6.1.1.3 -

4 1 buah pasang lampu TL 20 watt bh 6.1.1.4 -

5 1 buah pasang lampu SL 18 watt bh 6.1.1.5 -

6 1 buah pasang lampu Pijar 25 watt bh 6.1.1.6 -

7 1 buah pasang Panel Box + 1 MCB 6A bh 6.1.1.7 -

DIVISI 7 FASILITAS EKSTERIOR 7.1 PAVING, PERPARKIRAN, PEDESTRIAN


BANGUNAN

1 Err:509 m2 1.00 7.1.1 Err:509

7.2 PAGAR DAN GERBANG

7.3 PERTAMANAN DAN LANDSCAPING(TANAMAN, RUMPUT, TANAH)

DIVISI 8 Miscellaneous Work 8.1 PEKERJAAN LINGKUNGAN

8.1.1 JALAN LINGKUNGAN

1 1 m2 Penyiapan badan jalan (Manual) m2 1.00 8.1.1.1 Err:509

2 1 m2 Melabur dengan aspal untuk jalan beton m2 1.00 8.1.1.2 -

3 1 m1 Membuat delatasi dengan concrete cutter untuk jalan beton m1 1.00 8.1.1.3 -

4 1 m2 Membuat bekisting untuk jalan beton m2 1.00 8.1.1.4 #NAME?

5 1 m2 Menggaris / Finishing permukaan jalan beton (Manual) m2 1.00 8.1.1.5 -

8.1.2 DRAINASE

1 Menggali 1 m3 tanah biasa sedalam < 1 m m3 1.00 8.1.2.1 184,299.00

2 Menggali 1 m3 tanah biasa sedalam s.d 2 m m3 1.00 8.1.2.2 -

3 Menggali 1 m3 tanah biasa sedalam s.d 3 m m3 1.00 8.1.2.3 -

4 1 m3 galian lumpur sedalam ≤ 1 m m3 1.00 8.1.2.4 -

5 1 m3 galian lumpur sedalam s.d 2 m m3 1.00 8.1.2.5 -

6 1 m3 galian lumpur sedalam s.d 3 m m3 1.00 8.1.2.6 -

7 Pasang 1 m1 Profil melintang galian m1 1.00 8.1.2.7 -

8 1 m1 uitzet trase saluran m1 1.00 8.1.2.8 -

9 1 m2 Membuat Bekisting untuk parit beton dengan Multiflex m2 1.00 8.1.2.9 #NAME?

8.2 PEKERJAAN PERPIAPAAN AIR MINUM DI LUAR BANGUNAN GEDUNG


ITEM PEMBAYARAN NO. : 2.1.1.1
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = %


Lembar 1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2

B. PERALATAN
Periksa lembar 1.2-2

C. FASILITAS KANTOR
1 ....................................................
2 ....................................................
3 ....................................................
4 ....................................................

D. FASILITAS LABORATORIUM

1 Bh - - -
2 .................................................... Bh - - -
3 ....................................................

E. MOBILISASI LAINNYA
1 Dokumentasi + As Built Drawing Ls 1.00 500,000.00 500,000.00
2 Pengukuran Lapangan Ls 1.00 150,000.00 150,000.00
3 Alat Pelindung Keselamatan/Kesehatan Kerja (K3) Ls 1.00 150,000.00 150,000.00

F. DEMOBILISASI LS 0 0

Total Biaya Mobilisasi 800,000.00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. : 2.1.1.1


JENIS PEKERJAAN : MOBILISASI
Lembar 2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 COMPRESSOR 4000-6500 L\M Unit


2 CONCRETE MIXER 0.3-0.6 M3 Unit
3 CRANE 10-15 TON Unit
4 GENERATOR SET Unit
5 TAMPER Unit
6 JACK HAMMER Unit
7 CONCRETE PUMP Unit

Total untuk Item B pada Lembar 1


DAFTAR KUANTITAS DAN HARGA
ENGGINER ESTIMATE

Kegiatan : Pemeliharaan Atap Rumah Jabatan


Nama Pekerjaan : Pemeliharaan Atap Rumah Jabatan
Prop / Kec / Kota : Riau / Dumai Timur / Dumai
TA : 2023

Perkiraan Jumlah
No. Uraian Satuan / Harga Satuan Harga-Harga
Kuantitas (Rupiah)
a b c d e f = (d x e)

I PEKERJAAN PERSIAPAN
1 Pek. Pembobokan Lantai Untuk Galian Pondasi Ls 1.00 2,000,000.00 2,000,000.00
2 Papan Nama Proyek Ls 1.00 500,000.00 500,000.00
3 Pek. Keselamatan Kerja (K3) LS 1.00 879,500.00 879,500.00

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,379,500.00

II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 5.38 102,125.00 549,432.50
2 Pek. Pemasangan Kayu Cerucuk 5 s/d 6 inch M' 216.00 35,455.00 7,658,280.00
3 Urugan tanah kembali M3 5.38 74,250.00 399,465.00

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 8,607,177.50

III PEKERJAAN BETON


1 Pek. Pondasi
a. Beton mutu f'c = 21,7 Mpa (K 250) M3 1.54 1,507,470.07 2,315,474.03
b. Besi Beton Kg 131.53 19,063.00 2,507,309.92
2 Pek. Balok Sloff Uk. 20/35 cm
a. Beton mutu f'c = 21,7 Mpa (K 250) M3 1.96 1,507,470.07 2,959,917.48
b. Besi Beton Kg 297.42 19,063.00 5,669,692.43
c. Bekisting Sloff M2 9.82 216,735.00 2,127,795.86
3 Pek. Kolom Uk. 35/35 cm
a. Beton mutu f'c = 21,7 Mpa (K 250) M3 3.68 1,507,470.07 5,539,952.51
b. Besi Beton Kg 382.08 19,063.00 7,283,682.58
c. Bekisting Kolom M2 21.00 376,370.00 7,903,770.00
4 Pek. Balok Atas Uk. 30/50 cm
a. Beton mutu f'c = 21,7 Mpa (K 250) M3 4.21 1,507,470.07 6,342,680.32
b. Besi Beton Kg 385.55 19,063.00 7,349,773.51
c. Bekisting Balok M2 18.23 387,355.00 7,062,450.04
5 Pek. Lantai tebal 15 cm
a. Beton mutu f'c = 21,7 Mpa (K 250) M3 5.76 1,507,470.07 8,683,027.60
b. Besi Beton Kg 250.41 19,063.00 4,773,533.29
c. Bekisting Lantai M2 24.00 386,990.00 9,287,760.00

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 79,806,819.57

II PEKERJAAN PLAPOND
1 Pek. Pas. Rangka Langit Langit (Metal Furring) M2 48.00 132,340.62 6,352,349.76
2 Pek. Pas. PVC M2 48.00 252,729.46 12,131,014.08
3 Pek. Pas. List PVC M' 28.00 110,244.46 3,086,844.88

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 21,570,208.72

IV PEKERJAAN LANTAI
1 Granit 60x60 Lt. 2 M2 48.00 228,300.00 10,958,400.00

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 10,958,400.00

IV PEKERJAAN INSTALASI LISTRIK


1 Pek. Instalasi Listrik ttk 8.00 150,000.00 1,200,000.00
2 Pek. Pas Lampu Led Downlight 13 Watt Bh 8.00 225,411.50 1,803,292.00

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,003,292.00
V PEKERJAAN FINISHING
1 Pek. Pembersihan Akhir Ls 1.00 1,500,000.00 1,500,000.00

Jumlah Harga Pekerjaan (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,500,000.00
Harga Satuan Pekerjaan Fasilitas Pendukung Kesehatan dan Keselamatan Kerja (K3)

Harga Satuan Jumlah


No Uraian Satuan Koefisien
(Rp) (Rp)

1 2 4 5 6 7
A Alat Pelindung Diri
1 Topi pelindung ( safety Helmet ) + Stiker Logo Bh 3.00 64,500.00 193,500.00
Tanda Pengenal
2 Sepatu Keselematan (Safety Shoes) Psg - 375,000.00 -
3 Pelindung ernapasan dan Mulut ( Masker ) Bh 3.00 9,000.00 27,000.00
4 Pelindung Mata (safety Glasess) Bh 3.00 35,000.00 105,000.00
5 Sarung Tangan ( Safety Gloves) Psg 3.00 13,000.00 39,000.00
6 Rompi Keselamatan Bh 3.00 45,000.00 135,000.00

B P3K & Kesiagaan Tanggap Darurat


1 Kotak P3K Lengkap Set 1.00 380,000.00 380,000.00

C Traffic, Tanda dan Rambu


1 Tongkat Pengatur Lalu Lintas (Warning Light Stick) Bh - - -
2 Rambu Peringatan Bh - - -

D P3K & Kesiagaan Tanggap Darurat


1 Alat Pemadam Api Ringan ( APAR) Set - - -

E Jumlah Harga 879,500.00


DAFTAR UPAH, HARGA BAHAN & PERALATAN

NO. NAMA BAHAN SATUAN PERWAKO DPP HARGA

1 2 3 4 ###

A UPAH TENAGA KERJA


1 Pekerja OH 130,000.00
2 Tukang OH 154,000.00
3 Tukang gali OH 154,000.00
4 Tukang Batu/tembok OH 154,000.00
5 Tukang Kayu OH 154,000.00
6 Tukang besi/besi beton OH 154,000.00
7 Tukang cat/pelitur OH 154,000.00
8 Tukang pipa/operator pompa OH 154,000.00
9 Tukang penganyam bronjong OH 154,000.00
10 Tukang tebas OH 154,000.00
11 Tukang Las OH 154,000.00
12 Kepala Tukang OH 180,000.00
13 Mandor OH 185,000.00
14 Juru ukur OH -
15 Pembantu juru ukur OH -
16 Mekanik alat berat OH -
17 Operator alat berat OH -
18 Pembantu operator OH -
19 Supir truk OH -
20 Kenek truk OH -
21 Juru gambar OH -
22 Oprator printer/plotter OH -

B HARGA BAHAN
I BAHAN PASANGAN
1 Air Ltr 400.00 360.36 300.00
2 Aspal Curah Kg
3 Aspal Drum DRUM
4 Bataco Bh
5 Batu Alam Alur minium
6 Batu Alam Polos M2
7 Batu Bata Biasa Bh
8 Batu Bata Press Bh
9 Batu Kerawang Bh
10 Batu Sikat M2
11 Con Block 20 x 20 Bh
12 Con Block 30 x 30 Bh
13 Gorong-gorong Dia. 20 Cm Bh
14 Gorong-gorong Dia. 40 Cm Bh
0 15 Gorong-gorong Dia. 60 Cm Bh
16 Gorong-gorong Dia. 80 Cm Bh
17 Gorong-gorong Dia. 100 Cm Bh
18 Ijuk Kg
19 Kaca Block Uk. 20 x 20 Bh
20 Kerikil m3 378,400.00 340,900.90 340,000.00
batu pecah/ Splite
21 Pasir Beton m3 545,000.00 490,990.99 490,000.00
22 Pasir Pasang m3
23 Pasir Urug m3
24 Paving Block 6 cm Bh
25 Paving Block 8 cm (Segi 6 ) Bh
26 Semen Merah M3
27 Semen Portland 50 Kg Zak 94,000.00 84,684.68 84,000.00
28 Semen Portland Kg - 1,680.00
29 Semen Warna Zak -
30 Semen Warna Kg -
Semen 50Kg sak -
31 Tanah Urug M3 -
32 Tanah Urug Pilihan M3 -
34 Waterstop 150 mm M1 -
35 Waterstop 200 mm M1 -

16
36 Waterstop 230-320 mm M1 -
37 Plastik Alas M2 -
38 Batu Bata bh -
-
II BAHAN ROOSTER GRC -
1 GRC Ukir -
2 GRC Ukir Uk. 15 x 15 Bh -
3 GRC Ukir Uk. 20 x 20 Bh -
4 GRC Ukir Uk. 30 x 30 Bh -
5 GRC Ukir Uk. 50 x 50 Bh -
-
6 GRC Motif Melayu -
7 Lebah Begayut Bh -
8 Pucuk Rebung Uk. 10 x 15 cm Bh -
9 Pucuk Rebung Tinggi 40 cm Bh -
10 Pucuk Rebung Tinggi 50 cm Bh -
11 Itik Sekawan Uk. 60 x 30 cm Bh -
12 Kaluak Pakis Uk. 60 x 20 cm Bh -
13 Wajek Uk. 60 x 20 cm Bh -
-
III CONCRETE PILE -
1 Spun Pile D30 cm M1 -
2 Spun Pile D35 cm M1 -
3 Spun Pile D40 cm M1 -
4 Square Pile 20 x 20 cm M1 -
5 Square Pile 25 x 25 cm M1 -
6 Square Pile 30 x 30 cm M1 -
7 Square Pile 35 x 35 cm M1 -
8 Square Pile 40 x 40 cm M1 -
9 Penyambungan Tiang Pancang Ttk -
-
IV BAHAN MINYAK, PELUMAS & PENGENCER -
1 Bensin Ltr -
2 Minyak Bekisting Ltr 17,300.00 15,585.59 15,500.00
3 Minyak Cat / Tinner Ltr - -
4 Bio Solar Ltr - -
5 Spritus Ltr - -
6 Thinner Setara Merk Laba - Laba Kg - -
7 Oli Ltr - -
8 Minyak Tanah Ltr - -
- -
V BETON READY MIX - -
Untuk Jarak Tempuh < 20 Km - -
1 Ready Mix K-100 - -
2 Ready Mix K-125 M3 - -
Ready Mix K-150 - -
3 Ready Mix K-175 M3 - -
Ready Mix K-200 - -
4 Ready Mix K-225 M3 - -
5 Ready Mix K-250 M3 - -
Ready Mix K-275 - -
6 Ready Mix K-300 M3 - -
7 Ready Mix K-350 M3 - -
8 Ready Mix K-400 M3 - -
- -
Untuk Jarak Tempuh > 20 Km - -
1 Ready Mix K-125 M3 - -
2 Ready Mix K-175 M3 - -
3 Ready Mix K-225 M3 - -
4 Ready Mix K-250 M3 - -
5 Ready Mix K-300 M3 - -
6 Ready Mix K-350 M3 - -
7 Ready Mix K-400 M3 - -
- -
VI BAHAN KAYU - -
1 Kayu Cerucuk Dia. 3 s/d 4 Inci (MAHANG) Btg - -
Dolken kayu ɸ 8 - 10 cm Panjang 4 m Btg 10,800.00 9,729.73 9,700.00
2 Kayu Cerocok Dia. 5 s/d 6 inci-15 Cm Btg 35,000.00 31,531.53 31,000.00
5 Kayu Kelas I (MERANTI) M3 - -
6 Kayu Kelas II M3 3,724,100.00 3,355,045.05 3,355,000.00
7 Kayu Kelas III M3 2,234,500.00 2,013,063.06 2,013,000.00

17
8 Kayu Kelas IV M3 - -
8 Kayu Profil Btg - -
9 Teakwood Tebal 3 mm Lbr - -
10 Teakwood Tebal 4 mm Lbr - -
11 Teakwood Tebal 6 mm Lbr - -
12 Teakwood Tebal 8 mm Lbr - -
Kayu Bakar - -
Papan Lebar 20 cm /m3 - -
Broty - -
Tanah Timbun m3 - -
VII BAHAN BESI & ALUMINIUM - -
1 Aluminium Strip Lebar 8 Cm M1 - -
2 Baja Profil Kg - -
3 Baja Siku Kg - -
4 Baut + Mur Bh - -
5 Besi Beton Polos Kg 13,900.00 12,522.52 12,500.00
###
6 Besi Beton Ulir Kg - ###
-
7 Pagar BRC Lbr - -
7 Besi Strip Kg - -
8 Dynabolt Bh - -
9 Formite/penjaga jarak bekisting/spacer Bh - -
10 Hollow 40.40.2 M1 - -
11 Kanal C75.0,75 (TASO) Btg - -
Kanal C65.0,65 (TRUST) - -
12 Kawat Berduri Rol - -
13 Kawat Beton Kg 27,800.00 25,045.05 25,000.00
14 Kawat Harmonika /M - -
15 Kawat Las Kg - -
16 Kawat Nyamuk (BAJA) M1 - -
17 Metal Fuuring M1 - -
18 Paku Asbes Kg - -
19 Paku Beton Kg - -
20 Paku Biasa 0,5"-1" Kg - -
21 Paku 5 - 10 cm Kg 27,700.00 24,954.95 24,900.00
Paku 5 - 12 cm Kg 30,200.00 27,207.21 27,200.00
22 Paku Seng Kg - -
23 Paku Tripleks Kg - -
24 Plat Besi Kg - -
25 Profil Aluminium 4" M1 - -
26 Reng R32 MEREK GNET M - -
27 Reng R 45 M - -
28 Screw Truss Bh - -
29 Screw Roof Bh - -
30 Skrup Fixer Bh - -
31 Teralis Besi M2 - -
32 Vertical Blind M2 - -
33 Wiremesh M-5 Lbr - -
34 Wiremesh M-5A (5.2mm) Lbr - -
35 Wiremesh M-5B (5.3mm) Lbr - -
36 Wiremesh M-6 Lbr - -
37 Wiremesh M-6A Lbr - -
38 Wiremesh M-6B Lbr - -
39 Wiremesh M-7 Lbr - -
40 Wiremesh M-7.5 Lbr - -
41 Wiremesh M-7.7 Lbr - -
42 Wiremesh M-8B Lbr - -
43 Wiremesh M-8A Lbr - -
44 Wiremesh M-8A Lbr - -
45 Wiremesh M-9 Lbr - -
46 Wiremesh M-10 Lbr - -
47 Besi angker ukuran 8 mm panjang 12 m - -
48 Besi angker ukuran 6 mm panjang 12 m - -
49 Besi angker ukuran 10 mm panjang 12 m - -
50 Tabung Las Oksigen - -
VIII BAHAN ATAP - -
1 Aluminium Foil Double M2 - -
2 Aluminium Foil Single M2 - -
3 Atap Poly Carbonate M2 - -
4 Bubungan Genteng Kodok / Glazzur Bh - -
5 Bubungan Genteng Plentong "S" Bh - -
6 Genteng Metal Tebal 0.25 mm Lbr - -

18
7 Genteng Metal Tebal 0.3 mm Lbr - -
9 Genteng Metal Tebal 0.4 mm Lbr - -
10 Nok Genteng Metal Lbr - -
11 Nok Seng Lbr - -
12 Plastik Gelombang Tebal Lbr - -
13 Plastik Gelombang Tipis Lbr - -
14 Seng Aluminium Polos 0.25 mm Lbr - -
15 Seng Aluminium Polos 0.30 mm Lbr - -
16 Seng Aluminium Polos 0.40 mm Lbr - -
17 Seng Gelombang BJLS 18 Lbr - -
18 Seng Gelombang BJLS 20 Lbr - -
19 Seng Gelombang BJLS 30 Lbr - -
20 Seng Plat BJLS 18 Lbr - -
21 Seng Plat BJLS 20 Lbr - -
22 Seng Plat BJLS 30 Lbr - -
23 Spandek 0,25 mm M2 - -
24 Spandek 0,30 mm M2 - -
27 Sunscreen Aluminium M2 - -
28 Jinek Roof 0,125 - -
IX BAHAN PENGGANTUNG DAN PENGUNCI - -
1 Kunci 2 Slaag Kwalitas Bagus (Setara Morechi) Bh - -
2 Kunci 2 Slaag Kwalitas Menengah (Setara Sobar) Bh - -
3 Kunci 2 Slaag Kwalitas Biasa (Setara Villa) Bh - -
4 Kunci Toilet Kwalitas Bagus (Setara Cavel) Bh - -
5 Kunci Toilet Kwalitas Menengah (Setara Maxel) Bh - -
6 Kunci Toilet Kwalitas Biasa Bh - -
7 Engsel Pintu Kwalitas Bagus 4" (Setara Arcel s/s) Bh - -
8 Engsel Pintu Kwalitas Menengah 4" (Setara Soerento) Bh - -
9 Engsel Pintu Kwalitas Biasa 4" (Setara Rush) Bh - -
10 Engsel Jendela Kwalitas Bagus 3" (Setara Arcel s/s) Bh - -
11 Engsel Jendela Kwalitas Menengah 3" (Setara Soerento) Bh - -
12 Engsel Jendela Kwalitas Biasa 3" (Setara Fit) Bh - -
13 Grendel Pintu Kwalitas Bagus 4" (Setara Giordini) Bh - -
14 Grendel Pintu Kwalitas Menengah 4" (Setara Soligen s/s) Bh - -
15 Grendel Pintu Kwalitas Biasa 4" Bh - -
16 Grendel Jendela Kwalitas Bagus 2" (Setara Giordini) Bh - -
17 Grendel Jendela Kwalitas Menengah 2" (Setara Soligen s/s) Bh - -
18 Grendel Jendela Kwalitas Biasa 2" Bh - -
19 Grendel Gembok (Setara CHL) Bh - -
20 Hendel Pintu Kwalitas Bagus 8" (Setara Gerber) Bh - -
21 Hendel Pintu Kwalitas Menengah 8" (Setara Muller) Bh - -
22 Hendel Pintu Kwalitas Biasa 8" (Setara Cab) Bh - -
23 Hendel Jendela Kwalitas Bagus (Setara Arcel) Bh - -
24 Hendel Jendela Kwalitas Menengah (Setara Marcena) Bh - -
25 Hendel Jendela Kwalitas Biasa Bh - -
26 Hak Angin Kwalitas Bagus (Setara Cavel) Bh - -
27 Hak Angin Kwalitas Menengah (Setara Hampton) Bh - -
28 Hak Angin Kwalitas Biasa Bh - -
29 Gembok Bh - -
- -
X BAHAN SANITAIR - -
1 Kloset Jongkok Kwalitas Bagus (Setara Toto/ AMSTARD) Bh - -
2 Kloset Jongkok Kwalitas Menengah (Setara Duty/ OTO) Bh - -
3 Kloset Jongkok Kwalitas Biasa Bh - -
4 Kloset Duduk Kwalitas Bagus + Tabung (2 Tombol Air Setara Toto) Set - -
5 Kloset Duduk Kwalitas Menengah + Tabung (1 Tombol Air Setara Toto) Set - -
6 Kloset Duduk Kwalitas Biasa + Tabung (2 Tombol Air) Set - -
7 Bak Air Fiberglass Kwalitas Bagus Bh - -
8 Bak Air Fiberglass Kwalitas Menengah Bh - -
9 Bak Air Fiberglass Kwalitas Biasa Bh - -
10 Bathtub Kwalitas Bagus (Setara Toto) Set - -
11 Bathtub Kwalitas Menengah Set - -
12 Bathtub Kwalitas Biasa Set - -
12 Bathtub Kwalitas Biasa Set - -
13 Shower Kwalitas Bagus (Setara Toto) Set - -
14 Shower Kwalitas Menengah Set - -
15 Shower Kwalitas Biasa Set - -
16 Westafel Kwalitas Bagus (Setara Toto) Bh - -
17 Westafel Kwalitas Menengah (Setara AS) Bh - -
18 Westafel Kwalitas Biasa Bh - -
19 Pintu Fiber Set - -

19
20 Urinoir Lengkap Kwalitas Bagus (Moslem Type Setara Toto) Set - -
21 Urinoir Lengkap Kwalitas Menengah Set - -
22 Urinoir Lengkap Kwalitas Biasa Set - -
21 Tangki Air Kapasitas 500 Liter (Setara Tedmond) Bh - -
22 Tangki Air Kapasitas 900 Liter (Setara Tedmond) Bh - -
23 Tangki Air Kapasitas 1.000 liter (Setara Tedmond Bh - -
24 Kran Air Kwalitas Bagus Bh - -
25 Kran Air Kwalitas Menengah Bh - -
### 26 Kran Air Kwalitas Biasa Bh - -
27 Floor Drain Kwalitas Bagus Bh - -
28 Floor Drain Kwalitas Menengah Bh - -
29 Floor Drain Kwalitas Biasa Bh - -
30 Pompa Air Biasa Bh - -
31 Gantungan handuk 5 Kait Bh - -
32 Tempat sabun keramik Bh - -
33 Tempat sabun Stainless Bh - -
34 Bak cuci piring 2 lubang bagus Bh - -
35 Bak cuci piring 2 lubang menengah Bh - -
36 Bak cuci piring 2 lubang biasa Bh - -
Sealtape - -
XI BAHAN LANTAI - -
1 Granit Uk 60 x 60 cm (Setara Granito) M2 - -
2 Granit Uk 60 x 60 cm (Setara Garuda) M2 - -
3 Keramik Kualitas Bagus - -
4 Keramik Uk. 20 x 20 Cm (Setara Platinum) M2 - -
5 Keramik Uk. 20 x 25 Cm (Setara Asia Tile) M2 - -
6 Keramik Uk. 25 x 25 Cm (Setara Aristocrat) M2 - -
7 Keramik Uk. 30 x 30 Cm (Setara Platinum) M2 - -
8 Keramik Uk. 25 x 40 Cm (Setara Platinum) M2 - -
9 Keramik Uk. 40 x 40 Cm (Setara Ikad) M2 - -
10 Keramik Kualitas Menengah - -
11 Keramik Uk. 20 x 20 Cm (Setara Ikad) M2 - -
12 Keramik Uk. 20 x 25 Cm (Setara Ikad) M2 - -
13 Keramik Uk. 25 x 25 Cm (Setara Mulia) M2 - -
14 Keramik Uk. 30 x 30 Cm (Setara Ikad) M2 - -
15 Keramik Uk. 25 x 40 Cm (Setara Ikad) M2 - -
16 Keramik Uk. 40 x 40 Cm (Setara Mulia) M2 - -
17 Keramik Kualitas Biasa - -
18 Keramik Uk. 20 x 20 Cm (Setara Garuda) M2 - -
19 Keramik Uk. 20 x 25 Cm (Setara Garuda) M2 - -
20 Keramik Uk. 25 x 25 Cm (Setara Garuda) M2 - -
21 Keramik Uk. 30 x 30 Cm (Setara Garuda) M2 - -
22 Keramik Uk. 25 x 40 Cm (Setara Garuda) M2 - -
23 Keramik Uk. 40 x 40 Cm (Setara Garuda) M2 - -
24 Keramik Uk. 60 x 60 Cm (Setara Garuda) M2 - -
25 Plint Keramik M1 - -
26 Bon-bon Keramik M1 - -
27 Lem Vinyl Kg - -
28 Vinyl M2 - -
- -
XII BAHAN PLAFOND - -
1 Akustik M2 - -
2 Akustik 30x30 cm Lbr - -
3 Akustik 30x60 cm Lbr - -
4 Akustik 60x120 cm Lbr - -
5 Asbes M2 - -
6 Calsiboard Lbr - -
7 Eternit M2 - -
8 Gypsumboard 9 mm (INDO BOARD) Lbr - -
9 Kawat Dia. 4 mm Kg - -
10 List Calsiboard M1 - -
11 List Eternit M1 - -
12 List Gypsumboard M1 - -
13 Maplex Lbr - -
14 Paku Pancing Kg - -
15 Paku Skrup GYPSUM Kg - -
16 Paku Skrup GYPSUM Bh - -
17 Profil Aluminimum T M1 - -
18 Plafond PVC (MEREK Sunda Plafond) Lbr - -
Plafond PVC (MEREK Sunda HOMEFONE) - -
19 Profil PVC Btg - -

20
20 Ramset Bh - -
21 Tepung Gypsum Kg - -
22 Tripleks Tebal 3 mm Lbr - -
23 Tripleks Tebal 3.6 mm Lbr - -
24 Tripleks Tebal 4 mm Lbr - -
25 Tripleks Tebal 6 mm Lbr - -
26 Tripleks Tebal 8 mm Lbr - -
27 Tripleks Tebal 9 mm Lbr 204,600.00 184,324.32 184,000.00
28 Tripleks Tebal 12 mm Lbr - -
29 GRC 4,8 MM - -
30 GRC 3,5 MM - -
31 GRC 6 MM - -
- -
XIII BAHAN KACA 1 kaki=10.76 m2 - -
1 Kaca Bening 3 mm UK. 120X150 M2 - -
2 Kaca Bening 5 mm UK.120X150 M2 - -
3 Kaca Bening 8 mm UK. 120X150 M2 - -
4 Kaca Bening 10 mm UK. 110X195 M2 - -
5 Kaca Bening 12 mm UK. 600X300 M2 - -
6 Kaca Rayben 3 mm UK. 120150 M2 - -
7 Kaca Rayben 5 mm UK. 120X200 M2 - -
8 Kaca Rayben 10 mm M2 - -
9 Kaca Nako + Bingkai 5 TINGKAT M2 - -
10 Kaca Nako Bh - -
11 Kaca Block Bh - -
12 Kaca Cermin 5 mm UK.200X130 M2 - -
13 Profil Kaca M1 - -
14 Sealant Tube - -
- -
XIV BAHAN LISTRIK - -
1 Pemasangan Instalasi Titik - -
2 Stop Kontak (CLIPSAL) Bh - -
3 Stop Kontak (Setara PANASONIC) Bh - -
4 Stop Kontak (Setara VIBA) Bh - -
5 Saklar Tunggal Kualitas Bagus Setara CLIPSAL Bh - -
6 Saklar Tunggal Kualitas Menengah Setara PANASONIC Bh - -
7 Saklar Tunggal Kualitas Biasa VIBA Bh - -
8 Saklar Ganda Kualitas Bagus Setara CLIPSAL Bh - -
9 Saklar Ganda Kualitas Menengah Setara PANASONIC Bh - -
10 Saklar Ganda Kualitas Biasa Setara VIBA Bh - -
11 Saklar Triple Kualitas Bagus Bh - -
12 Saklar Triple Kualitas Menengah Bh - -
13 Saklar Triple Kualitas Biasa Bh - -
14 Lampu Pijar Bh - -
15 Kabel NYA 1 x 2,5 mm M1 - -
16 Pipa Paralon 5/8" Btg - -
17 Lampu TL 20 Watt Set - -
18 Lampu SL 18 Watt Bh - -

20 Lampu Pijar 25 Watt Bh


21 MCB 6 A Bh
22 Pannel Box Bh
23 Isolasi Bh

XV BAHAN PIPA
A BAHAN PIPA SNI PRALON
I Pipa PVC Pralon S-10 (12.5 kgf/cm2)
1 Pipa PVC Dia. 1/2" M1
2 Pipa PVC Dia. 3/4" M1
3 Pipa PVC Dia. 1" M1
4 Pipa PVC Dia. 1 1/4" M1
5 Pipa PVC Dia. 1 1/2" M1
6 Pipa PVC Dia. 2" M1
7 Pipa PVC Dia. 2 1/2" M1
8 Pipa PVC Dia. 3" M1
9 Pipa PVC Dia. 4" M1
10 Pipa PVC Dia. 5" M1
11 Pipa PVC Dia. 6" M1
12 Pipa PVC Dia. 8" M1
21
13 Pipa PVC Dia. 10" M1
14 Pipa PVC Dia. 12" M1
II Pipa PVC Pralon S-12,5 (10 kgf/cm2)
1 Pipa PVC Dia. 1/2" M1
2 Pipa PVC Dia. 3/4" M1
3 Pipa PVC Dia. 1" M1
4 Pipa PVC Dia. 1 1/4" M1
5 Pipa PVC Dia. 1 1/2" M1
6 Pipa PVC Dia. 2" M1
7 Pipa PVC Dia. 2 1/2" M1
8 Pipa PVC Dia. 3" M1
9 Pipa PVC Dia. 4" M1
10 Pipa PVC Dia. 5" M1
11 Pipa PVC Dia. 6" M1
12 Pipa PVC Dia. 8" M1
13 Pipa PVC Dia. 10" M1
14 Pipa PVC Dia. 12" M1

III TS. Valve Socket SNI


1 TS. Valve Socket SNI 1/2" Bh
2 TS. Valve Socket SNI 3/4" Bh
3 TS. Valve Socket SNI 1" Bh
4 TS. Valve Socket SNI 1 1/4" Bh
5 TS. Valve Socket SNI 1 1/2" Bh
6 TS. Valve Socket SNI 2" Bh
7 TS. Valve Socket SNI 2 1/2" Bh
8 TS. Valve Socket SNI 3" Bh
9 TS. Valve Socket SNI 4" Bh
IV TS. Faucet Socket SNI
1 TS. Faucet Socket SNI 1/2" Bh
2 TS. Faucet Socket SNI 3/4" Bh
3 TS. Faucet Socket SNI 1" Bh

4 TS. Faucet Socket SNI 1 1/4" Bh


5 TS. Faucet Socket SNI 1 1/2" Bh
6 TS. Faucet Socket SNI 2" Bh
V TS. Faucet Elbow SNI
1 TS. Faucet Elbow SNI 1/2" Bh
2 TS. Faucet Elbow SNI 3/4" Bh
VI TS. Faucet Tee SNI
1 TS. Faucet Tee SNI 1/2" Bh
2 TS. Faucet Tee SNI 3/4" x 1/2" Bh
VII Clamp Saddle SNI
1 Clamp Saddle SNI 63mm x 1/2" Bh
2 Clamp Saddle SNI 63mm x 3/4" Bh
3 Clamp Saddle SNI 63mm x 1" Bh
4 Clamp Saddle SNI 90mm x 1/2" Bh
5 Clamp Saddle SNI 90mm x 3/4" Bh
6 Clamp Saddle SNI 90mm x 1" Bh
7 Clamp Saddle SNI 110mm x 1/2" Bh
8 Clamp Saddle SNI 110mm x 3/4" Bh
9 Clamp Saddle SNI 110mm x 1" Bh
VIII Ts. Cap SNI
1 Ts. Cap SNI 1/2" Bh
2 Ts. Cap SNI 3/4" Bh
3 Ts. Cap SNI 1" Bh
4 Ts. Cap SNI 1 1/4" Bh
5 Ts. Cap SNI 1 1/2" Bh
6 Ts. Cap SNI 2" Bh

22
7 Ts. Cap SNI 2 1/2" Bh
8 Ts. Cap SNI 3" Bh
9 Ts. Cap SNI 4" Bh
10 Ts. Cap SNI 5" Bh
11 Ts. Cap SNI 6" Bh
12 Ts. Cap SNI 8" Bh
13 Ts. Cap SNI 10" Bh
14 Ts. Cap SNI 12" Bh
IX Bell Cap SNI
1 Bell Cap SNI 2" Bh
2 Bell Cap SNI 2 1/2" Bh
3 Bell Cap SNI 3" Bh
4 Bell Cap SNI 4" Bh
5 Bell Cap SNI 5" Bh
6 Bell Cap SNI 6" Bh
7 Bell Cap SNI 8" Bh
8 Bell Cap SNI 10" Bh
9 Bell Cap SNI 12" Bh
10 Bell Cap SNI 14" Bh
11 Bell Cap SNI 16" Bh
X Dresser Joint SNI
1 Dresser Joint SNI 2" Bh
2 Dresser Joint SNI 2 1/2" Bh
3 Dresser Joint SNI 3" Bh
4 Dresser Joint SNI 4" Bh
5 Dresser Joint SNI 5" Bh
6 Dresser Joint SNI 6" Bh
7 Dresser Joint SNI 8" Bh
8 Dresser Joint SNI 10" Bh
9 Dresser Joint SNI 12" Bh
10 Dresser Joint SNI 14" Bh
11 Dresser Joint SNI 16" Bh
XI Ts. Socket / Straight Socket SNI
1 Ts. Socket / Straight Socket SNI 1/2" Bh
2 Ts. Socket / Straight Socket SNI 3/4" Bh
3 Ts. Socket / Straight Socket SNI 1" Bh
4 Ts. Socket / Straight Socket SNI 1 1/4" Bh
5 Ts. Socket / Straight Socket SNI 1 1/2" Bh
6 Ts. Socket / Straight Socket SNI 2" Bh
7 Ts. Socket / Straight Socket SNI 2 1/2" Bh
8 Ts. Socket / Straight Socket SNI 3" Bh
9 Ts. Socket / Straight Socket SNI 4" Bh
10 Ts. Socket / Straight Socket SNI 5" Bh
11 Ts. Socket / Straight Socket SNI 6" Bh
12 Ts. Socket / Straight Socket SNI 8" Bh
13 Ts. Socket / Straight Socket SNI 10" Bh
14 Ts. Socket / Straight Socket SNI 12" Bh
XII Bell Socket / Bell Repair Socket SNI
1 Bell Socket / Bell Repair Socket SNI 2" Bh
2 Bell Socket / Bell Repair Socket SNI 2 1/2" Bh
3 Bell Socket / Bell Repair Socket SNI 3" Bh
4 Bell Socket / Bell Repair Socket SNI 4" Bh
5 Bell Socket / Bell Repair Socket SNI 5" Bh
6 Bell Socket / Bell Repair Socket SNI 6" Bh
7 Bell Socket / Bell Repair Socket SNI 8" Bh
8 Bell Socket / Bell Repair Socket SNI 10" Bh
9 Bell Socket / Bell Repair Socket SNI 12" Bh
10 Bell Socket / Bell Repair Socket SNI 14" Bh
11 Bell Socket / Bell Repair Socket SNI 16" Bh
12 Bell Socket / Bell Repair Socket SNI 20" Bh

23
13 Bell Socket / Bell Repair Socket SNI 24" Bh
XIII Bell Spigot SNI
1 Bell Spigot SNI 2" Bh
2 Bell Spigot SNI 2 1/2" Bh
3 Bell Spigot SNI 3" Bh
4 Bell Spigot SNI 4" Bh
5 Bell Spigot SNI 5" Bh
6 Bell Spigot SNI 6" Bh
7 Bell Spigot SNI 8" Bh
8 Bell Spigot SNI 10" Bh
9 Bell Spigot SNI 12" Bh
10 Bell Spigot SNI 14" Bh
11 Bell Spigot SNI 16" Bh
12 Bell Spigot SNI 20" Bh
13 Bell Spigot SNI 24" Bh
XIV Ts. Reducer Socket SNI
1 Ts. Reducer Socket SNI 3/4" x 1/2" Bh
2 Ts. Reducer Socket SNI 1" x 1/2" Bh
3 Ts. Reducer Socket SNI 1" x 1/4" Bh
4 Ts. Reducer Socket SNI 1 1/4" x 1/2" Bh
5 Ts. Reducer Socket SNI 1 1/4" x 1" Bh
6 Ts. Reducer Socket SNI 1 1/2" x 3/4" Bh
7 Ts. Reducer Socket SNI 1 1/2" x 1 1/4" Bh
8 Ts. Reducer Socket SNI 2" x 1" Bh
9 Ts. Reducer Socket SNI 2" x 1 1/2" Bh
10 Ts. Reducer Socket SNI 2 1/2" x 1 1/4" Bh
11 Ts. Reducer Socket SNI 2 1/2" x 2" Bh
12 Ts. Reducer Socket SNI 3" x 1 1/2" Bh
13 Ts. Reducer Socket SNI 3" x 2 1/2" Bh
14 Ts. Reducer Socket SNI 4" x 2" Bh
15 Ts. Reducer Socket SNI 4" x 3" Bh
16 Ts. Reducer Socket SNI 5" x 2 1/2" Bh
17 Ts. Reducer Socket SNI 5" x 4" Bh
18 Ts. Reducer Socket SNI 6" x 3" Bh
19 Ts. Reducer Socket SNI 6" x 5" Bh
20 Ts. Reducer Socket SNI 8" x 4" Bh
21 Ts. Reducer Socket SNI 8" x 6" Bh
22 Ts. Reducer Socket SNI 10" x 5" Bh
23 Ts. Reducer Socket SNI 10" x 8" Bh
24 Ts. Reducer Socket SNI 12" x 6" Bh
25 Ts. Reducer Socket SNI 12" x 10" Bh
XV Bell Reducer SNI
1 Bell Reducer SNI 2" x 1 1/4" Bh
2 Bell Reducer SNI 2" x 1 1/2" Bh
3 Bell Reducer SNI 2 1/2" x 1 1/4" Bh
4 Bell Reducer SNI 2 1/2" x 2" Bh
5 Bell Reducer SNI 3" x 1 1/2" Bh
6 Bell Reducer SNI 3" x 2 1/2" Bh
7 Bell Reducer SNI 4" x 2" Bh
8 Bell Reducer SNI 4" x 3" Bh
9 Bell Reducer SNI 5" x 2 1/2" Bh
10 Bell Reducer SNI 5" x 4" Bh
11 Bell Reducer SNI 6" x 3" Bh
12 Bell Reducer SNI 6" x 5" Bh
13 Bell Reducer SNI 8" x 4" Bh
14 Bell Reducer SNI 8" x 6" Bh
15 Bell Reducer SNI 10" x 5" Bh
16 Bell Reducer SNI 10" x 8" Bh
17 Bell Reducer SNI 12" x 6" Bh
18 Bell Reducer SNI 12" x 10" Bh

24
19 Bell Reducer SNI 14" x 8" Bh
20 Bell Reducer SNI 14" x 12" Bh
21 Bell Reducer SNI 16" x 10" Bh
22 Bell Reducer SNI 16" x 14" Bh
23 Bell Reducer SNI 20" x 12" Bh
24 Bell Reducer SNI 20" x 16" Bh
XVI VA Socket / VC Socket SNI
1 VA Socket / VC Socket SNI 2" Bh
2 VA Socket / VC Socket SNI 2 1/2" Bh
3 VA Socket / VC Socket SNI 3" Bh
4 VA Socket / VC Socket SNI 4" Bh
5 VA Socket / VC Socket SNI 5" Bh
6 VA Socket / VC Socket SNI 6" Bh
7 VA Socket / VC Socket SNI 8" Bh
8 VA Socket / VC Socket SNI 10" Bh
XVII Bell VA Socket / Bell VC Socket SNI
1 Bell VA Socket / Bell VC Socket SNI 2" Bh
2 Bell VA Socket / Bell VC Socket SNI 2 1/2" Bh
3 Bell VA Socket / Bell VC Socket SNI 3" Bh
4 Bell VA Socket / Bell VC Socket SNI 4" Bh
5 Bell VA Socket / Bell VC Socket SNI 5" Bh
6 Bell VA Socket / Bell VC Socket SNI 6" Bh
7 Bell VA Socket / Bell VC Socket SNI 8" Bh
8 Bell VA Socket / Bell VC Socket SNI 10" Bh
XVIII Bell S Bend SNI
1 Bell S Bend SNI 3" Bh
2 Bell S Bend SNI 4" Bh
3 Bell S Bend SNI 6" Bh
XIX Lubricant
1 Lubricant 1 kg/kaleng
XX ALL BELL REDUCER SNI
1 All Bell Reducer 2 1/2" x 2" Bh
2 All Bell Reducer 3" x 2" Bh
3 All Bell Reducer 3" x 2 1/2" Bh
4 All Bell Reducer 4" x 2" Bh
5 All Bell Reducer 4" x 3" Bh
6 All Bell Reducer 5" x 3" Bh
7 All Bell Reducer 5" x 4" Bh
8 All Bell Reducer 6" x 3" Bh
9 All Bell Reducer 6" x 4" Bh
10 All Bell Reducer 8" x 4" Bh
11 All Bell Reducer 8" x 6" Bh
12 All Bell Reducer 10" x 6" Bh
13 All Bell Reducer 10" x 8" Bh
14 All Bell Reducer 12" x 8" Bh
15 All Bell Reducer 12" x 10" Bh
16 All Bell Reducer 14" x 10" Bh
17 All Bell Reducer 14" x 12" Bh
18 All Bell Reducer 16" x 12" Bh
19 All Bell Reducer 16" x 14" Bh
20 All Bell Reducer 20" x 14" Bh
21 All Bell Reducer 20" x 16" Bh
XXI FLANGE SPIGOT/FLANGE SOCKET SNI
1 Flange spigot/flange socket 1 1/2" Bh
2 Flange spigot/flange socket 2" Bh
3 Flange spigot/flange socket 2 1/2" Bh
4 Flange spigot/flange socket 3" Bh
5 Flange spigot/flange socket 4" Bh
6 Flange spigot/flange socket 5" Bh
7 Flange spigot/flange socket 6" Bh

25
8 Flange spigot/flange socket 8" Bh
9 Flange spigot/flange socket 10" Bh
10 Flange spigot/flange socket 12" Bh
11 Flange spigot/flange socket 14" Bh
12 Flange spigot/flange socket 16" Bh
13 Flange spigot/flange socket 20" Bh
XXII FLANGE BELL END SNI
1 Flange Bell End 2" Bh
2 Flange Bell End 2 1/2" Bh
3 Flange Bell End 3" Bh
4 Flange Bell End 4" Bh
5 Flange Bell End 5" Bh
6 Flange Bell End 6" Bh
7 Flange Bell End 8" Bh
8 Flange Bell End 10" Bh
9 Flange Bell End 12" Bh
10 Flange Bell End 14" Bh
11 Flange Bell End 16" Bh
12 Flange Bell End 20" Bh
XXIII TS.TEE SNI
1 Ts. Tee 1/2" Bh
2 Ts. Tee 3/4" Bh
3 Ts. Tee 1" Bh
4 Ts. Tee 1 1/4" Bh
5 Ts. Tee 1 1/2" Bh
6 Ts. Tee 2" Bh
7 Ts. Tee 2 1/2" Bh
8 Ts. Tee 3" Bh
9 Ts. Tee 4" Bh
10 Ts. Tee 5" Bh
11 Ts. Tee 6" Bh
12 Ts. Tee 8" Bh
12 Ts. Tee 10" Bh
13 Ts. Tee 3/4" x 1/2" Bh
7 Ts. Tee 1" x 1/2" Bh
8 Ts. Tee 1" x 3/4" Bh
9 Ts. Tee 1 1/4" x 1/2" Bh
10 Ts. Tee 1 1/4" x 3/4" Bh
11 Ts. Tee 1 1/4" x 1" Bh
12 Ts. Tee 1 1/4" x 3/4" Bh
12 Ts. Tee 1 1/4" x 1" Bh
9 Ts. Tee 1 1/4" x 1 1/4" Bh
10 Ts. Tee 2" x 3/4" Bh
11 Ts. Tee 2" x 1" Bh
12 Ts. Tee 3" x 2" Bh
12 Ts. Tee 4" x 2" Bh
12 Ts. Tee 4" x 3" Bh
12 Ts. Tee 5" x 3" Bh
12 Ts. Tee 6" x 3" Bh
12 Ts. Tee 6" x 4" Bh
12 Ts. Tee 8" x 4" Bh
12 Ts. Tee 8" x 6" Bh
12 Ts. Tee 10" x 8" Bh
XXIV BELL TS.TEE BRANCH SNI
1 Bell Ts. Tee Branch 2" x 1/2" Bh
2 Bell Ts. Tee Branch 2" x 3/4" Bh
3 Bell Ts. Tee Branch 2" x 1" Bh
4 Bell Ts. Tee Branch 2" x 1 1/4" Bh
5 Bell Ts. Tee Branch 2" x 1 1/2" Bh
6 Bell Ts. Tee Branch 2 1/2" x 1 1/2" Bh

26
7 Bell Ts. Tee Branch 2 1/2" x 2" Bh
8 Bell Ts. Tee Branch 3" x 1 1/2" Bh
9 Bell Ts. Tee Branch 3" x 2" Bh
10 Bell Ts. Tee Branch 4" x 2" Bh
11 Bell Ts. Tee Branch 4" x 3" Bh
12 Bell Ts. Tee Branch 5" x 3" Bh
12 Bell Ts. Tee Branch 5" x 4" Bh
13 Bell Ts. Tee Branch 6" x 4" Bh
XXV BEND SNI 90
1 Bend 1/2" Bh
2 Bend 3/4" Bh
3 Bend 1" Bh
4 Bend 1 1/4" Bh
5 Bend 1 1/2" Bh
6 Bend 2" Bh
7 Bend 2 1/2" Bh
8 Bend 3" Bh
9 Bend 4 Bh
10 Bend 5" Bh
11 Bend 6" Bh
12 Bend 8" Bh
12 Bend 10" Bh
13 Bend 12" Bh
XXVI BEND SNI 45
1 Bend 1/2" Bh
2 Bend 3/4" Bh
3 Bend 1" Bh
4 Bend 1 1/4" Bh
5 Bend 1 1/2" Bh
6 Bend 2" Bh
7 Bend 2 1/2" Bh
8 Bend 3" Bh
9 Bend 4 Bh
10 Bend 5" Bh
11 Bend 6" Bh
12 Bend 8" Bh
12 Bend 10" Bh
13 Bend 12" Bh
XXVII BEND SNI 22 1/2
1 Bend 1/2" Bh
2 Bend 3/4" Bh
3 Bend 1" Bh
4 Bend 1 1/4" Bh
5 Bend 1 1/2" Bh
6 Bend 2" Bh
7 Bend 2 1/2" Bh
8 Bend 3" Bh
9 Bend 4 Bh
10 Bend 5" Bh
11 Bend 6" Bh
12 Bend 8" Bh
12 Bend 10" Bh
13 Bend 12" Bh
XXVIII BEND SNI 11 1/4
1 Bend 1/2" Bh
2 Bend 3/4" Bh
3 Bend 1" Bh
4 Bend 1 1/4" Bh
5 Bend 1 1/2" Bh
6 Bend 2" Bh

27
7 Bend 2 1/2" Bh
8 Bend 3" Bh
9 Bend 4 Bh
10 Bend 5" Bh
11 Bend 6" Bh
12 Bend 8" Bh
12 Bend 10" Bh
13 Bend 12" Bh
XXIX BELL BEND SNI 90
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXX BELL BEND SNI 45
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXXI BELL BEND SNI 22 1/2
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXXII BELL BEND SNI 11 1/4"
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh

28
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXXIII ALL BELL BEND SNI 90
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXXIV ALL BELL BEND SNI 45
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXXV ALL BELL BEND SNI 22 1/2
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh
XXXVI ALL BELL BEND SNI 11 1/4
1 Bend 2" Bh
2 Bend 2 1/2" Bh
3 Bend 3" Bh
4 Bend 4" Bh
5 Bend 5" Bh
6 Bend 6" Bh
7 Bend 8" Bh
8 Bend 10" Bh
9 Bend 12" Bh
10 Bend 14" Bh
11 Bend 16" Bh
12 Bend 20" Bh
12 Bend 24" Bh

29
A Pipa PVC WAVIN (Pipa Tebal)
1 Pipa PVC Dia. 1/2" M1
2 Pipa PVC Dia. 3/4" M1
3 Pipa PVC Dia. 1" M1
4 Pipa PVC Dia. 1 1/2" M1
5 Pipa PVC Dia. 2" M1
6 Pipa PVC Dia. 2 1/2" M1
7 Pipa PVC Dia. 3" M1
8 Pipa PVC Dia. 4" M1
9 Pipa PVC Dia. 6" M1
10 Pipa Ukuran 1 Inci wavin Buah
11 Pipa Ukuran 2 Inci wavin Buah
12 Pipa Ukuran 1 Inci OK Buah
13 Pipa Ukuran 2 Inci OK Buah
14 Pipa Ukuran 3 Inci wavin Buah
15 Pipa Ukuran 4 Inci wavin Buah
16 Pipa Ukuran 3 Inci OK Buah
17 Pipa Ukuran 4 Inci OK Buah
18 Pipa Ukuran 3 Inci Bambu Buah
19 Pipa Ukuran 4 Inci Bambu Buah
20 Pipa Ukuran 3/4 Inci wavin Buah
21 Pipa Ukuran 1/2 Inci wavin Buah
22 Pipa Ukuran 3/4 Inci OK Buah
23 Pipa Ukuran 1/2 Inci OK Buah
24 Pipa Ukuran 1 Inci Power Max Buah
25 Pipa Ukuran 3/4 Inci Power Max Buah
26 Pipa Ukuran 1/2 Inci Power Max Buah
27 Pipa Ukuran 1 Inci @4m wavin Buah
28 Pipa Ukuran 2 Inci @4m wavin Buah
29 Pipa Ukuran 3 Inci @4m wavin Buah
30 Pipa Ukuran 4 Inci @4m wavin Buah
31 Pipa Ukuran 3/4 Inci @4m wavin Buah
32 Pipa Ukuran 1/2 Inci @4m wavin Buah
33 Pipa Ukuran 1 Inci @6m Invilon Buah
34 Pipa Ukuran 3/4 Inci @6m Invilon Buah
35 Pipa Ukuran 1/2 Inci @6m Invilon Buah

B Pipa PVC D (Pipa Tipis)


1 Pipa PVC Dia. 1/2" M1
2 Pipa PVC Dia. 3/4" M1
3 Pipa PVC Dia. 1" M1
4 Pipa PVC Dia. 1 1/2" M1
5 Pipa PVC Dia. 2" M1
6 Pipa PVC Dia. 2 1/2" M1
7 Pipa PVC Dia. 3" M1
8 Pipa PVC Dia. 4" M1
9 Pipa PVC Dia. 6" M1
C Socket Drat Dalam
1 Socket 5" Bh
2 Socket 4" Bh
3 Socket 3" Bh
4 Socket 2,5" Bh
5 Socket 2" Bh
6 Socket 1,5" Bh
7 Socket 1" Bh
8 Socket 3/4" Bh
9 Socket 1/2" Bh
D Socket Drat Luar
1 Socket 5" Bh
2 Socket 4" Bh
3 Socket 3" Bh
4 Socket 2,5" Bh
5 Socket 2" Bh
6 Socket 1,5" Bh
7 Socket 1" Bh
8 Socket 3/4" Bh
9 Socket 1/2" Bh
E Tee (Tipis)
1 Tee 5" Bh
2 Tee 4" Bh

30
3 Tee 3" Bh
4 Tee 2,5" Bh
5 Tee 2" Bh
6 Tee 1,5" Bh
7 Tee 1" Bh
8 Tee 3/4" Bh
9 Tee 1/2" Bh
F Tee (Tebal)
1 Tee 5" Bh
2 Tee 4" Bh
3 Tee 3" Bh
4 Tee 2,5" Bh
5 Tee 2" Bh
6 Tee 1,5" Bh
7 Tee 1" Bh
8 Tee 3/4" Bh
9 Tee 1/2" Bh
G Elbow drat luar
1 Elbow 5" Bh
2 Elbow 4" Bh
3 Elbow 3" Bh
4 Elbow 2,5" Bh
5 Elbow 2" Bh
6 Elbow 1,5" Bh
7 Elbow 1" Bh
8 Elbow 3/4" Bh
9 Elbow 1/2" Bh
H Elbow drat dalam
1 Elbow 5" Bh
2 Elbow 4" Bh
3 Elbow 3" Bh
4 Elbow 2,5" Bh
5 Elbow 2" Bh
6 Elbow 1,5" Bh
7 Elbow 1" Bh
8 Elbow 3/4" Bh
9 Elbow 1/2" Bh

31
I PIPA GIP
1 Pipa Galvanis Medium 6 inchi x 6 m x 4.60 mm m
2 Pipa Galvanis Medium 4 inchi x 6 m x 4.20 mm m
3 Pipa Screen Low Carbon Steel Slot 0.2 mm x 4" x 2.5 m m
4 Pipa Galvanis Medium 1.5 inchi x 3.40 mm x 6 m m
5 Pompa Submersible Pump SP 5A-3 Unit
6 Panel Contraktor Relay (Anti Phse) A. Meter Digital Set
7 Plat Besi Baja Hitam 1.2 mm Kg
8 Kabel NYYHY 3 x 6 mm m
9 Kabel 3 x 2.5 mm NYYHY cw Elektrda Level Switch m
10 Kawat Las Kg
11 Kunci Gembok Bh
12 Stavolt 15000 Wat 3 Phase ( SVC-3-15KVA) Unit
13 Sling Safety Pompa D8 mm Stainlees m
14 Besi Plat Strip (3 x 19 mmx 6 m, 26 kg) Kg
15 Besi Siku 30 x 30 x 3 mm, 8.16 kg) Kg
16 Engsel Besi Bh
17 Pipa Galvanis 2.5 inchi x 6 m Biasa m1
18 Pipa Galvanis 1.5 " inchi x 6 m Biaa m1
19 Stop Kran dia 2 " ( besi) bh
20 Stop Kran dia 3/4 " ( besi) bh

XVI BAHAN CAT / FINISHING


1 Plamir Kg
2 Residu Ltr
3 Dempul Kg
4 Amplas m
5 Kuas Gulung Kecil Bh
6 Kuas Gulung besar Bh
7 Kuas Biasa 1" Bh
8 Kuas Biasa 1 1/2" Bh
9 Kuas Biasa 2" Bh
10 Kuas Biasa 2 1/2" Bh
11 Kuas 3" Bh
12 Kuas 4" Bh
13 Kuas 5" Bh
14 Tempat Cat Bagus Bh
15 Tempat Cat Biasa Bh
Cat Dasar merek EBONY Kg
17 Cat Dasar merek jotun Kg
25 Cat Minyak Kwalitas JOTUN Exterior Kg
26 Cat Minyak Kwalitas AVIAN Kg
28 Cat Minyak Kwalitas Biasa Setara YOYO Kg
31 Cat Air Kwalitas JOTUN Exterior Kg
33 Cat Air Kwalitas Menengah Setara CATYLAC ICI/SPECTRUM Kg
34 Cat Air Kwalitas Biasa Setara LEKTONE/SIMPATI Kg
36 Cat Maritex Kg
38 Type Cat Setara Jotun Interior Ltr
39 Type Cat Setara Jotun Eksterior Ltr
40 Cat Kayu Dasar /Menie Kg
41 Cat Many Besi Kg
42 Vernish Biasa Ltr
43 Vernish Bagus Ltr
44 Lem Kayu Kg
45 Wall Paper Kualitas Sedang M2
46 Wallpaper Kualitas Bagus M2
48 Soda Api Kg
49 Sabun bh

XIII BAHAN U-DITCH


33 U-Ditch uk 30 x 40 x 1 Meter Pcs
34 U-Ditch uk 40 x 40 x 1 Meter Pcs
35 U-Ditch uk 60 x 60 x 1 Meter Pcs
34 U-Ditch uk 1 x 1 x 1 Meter Pcs
35 U-Ditch uk 1.5 x 1.5 x 1 Meter Pcs
35 Tutup Udith 60 x 230 cm tebal 15 cm Pcs

XIV BOX CULVERT

32
36 Box uk 1 x 1 x 1 Meter Pcs
35 Box uk 1.5 x 1.5 x 1 Meter Pcs
36 Box uk 1.5 x 2 x 1 Meter Pcs

XVII KELOMPOK PERALATAN


1 Crane sewa/hari
2 Alat Hammer 0,5 - 1 Ton sewa/hari
3 Alat Hammer 1 - 2 Ton sewa/hari
4 Concrete Pump sewa/hari
5 Molen 0,35 sewa/hari 309,375.00 309,000.00
6 Vibrator sewa/hari
7 Waterpass sewa/hari
8 Theodolith sewa/hari
9 Concrete Cutter sewa/hari
10 Air Compressor sewa/hari
11 Alat Tamper sewa/hari
11 Alat Las sewa/Jam

33
2.2.1 PEKERJAAN TANAH
2.2.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.750 130,000.00 97,500.00
2 Mandor L.04 OH 0.025 185,000.00 4,625.00
Jumlah Harga Tenaga Kerja 102,125.00
B Bahan

Jumlah Harga Bahan -


C Peralatan
1
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 102,125.00
E Profit/ Overhead 10% 10,212.50
F Harga Satuan Pekerjaan (D+E) 102,125.00

2.2.1.7 Pengurugan Kembali 1 m3 galian tanah biasa sedalam 1 m

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 130,000.00 65,000.00
2 Mandor L.04 OH 0.0500 185,000.00 9,250.00

Jumlah Harga Tenaga Kerja 74,250.00


B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 74,250.00
E Profit/ Overhead 10% 7,425.00
F Harga Satuan Pekerjaan (D+E) 74,250.00

2.2.1.16 1 m1 pasang kayu cerucuk dia. 5 s/d 6 Inci

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.030 130,000.00 3,900.00
4 Mandor L.04 OH 0.003 185,000.00 555.00
Jumlah Harga Tenaga Kerja 4,455.00
B Bahan
1 Kayu Cerocok Dia. 5 s/d 6 inci-15 Cm m1 1.000 31,000.00 31,000.00

Jumlah Harga Bahan 31,000.00


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 35,455.00
E Profit/ Overhead 10% 3,545.50
F Harga Satuan Pekerjaan (D+E) 35,455.00
4.1.1 PEKERJAAN BETON

4.1.1.15 Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (Molen)

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.323 130,000.00 171,990.00
2 Tukang Batu/tembok L.02 OH 0.189 154,000.00 29,106.00
3 Kepala Tukang L.03 OH 0.019 180,000.00 3,420.00
4 Mandor L.04 OH 0.066 185,000.00 12,210.00
Jumlah Harga Tenaga Kerja 216,726.00
B Bahan
1 Semen Portland Kg 384.000 1,680.00 645,120.00
2 Pasir Beton m3 0.494 490,000.00 242,200.00
3 Kerikil m3 0.770 340,000.00 261,674.07
4 Air Liter 215.000 300.00 64,500.00
Jumlah Harga Bahan 1,213,494.07
C Peralatan
1 Molen 0,35 Sewa-hari 0.250 309,000.00 77,250.00
Jumlah Harga Peralatan 77,250.00
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,507,470.07
E Profit/ Overhead 10% 150,747.01
F Harga Satuan Pekerjaan (D+E) 1,507,470.07
4.1.1.29 Pembesian 1 Kg dengan besi polos

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0070 130,000.00 910.00
2 Tukang besi/besi beton L.02 OH 0.0070 154,000.00 1,078.00
3 Kepala Tukang L.03 OH 0.0007 180,000.00 126.00
4 Mandor L.04 OH 0.0004 185,000.00 74.00
Jumlah Harga Tenaga Kerja 2,188.00
B Bahan
1 Besi Beton Polos kg 1.050 12,500.00 13,125.00
2 Kawat beton kg 0.150 25,000.00 3,750.00
Jumlah Harga Bahan 16,875.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 19,063.00
E Profit/ Overhead 10% 1,906.30
F Harga Satuan Pekerjaan (D+E) 19,063.00

4.1.1.34 Pemasangan 1 m2 bekisting untuk pondasi

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5200 130,000.00 67,600.00
2 Tukang Kayu L.02 OH 0.2600 154,000.00 40,040.00
3 Kepala Tukang L.03 OH 0.0260 180,000.00 4,680.00
4 Mandor L.04 OH 0.0260 185,000.00 4,810.00
Jumlah Harga Tenaga Kerja 117,130.00
B Bahan
1 Kayu kelas III m3 0.040 2,013,000.00 80,520.00
2 Paku 5 - 10 cm kg 0.300 24,900.00 7,470.00
3 Minyak bekisting Liter 0.100 15,500.00 1,550.00
Jumlah Harga Bahan 89,540.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 206,670.00
E Profit/ Overhead 10% 20,667.00
F Harga Satuan Pekerjaan (D+E) 206,670.00
4.1.1.35 Pemasangan 1 m2 bekisting untuk sloof

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5200 130,000.00 67,600.00
2 Tukang Kayu L.02 OH 0.2600 154,000.00 40,040.00
3 Kepala Tukang L.03 OH 0.0260 180,000.00 4,680.00
4 Mandor L.04 OH 0.0260 185,000.00 4,810.00
Jumlah Harga Tenaga Kerja 117,130.00
B Bahan
1 Kayu kelas III m3 0.045 2,013,000.00 90,585.00
2 Paku 5 - 10 cm kg 0.300 24,900.00 7,470.00
3 Minyak bekisting Liter 0.100 15,500.00 1,550.00
Jumlah Harga Bahan 99,605.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 216,735.00
E Profit/ Overhead 10% 21,673.50
F Harga Satuan Pekerjaan (D+E) 216,735.00

4.1.1.36 Pemasangan 1 m2 bekisting untuk kolom

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6600 130,000.00 85,800.00
2 Tukang Kayu L.02 OH 0.3300 154,000.00 50,820.00
3 Kepala Tukang L.03 OH 0.0330 180,000.00 5,940.00
4 Mandor L.04 OH 0.0330 185,000.00 6,105.00
Jumlah Harga Tenaga Kerja 148,665.00
B Bahan
1 Kayu kelas III m3 0.040 2,013,000.00 80,520.00
2 Paku 5 - 10 cm kg 0.400 24,900.00 9,960.00
3 Minyak Bekisting Liter 0.200 15,500.00 3,100.00
4 kayu kelas II m3 0.015 3,355,000.00 50,325.00
5 Tripleks Tebal 9 mm Lbr 0.350 184,000.00 64,400.00
6 Dolken kayu ɸ 8 - 10 cm Panjang 4 m Batang 2.000 9,700.00 19,400.00
Jumlah Harga Bahan 227,705.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 376,370.00
E Profit/ Overhead 10% 37,637.00
F Harga Satuan Pekerjaan (D+E) 376,370.00
4.1.1.37 Pemasangan 1 m2 bekisting untuk balok

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6600 130,000.00 85,800.00
2 Tukang Kayu L.02 OH 0.3300 154,000.00 50,820.00
3 Kepala Tukang L.03 OH 0.0330 180,000.00 5,940.00
4 Mandor L.04 OH 0.0330 185,000.00 6,105.00
Jumlah Harga Tenaga Kerja 148,665.00
B Bahan
1 Kayu kelas III m3 0.040 2,013,000.00 80,520.00
2 Paku 5 - 12 cm kg 0.400 27,200.00 10,880.00
3 Minyak Bekisting Liter 0.200 15,500.00 3,100.00
4 kayu kelas II m3 0.018 3,355,000.00 60,390.00
5 Tripleks Tebal 9 mm Lbr 0.350 184,000.00 64,400.00
6 Dolken kayu ɸ 8 - 10 cm Panjang 4 m Batang 2.000 9,700.00 19,400.00
Jumlah Harga Bahan 238,690.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 387,355.00
E Profit/ Overhead 10% 38,735.50
F Harga Satuan Pekerjaan (D+E) 387,355.00
4.1.1.38 Pemasangan 1 m2 bekisting untuk lantai

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6600 130,000.00 85,800.00
2 Tukang Kayu L.02 OH 0.3300 154,000.00 50,820.00
3 Kepala Tukang L.03 OH 0.0330 180,000.00 5,940.00
4 Mandor L.04 OH 0.0330 185,000.00 6,105.00
Jumlah Harga Tenaga Kerja 148,665.00
B Bahan
1 Kayu kelas III m3 0.040 2,013,000.00 80,520.00
2 Paku 5 - 12 cm kg 0.400 27,200.00 10,880.00
3 Minyak Bekisting Liter 0.200 15,500.00 3,100.00
4 kayu kelas II m3 0.015 3,355,000.00 50,325.00
5 Tripleks Tebal 9 mm Lbr 0.350 184,000.00 64,400.00
6 Dolken kayu ɸ 8 - 10 cm Panjang 4 m Batang 3.000 9,700.00 29,100.00
Jumlah Harga Bahan 238,325.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 386,990.00
E Profit/ Overhead 10% 38,699.00
F Harga Satuan Pekerjaan (D+E) 386,990.00
HITUNGAN

Nama Kegiatan : #REF!


Nama Pekerjaan : #REF!
Lokasi : #REF!
Tahun Aggaran : #REF!

1 Pengukuran dan Pasang Bowplank


Dimensi
No Keterangan = Panjang (m) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

28.00 28.00 1.00 28.00


TOTAL 28.00
GRAND TOTAL 28.00

2 Pek. Galian Pondasi


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

0.80 0.80 1.40 0.90 6.00 5.38


TOTAL 5.38
GRAND TOTAL 5.38

2 Pek. Pemasangan Kayu Cerucuk 5 s/d 6 inch


Dimensi
No Keterangan = Volume x Jumlah = Total
Lebar 1 x Lebar 2 x Jarak x Jlh x Total
x-x 0.80 0.3 3
y-y 0.80 0.3 3
9.00 36.00 6.00 216.00
TOTAL 216.00
GRAND TOTAL 216.00

2 Pek. Urugan Tanah (Pondasi)


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

0.80 0.80 1.40 0.90 6.00 5.38

TOTAL 5.38
GRAND TOTAL 5.38

3 Pek. Pondasi
Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

a. Beton mutu f'c = 21,7 Mpa (K 250) 0.80 0.80 0.40 0.26 6.00 1.54
b. Besi Beton 21.92 6.00 131.53

4 Pek. Balok Sloff Uk. 20/35 cm


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

a. Beton mutu f'c = 21,7 Mpa (K 250) 0.20 0.35 28 1.96 1.00 1.96
b. Besi Beton 297.42 1.00 297.42
c. Bekisting Sloff 0.35 28 19.64 9.82 1.00 9.82
5 Pek. Kolom Uk. 35/35 cm
Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

a. Beton mutu f'c = 21,7 Mpa (K 250) 0.35 0.35 5.00 0.61 6.00 3.68
b. Besi Beton 63.68 6.00 382.08
c. Bekisting Kolom 0.35 0.35 5.00 7.00 3.50 6.00 21.00

6 Pek. Balok Atas Uk. 30/50 cm


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

a. Beton mutu f'c = 21,7 Mpa (K 250) 0.3 0.5 28 4.2075 1.00 4.2075
b. Besi Beton 386 1.00 386
c. Bekisting Balok 0.3 0.5 28 36.47 18.23 1.00 18.2325

8 Pek. Lantai tebal 15 cm


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

a. Beton mutu f'c = 21,7 Mpa (K 250) 8 6 0.12 5.76 1.00 5.76
b. Besi Beton 250 1.00 250
c. Bekisting Lantai 8 6 0.15 24 1.00 24.00

9 Pemasangan 1 m2 dinding bata merah tebal 1 batu camp 1 SP : 4 PP


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

17 0.4 69.5 89.6 89.6 1.00 89.60

10 Pemasangan 1 m2 dinding bata merah tebal 1/2 batu camp 1 SP : 4 PP


Dimensi
No Keterangan = Volume (m3) x Jumlah = Total
Lebar 1 x Lebar 2 x Tinggi x Panjang x Luas

elev. Sd.3.6 m 17 3.5 69.5 520.5 520.5 1.00 520.50


Dikurangi
- P1 1.9 2.14 4.066 4.066 -1.00 -4.07
- J1 0.5 1.4 0.7 0.7 -36.00 -25.20
- Angin2 0.15 0.5 0.075 0.075 -36.00 -2.70

elev. Sd.3.6 m 17 #REF! 69.5 #REF! #REF! 1.00 #REF!


Dikurangi
- Angin2 0.15 0.5 0.075 0.075 -123.00 -9.23

#REF!

10 Atap
Dimensi
No Keterangan = Volume (m2) x Jumlah = Total
Lebar 1 x Lebar 2 x Derjat x Luas x Cos

1 xx 19
2 yy 24
30
456 0.8660254 527 1.00 526.54
Tinggi At 9.5 tan
0.57735027
5.48482756

526.54

10 Listplank
Dimensi
No Keterangan = Volume (m2) x Jumlah = Total
Lebar 1 x Lebar 2 x Derjat x Luas x Cos

1 xx 19 19 2.00 38.00
2 yy 24 24 2.00 48.00

86.00
96000000
182,321.14

96000000
#DIV/0!
PERHITUNGAN VOLUME BESI
Nama Program :
Nama Kegiatan

Pekerjaan :

Ukuran :
Tahun Anggaran :

1. PERHITUNGAN PENULANGAN TAPAK


Parameter Rencana :
B1 = 0.80 m KE CM → 80 cm
D = 0.40 m KE CM → 40 cm
B2 = 0.80 m KE CM → 80 cm
Selimut Beton = 5 cm

Diameter
Berat satuan
No Jenis Panjang (cm) Jumlah Total Panjang (cm) Tulangan Berat Total (Kg)
(kg/cm)
(cm)

1 Tul X-X a= 75.2


c b= 30
c= 70
b d= d 35.2
d
210.4 5 1,052.00 1.3 0.0104189 10.96
a

2 Tul Y-Y a= 75.2


c b= 30
c= 70
b d= d 35.2
d
210.4 5 1,052.00 1.3 0.0104189 10.96
a

GRAND TOTAL (KG) 21.921

Pek. Balok Sloff Uk. 20/35 cm


Parameter Rencana :
B1 = 0.20 m KE CM → 20 cm
H = 0.35 m KE CM → 35 cm
Panjang = 36.00 m KE CM → 3600 cm
Selimut Beton = 5 cm

Diameter
Berat satuan
No Jenis Panjang (cm) Jumlah Total Panjang (cm) Tulangan Berat Total (Kg)
(kg/cm)
(cm)

c
1 Begel a= 13.2
b= 25
c= 10
b d d= d 28.2
76.4 240 18,336.00 0.8 0.0039456 72.35
a
2 Tul Pokok a= 5.2
a b= 3590
c
c= 5.2
b d
3600.4 6 21,602.40 1.3 0.0104189 225.07

GRAND TOTAL (KG) 297.419

Pek. Kolom Uk. 35/35 cm


Parameter Rencana :
B1 = 0.35 m KE CM → 35 cm
H = 5.00 m KE CM → 500 cm
B2 = 0.35 m KE CM → 35 cm
Selimut Beton = 5 cm

Diameter
Berat satuan
No Jenis Panjang (cm) Jumlah Total Panjang (cm) Tulangan Berat Total (Kg)
(kg/cm)
(cm)

1 Begel a= 29
c b= 25
c= 25
b d d= d 29
108 33 3,564.00 1 0.0061650 21.97
a
2 Tul Pokok a= 5.2
a b= 490
c
c= 5.2
b d
500.4 8 4,003.20 1.3 0.0104189 41.71
b

63.681
Pek. Balok 30/50 cm
Parameter Rencana :
B1 = 0.30 m KE CM → 30 cm
Panjang = 28.05 m KE CM → 2805 cm
H = 0.50 m KE CM → 50 cm
Selimut Beton = 5 cm

Diameter
Berat satuan
No Jenis Panjang (cm) Jumlah Total Panjang (cm) Tulangan Berat Total (Kg)
(kg/cm)
(cm)

c
1 Begel a= 23.2
b= 40
c= 20
b d d= d 43.2
126.4 187 23,636.80 0.8 0.0039456 93.26

2 Tul Pokok a a= 5.2


a b= 2795
c
c= 5.2
b d
2805.4 10 28,054.00 1.3 0.0104189 292.29

385.552

Pek. Lantai
Parameter Rencana :
B1 = 8.00 m KE CM → 800 cm
B2 = 6.00 m KE CM → 600 cm
T = 0.12 m KE CM → 12 cm
Selimut Beton = 5 cm

Diameter
Berat satuan
No Jenis Panjang (cm) Jumlah Total Panjang (cm) Tulangan Berat Total (Kg)
(kg/cm)
(cm)

1 Begel a= 3.2
b= 790
a c
c= 3.2
d 796.4 40 31,856.00 0.8 0.0039456 125.69
b
2 Tul Pokok a a= 3.2
a b= 590
c
c= 3.2
b d
596.4 53 31,609.20 0.8 0.0039456 124.72

250.408