PT.

RESTU ANAK JAYA ABADI BETON INDONESIA


Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan
Berat Kuat Tekan Korelasi Ke 28 Hari Prosentase Terhadap
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
2 Umur 28 hari ( %)
( Kg ) ( KN ) (MPa) (kg/cm ) (MPa)

1 19-Mar-2023 27-Mar-2023 8 13.10 567 32.07 327.27 49.34 106.91 Borepile P 5A 189
2 19-Mar-2023 27-Mar-2023 8 13.20 559 31.62 48.65 105.40 Borepile P 5A 189
3 19-Mar-2023 27-Mar-2023 8 13.44 563 31.85 324.96 48.99 106.15 Borepile P 5A 189

Rata -rata 31.85 326.12 48.99 106.15

Karangjoang - Balikpapan 27-Mar-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 19-Mar-2023 27-Mar-2023 8 13.28 551 31.17 318.04 47.95 103.89 Borepile P 5A 190
2 19-Mar-2023 27-Mar-2023 8 13.42 535 30.26 308.80 46.56 100.88 Borepile P 5A 190
3 19-Mar-2023 27-Mar-2023 8 13.35 547 30.94 315.73 47.60 103.14 Borepile P 5A 190

Rata -rata 30.79 314.19 47.37 102.64

Karangjoang - Balikpapan 27-Mar-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 19-Mar-2023 27-Mar-2023 8 13.24 476 26.93 274.75 41.42 89.75 Borepile P 5B 176
2 19-Mar-2023 27-Mar-2023 8 13.15 496 28.06 286.29 43.16 93.52 Borepile P 5B 176
3 19-Mar-2023 27-Mar-2023 8 13.34 500 28.28 288.60 43.51 94.28 Borepile P 5B 176

Rata -rata 27.75 283.21 42.70 92.52

Karangjoang - Balikpapan 27-Mar-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 26-Mar-2023 2-Apr-2023 7 12.94 420 23.76 242.42 36.55 79.19 Bore Pile Titik P5A 199
2 26-Mar-2023 2-Apr-2023 7 12.97 433 24.49 249.93 37.68 81.64 Bore Pile Titik P5A 199
3 26-Mar-2023 2-Apr-2023 7 12.92 410 23.19 236.65 35.68 77.31 Bore Pile Titik P5A 199

Rata -rata 23.81 243.00 36.64 79.38

Karangjoang - Balikpapan 2-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 26-Mar-2023 2-Apr-2023 7 12.93 405.0 22.91 233.77 35.24 76.36 Bore Pile Titik P4A 166
2 26-Mar-2023 2-Apr-2023 7 12.95 437.0 24.72 252.24 38.03 82.40 Bore Pile Titik P4A 166
3 26-Mar-2023 2-Apr-2023 7 12.93 415.0 23.47 239.54 36.11 78.25 Bore Pile Titik P4A 166

Rata -rata 23.70 241.85 36.46 79.00

Karangjoang - Balikpapan 2-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 26-Mar-2023 2-Apr-2023 7 12.97 442.0 25.00 255.12 38.46 83.34 Bore Pile Titik P5B 168
2 26-Mar-2023 2-Apr-2023 7 12.93 417.0 23.59 240.69 36.29 78.63 Bore Pile Titik P5B 168
3 26-Mar-2023 2-Apr-2023 7 12.95 428.0 24.21 247.04 37.25 80.70 Bore Pile Titik P5B 168

Rata -rata 24.27 247.62 37.33 80.89

Karangjoang - Balikpapan 2-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 1-Apr-2023 8-Apr-2023 7 13.08 440.0 24.89 253.97 38.29 82.96 Bore Pile P5A 193
2 1-Apr-2023 8-Apr-2023 7 13.00 408.0 23.08 235.50 35.51 76.93 Bore Pile P5A 193
3 1-Apr-2023 8-Apr-2023 7 13.14 395.0 22.34 227.99 34.37 74.48 Bore Pile P5A 193

Rata -rata 23.44 239.15 36.06 78.12

Karangjoang - Balikpapan 8-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 1-Apr-2023 8-Apr-2023 7 12.86 384.0 21.72 221.65 33.42 72.40 Bore Pile P5A 194
2 1-Apr-2023 8-Apr-2023 7 12.96 401.0 22.68 231.46 34.90 75.61 Bore Pile P5A 194
3 1-Apr-2023 8-Apr-2023 7 12.78 432.0 24.44 249.35 37.59 81.45 Bore Pile P5A 194

Rata -rata 22.95 234.15 35.30 76.49

Karangjoang - Balikpapan 8-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 1-Apr-2023 8-Apr-2023 7 12.78 455.0 25.74 262.63 39.60 85.79 Bore Pile P5A 195
2 1-Apr-2023 8-Apr-2023 7 12.63 430.0 24.32 248.20 37.42 81.08 Bore Pile P5A 195
3 1-Apr-2023 8-Apr-2023 7 12.68 418.0 23.64 241.27 36.38 78.81 Bore Pile P5A 195

Rata -rata 24.57 250.70 37.80 81.89

Karangjoang - Balikpapan 8-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 2-Apr-2023 9-Apr-2023 7 12.99 400.0 22.63 230.88 34.81 75.42 Bore Pile P5A 194 CSL
2 2-Apr-2023 9-Apr-2023 7 13.25 397.0 22.46 229.15 34.55 74.86 Bore Pile P5A 194 CSL
3 2-Apr-2023 9-Apr-2023 7 13.10 433.0 24.49 249.93 37.68 81.64 Bore Pile P5A 194 CSL

Rata -rata 23.19 236.65 35.68 77.31

Karangjoang - Balikpapan 9-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 2-Apr-2023 9-Apr-2023 7 13.04 421.0 23.81 243.00 36.64 79.38 Bore Pile P5B 160
2 2-Apr-2023 9-Apr-2023 7 12.87 412.0 23.31 237.81 35.85 77.68 Bore Pile P5B 160
3 2-Apr-2023 9-Apr-2023 7 13.15 440.0 24.89 253.97 38.29 82.96 Bore Pile P5B 160

Rata -rata 24.00 244.93 36.93 80.01

Karangjoang - Balikpapan 9-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 2-Apr-2023 9-Apr-2023 7 12.72 451.0 25.51 260.32 39.25 85.04 Bore Pile P4A 163
2 2-Apr-2023 9-Apr-2023 7 13.08 437.0 24.72 252.24 38.03 82.40 Bore Pile P4A 163
3 2-Apr-2023 9-Apr-2023 7 12.98 460.0 26.02 265.51 40.03 86.73 Bore Pile P4A 163

Rata -rata 25.42 259.36 39.10 84.72

Karangjoang - Balikpapan 9-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 2-Apr-2023 9-Apr-2023 7 13.32 445.0 25.17 256.85 38.73 83.91 Bore Pile P4B 159
2 2-Apr-2023 9-Apr-2023 7 13.15 389.0 22.00 224.53 33.85 73.35 Bore Pile P4B 159
3 2-Apr-2023 9-Apr-2023 7 13.23 428.0 24.21 247.04 37.25 80.70 Bore Pile P4B 159

Rata -rata 23.80 242.81 36.61 79.32

Karangjoang - Balikpapan 9-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 6-Apr-2023 13-Apr-2023 7 13.18 438.2 24.79 252.93 38.13 82.62 Bore Pile P4A 161
2 6-Apr-2023 13-Apr-2023 7 13.08 435.0 24.61 251.08 37.86 82.02 Bore Pile P4A 161
3 6-Apr-2023 13-Apr-2023 7 13.19 474.9 26.86 274.11 41.33 89.54 Bore Pile P4A 161

Rata -rata 25.42 259.37 39.11 84.73

Karangjoang - Balikpapan 13-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 7-Apr-2023 14-Apr-2023 7 13.090 385.0 21.78 222.22 33.50 72.59 Bore Pile Titik P4B 152
2 7-Apr-2023 14-Apr-2023 7 13.010 406.0 22.97 234.34 35.33 76.55 Bore Pile Titik P4B 152
3 7-Apr-2023 14-Apr-2023 7 12.975 381.0 21.55 219.91 33.16 71.84 Bore Pile Titik P4B 152

Rata -rata 22.10 225.49 34.00 73.66

Karangjoang - Balikpapan 14-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 8-Apr-2023 15-Apr-2023 7 13.38 462.0 26.13 266.67 40.21 87.11 Bore Pile Titik P4B 149
2 8-Apr-2023 15-Apr-2023 7 12.84 402.0 22.74 232.03 34.98 75.80 Bore Pile Titik P4B 149
3 8-Apr-2023 15-Apr-2023 7 13.22 387.0 21.89 223.38 33.68 72.97 Bore Pile Titik P4B 149

Rata -rata 23.59 240.69 36.29 78.63

Karangjoang - Balikpapan 15-Apr-2023

Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO Dilaporkan Oleh,


PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 8-Apr-2023 15-Apr-2023 7 13.42 410.0 23.19 236.65 35.68 77.31 Bore Pile Titik P4B 149
2 8-Apr-2023 15-Apr-2023 7 13.31 380.0 21.49 219.34 33.07 71.65 Bore Pile Titik P4B 149
3 8-Apr-2023 15-Apr-2023 7 12.94 391.0 22.12 225.69 34.03 73.72 Bore Pile Titik P4B 149

Rata -rata 22.27 227.22 34.26 74.23

Karangjoang - Balikpapan 15-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 9-Apr-2023 16-Apr-2023 7 13.05 412.0 23.31 237.81 35.85 77.68 Bore Pile Titik P4B 150
2 9-Apr-2023 16-Apr-2023 7 13.20 438.0 24.78 252.81 38.12 82.59 Bore Pile Titik P4B 150
3 9-Apr-2023 16-Apr-2023 7 12.98 406.0 22.97 234.34 35.33 76.55 Bore Pile Titik P4B 150

Rata -rata 23.68 241.65 36.43 78.94

Karangjoang - Balikpapan 16-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 10-Apr-2023 17-Apr-2023 7 13.20 448.0 25.34 258.59 38.99 84.47 Bore Pile Titik P4B 144
2 10-Apr-2023 17-Apr-2023 7 13.10 417.0 23.59 240.69 36.29 78.63 Bore Pile Titik P4B 144
3 10-Apr-2023 17-Apr-2023 7 13.15 426.0 24.10 245.89 37.07 80.32 Bore Pile Titik P4B 144

Rata -rata 24.34 248.39 37.45 81.14

Karangjoang - Balikpapan 17-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 10-Apr-2023 17-Apr-2023 7 12.97 411 23.25 237.23 35.77 77.49 Bore Pile Titik P4B 140
2 10-Apr-2023 17-Apr-2023 7 13.10 432 24.44 249.35 37.59 81.45 Bore Pile Titik P4B 140
3 10-Apr-2023 17-Apr-2023 7 13.10 415 23.47 239.54 36.11 78.25 Bore Pile Titik P4B 140

Rata -rata 23.72 242.04 36.49 79.07

Karangjoang - Balikpapan 17-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 10-Apr-2023 17-Apr-2023 7 13.22 442 25.00 255.12 38.46 83.34 Bore Pile Titik P4A 152
2 10-Apr-2023 17-Apr-2023 7 13.15 397 22.46 229.15 34.55 74.86 Bore Pile Titik P4A 152
3 10-Apr-2023 17-Apr-2023 7 13.20 416 23.53 240.12 36.20 78.44 Bore Pile Titik P4A 152

Rata -rata 23.66 241.46 36.41 78.88

Karangjoang - Balikpapan 17-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan
Berat Kuat Tekan Korelasi Ke 28 Hari Prosentase Terhadap
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
2 Umur 28 hari ( %)
( Kg ) ( KN ) (MPa) (kg/cm ) (MPa)

1 19-Mar-2023 16-Apr-2023 28 13.36 680 38.46 392.50 38.46 128.22 Borepile P 5A 189
2 19-Mar-2023 16-Apr-2023 28 13.51 711 40.22 410.39 40.22 134.06 Borepile P 5A 189
3 19-Mar-2023 16-Apr-2023 28 13.48 637 36.03 367.68 36.03 120.11 Borepile P 5A 189

Rata -rata 38.24 390.19 38.24 127.46

Karangjoang - Balikpapan 16-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 19-Mar-2023 16-Apr-2023 28 12.97 711 40.22 410.39 40.22 134.06 Borepile P 5A 190
2 19-Mar-2023 16-Apr-2023 28 12.99 657 37.16 379.22 37.16 123.88 Borepile P 5A 190
3 19-Mar-2023 16-Apr-2023 28 13.10 687 38.86 396.54 38.86 129.54 Borepile P 5A 190

Rata -rata 38.75 395.38 38.75 129.16

Karangjoang - Balikpapan 16-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 19-Mar-2023 16-Apr-2023 28 13.28 657 37.16 379.22 37.16 123.88 Borepile P 5B 176
2 19-Mar-2023 16-Apr-2023 28 13.38 722 40.84 416.74 40.84 136.13 Borepile P 5B 176
3 19-Mar-2023 16-Apr-2023 28 13.08 745 42.14 430.01 42.14 140.47 Borepile P 5B 176

Rata -rata 40.05 408.66 40.05 133.49

Karangjoang - Balikpapan 16-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 26-Mar-2023 23-Apr-2023 28 13.10 588 33.26 339.39 33.26 110.87 Bore Pile Titik P5A 199
2 26-Mar-2023 23-Apr-2023 28 13.15 605 34.22 349.21 34.22 114.07 Bore Pile Titik P5A 199
3 26-Mar-2023 23-Apr-2023 28 13.25 620 35.07 357.86 35.07 116.90 Bore Pile Titik P5A 199

Rata -rata 34.18 348.82 34.18 113.95

Karangjoang - Balikpapan 23-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 26-Mar-2023 23-Apr-2023 28 12.99 622 35.18 359.02 35.18 117.28 Bore Pile Titik P4A 166
2 26-Mar-2023 23-Apr-2023 28 13.05 575 32.53 331.89 32.53 108.42 Bore Pile Titik P4A 166
3 26-Mar-2023 23-Apr-2023 28 13.05 594 33.60 342.86 33.60 112.00 Bore Pile Titik P4A 166

Rata -rata 33.77 344.59 33.77 112.57

Karangjoang - Balikpapan 23-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control
PT. RESTU ANAK JAYA ABADI BETON INDONESIA
Galaxy Bumi Permai Blok H5 No. 8A Semolowaru, Surabaya No. Telp : 031-5955150

LAPORAN PENGUJIAN BENDA UJI BETON


Kontraktor : Hutama - Adhi - Abipraya, KSO Batching Plant : Karangjoang - Balikpapan
Proyek : Pembangunan Jalan Tol IKN Segmen Karangjoang - KKT Kariangau Benda uji : Silinder (15 x 30) cm
Lokasi : Balikpapan Mutu : Fc' 30 SCC = 30 MPa

Tekanan Korelasi Ke 28 Hari Prosentase Terhadap


Berat Kuat Tekan
No Tanggal Cor Tanggal Tes Umur Hancur Keterangan
( Kg ) ( KN ) (MPa) (kg/cm2) (MPa) Umur 28 hari ( %)

1 26-Mar-2023 23-Apr-2023 28 13.08 592 33.49 341.70 33.49 111.62 Bore Pile Titik P5B 168
2 26-Mar-2023 23-Apr-2023 28 13.20 641 36.26 369.99 36.26 120.86 Bore Pile Titik P5B 168
3 26-Mar-2023 23-Apr-2023 28 13.15 625 35.35 360.75 35.35 117.85 Bore Pile Titik P5B 168

Rata -rata 35.03 357.48 35.03 116.78

Karangjoang - Balikpapan 23-Apr-2023

Dilaporkan Oleh,
Direksi PU Konsultan Supervisi Hutama - Adhi - Abipraya, KSO PT. Raja Beton Indonesia

( ) ( ) ( ) Quality Control