M.H./ MANORĂ
NR. CRT. DESCRIEREA LUCRĂRII UNITATE JOS
C. DECUPAREA FORMULARELOR
PERETE PE PĂMÂNT M.P. 0.50
PERETE PESTE 10' M.P. 2.58
GRINZI M.P. 2.06
COLOANE M.P. 1.70
M.P.
PLACĂ SUSPENDATĂ DE LA 0 LA 18' M.P. 1.67
18' PÂNĂ LA 36' SUS M.P. 2.16
M.P.
FÂȘII DE FORMĂ DE PLĂCI ÎNĂLȚATE ȘI ȚĂRMATE M.P. 7.00
PLACĂ DE PODEA LA GRADUL BENZI DE FORME M.P. 5.60
E. UȘI ȘI FERESTRE
INSTALAREA PANOULUI W PC. 0.80
INSTALAREA FERESTRELOR DIN OȚEL PC. 4.00
INSTALAREA FERESTRELOR CU JALUZELE:
AZBEST FIX M.P. 9.26
JALUZELE METALICE FIXE M.P. 6.24
FOI IG FIXE M.P. 9.26
STICLĂ FIXĂ M.P. 6.34
LEMN FIX M.P. 6.76
FERESTRE CU RAME DIN ALUMINIU FIECARE 20.00
UȘĂ GLISANTĂ DIN STICLĂ FIECARE 24.00
UȘĂ METALICĂ GOALĂ FIECARE 20.00
UȘI RULANTE FIECARE 50.00
FEREASTRĂ FIXĂ S.F. 0.63
SET DE ÎNCUIETORI PENTRU UȘI APUS 3.20
FABRICAREA PRAGURILOR UȘILOR B.F. 0.44
INSTALAREA PRAGULUI UȘII B.F. 0.66
INSTALAREA SÂRMEI CICLONICE M.P. 6.24
G. TINICHIGERIE
FOI CORR GI:
RIDICARE M.P. 2.16
INSTALARE M.P. 6.12
INSTALAREA ACOPERIȘURILOR DIN AZBEST COLI. 2.00
INSTALAREA FOII GI DIN ALUMINIU COLI. 1.60
PLACARI PLACARI DIN CUPRU PE ACOPERIS L.M. 1.01
FAB, GI JGHEAB COLI. 6.94
ACOPERIȘURI DIN TABLĂ GI COLI. 1.64
FAB DE GI JGHEAB L.M. 1.05
FAB. BURLAN GI L.M. 1.94
JGHEAB TĂIAT ȘI FORMĂ L.M. 0.32
INST. DE JGHEAB L.M. 1.78
BURLAN TĂIAT ȘI MODELAT L.M. 0.59
INSTALAREA BURLANULUI L.M. 0.27
CORR. ACOPERIȘURI GI M.P. 3.60
ACOPERIȘ DIN ALUMINIU CORR M.P. 3.60
ACOPERIȘ CONSTRUIT 4 STRATURI M.P. 17.00
METAL PROTEJAT M.P. 4.00
CORR. AZBEST INST., RIDICARE ȘI TRACTARE M.P. 3.40
LIDERI &; Jgheaburi M.P. 1.20
L. IZOLAREA COMERCIALĂ
INSTALAREA ECHIPAMENTELOR
NAVĂ, SCHIMB ȘI REZERVOARE IZOLAREA
FABRICĂRII TERENURILOR S.M. 5.00
CONFECȚIONAREA CÂMPULUI ÎNVELITOARE DIN S.M. 24.00
TABLĂ APLICAȚI IZOLAȚIA S.M. 10.00
APLICAȚI CAPACUL DIN TABLĂ S.M. 10.00
FABRICAREA POMPELOR, COMPRESOARELOR ȘI
TURBINELOR S.M. 34.00
APLICA S.M. 60.00
FABRICAREA CONDUCTELOR ȘI A
COMPONENTELOR DE IZOLAȚIE FLG. 8.00
FIELD FABRICESHEET METAL COVER S.M. 1.60
APLICAȚI IZOLAȚIA L.M. 5.40
APLICAȚI CAPACUL DIN TABLĂ SAU CAPACUL FIECARE 3.00
METALIC CAPACUL INSTRUMENTULUI
FABRICAȚI FIECARE 16.00
INSTALAȚI CAPACUL INSTRUMENTULUI FIECARE 12.00
IZOLAȚI UMERASELE PENTRU ȚEVI FIECARE 8.00
PENTRU LINIILE STREAM TRACED L.M. 7.40
ELIMINAREA INSTALAȚIEI VECHI SAU EXISTENTE L.M. 3.00
M. COMERȚ:IGNIFUGARE
INSTALAȚI ȘTIFTURI FIECARE 1.00
INSTALAȚI MESH S.M. 2.40
TURNAT
FORMAREA S.M. 28.00
FORME DE BENZI S.M. 12.00
TURNAȚI BETONUL S.M. 140.00
ÎNTĂRIRE/PLASTURERE S.M. 1.20
FINISARE S.M. 1.40
MISTIE, TENCUITĂ S.M. 5.40
APLICARE PNEUMATICĂ
GUNITE S.M. 2.40
APLICAȚI CĂRĂMIDĂ FINĂ SAU BLOC PC. 1.60
ÎNDEPĂRTAREA IGNIFUGĂRII EXISTENTE SAU VECHI S.M. 5.00
APLICAȚI VOPSEA IGNIFUGĂ S.M. 6.00
PROTECȚIE ÎMPOTRIVA INCENDIILOR:
INSTALAREA ECHIPAMENTELOR DE PROTECȚIE
ÎMPOTRIVA
MONITORINCENDIILOR: FIECARE 10.00
TAMBURURI ȘI CĂRUCIOARE DE FURTUN FIECARE 30.00
EXTINCTOARE FIECARE 10.00
ECHIPAMENT PERSONAL:
SPĂLARE PENTRU OCHI FIECARE 20.00
DUȘURI DE SIGURANȚĂ FIECARE 20.00
APARATE DE RESPIRAT FIECARE 10.00
SISTEM DE ASPERSOARE
DUZE DE PULVERIZARE FIECARE 2.00
TUNURI DE APĂ FIECARE 10.00
N. COMERT:GARDURI PERMANENTE
INSTALAȚI FENCE L.M. 2.40
INSTALAȚI PORȚI L.M. 6.00
CĂTRE CALEA FERATĂ L.M. 0.60
SÂRMĂ GHIMPATĂ, 3 TOROANE L.M. 0.60
O. COMERȚ:LUCRĂRI DE PICTURĂ
OȚEL STRUCTURAL NOU TONĂ 20.00
OȚEL STRUCTURAL VECHI S.M. 1.10
PLĂCI PLATE NOI S.M. 0.64
PREGĂTIREA SUPRAFEȚEI:
ÎN CEEA CE PRIVEȘTE GREUTATEA TONĂ 16.00
ÎN CEEA CE PRIVEȘTE SUPRAFAȚA S.M. 0.86
PREGĂTIREA NISIPULUI TONĂ 60.00
Q. DIVERS
INSTALAREA OPRIRII APEI L.M. 1.34
ÎMBINAREA PLĂCII DE ETANȘARE L.M. 0.40
ASFALTARE S.M. 1.60
CHITUIRE ȘI TENCUIALĂ DE SCULE S.M. 3.34
HIDROIZOLATII CAUCIUCATE S.M. 1.10
PLACARI PLACARI DIN CUPRU PE ACOPERIS L.M. 1.00
HIDROIZOLATIE FLINKOTE S.M. 0.54
DEMOLAREA ZIDULUI ADOBE CU.M. 3.20
PICTURĂ S.M. 0.68
CUPRU OPRITOR DE APĂ TĂIAT ȘI FORMĂ L.M. 11.0
TĂIEREA ȘI INSTALAREA OPRITORULUI DE APĂ L.M. 0 22.0
DIN CUPRU
FIXAREA BOLȚULUI DE ANCORARE KG 0 97.0
SETAREA CASETELOR DE ANCORARE CU.M. 0 3.64
S PE CANTITATE (M.H./UNITATE)
MEDIE ÎNALT
2.00 1.60
2.35 1.88
3.08 2.46
2.35 1.88
1.67 1.34
3.33 2.66
9.00 6.88
11.00 8.80
0.60 0.40
1.08 0.86
0.25 0.20
1.29 1.03
1.03 0.82
0.85 0.68
0.83 0.67
1.08 0.86
3.50 2.80
2.80 2.24
1.00 0.80
0.14 0.11
0.36 0.29
0.27 0.21
0.97 0.77
0.43 0.34
0.35 0.28
0.80 0.64
0.21 0.17
0.13 0.11
0.27 0.10
0.46 0.36
1.00 0.80
0.42 0.33
1.33 1.06
1.00 0.90
0.13 0.10
0.18 0.14
0.50 0.40
7.00 5.60
4.50 3.60
3.50 2.80
0.40 0.32
2.00 1.60
4.63 3.70
3.12 2.50
4.63 3.70
3.12 2.50
3.38 2.70
10.00 8.00
12.00 9.60
10.00 8.00
25.00 20.00
0.31 0.25
1.60 1.28
0.22 0.18
0.33 0.26
3.12 2.50
1.67 1.34
1.43 1.34
2.00 1.60
5.00 4.00
10.53 8.42
4.35 3.48
3.00 2.40
4.50 3.60
4.00 3.20
0.50 0.40
3.00 3.40
2.00 1.60
1.20 0.96
1.80 1.44
9.50 6.80
1.14 0.91
0.72 0.57
1.60 1.28
1.33 1.06
2.00 1.60
5.33 4.26
5.97 4.78
1.08 0.86
3.06 2.45
1.00 0.80
9.80 0.64
0.51 0.40
3.47 2.78
0.82
0.66
0.53
0.42
0.97
0.16 1.78
9.00 0.13
0.30 0.71
0.13 0.24
1.80 0.11
1.80 1.44
8.50 1.44
2.00 6.80
1.70 1.60
0.60 1.36
0.48
5.00 4.00
25.00 20.00
1.00 0.80
1.43 1.14
0.07 0.06
0.08 0.06
0.10 0.08
16.00 12.80
1.80 1.44
7.00 5.60
14.00 11.20
27.00 21.60
2.80 2.24
21.00 16.80
0.53 0.42
0.33 0.26
0.60 0.48
0.80 0.64
1.10 0.88
1.20 0.96
1.50 1.20
4.00 3.20
6.50 5.20
10.50 8.40
5.50 4.40
8.00 6.40
12.00 9.60
1.30 1.04
18.00 14.40
0.45 0.36
0.55 0.44
1.20 0.96
0.12 0.10
1.80 1.44
1.30 1.04
1.40 1.12
1.50 1.20
0.32 0.26
1.20 0.96
0.32 0.26
0.42 0.34
0.52 0.42
0.60 0.48
0.42 0.34
0.20 0.16
0.20 0.16
0.42 0.34
4.20 3.36
0.32 0.26
0.42 0.34
0.52 0.42
0.70 0.56
0.20 0.16
2.00 1.60
8.00 6.40
1.31 1.05
1.64 1.31
2.63 2.10
6.67 5.34
16.67 13.34
0.82 0.66
5.00 4.00
1.25 1
1.67 2.34
2.5 2
3.33 2.66
0.11 0.08
0.21 0.17
0.48 0.38
0.06 0.04
0.05 0.04
0.03 0.02
1.69 1.35
1.00 0.8
2.07 1.66
1.07 0.86
0.66 0.53
0.66 0.53
0.74 0.59
0.82 0.66
0.98 0.70
1.08 0.86
1.15 0.92
1.32 1.06
2.19 1.75
3.29 2.63
4.92 3.94
6.57 5.26
9.85 7.98
10.31 8.25
12.05 9.64
13.69 10.95
15.34 12.27
16.43 13.14
18.07 14.46
20.54 16.43
0.19 0.15
0.74 0.59
0.82 0.66
0.98 0.78
1.08 0.86
1.31 1.05
1.64 1.31
2.46 1.97
4.00 3.20
6.40 5.12
10.67
1.20 8.54
0.96
1.33
0.80 1.06
0.64
2.50 2.00
3.00
8.00 2.40
6.40
12.00 9.60
24.00 19.20
16.00
5.00 12.80
4.00
15.00
10.00 12.00
8.00
5.00
36.00 4.00
28.80
24.00 19.20
10.00
14.00 8.00
11.20
10.00
14.00 8.00
11.20
5.00
26.00 4.00
20.80
13.00 10.40
1.00
9.00 80.00
6.40
5.00
2.00 4.00
1.60
8.00 6.40
4.00 3.20
6.40
1.20 5.12
0.96
10.66
3.00 8.53
2.40
0.30 0.24
0.30 0.24
2.50
1.00 2.00
9.00
12.00
0.55 9.60
44.00
0.32
5.00 26.00
4.00
5.00 4.00
8.00 6.40
30.00
17.00 0.34
13.60
30.00 24.00
24.00
4.00 3.20
0.80 0.64
3.50 2.80
2.70 2.16
6.00 4.80
1.50 1.20
18.00 14.40
8.00 6.40
24.00 19.20
6.00 4.80
12.00 9.60
4.00 3.20
5.00 4.00
3.70 2.96
8.00 6.40
1.50 1.20
7.30 5.84
24.00 19.20
8.00 6.40
0.50 0.40
3.50 2.80
1.20 0.96
14.00 11.20
0.67 0.54
6.00 4.80
0.20 0.16
70.00 56.00
0.80 0.64
0.60 0.48
1.67 0.84
0.70 0.56
0.55 0.28
2.70 2.16
0.50 0.25
0.27 0.14
1.60 0.80
0.34 0.17
6.00 0.03
11.00 0.06
49.00 0.24
1.82 0.91
A. STRIPAREA FORMELOR METALICE
ECHIPAJ: INSTRUMENTE:
1 TÂMPLAR CONDUCĂTOR 8 UN LOT CARPENTR
3 TULGHERI 24 8 UNELTE HO
6 AJUTOARE 48
10 ZILE LUCRĂTOARE 80 DE ORE DE
PMENT-ORE
MEDIE ÎNALT
2.69 1.94
2.46 1.77
2.98 2.15
28.00 ORE DE
SCULE
PMENT-ORE
MEDIE RIDICATĂ
C. ECHIPAMENTE/UNELTE:
NU. DESCRIERE NU. NR. DE ZILE TARIF ORAR
D COSTUL DIRECT TOTAL (A+B+C)
E O.C.M. (% din D)
F PROFITUL CONTRACTORILOR
(% DIN D)
G TVA (10% Oof B + C)
H COST TOTAL (D+E+F+G)
Eu COST UNITAR ( DIRECT)
SUMĂ
SUMĂ
SUMĂ
PRODUCȚIA PROBABILĂ DE ECHIPAMENTE GRELE
C. AUTOBASCULANTĂ - 10 MP
Tractare (dist. = 600M) 90.00 cu.m./oră 0,011
ore/m³
D. GRADER- 130G 700.00 mp / oră 0.001
10 Abonamente oră/m²
Subclasificare 300.00 mp / oră 0,003
Răspândirea oră/m²
40.00 cu.m./oră 0,025
ore/m³
E.1 VIBRATOR CU ROLE 600.00 mp / oră 0,002
10 Abonamente oră/m²
FOI ROLE DE PICIOR
Rulare statică 12 treceri-15m3 lift
Rulare vibratoare-4 pase-15m3 lift 135.00 cu.m./oră 0,007 oră/m³
Nr.3W Road Roller-static rulare 4 24.00 cu.m./oră 0,042
treceri-15 m3 lift oră/m³
Rolă trasă de tractor (1-d) 240.00 cu.m./oră 0,004
Rulare statică 6 treceri-20m3 lift ore/m³
Tandem Rulare pe role 6 treceri-20 24.00 cu.m./oră 0,042
m3 lift oră/m³
COMPACTOR VIBRATOR E.2 CA25D
G. CAMION DE APĂ - 10 MP
Udare
1,600.00 mp / oră 0.001 oră/m²
PAVAJ ASFALTIC PULVERIZAREA FALTULUI
COMPACTOR PLACĂ
DISTRIBUITOR ASFALT 8.00 cu.m./oră 0,125
Așternut de mormânt ore/m³
Vibrator de beton: 40.00 cu.m./oră 0,025
Beton vibrator ore/m³
FORŢA:
MATERIALE:
Compensare și Clasificarea lotului (tăiere Excavarea
defrișare și umplere) m3 șanțurilor
769.23 m3/oră
300 30
m3/oră
232.55 m3/oră
232.55 m3/oră
384.62 m3/oră
303.03 m3/oră
769.23 m3/oră
Eliminarea materialelor Excavarea drumurilor (m3)
necorespunzătoare m3-km
29.41 m3 /
oră
125.00
m3/oră
125.00
m3/oră
Terasament/rambleu importat (m3) Pregătirea subgradă (m2)
65.00
MT/oră
32.50
MT/oră
300 MP
Tăiere asfalt MC grad 70 MT
Strat de asfalt, SS-1 (tambur .042/mt) Tobe