Anda di halaman 1dari 5

ST(DSM/PTE/2019_12)

Nama : MOHAMAD NAQUIB BIN MORSIN

No Kad Pengenalan : 930929-01-5449

LAMPIRAN A

Tugas-Tugas Pengurusan Tenaga Elektrik Dengan Cekap Yang Dilaksanakan Tarikh Mula dan
Nama & Alamat Tamat Tempoh
Penjelasan Yang Terperinci Tentang Tugas-Tugas Peranan Yang (dd/mm/yyyy Penglibatan
Pepasangan Nama Projek Yang Pengurusan Tenaga Elektrik Dengan Cekap Yang Dimainkan Di Dalam
Telah Dijalankan - (Minggu)
Telah Dilaksanakan Projek/Jawatan dd/mm/yyyy)

Schaefer Systems Schedule the use of 1. Conduct energy audit analysis in current usage Electrical engineer 04th November 7weeks
International Sdn Bhd, street lights using a of street lighting. Current user are conducting 2019
Simpang Renggam timer in the MH, the street lighting MANUALLY. -
KLS and HES 2. Prepare current consumption and estimation 20th December
building. saving by adding timer in circuit. Below are 2020
detail of street light.
Type street light 400W metal halide
Number of poles 16 poles
Current running 7.00 pm to 6.00 pm +-
hours 2.00 hour (Manual OFF)
New running 7.00 pm to 6.00 pm
hours (Timer)

3. Prepare drawing for this improvement and


modify the circuit.
4. Measure actual kWh after implementing the
improvement. Saving 8 %. Payback period
within 0.1 years
Jumlah tempoh penglibatan (minggu) 7 weeks

(i) Sila terangkan dengan terperinci tentang tugas-tugas yang dilaksankan dan sertakan dalam lampiran berasingan jika ruang yang disediakan
tidak mencukupi
Disahkan oleh : Cop Jawatan dan Organisasi :

.
Muka 1 daripada 5
( )
ST(DSM/PTE/2019_12)
Nama : MOHAMAD NAQUIB BIN MORSIN

No Kad Pengenalan : 930929-01-5449

LAMPIRAN A

Tugas-Tugas Pengurusan Tenaga Elektrik Dengan Cekap Yang Dilaksanakan Tarikh Mula dan
Nama & Alamat Tamat Tempoh
Penjelasan Yang Terperinci Tentang Tugas-Tugas Peranan Yang (dd/mm/yyyy Penglibatan
Pepasangan Nama Projek Yang Pengurusan Tenaga Elektrik Dengan Cekap Yang Dimainkan Di Dalam
Telah Dijalankan - (Minggu)
Telah Dilaksanakan Projek/Jawatan dd/mm/yyyy)

Schaefer Systems Optimase the air 1. There are 2 mission for this project; Electrical engineer 13th January 2020 6 weeks
International Sdn Bhd, compressor usage a) Eliminate the air leaking along the air -
Simpang Renggam in the factory. pipeline. 28th February
b) Banned usage of spray nozzle for cloths 2020
cleaning
2. Install Amp loggers to analys the current
consumption for 2 week before start the
mission. Result as below;
Capacity 100%
% running hours (Weekday) 78 %
Input pressure 7.8 bar
Machine required 6.0 bar

3. There was 11 air leaking points due to wear &


tear nozzle and 2 points spray nozzle.
4. After complete mission, % running hours drop
to 74% and input pressure set at 7.4 bar.
5. Saving Result 5% kWh.
Jumlah tempoh penglibatan (minggu) 13 weeks

(i) Sila terangkan dengan terperinci tentang tugas-tugas yang dilaksankan dan sertakan dalam lampiran berasingan jika ruang yang disediakan
tidak mencukupi
Disahkan oleh : Cop Jawatan dan Organisasi :

.
Muka 2 daripada 5
( )
ST(DSM/PTE/2019_12)
Nama : MOHAMAD NAQUIB BIN MORSIN

No Kad Pengenalan : 930929-01-5449

LAMPIRAN A

Tugas-Tugas Pengurusan Tenaga Elektrik Dengan Cekap Yang Dilaksanakan Tarikh Mula dan
Nama & Alamat Tamat Tempoh
Penjelasan Yang Terperinci Tentang Tugas-Tugas Peranan Yang (dd/mm/yyyy Penglibatan
Pepasangan Nama Projek Yang Pengurusan Tenaga Elektrik Dengan Cekap Yang Dimainkan Di Dalam
Telah Dijalankan - (Minggu)
Telah Dilaksanakan Projek/Jawatan dd/mm/yyyy)

Schaefer Systems Install new inverter 1. Requirement for ducting velocity are 18 – 25 Electrical engineer 06th January 2020 15 weeks
International Sdn Bhd, starter for Booster m/s. -
Simpang Renggam centrifugal fan 18.5 2. Using DOL starter the capture velocity was up 17th April 2020
kW (IE2 – High to 32 m/s. Over supply.
efficiency) for LEV 3. By using calculation, required (Hz) was only
system. 42%. So project team suggest to install
inverter.
4. HLP-A100 (HOLIP) was selected and (Hz) set
as per required.
5. Prepare drawing of the circuit to install the
inverter complete with Panel sizing for good
ventilation system.
6. After installation, energy audit was conducted
and showed 16% saving in kWh using high
efficiency motor and inverter .

Jumlah tempoh penglibatan (minggu) 28 weeks

(i) Sila terangkan dengan terperinci tentang tugas-tugas yang dilaksankan dan sertakan dalam lampiran berasingan jika ruang yang disediakan
tidak mencukupi
Disahkan oleh : Cop Jawatan dan Organisasi :

.
Muka 3 daripada 5
( )
ST(DSM/PTE/2019_12)
Nama : MOHAMAD NAQUIB BIN MORSIN

No Kad Pengenalan : 930929-01-5449

LAMPIRAN A

Tugas-Tugas Pengurusan Tenaga Elektrik Dengan Cekap Yang Dilaksanakan Tarikh Mula dan
Nama & Alamat Tamat Tempoh
Penjelasan Yang Terperinci Tentang Tugas-Tugas Peranan Yang (dd/mm/yyyy Penglibatan
Pepasangan Nama Projek Yang Pengurusan Tenaga Elektrik Dengan Cekap Yang Dimainkan Di Dalam
Telah Dijalankan - (Minggu)
Telah Dilaksanakan Projek/Jawatan dd/mm/yyyy)

Schaefer Systems Setup schedule for 1. List out the total Air conditioning in plant Electrical engineer 13th January 2020 6 weeks
International Sdn Bhd, preventive complete with spec and labeling. -
Simpang Renggam maintenance on Air 2. Type of Air cond and HP as below table; 28th February
conditoning and Hp Quantity Type 2020
campaign Set 1-1.5 33 Split unit –Wall mounted
temperature at 2-2.5 62 Split unit – Cassette
25°C 3-5 15 Split unit – Cassette

3. Indication for PM which is 3 month to service


indoor unit and 8 month to service outdoor
unit.
4. Static data using Amp clamp meter before and
after campaign.
5. Saving 1.5 % from total aircond consumption.

Jumlah tempoh penglibatan (minggu) 33 weeks

(i) Sila terangkan dengan terperinci tentang tugas-tugas yang dilaksankan dan sertakan dalam lampiran berasingan jika ruang yang disediakan
tidak mencukupi
Disahkan oleh : Cop Jawatan dan Organisasi :

.
Muka 4 daripada 5
( )
ST(DSM/PTE/2019_12)
Nama : MOHAMAD NAQUIB BIN MORSIN

No Kad Pengenalan : 930929-01-5449

LAMPIRAN A

Tugas-Tugas Pengurusan Tenaga Elektrik Dengan Cekap Yang Dilaksanakan Tarikh Mula dan
Tamat Tempoh
Nama & Alamat
Pepasangan Nama Projek Yang Penjelasan Yang Terperinci Tentang Tugas-Tugas Peranan Yang (dd/mm/yyyy Penglibatan
Telah Dijalankan Pengurusan Tenaga Elektrik Dengan Cekap Yang Dimainkan Di Dalam - (Minggu)
Telah Dilaksanakan Projek/Jawatan dd/mm/yyyy)

Schaefer Systems To reduce energy 1. Conduct energy audit regarding current Electrical engineer 28th October 2020 25 weeks
International Sdn Bhd, consumption by consumption of compress air. -
Simpang Renggam add in 1 unit VSD 2. Verify the current compressor efficiency, which 19th March 2021
compressor. is already serviced for production 22 years.
6. Propose the new air compressor VSD+, High
efficiency system.
7. Propose new compressor working
arrangement. Fix speed compressor will work
alternately and New GA75VSD+ will act as
trimmer to meet operation process.
8. Expected saving of electricity consumption
(kWh/year) is 16.15%
9. Simple payback period is 3.62 years.
10. Installation of end year take 2 weeks including
(testing and commissioning). Week 39 & 40
2021.

Jumlah tempoh penglibatan (minggu) 58 weeks

(i) Sila terangkan dengan terperinci tentang tugas-tugas yang dilaksankan dan sertakan dalam lampiran berasingan jika ruang yang disediakan
tidak mencukupi
Disahkan oleh : Cop Jawatan dan Organisasi :

.
Muka 5 daripada 5
( )

Anda mungkin juga menyukai