Monitoring NCR LT 19 Update
Monitoring NCR LT 19 Update
10/24/2023 11:37
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC
1 Pengecoran Capping Beam CL.1 / GRID E -J1 2-Sep-17 001/LKP/IX/2017 11-Oct-17 Closed Sardiono
2 Pengecoran Capping Beam CL - J / Grid 1 - 6.1 8-Sep-17 002/LKP/IX/2017 27-Sep-17 Closed Sardiono
5 Ketidak sesuaian pek. GA GA.149 layer 1 25-Sep-17 005/LKP/IX/2017 24-Oct-17 Closed Sardiono
7 Stresing tidak tercapai GA.86,90,143 layer 1 6-Oct-17 007/LKP/X/2017 25-Oct-17 Closed Sardiono
8 Stran tendon putus GA.27 layer 1 7-Oct-17 008/LKP/X/2017 10-Nov-17 Closed Sardiono
9 Titik inclonometer patah No.4 P10 11-Oct-17 009/LKP/X/2017 14-Oct-17 Closed Sardiono
19 Stek Besi Beton Penulangan Plat 22-Dec-17 019/LKP/X/2017 29-Jan-18 Closed Eko
Permukaan D-Wall
Lantai D-16 mm Patah akibat
Basement 7
chipping Beton
20 Stek Besi Beton Penulangan Plat 28-Dec-17 020/LKP/X/2017 29-Jan-18 Closed Eko
Permukaan D-Wall
Lantai D-16 mm Patah akibat
Basement 7
chipping Beton
21 Posisi stek kolom mengalami 2-Jan-18 021/LKP/X/2017 22-Dec-17 Closed Jimmy
slab B7
pergeseran
22 13-Jan-18 022/LKP/X/2017 18-Aug-18 Closed proses 6 maret 2018 dikirim lagi 30 mei 18 dikembalikan owner 2 agustus Eko
Stek besi retaining wall RW ditolak hingga besi di dikirim lg 10-8-18
tmbhkan sedang cek inspetor owner
Page 1 of 284
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC
26 Potensi Selimut Beton Kolom Tidak 1-Feb-18 026/LKP/X/2017 6-Mar-18 Closed Eko
Kolom As J.1/6, J.2/6, J.1/5 &
Tercapai ( hasil pengecoran pelat
J.2/4
lantai tgl 26 Jan 2018
27 Pekerjaan Lantai Kerja mengalamai Pemadatan tanah, Elevasi 29-Jan-18 027/LKP/X/2017 10-Feb-18 Closed Jimmy
keterlambatan terhadap pekerjaan Lanatai Kerja & Pembersihan
pembesian besi beton
28 Pembesian Pile cap titik BP no.3 9-Feb-18 028/LKP/X/2017 12-Feb-18 Closed arif
BP no.3
tidak sesuai petunjuk GIS
31 KONVERSI BESI LAPIS BAWAH BASEMENT 7 ZONE 5 DAN 12-Mar-18 031/LKP/III/2018 30-Apr-18 Closed ada revisi permintaan SD jimmy
TANPA PERSETUJUAN OWNER ZONE 3 SEBAGIAN
37 hasil pengecoran kolom dan mutu 28-Apr-18 037/LKP/IV/2018 11-May-18 Closed yoga
Basement 5 CL A.A grid 6
beton harus dilakukan uji lapangan
Page 2 of 284
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC
39 tindakan perbaikan semua temuan 3-May-18 039/LKP/V/2018 open dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi jimmy
all area
lapangan tgl 3 juli 18
dikirim 6/11/18
40 ketebalan matrial ducting tidak 8-May-18 040/LKP/V/2018 21-May-18 Close Atang
B7
sesuai
55 kolom praktis tidak sesuai metode 23-Oct-18 055/LKP/X/2018 2-Nov-18 Close nasri
basement SUBMIT 28/10/18
kerja
56 pasangan bata tidak sesuai metode 23-Oct-18 056/LKP/X/2018 26-Oct-18 Close nasri
B3
kerja
Page 3 of 284
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC
Page 4 of 284
L
U
10/24/2023 11:37
M
BASEMENT 7 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
O
1 13-Dec-2018 086/LKP/XII/2018 penutupan lobang tie rod PG WAHYU BIMO Submit Onwer
N
###
###
7 13-Dec-2018 092/LKP/XII/2018 perbaikan balok struktur dan ramp P&S WAHYU BIMO CLOSE
Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
BASEMENT 6 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
1 14-Dec-2018 110/LKP/XII/2018 slab dan balok ngeplint C WAHYU HERU Submit Owner O
N
###
2 14-Dec-2018 111/LKP/XII/2018 injeksi lubang tie rod PG WAHYU BIMO Submit Owner
###
4 14-Dec-2018 113/LKP/XII/2018 terjadi keropos balok dan slab PG WAHYU BIMO Siap Submit
###
Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
BASEMENT 5 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
O
1 14-Dec-2018 103/LKP/XII/2018 Sisa bekisting C WAHYU HERU Submit 10 Jan 19
N
2 14-Dec-2018 104/LKP/XII/2018 Lubang Bekas Tirod Balok Ramp 2 PG WAHYU BIMO Submit 14 Jan 19
4 14-Dec-2018 106/LKP/XII/2018 Lubang Bekas Tirod Ramp 3 PG WAHYU BIMO Submit 14 Jan 19
5 14-Dec-2018 107/LKP/XII/2018 Sisa Bekistik di area Ramp 3 PG WAHYU BIMO Close 11 Jan 19
6 14-Dec-2018 108/LKP/XII/2018 Sisa bekisting Ramp 2 C & PG WAHYU BIMO Close 11 Jan 19
7 14-Dec-2018 109/LKP/XII/2018 Balok kropos (R. Pompa) P WAHYU BIMO Submit 10 Jan 19
Pelat Sambungan Rembes P Patching with Sika 215 WAHYU BIMO Submit 10 Jan 19
Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
BASEMENT 4 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
O
1 14-Dec-2018 098/LKP/XII/2018 Balok Ramp Gelombang S WAHYU BIMO Submit 14 Jan 19 N
2 14-Dec-2018 099/LKP/XII/2018 Perbaikan Struktur Parapet Ramp S WAHYU BIMO Submit 14 Jan 19
3 14-Dec-2018 100/LKP/XII/2019 Perbaikan Struktur Kolom dan Balok S WAHYU BIMO CLOSE 11 JAN 19
On Progress,
Perbaikan Stuktur Balok dan Parapet, S & BETON
4 14-Dec-2018 101/LKP/XII/2019 WAHYU BIMO Pengecoran
Pengecoran Parapet READY MIX
Menunggu Pak Eko
5 14-Dec-2018 102/LKP/XII/2020 Perbaikan Slab Lantai B4-B3 P WAHYU BIMO CLOSE 11 JAN 19
Menunggu Keputusan
Pemasangan balok WF tidak ada gap Owner ttg H Beam
6 14-Dec-2018 117/LKP/XII/2020 WAHYU BIMO
dan juga miring yang Lot tp Kolom
Geser
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
BASEMENT 3 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO DATE NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
On Progres,
1 14-Dec-2018 093/LKP/XII/2018 093.a Balok Plin P 18-Jan-19 Wahyu Bimo
bobokan
tgl . tgl . tgl . tgl .
On Progres,
093.b Slab Plin P 18-Jan-19 Wahyu Bimo
bobokan
tgl . tgl . tgl . tgl .
On Progres,
093.c Dak Bordes Tangga Plin P 18-Jan-19 Wahyu Bimo
bobokan
tgl . tgl . tgl . tgl .
On Progres,
093.d Kolom Plin P+S 18-Jan-19 Wahyu Bimo
Plester
tgl . tgl . tgl . tgl .
2 14-Dec-2018 094/LKP/XII/2018 094.a Keropos Balok PG 12-Jan-19 Wahyu Bimo Siap Submit
On Progres,
4 13-Dec-2018 096/LKP/XII/2018 bekas lubang tie rod PG 12-Jan-19 Wahyu Bimo Preasure
Grouting
tgl . tgl . tgl . tgl .
Kendala Material
097.c Kolom 3 S 12-Jan-19 Wahyu Bimo
ME
tgl . tgl . tgl . tgl .
6 14-Dec-2018 114/LKP/XII/2018 perapihan balok ramp P 12-Jan-19 Wahyu Bimo Siap Submit
tgl . tgl . tgl . tgl .
Closed 14 Jan
7 27-Dec-2018 137/LKP/XII/2018 Sisa Bekisting tertinggal di Basement 3 P 12-Jan-19 Wahyu Bimo
2019
tgl . tgl . tgl . tgl .
8 18-Dec-2018 123/LKP/XII/2018 Slab Ramp 2 rembes dan keropos P 13-Jan-19 Wahyu Bimo Siap Submit
tgl . tgl . tgl . tgl .
10 27-Dec-2018 141/LKP/XII/2018 Sisa Bekisting tertinggal di Basement 3 15-Jan-19 Wahyu Bimo Siap Submit
tgl . tgl . tgl . tgl .
Tinggal Foto
11 28-Dec-2018 144/LKP/XII/2018 Hasil cor ngeplint Lt. B3 16-Jan-19 Wahyu Bimo
Akhir
tgl . tgl . tgl . tgl .
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
PG
PG
PG
PG
PG
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 3
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN
079.2 bekisting P
Closed S Skimcoat
Menunggu Keputusan Owner
AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan
Heri Heru
Heri Heru
Heri Heru
Heri Heru
AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 5
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
161.3 bekisting PG
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
169.4 bekisting PG
include
9 172/LKP/I/2019
160,163,164,166
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 304 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
10
11
12
13
14
15
16
17
18
19
Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 305 (BETON BUNTING) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 309 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
10
11
12
13
Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 310 (BETON GEMBUNG) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 12
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
254 5
254 6
254 19
254 20
254 21
254 22
254 23
254 24
254 25
254 26
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
254 5
254 6
254 19
254 20
254 21
254 22
254 23
254 24
254 25
254 26
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
254 19
254 20
254 21
254 22
254 23
254 24
254 25
254 26
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
256
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR Keterangan A
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN C
Chipping Metode Disetujui Finishing Status T
1 12-Dec-2018 084/LKP/XII/2018 honeycomb B2 (owner) On Progres, bobokan I
O
2 13-Dec-2018 085/LKP/XII/2018 beton keropos B2 (owner) On Progres, bobokan N
10
11
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN
Chipping Metode Disetujui Finishing
12
13
14
15
16
17
18
19
20
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN
Chipping Metode Disetujui Finishing
21
22
23
24
25
26
27
On Progres, bobokan
On Progres, bobokan
On Progres, bobokan
On Progres, bobokan
L
U
M
N KETIDAKSESUAIAN PRODUK (LKP)
Keterangan A
C
Status T
I
O
N
L
U
M
N KETIDAKSESUAIAN PRODUK (LKP)
Keterangan A
C
Status T
I
O
N
L
U
10/24/2023 11:37
M
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR Keterangan A
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN C
Chipping Metode Disetujui Finishing Status T
1 6-Dec-2018 077/LKP/XII/2018 bunting dan bocor GF I
O
2 17-Dec-2018 118/LKP/XII/2018 cor bordes tangga 1 dgn chemset GF N
39 3-May-2018 039/LKP/V/2018 tindakan perbaikan semua temuan lapangan all area jimmy submit 6 NOV 18 dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi
53 19-Oct-2018 053/LKP/X/2018 perbaikan area site visit all area nasri/eko/jimmy BELUM ACTION ###
54 20-Oct-2018 054/LKP/X/2018 perbaikan area EOS lt 3 & 4 as A dan J eko/jimmy BELUM ACTION ###
58 31-Oct-2018 058/LKP/X/2018 KOLOM MIRING K9 - B1 AS E'-9.1 Eko BELUM ACTION Sudah dikerjakan proses closing ke owner
59 1-Nov-2018 059/LKP/XI/2018 coring slab slab lt.4 zone A3 Jimmy BELUM ACTION Tunggu umur 28 hari tgl 26 Nop 2018
60 1-Nov-2018 060/LKP/XI/2018 perbaikan EOS LT 2,3,4 Eko/Jimmy BELUM ACTION Tunggu Approval Konsultan
61 1-Nov-2018 061/LKP/XI/2018 Dak beton gembung shaft no.18-B4 Eko submit 30 nov 18 Sudah dikerjakan proses closing ke owner
62 5-Nov-2018 062/LKP/XI/2018 dimensi balok tidak sesuai lt.3 B3 SW4 Eko BELUM ACTION ###
64 12-Nov-2018 064/LKP/XI/2018 6 item keropos,susut LT 2-3 Eko BELUM ACTION ###
65 13-Nov-2018 065/LKP/XI/2018 8 item keropos,sisa bekisting LT B1-3 Eko BELUM ACTION ###
66 19-Nov-2018 066/LKP/XI/2018 kolom keropos LT 5 Eko submit 21 nov 18 segera dikirim 21 nov 18
67 22-Nov-2018 067/LKP/XI/2018 balok keropos BSM 1 Jimmy BELUM ACTION segera
68 22-Nov-2018 068/LKP/XI/2018 Perapihan stek besi di shaft 16 Lt. B4 BSM 4 Jimmy BELUM ACTION segera
69 22-Nov-2018 069/LKP/XI/2018 Perbaikan slab di lt. Basement 3 BSM 3 Eko BELUM ACTION segera
70 22-Nov-2018 070/LKP/XI/2018 Perbaikan pekerjaan struktur di GF GF Eko-Jimmy BELUM ACTION segera
71 23-Nov-2018 071/LKP/XI/2018 6 item keberishan dan GA BSM 7 Eko-Jimmy revisi 27 nov 18 segera dikirim 26-11-18
73 27-Nov-2018 073/LKP/XI/2018 perbaikan area waterproof lt.GF Eko submit 30 nov 18 segera
74 30-Nov-2018 074/LKP/XI/2018 man hole area doble slab lt.3 Eko BELUM ACTION segera
75 1-Dec-2018 075/LKP/XII/2018 defect lt.3 lt.3 Eko/jimmy BELUM ACTION segera
1 4 75 56 0 14
TOTAL BELUM
REVISI SUBMIT OWNER TOTAL LKP BERJALAN
CLOSING ACTION
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3
39 3-May-2018 039/LKP/V/2018 tindakan perbaikan semua temuan lapangan all area jimmy DIKIRIM 6 NOV 18 dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi
dikembalikan owner 2
49 9-Jul-2018 049/LKP/VII/2018 SW3 B3-B4 keropos B3-B4 sudaryanto berjalan dikirim 9 juli 18
agustus 18 (berjalan)
dikembalikan owner
50 10-Sep-2018 050/LKP/IX/2018 hasil cor slab B2 B2 sudaryanto DIKIRIM 12 NOV 18 dikirim 12/11/18
3 okt 18 (revisi)
53 19-Oct-2018 053/LKP/X/2018 perbaikan area site visit all area nasri/eko/jimmy BELUM ACTION ###
54 20-Oct-2018 054/LKP/X/2018 perbaikan area EOS lt 3 & 4 as A dan J eko/jimmy BELUM ACTION ###
58 31-Oct-2018 058/LKP/X/2018 KOLOM MIRING K9 - B1 AS E'-9.1 Eko Sudah dikerjakan proses closing ke owner
59 1-Nov-2018 059/LKP/XI/2018 coring slab slab lt.4 zone A3 Jimmy BELUM ACTION Tunggu umur 28 hari tgl 26 Nop 2018
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3
60 1-Nov-2018 060/LKP/XI/2018 perbaikan EOS LT 2,3,4 Eko/Jimmy BELUM ACTION Tunggu Approval Konsultan
61 1-Nov-2018 061/LKP/XI/2018 Dak beton gembung shaft no.18-B4 Eko Sudah dikerjakan proses closing ke owner
62 5-Nov-2018 062/LKP/XI/2018 dimensi balok tidak sesuai lt.3 B3 SW4 Eko BELUM ACTION ###
64 12-Nov-2018 064/LKP/XI/2018 6 item keropos,susut LT 2-3 Eko BELUM ACTION ###
65 13-Nov-2018 065/LKP/XI/2018 8 item keropos,sisa bekisting LT B1-3 Eko BELUM ACTION ###
66 19-Nov-2018 066/LKP/XI/2018 kolom keropos LT 5 Eko submit 21 nov 18 segera dikirim 21 nov 18
67 22-Nov-2018 067/LKP/XI/2018 balok keropos BSM 1 Jimmy BELUM ACTION segera
68 22-Nov-2018 068/LKP/XI/2018 Perapihan stek besi di shaft 16 Lt. B4 BSM 4 Jimmy BELUM ACTION segera
69 22-Nov-2018 069/LKP/XI/2018 Perbaikan slab di lt. Basement 3 BSM 3 Eko BELUM ACTION segera
70 22-Nov-2018 070/LKP/XI/2018 Perbaikan pekerjaan struktur di GF GF Eko-Jimmy BELUM ACTION segera
71 23-Nov-2018 071/LKP/XI/2018 6 item keberishan dan GA BSM 7 Eko-Jimmy submit 26 nov 18 segera dikirim 26-11-18
72 23-Nov-2018 072/LKP/XI/2018 balok keropos BSM 1 AS G Eko revisi 27 nov 18 segera dikirim 27 nov 18
1 4 72 53 1 13
TOTAL BELUM
REVISI SUBMIT OWNER TOTAL LKP BERJALAN
CLOSING ACTION
STATUS LAPORAN KETIDAKSESUAIAN PRODUK
10/24/2023 11:37
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC
39 tindakan perbaikan semua temuan 3-May-18 039/LKP/V/2018 open dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi jimmy
all area
lapangan tgl 3 juli 18
47 Tanggapan, hasil inspeksi bersama 25-Jun-18 047/LKP/VI/2018 open dikirim 26 juni 18 dikembalika utk direvisi sudaryanto
all area
CP/02?02/032/VI/2018 tgl 3 juli 18
48 hammer test gagal, diminta 25-Jun-18 048/LKP/VI/2018 open dikirim 28 juni 18 sudaryanto
zone 2,3,5 B3
coredrill