Anda di halaman 1dari 284

STATUS LAPORAN KETIDAKSESUAIAN PRODUK

10/24/2023 11:37
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC

1 Pengecoran Capping Beam CL.1 / GRID E -J1 2-Sep-17 001/LKP/IX/2017 11-Oct-17 Closed Sardiono

2 Pengecoran Capping Beam CL - J / Grid 1 - 6.1 8-Sep-17 002/LKP/IX/2017 27-Sep-17 Closed Sardiono

3 Penomoran Benda Uji - 15-Sep-17 003/LKP/IX/2017 9-Sep-17 Closed Sardiono

4 Posisi Slave Terlewati CB P3-P4 20-Sep-17 004/LKP/IX/2017 8-Oct-17 Closed Sardiono

5 Ketidak sesuaian pek. GA GA.149 layer 1 25-Sep-17 005/LKP/IX/2017 24-Oct-17 Closed Sardiono

6 Pengecoran RW RW AS A-D' P30-P25 3-Oct-17 006/LKP/X/2017 25-Oct-17 Closed Sardiono

7 Stresing tidak tercapai GA.86,90,143 layer 1 6-Oct-17 007/LKP/X/2017 25-Oct-17 Closed Sardiono

8 Stran tendon putus GA.27 layer 1 7-Oct-17 008/LKP/X/2017 10-Nov-17 Closed Sardiono

9 Titik inclonometer patah No.4 P10 11-Oct-17 009/LKP/X/2017 14-Oct-17 Closed Sardiono

10 Baseplate tidak menggunakan GA 29,30,31 17-Oct-17 010/LKP/X/2017 25-Oct-17 Closed Sardiono


stifness
11 Hasil Acceptance Tes GA, strand GA 130 24-Oct-17 011/LKP/X/2017 8-Nov-17 Closed Sardiono
putus
12 tes tarik tidak mencapai design GA 41 ly.3 3-Nov-17 012/LKP/X/2017 10-Nov-17 Closed Sardiono
load
coring dril ttk GA 46' mengenai
13 GA 46 ly.3 7-Nov-17 013/LKP/X/2017 24-Nov-17 Closed Sardiono
tendon GA 46
14 tes tarik tidak mencapai design GA 46 ly.3 7-Nov-17 014/LKP/X/2017 7-Nov-17 Closed Sardiono
load
15 GA 54 ly.4 13-Nov-17 015/LKP/X/2017 22-Nov-17 Closed Sardiono
kabel strand terkena excavator

16 GA 107 ly.4 16-Nov-17 016/LKP/X/2017 22-Nov-17 Closed Sardiono


kabel strand terkena excavator

17 GA 49 ly.4 20-Nov-17 017/LKP/X/2017 13-Dec-17 Closed Eko


strand putus saat test

18 GA 56 & 81 ly.5 23-Nov-17 018/LKP/X/2017 13-Dec-17 Closed Eko


hasil test stresing tidak tercapai

19 Stek Besi Beton Penulangan Plat 22-Dec-17 019/LKP/X/2017 29-Jan-18 Closed Eko
Permukaan D-Wall
Lantai D-16 mm Patah akibat
Basement 7
chipping Beton

20 Stek Besi Beton Penulangan Plat 28-Dec-17 020/LKP/X/2017 29-Jan-18 Closed Eko
Permukaan D-Wall
Lantai D-16 mm Patah akibat
Basement 7
chipping Beton
21 Posisi stek kolom mengalami 2-Jan-18 021/LKP/X/2017 22-Dec-17 Closed Jimmy
slab B7
pergeseran
22 13-Jan-18 022/LKP/X/2017 18-Aug-18 Closed proses 6 maret 2018 dikirim lagi 30 mei 18 dikembalikan owner 2 agustus Eko
Stek besi retaining wall RW ditolak hingga besi di dikirim lg 10-8-18
tmbhkan sedang cek inspetor owner

Page 1 of 284
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC

23 19-Jan-18 023/LKP/X/2017 6-Feb-18 Closed jimmy


Hasil cor kolom visual kurang baik as F-G-H / 0.2-0.3

24 29-Jan-18 024/LKP/X/2017 2-Feb-18 Closed Eko


stek borepile bengkok B7

25 Keterlambatan pekerjaan lantai 29-Jan-18 025/LKP/X/2017 10-Feb-18 Closed Jimmy


Podium
kerja terhadap pembesian

26 Potensi Selimut Beton Kolom Tidak 1-Feb-18 026/LKP/X/2017 6-Mar-18 Closed Eko
Kolom As J.1/6, J.2/6, J.1/5 &
Tercapai ( hasil pengecoran pelat
J.2/4
lantai tgl 26 Jan 2018

27 Pekerjaan Lantai Kerja mengalamai Pemadatan tanah, Elevasi 29-Jan-18 027/LKP/X/2017 10-Feb-18 Closed Jimmy
keterlambatan terhadap pekerjaan Lanatai Kerja & Pembersihan
pembesian besi beton

28 Pembesian Pile cap titik BP no.3 9-Feb-18 028/LKP/X/2017 12-Feb-18 Closed arif
BP no.3
tidak sesuai petunjuk GIS

29 Insulasi pelapis area mat 6-Mar-18 029/LKP/III/2018 8-Mar-18 Closed jimmy


MAT FOUNDATION
foundation terbuka

30 Insulasi pelapis area mat 8-Mar-18 030/LKP/III/2018 23-Mar-18 Closed jimmy


MAT FOUNDATION
foundation terbuka

31 KONVERSI BESI LAPIS BAWAH BASEMENT 7 ZONE 5 DAN 12-Mar-18 031/LKP/III/2018 30-Apr-18 Closed ada revisi permintaan SD jimmy
TANPA PERSETUJUAN OWNER ZONE 3 SEBAGIAN

32 26-Mar-18 032/LKP/III/2018 19-Apr-18 Closed Eko


Kondisi kepala kolom K1 retak Basement 6 CI G/2

33 2-Apr-18 033/LKP/IV/2018 26-May-18 Closed nasri


Hasil pengecoran B6 Basement 6 CI G/2

34 10-Apr-18 034/LKP/IV/2018 26-May-18 Closed nasri


Hasil pengecoran plat B6 & B5 Basement 6 & 5

35 Pelaksanaan Pekerjaan Pengecoran 13-Apr-18 035/LKP/IV/2018 20-Apr-18 Closed jimmy


SW-7 tanpa persetujuan Pihak Basement 7 + STP
Pengawas
dikirim 3 mei 18, revisi tunggu tes 28dikirim
dan 567 juni 18 tbp kirim lagi
36 hasil tes beton yang tidak sesuai 28-Apr-18 036/LKP/IV/2018 13-Nov-18 Close sudaryanto
dalam standar spesifikasi teknis
matfound dan cor actual
dan pembongkaran bekisting dikembalika utk direvisi 3 juli
(buble kolom) 3 juli 18
18

37 hasil pengecoran kolom dan mutu 28-Apr-18 037/LKP/IV/2018 11-May-18 Closed yoga
Basement 5 CL A.A grid 6
beton harus dilakukan uji lapangan

38 perbaikan area matfound dan 2-May-18 038/LKP/V/2018 11-May-18 Closed yoga


B7
kolom

Page 2 of 284
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC

39 tindakan perbaikan semua temuan 3-May-18 039/LKP/V/2018 open dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi jimmy
all area
lapangan tgl 3 juli 18
dikirim 6/11/18
40 ketebalan matrial ducting tidak 8-May-18 040/LKP/V/2018 21-May-18 Close Atang
B7
sesuai

41 penambahan dowel pada upstand 12-May-18 041/LKP/V/2018 19-May-18 Close eko


B5
beam/cor monolit

42 14-May-18 042/LKP/V/2018 13-Nov-18 Close dikirim 2 juni 18 eko


kolom bubble B4-B5
dikembalikan owner 28 jun
(berjalan)
43 30-May-18 043/LKP/V/2018 13-Nov-18 Close dikirim 2 juni 18 eko
lubang tie rod & kolom bubble B4-B5-B6
dikembalikan owner 28 jun
(berjalan)
44 30-May-18 044/LKP/V/2018 13-Nov-18 Close dikirim 2 juni 18 eko
kolom bubble dan ngeplin B4-B5-B6
dikembalikan owner 28 jun
(berjalan)
45 25-Jun-18 045/LKP/VI/2018 13-Nov-18 Close dikirim 3 juli 18 dikembalikan owner 2 jimmy
kolom bubble dan ngeplin B3-B4-B5-B6
agustus 18 (berjalan)

46 25-Jun-18 046/LKP/VI/2018 berjalan dikirim 4 juli 18 dikembalikan owner 2 nasri


finishing,MEP,dwal bocor,gridline all area
agustus 18 (berjalan)
dikirim 6/11/18
47 Tanggapan, hasil inspeksi bersama 25-Jun-18 047/LKP/VI/2018 13-Nov-18 Close dikirim 26 juni 18 dikembalika utk direvisi sudaryanto
all area
CP/02?02/032/VI/2018 tgl 3 juli 18
dikirim 6/11/18
48 hammer test gagal, diminta 25-Jun-18 048/LKP/VI/2018 27-Sep-18 Close dikirim 28 juni 18 sudaryanto
zone 2,3,5 B3
coredrill

49 9-Jul-18 049/LKP/VII/2018 berjalan dikirim 9 juli 18 dikembalikan owner 2 sudaryanto


SW3 B3-B4 keropos B3-B4
agustus 18 (berjalan)

50 10-Sep-18 050/LKP/IX/2018 open dikembalikan owner 3 okt sudaryanto


hasil cor slab B2 B2 dikirim 12/11/18
18 (revisi)

51 11-Oct-18 051/LKP/X/2018 2-Nov-18 Close nasri


10 item site visit all area SUBMIT 30/10/18

52 17-Oct-18 052/LKP/X/2018 open sudaryanto


14 sitememo agar diclosing all area dikirim ke owner 19-10-18

53 19-Oct-18 053/LKP/X/2018 open nasri/eko/jimmy


perbaikan area site visit all area

54 20-Oct-18 054/LKP/X/2018 open eko/jimmy


perbaikan area EOS lt 3 & 4 as A dan J

55 kolom praktis tidak sesuai metode 23-Oct-18 055/LKP/X/2018 2-Nov-18 Close nasri
basement SUBMIT 28/10/18
kerja

56 pasangan bata tidak sesuai metode 23-Oct-18 056/LKP/X/2018 26-Oct-18 Close nasri
B3
kerja

57 26-Oct-18 057/LKP/X/2018 13-Nov-18 Close Eko/Jimmy


pemakaian bekisting jelek all area
dikirim 12/11/18

Page 3 of 284
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS target closed Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC

58 31-Oct-18 058/LKP/X/2018 open Eko


KOLOM MIRING K9 - B1 AS E'-9.1

59 1-Nov-18 059/LKP/XI/2018 open Jimmy


coring slab slab lt.4 zone A3

60 1-Nov-18 060/LKP/XI/2018 open Eko/Jimmy


perbaikan EOS LT 2,3,4

61 1-Nov-18 061/LKP/XI/2018 open Eko


Dak beton gembung shaft no.18-B4

62 5-Nov-18 062/LKP/XI/2018 open Eko


dimensi balok tidak sesuai lt.3 B3 SW4

63 posisi stek SW tidak memenuhi 9-Nov-18 063/LKP/XI/2018 13-Nov-18 Close Eko


SW1,3,4,6,7 lt.5
ukuran panjang

64 12-Nov-18 064/LKP/XI/2018 open Eko


6 item keropos,susut LT 2-3

65 13-Nov-18 065/LKP/XI/2018 open Eko


8 item keropos,sisa bekisting LT B1-3

Jumlah LKP : 65 submit owner berjalan belum action revisi


Status Open LKP : 12 3 2 9 0
Status Close LKP : 51 52,50,39 49.46 53,54,58,59,60,61,62.64,65
Status Continue : 2

Page 4 of 284
L
U
10/24/2023 11:37
M
BASEMENT 7 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
O
1 13-Dec-2018 086/LKP/XII/2018 penutupan lobang tie rod PG WAHYU BIMO Submit Onwer
N
###

2 13-Dec-2018 087/LKP/XII/2018 bekisting tertinggal P WAHYU BIMO CLOSE


###

3 13-Dec-2018 088/LKP/XII/2018 perbaikan struktur area ramp S WAHYU BIMO CLOSE

4 13-Dec-2018 089/LKP/XII/2018 perbaikan struktur kolom S WAHYU BIMO CLOSE 11 JAN 19

###

5 13-Dec-2018 090/LKP/XII/2018 perbaikan balok struktur ramp S WAHYU BIMO CLOSE

6 13-Dec-2018 091/LKP/XII/2018 perbaikan struktur kolom S WAHYU BIMO CLOSE

7 13-Dec-2018 092/LKP/XII/2018 perbaikan balok struktur dan ramp P&S WAHYU BIMO CLOSE

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
BASEMENT 6 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
1 14-Dec-2018 110/LKP/XII/2018 slab dan balok ngeplint C WAHYU HERU Submit Owner O
N
###

2 14-Dec-2018 111/LKP/XII/2018 injeksi lubang tie rod PG WAHYU BIMO Submit Owner
###

3 14-Dec-2018 112/LKP/XII/2018 slab ada rembes P WAHYU HERU Submit Owner


###

4 14-Dec-2018 113/LKP/XII/2018 terjadi keropos balok dan slab PG WAHYU BIMO Siap Submit
###

P WAHYU BIMO Siap Submit

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
BASEMENT 5 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
O
1 14-Dec-2018 103/LKP/XII/2018 Sisa bekisting C WAHYU HERU Submit 10 Jan 19
N

2 14-Dec-2018 104/LKP/XII/2018 Lubang Bekas Tirod Balok Ramp 2 PG WAHYU BIMO Submit 14 Jan 19

Hasil Pengecoran dinding ngeplint pada


3 14-Dec-2018 105/LKP/XII/2018 C, P, S Patching with Plester WAHYU BIMO Close 11 Jan 19
drop panel SW 7

4 14-Dec-2018 106/LKP/XII/2018 Lubang Bekas Tirod Ramp 3 PG WAHYU BIMO Submit 14 Jan 19

5 14-Dec-2018 107/LKP/XII/2018 Sisa Bekistik di area Ramp 3 PG WAHYU BIMO Close 11 Jan 19

6 14-Dec-2018 108/LKP/XII/2018 Sisa bekisting Ramp 2 C & PG WAHYU BIMO Close 11 Jan 19

7 14-Dec-2018 109/LKP/XII/2018 Balok kropos (R. Pompa) P WAHYU BIMO Submit 10 Jan 19

Dinding Parapet Ngeplint, C&P WAHYU BIMO Submit 10 Jan 19

Bordes Tangga Kropos P WAHYU BIMO Submit 10 Jan 19

Pelat Sambungan Rembes P Patching with Sika 215 WAHYU BIMO Submit 10 Jan 19

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
BASEMENT 4 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR PEKERJAAN PIC Keterangan A
NO DATE NUMBER ITEM METODH C
Chipping Metode Disetujui Finishing PLAN ACTUAL TBP CP Status T
I
O
1 14-Dec-2018 098/LKP/XII/2018 Balok Ramp Gelombang S WAHYU BIMO Submit 14 Jan 19 N

2 14-Dec-2018 099/LKP/XII/2018 Perbaikan Struktur Parapet Ramp S WAHYU BIMO Submit 14 Jan 19

3 14-Dec-2018 100/LKP/XII/2019 Perbaikan Struktur Kolom dan Balok S WAHYU BIMO CLOSE 11 JAN 19

On Progress,
Perbaikan Stuktur Balok dan Parapet, S & BETON
4 14-Dec-2018 101/LKP/XII/2019 WAHYU BIMO Pengecoran
Pengecoran Parapet READY MIX
Menunggu Pak Eko

5 14-Dec-2018 102/LKP/XII/2020 Perbaikan Slab Lantai B4-B3 P WAHYU BIMO CLOSE 11 JAN 19

Menunggu Keputusan
Pemasangan balok WF tidak ada gap Owner ttg H Beam
6 14-Dec-2018 117/LKP/XII/2020 WAHYU BIMO
dan juga miring yang Lot tp Kolom
Geser

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
BASEMENT 3 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO DATE NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

On Progres,
1 14-Dec-2018 093/LKP/XII/2018 093.a Balok Plin P 18-Jan-19 Wahyu Bimo
bobokan
tgl . tgl . tgl . tgl .

On Progres,
093.b Slab Plin P 18-Jan-19 Wahyu Bimo
bobokan
tgl . tgl . tgl . tgl .

On Progres,
093.c Dak Bordes Tangga Plin P 18-Jan-19 Wahyu Bimo
bobokan
tgl . tgl . tgl . tgl .

On Progres,
093.d Kolom Plin P+S 18-Jan-19 Wahyu Bimo
Plester
tgl . tgl . tgl . tgl .

093.e Kolom Plin 18-Jan-19 Wahyu Bimo On Progres

tgl . tgl . tgl . tgl .

2 14-Dec-2018 094/LKP/XII/2018 094.a Keropos Balok PG 12-Jan-19 Wahyu Bimo Siap Submit

tgl . tgl . tgl . tgl .

094.b Keropos Slab P 12-Jan-19 Wahyu Bimo Siap Submit

tgl . tgl . tgl . tgl .


On Progres,
3 13-Dec-2018 095/LKP/XII/2018 Keropos 1 16-Jan-19 Wahyu Bimo Preasure
Grouting
tgl . tgl . tgl . tgl .
On Progres,
Keropos 2 16-Jan-19 Wahyu Bimo Preasure
Grouting
tgl . tgl . tgl . tgl .
On Progres,
Keropos 3 16-Jan-19 Wahyu Bimo Preasure
Grouting
tgl . tgl . tgl . tgl .

Keropos 4 18-Jan-19 Wahyu Bimo


tgl . tgl . tgl . tgl .

Keropos 5 18-Jan-19 Wahyu Bimo


tgl . tgl . tgl . tgl .
10/24/2023 11:37
BASEMENT 3 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO DATE NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

On Progres,
4 13-Dec-2018 096/LKP/XII/2018 bekas lubang tie rod PG 12-Jan-19 Wahyu Bimo Preasure
Grouting
tgl . tgl . tgl . tgl .

5 13-Dec-2018 097/LKP/XII/2018 097.a Kolom 1 S 12-Jan-19 Wahyu Bimo ok


tgl . tgl . tgl . tgl .

097.d Kolom 2 S 12-Jan-19 Wahyu Bimo ok


tgl . tgl . tgl . tgl .

Kendala Material
097.c Kolom 3 S 12-Jan-19 Wahyu Bimo
ME
tgl . tgl . tgl . tgl .

6 14-Dec-2018 114/LKP/XII/2018 perapihan balok ramp P 12-Jan-19 Wahyu Bimo Siap Submit
tgl . tgl . tgl . tgl .

Closed 14 Jan
7 27-Dec-2018 137/LKP/XII/2018 Sisa Bekisting tertinggal di Basement 3 P 12-Jan-19 Wahyu Bimo
2019
tgl . tgl . tgl . tgl .

8 18-Dec-2018 123/LKP/XII/2018 Slab Ramp 2 rembes dan keropos P 13-Jan-19 Wahyu Bimo Siap Submit
tgl . tgl . tgl . tgl .

Keropos di area Ramp 3 Lt. Basement


9 27-Dec-2018 138/LKP/XII/2018 13-Jan-19 Wahyu Bimo On Progress
4_Basement 3
tgl . tgl . tgl . tgl .

10 27-Dec-2018 141/LKP/XII/2018 Sisa Bekisting tertinggal di Basement 3 15-Jan-19 Wahyu Bimo Siap Submit
tgl . tgl . tgl . tgl .

Tinggal Foto
11 28-Dec-2018 144/LKP/XII/2018 Hasil cor ngeplint Lt. B3 16-Jan-19 Wahyu Bimo
Akhir
tgl . tgl . tgl . tgl .

Keropos pada Ltani B3 (Slab B2 bagian


12 28-Dec-2018 142/LKP/XII/2018 19-Jan-19 Wahyu Bimo On Progress
Bawah
tgl . tgl . tgl . tgl .

Retak dan Rembes pada Lantai B3 (Slab


13 28-Dec-2018 143/LKP/XII/2018 19-Jan-19 Wahyu Bimo On Progress
B2 bagian bawah)
tgl . tgl . tgl . tgl .

Rembesan air pada slab B3 (bagian


14 31-Dec-2018 150/LKP/XII/2018 19-Jan-19 Wahyu Bimo On Progress
bawah)
tgl . tgl . tgl . tgl .

15 18-Dec-2018 122/LKP/XII/2018 Grouting Slab Balok 18-Jan-19 Wahyu Bimo On Progress


tgl . tgl . tgl . tgl .
10/24/2023 11:37
BASEMENT 3 LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO DATE NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

12 178/LKP/I/2019 178.4 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.5 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.6 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.7 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.8 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.9 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.10 sisa bekisting PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

178.11 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.12 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.13 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.14 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.15 sisa bekisting PG

tgl . tgl . tgl . tgl .

178.16 sisa bekisting PG

tgl . tgl . tgl . tgl .

PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

PG

tgl . tgl . tgl . tgl .

PG

tgl . tgl . tgl . tgl .

PG

tgl . tgl . tgl . tgl .

PG

tgl . tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 060/LKP/XII/2018 060.1 perkuatan pelat twisted PG

tgl . tgl . tgl . tgl .

060.2 perkuatan pelat twisted PG

tgl . tgl . tgl . tgl .

060.3 perkuatan pelat twisted PG

tgl . tgl . tgl . tgl .

060.4 perkuatan pelat twisted PG

tgl . tgl . tgl . tgl .

2 064/LKP/XII/2018 064.1 sisa bekisting P

tgl . tgl . tgl . tgl .

064.2 beton gembung P

tgl . tgl . tgl . tgl .

064.3 sambungan tidak rata p

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

064.4 Beton Keropos PG

tgl . tgl . tgl . tgl .

3 130/LKP/XII/2018 130.1 Beton Keropos PG

tgl . tgl . tgl . tgl .

130.2 Beton Keropos PG

tgl . tgl . tgl . tgl .

130.3 Beton Keropos PG

tgl . tgl . tgl .

130.4 Beton Keropos PG

tgl . tgl . tgl . tgl .

130.5 Beton Keropos PG

tgl . tgl . tgl . tgl .

4 156/LKP/I/2019 156.1 beton ngeplin P

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

156.2 beton ngeplin PG

tgl . tgl . tgl . tgl .

5 157/LKP/I/2019 157.1 beton keropos PG

tgl . tgl . tgl . tgl .

157.2 beton keropos PG

tgl . tgl. tgl . tgl .

157.3 beton keropos PG

tgl . tgl . tgl . tgl .

157.4 beton keropos PG

tgl . tgl . tgl . tgl .

157.5 beton keropos PG

tgl . tgl . tgl . tgl .

157.6 beton keropos PG

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 2
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 3
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 075/LKP/XII/2018 075.1 beton gembung P

tgl . tgl . tgl . tgl .

075.2 bekisting P Heri Heru

tgl . tgl . tgl . tgl .

075.3 beton keropos PG Heri Heru

tgl . tgl . tgl . tgl .

075.4 beton keropos PG

tgl . tgl . tgl . tgl .

075.5 sisa bekisting P

tgl . tgl . tgl . tgl .

075.6 beton gembung P

tgl . tgl . tgl . tgl .

075.7 sambungan tidak rata p

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 3
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

2 075.8 Beton Keropos PG

tgl . tgl . tgl . tgl .

075.9 Beton Keropos PG Heri Heru

tgl . tgl . tgl . tgl .

3 075.10 Beton Keropos PG

tgl . tgl . tgl . tgl .

075.11 Beton Keropos PG

tgl . tgl . tgl . tgl .

075.12 Beton Keropos PG

tgl . tgl . tgl . tgl .

075.13 beton gembung

tgl . tgl . tgl . tgl .

075.14 bekisting Heri Heru

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 3
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

075.15 bekisting PG Heri Heru

tgl . tgl . tgl . tgl .

075.16 bekisting S Heri Heru

tgl . tgl . tgl . tgl .

2 155/LKP/XII/2018 155.1 beton ngeplin p

tgl . tgl . tgl . tgl .

155.2 beton ngeplin p

tgl . tgl . tgl . tgl .

155.3 beton ngeplin p

tgl . tgl . tgl . tgl .

3 060/LKP/XII/2018 060.1 perbaikan pelat twisted

tgl . tgl . tgl . tgl .

060.2 perbaikan pelat twisted

tgl . tgl . tgl . tgl .

060.3 perbaikan pelat twisted

tgl . tgl . tgl . tgl .

060.4 perbaikan pelat twisted

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 3
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

1 079/LKP/XII/2018 079.1 beton keropos PG

tgl . tgl . tgl . tgl .

079.2 bekisting P

tgl . tgl . tgl . tgl .

079.3 beton ngeplint P

tgl . tgl . tgl . tgl .

079.4 beton ngeplint P

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

079.5 beton keropos PG

tgl . tgl . tgl . tgl .

079.6 beton gelombang P

tgl . tgl . tgl . tgl .

079.7 beton ngeplint P

tgl . tgl . tgl . tgl .

079.8 beton ngeplint P

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

079.9 beton ngeplint

tgl . tgl . tgl . tgl .

079.10 beton ngeplint P

tgl . tgl . tgl . tgl .

079.11 permukaan beton grepes p

tgl . tgl . tgl . tgl .

2 081/LKP/XII/2018 081.1 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

081.2 beton keropos PG

tgl . tgl . tgl . tgl .

081.3 beton keropos PG

tgl . tgl . tgl . tgl .

081.4 permukaan beton grepes p

tgl . tgl . tgl . tgl .

081.5 beton ngeplint p

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

3 083/LKP/XII/2018 083.1 beton keropos PG

tgl . tgl. tgl . tgl .

083.2 beton keropos PG

tgl . tgl . tgl . tgl .

083.3 beton keropos PG

tgl . tgl . tgl . tgl .

083.4 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

083.5 beton ngeplint

tgl . tgl . tgl . tgl .

083.6 permukaan beton grepes p

tgl . tgl . tgl .

083.7 beton ngeplint

tgl . tgl . tgl . tgl .

4 129/LKP/XII/2018 129.1 beton keropos P

tgl . tgl . tgl . tgl .

129.2 beton keropos PG

tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 4
FOTO STATUS
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN

5 151/LKP/XII/2018 151.1 beton ngeplint p

tgl . tgl . tgl . tgl .

151.2 beton ngeplint p

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status


AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status


AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status


AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status


AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status

Heri Heru

Heri Heru

Heri Heru

Heri Heru
AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status


AKSESUAIAN PRODUK (LKP) Lantai 4
STATUS PIC Keterangan

ACTUAL TBP CP Status


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

6 153/LKP/I/2019 153.1 beton keropos PG

tgl . tgl . tgl . tgl .

153.2 beton keropos PG

tgl . tgl . tgl . tgl .

153.3 beton keropos PG

tgl . tgl . tgl . tgl .

153.4 beton keropos PG

tgl . tgl . tgl . tgl .

153.5 beton keropos PG

tgl . tgl . tgl . tgl .

153.6 beton keropos PG

tgl . tgl . tgl . tgl .

153.7 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

153.8 beton keropos PG

tgl . tgl . tgl . tgl .

153.9 beton keropos PG

tgl . tgl . tgl . tgl .

153.10 beton keropos PG

tgl . tgl . tgl . tgl .

7 174/LKP/I/2019 mutu beton tdk sesuai spesifikasi

8 179/LKP/I/2019 179.1 beton ngeplin P

tgl . tgl . tgl . tgl .

179.2 beton ngeplin P

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

9 180/LKP/I/2019 180.1 beton keropos PG

tgl . tgl . tgl . tgl .

180.2 beton keropos PG

tgl . tgl . tgl . tgl .

180.3 beton keropos PG

tgl . tgl . tgl . tgl .

180.4 beton keropos PG

tgl . tgl . tgl . tgl .

180.5 beton keropos PG

tgl . tgl. tgl . tgl .

180.6 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

180.7 beton keropos PG

tgl . tgl . tgl . tgl .

180.8 beton keropos PG

tgl . tgl . tgl . tgl .

180.9 beton keropos PG

tgl . tgl . tgl . tgl .

180.10 beton keropos PG

tgl . tgl . tgl . tgl .

180.11 beton keropos PG

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 5
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 066/LKP/XII/2018 066.1 beton keropos PG

tgl . tgl . tgl . tgl .

066.2 beton keropos PG

tgl . tgl . tgl . tgl .

066.3 beton keropos PG

tgl . tgl . tgl . tgl .

066.4 beton keropos PG

tgl . tgl . tgl . tgl .

2 147/LKP/XII/2018 147.1 injeksi lubang terot PG

tgl . tgl . tgl . tgl .

injeksi lubang terot PG

tgl . tgl . tgl . tgl .

3 148/LKP/XII/2018 148.1 Beton Keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 5
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

148.2 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.3 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.4 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.5 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.6 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.7 Beton Keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 5
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

148.8 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.9 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.10 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.11 Beton Keropos PG

tgl . tgl. tgl . tgl .

148.12 Beton Keropos PG

tgl . tgl . tgl . tgl .

148.13 Beton Keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 5
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

148.14 Beton Keropos PG

tgl . tgl . tgl . tgl .

4 149/LKP/XII/2018 149.1 beton ngeplint p

tgl . tgl . tgl . tgl .

149.2 beton ngeplint p

tgl . tgl . tgl .

tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 159/LKP/I/2019 159.1 beton gelombang P

tgl . tgl . tgl . tgl .

159.2 beton gelombang P

tgl . tgl . tgl . tgl .

159.3 beton gelombang P

tgl . tgl . tgl . tgl .

159.4 beton gelombang P

tgl . tgl . tgl . tgl .

2 160/LKP/I/2019 160.1 beton ngeplint PG

tgl . tgl . tgl . tgl .

160.2 beton ngeplint PG

tgl . tgl . tgl . tgl .

160.3 beton ngeplint PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

160.4 beton ngeplint PG

tgl . tgl . tgl . tgl .

3 161/LKP/I/2019 161.1 beton ngeplint PG

tgl . tgl . tgl . tgl .

161.2 beton ngeplint PG

tgl . tgl . tgl . tgl .

161.3 bekisting PG

tgl . tgl . tgl . tgl .

161.4 Beton Keropos PG

tgl . tgl . tgl . tgl .

161.5 Beton Keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

161.6 Beton Keropos PG

tgl . tgl . tgl . tgl .

161.7 Beton Keropos PG

tgl . tgl . tgl . tgl .

163/LKP/I/2019 163.1 Beton Keropos PG

tgl . tgl. tgl . tgl .

163.2 Beton Keropos PG

tgl . tgl . tgl . tgl .

4 164/LKP/I/2019 164.1 Beton Keropos PG

tgl . tgl . tgl . tgl .

164.2 Beton Keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

164.3 Beton Keropos p

tgl . tgl . tgl . tgl .

164.4 Beton Keropos p

tgl . tgl . tgl .

164.5 Beton Keropos

tgl . tgl . tgl . tgl .

164.6 Beton Keropos

tgl . tgl . tgl . tgl .

164.7 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

5 165/LKP/I/2019 165.1 injeksi lubang terot P

tgl . tgl . tgl . tgl .

165.2 injeksi lubang terot P

tgl . tgl . tgl . tgl .

6 166/LKP/I/2019 166.1 beton bunting P

tgl . tgl . tgl . tgl .

166.2 beton bunting P

tgl . tgl . tgl . tgl .

166.3 beton bunting PG

tgl . tgl . tgl . tgl .

166.4 beton bunting PG

tgl . tgl . tgl . tgl .

166.5 beton bunting PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

7 169/LKP/I/2019 169.1 beton ngeplint PG

tgl . tgl . tgl . tgl .

169.2 beton ngeplint PG

tgl . tgl . tgl . tgl .

169.3 beton ngeplint PG

tgl . tgl . tgl . tgl .

169.4 bekisting PG

tgl . tgl . tgl . tgl .

169.5 Beton Keropos PG

tgl . tgl . tgl . tgl .

8 170/LKP/I/2019 170.1 injeksi lubang terot PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

170.2 injeksi lubang terot PG

tgl . tgl . tgl . tgl .

perbaikan kepala kolom tanpa di


171/LKP/I/2019 171.1 PG
saksikan

tgl . tgl . tgl . tgl .

perbaikan kepala kolom tanpa di


171.2 PG
saksikan

tgl . tgl. tgl . tgl .

perbaikan kepala kolom tanpa di


171.3 PG
saksikan

tgl . tgl . tgl . tgl .

perbaikan kepala kolom tanpa di


171.4 PG
saksikan

tgl . tgl . tgl . tgl .

include
9 172/LKP/I/2019
160,163,164,166

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 6
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

10 173/LKP/I/2019 include 169

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 080/LKP/XII/2018 080.1 beton keropos PG

tgl . tgl . tgl . tgl .

2 183/LKP/I/2019 183.1 beton Keropos PG

tgl . tgl . tgl . tgl .

183.2 beton keropos PG

tgl . tgl . tgl . tgl .

183.3 beton keropos PG

tgl . tgl . tgl . tgl .

183.4 beton keropos PG

tgl . tgl . tgl . tgl .

183.5 beton keropos PG

tgl . tgl . tgl . tgl .

183.6 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

183.7 beton keropos PG

tgl . tgl . tgl . tgl .

183.8 beton keropos PG

tgl . tgl . tgl . tgl .

183.9 beton keropos PG

tgl . tgl . tgl . tgl .

183.10 beton keropos PG

tgl . tgl . tgl . tgl .

183.11 beton keropos PG

tgl . tgl . tgl . tgl .

183.12 beton keropos PG

tgl . tgl . tgl . tgl .

183.13 beton keropos PG Heri Heru

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

183.14 beton keropos PG Heri Heru

tgl . tgl . tgl . tgl .

183.15 beton keropos PG Heri Heru

tgl . tgl . tgl . tgl .

183.16 beton keropos PG Heri Heru

tgl . tgl. tgl . tgl .

183.17 beton keropos PG

tgl . tgl . tgl . tgl .

183.18 beton keropos PG

tgl . tgl . tgl . tgl .

183.19 beton keropos PG

tgl . tgl . tgl . tgl .

183.20 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

183.21 beton keropos PG

tgl . tgl . tgl . tgl .

183.22 beton keropos PG

tgl . tgl . tgl . tgl .

183.23 beton keropos PG

tgl . tgl . tgl . tgl .

183.24 beton keropos PG

tgl . tgl . tgl . tgl .

183.25 beton keropos PG

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

3 183/LKP/I/2019 183.26 beton Keropos PG

tgl . tgl . tgl . tgl .

183.27 beton keropos PG

tgl . tgl . tgl . tgl .

183.28 beton keropos PG

tgl . tgl . tgl . tgl .

183.29 beton keropos PG

tgl . tgl . tgl . tgl .

183.30 beton keropos PG

tgl . tgl . tgl . tgl .

183.31 beton keropos PG

tgl . tgl . tgl . tgl .

183.32 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

183.33 beton keropos PG

tgl . tgl . tgl . tgl .

183.34 beton keropos PG

tgl . tgl . tgl . tgl .

183.35 beton keropos PG

tgl . tgl . tgl . tgl .

183.36 beton keropos PG

tgl . tgl . tgl . tgl .

183.37 beton keropos PG

tgl . tgl . tgl . tgl .

183.38 beton keropos PG

tgl . tgl . tgl . tgl .

183.39 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

183.40 beton keropos PG

tgl . tgl . tgl . tgl .

183.41 beton keropos PG

tgl . tgl. tgl . tgl .

183.42 beton keropos PG

tgl . tgl . tgl . tgl .

183.43 beton keropos PG

tgl . tgl . tgl . tgl .

183.44 beton keropos PG

tgl . tgl . tgl . tgl .

183.45 beton keropos PG

tgl . tgl . tgl . tgl .

183.46 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

4 190/LKP/I/2019 190.1 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.2 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.3 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.4 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.5 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.6 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.7 beton ngeplint PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

190.8 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.9 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.10 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.11 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.12 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.13 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.14 beton ngeplint PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

190.15 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.16 beton ngeplint PG

tgl . tgl. tgl . tgl .

190.17 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.18 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.19 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.20 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.21 beton ngeplint PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

4 190/LKP/I/2019 190.22 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.23 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.24 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.25 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.26 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.27 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.28 beton ngeplint PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

190.29 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.30 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.31 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.32 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.33 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.34 beton ngeplint PG

tgl . tgl . tgl . tgl .

190.35 beton ngeplint PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

5 191/LKP/I/2019 191.1 beton keropos

tgl . tgl . tgl . tgl .

191.2 beton keropos

tgl . tgl. tgl . tgl .

191.3 beton keropos

tgl . tgl . tgl . tgl .

191.4 beton keropos

tgl . tgl . tgl . tgl .

191.5 beton keropos

tgl . tgl . tgl . tgl .

191.6 beton keropos

tgl . tgl . tgl . tgl .

191.7 beton keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

5 191/LKP/I/2019 191.8 beton keropos PG

tgl . tgl . tgl . tgl .

191.9 beton keropos PG

tgl . tgl . tgl . tgl .

191.10 beton keropos PG

tgl . tgl . tgl . tgl .

191.11 beton keropos PG

tgl . tgl . tgl . tgl .

191.12 beton keropos PG

tgl . tgl . tgl . tgl .

191.13 beton keropos PG

tgl . tgl . tgl . tgl .

191.14 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

191.15 beton keropos PG

tgl . tgl . tgl . tgl .

191.16 beton keropos PG

tgl . tgl . tgl . tgl .

191.17 beton keropos PG

tgl . tgl . tgl . tgl .

191.18 beton keropos PG

tgl . tgl . tgl . tgl .

191.19 beton keropos PG

tgl . tgl . tgl . tgl .

191.20 beton keropos PG

tgl . tgl . tgl . tgl .

191.21 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

191.22 beton keropos

tgl . tgl . tgl . tgl .

191.23 beton keropos

tgl . tgl. tgl . tgl .

191.24 beton keropos

tgl . tgl . tgl . tgl .

191.25 beton keropos

tgl . tgl . tgl . tgl .

191.26 beton keropos

tgl . tgl . tgl . tgl .

191.27 beton keropos

tgl . tgl . tgl . tgl .

191.28 beton keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

5 191/LKP/I/2019 191.29 beton keropos PG

tgl . tgl . tgl . tgl .

191.30 beton keropos PG

tgl . tgl . tgl . tgl .

191.31 beton keropos PG

tgl . tgl . tgl . tgl .

191.32 beton keropos PG

tgl . tgl . tgl . tgl .

191.33 beton keropos PG

tgl . tgl . tgl . tgl .

191.34 beton keropos PG

tgl . tgl . tgl . tgl .

2 191.35 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

191.36 beton keropos PG

tgl . tgl . tgl . tgl .

3 191.37 beton keropos PG

tgl . tgl . tgl . tgl .

191.38 beton keropos PG

tgl . tgl . tgl . tgl .

191.39 beton keropos PG

tgl . tgl . tgl . tgl .

191.40 beton keropos PG

tgl . tgl . tgl . tgl .

191.41 beton keropos PG

tgl . tgl . tgl . tgl .

191.42 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

191.43 beton keropos

tgl . tgl . tgl . tgl .

191.44 beton keropos

tgl . tgl. tgl . tgl .

191.45 beton keropos

tgl . tgl . tgl . tgl .

6 191.46 beton keropos

tgl . tgl . tgl . tgl .

7 191.47 beton keropos

tgl . tgl . tgl . tgl .

191.48 beton keropos

tgl . tgl . tgl . tgl .

191.49 beton keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 7
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 184/LKP/XII/2018 184.1 beton keropos PG

tgl . tgl . tgl . tgl .

184.2 beton Keropos PG

tgl . tgl . tgl . tgl .

184.3 beton keropos PG

tgl . tgl . tgl . tgl .

184.4 beton keropos PG

tgl . tgl . tgl . tgl .

184.5 beton keropos PG

tgl . tgl . tgl . tgl .

184.6 beton keropos PG

tgl . tgl . tgl . tgl .

184.7 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

184.8 beton keropos PG

tgl . tgl . tgl . tgl .

184.9 beton keropos PG

tgl . tgl . tgl . tgl .

184.10 beton keropos PG

tgl . tgl . tgl . tgl .

184.11 beton keropos PG

tgl . tgl . tgl . tgl .

184.12 beton keropos PG

tgl . tgl . tgl . tgl .

184.13 beton keropos PG

tgl . tgl . tgl . tgl .

184.14 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

184.15 beton keropos PG

tgl . tgl . tgl . tgl .

184.16 beton keropos PG

tgl . tgl . tgl . tgl .

184.17 beton keropos PG

tgl . tgl. tgl . tgl .

184.18 beton keropos PG

tgl . tgl . tgl . tgl .

184.19 beton keropos PG

tgl . tgl . tgl . tgl .

184.20 beton keropos PG

tgl . tgl . tgl . tgl .

184.21 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

184.22 beton keropos PG

tgl . tgl . tgl . tgl .

184.23 beton keropos PG

tgl . tgl . tgl . tgl .

184.24 beton keropos PG

tgl . tgl . tgl . tgl .

184.25 beton keropos PG

tgl . tgl . tgl . tgl .

184.26 beton keropos PG

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 184/LKP/XII/2018 184.27 beton keropos PG

tgl . tgl . tgl . tgl .

184.28 beton Keropos PG

tgl . tgl . tgl . tgl .

184.29 beton keropos PG

tgl . tgl . tgl . tgl .

184.30 beton keropos PG

tgl . tgl . tgl . tgl .

184.31 beton keropos PG

tgl . tgl . tgl . tgl .

184.32 beton keropos PG

tgl . tgl . tgl . tgl .

184.33 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

184.34 beton keropos PG

tgl . tgl . tgl . tgl .

184.35 beton keropos PG

tgl . tgl . tgl . tgl .

184.36 beton keropos PG

tgl . tgl . tgl . tgl .

184.37 beton keropos PG

tgl . tgl . tgl . tgl .

184.38 beton keropos PG

tgl . tgl . tgl . tgl .

184.39 beton keropos PG

tgl . tgl . tgl . tgl .

184.40 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

184.41 beton keropos PG

tgl . tgl . tgl . tgl .

184.42 beton keropos PG

tgl . tgl . tgl . tgl .

184.43 beton keropos PG

tgl . tgl. tgl . tgl .

184.44 beton keropos PG

tgl . tgl . tgl . tgl .

184.45 beton keropos PG

tgl . tgl . tgl . tgl .

184.46 beton keropos PG

tgl . tgl . tgl . tgl .

184.47 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

184.48 beton keropos PG

tgl . tgl . tgl . tgl .

184.49 beton keropos PG

tgl . tgl . tgl . tgl .

184.50 beton keropos PG

tgl . tgl . tgl . tgl .

184.51 beton keropos PG

tgl . tgl . tgl . tgl .

184.52 beton keropos PG

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

2 192/LKP/I/2019 192.1 beton keropos PG

tgl . tgl . tgl . tgl .

192.2 beton Keropos PG

tgl . tgl . tgl . tgl .

192.3 beton keropos PG

tgl . tgl . tgl . tgl .

192.4 beton keropos PG

tgl . tgl . tgl . tgl .

192.5 beton keropos PG

tgl . tgl . tgl . tgl .

192.6 beton keropos PG

tgl . tgl . tgl . tgl .

192.7 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

192.8 beton keropos PG

tgl . tgl . tgl . tgl .

192.9 beton keropos PG

tgl . tgl . tgl . tgl .

192.10 beton keropos PG

tgl . tgl . tgl . tgl .

192.11 beton keropos PG

tgl . tgl . tgl . tgl .

192.12 beton keropos PG

tgl . tgl . tgl . tgl .

192.13 beton keropos PG

tgl . tgl . tgl . tgl .

192.14 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

192.15 beton keropos PG

tgl . tgl . tgl . tgl .

192.16 beton keropos PG

tgl . tgl . tgl . tgl .

192.17 beton keropos PG

tgl . tgl. tgl . tgl .

192.18 beton keropos PG

tgl . tgl . tgl . tgl .

192.19 beton keropos PG

tgl . tgl . tgl . tgl .

192.20 beton keropos PG

tgl . tgl . tgl . tgl .

192.21 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

192.22 beton keropos PG

tgl . tgl . tgl . tgl .

192.23 beton keropos PG

tgl . tgl . tgl . tgl .

192.24 beton keropos PG

tgl . tgl . tgl . tgl .

192.25 beton keropos PG

tgl . tgl . tgl . tgl .

192.26 beton keropos PG

tgl . tgl . tgl . tgl .

192.27 beton keropos PG

tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

2 192/LKP/I/2019 192.28 beton keropos PG

tgl . tgl . tgl . tgl .

192.29 beton Keropos PG

tgl . tgl . tgl . tgl .

192.30 beton keropos PG

tgl . tgl . tgl . tgl .

192.31 beton keropos PG

tgl . tgl . tgl . tgl .

192.32 beton keropos PG

tgl . tgl . tgl . tgl .

192.33 beton keropos PG

tgl . tgl . tgl . tgl .

192.34 beton keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

192.35 beton keropos PG

tgl . tgl . tgl . tgl .

192.36 beton keropos PG

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 304 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=


LKP NO 304 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
8 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

10

TGL= TGL= TGL= TGL=

11

TGL= TGL= TGL= TGL=

12

TGL= TGL= TGL= TGL=

13

TGL= TGL= TGL= TGL=

14

TGL= TGL= TGL= TGL=

15

TGL= TGL= TGL= TGL=

16

TGL= TGL= TGL= TGL=


LKP NO 304 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
16

TGL= TGL= TGL= TGL=

17

TGL= TGL= TGL= TGL=

18

TGL= TGL= TGL= TGL=

19

TGL= TGL= TGL= TGL=


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 304/LKP-ST/IV/2019 304 1 Beton Plint

tgl . tgl . tgl . tgl .

304 2 Beton Plint

tgl . tgl . tgl . tgl .

304 3 Beton Plint

tgl . tgl . tgl . tgl .

304 4 Beton Plint

tgl . tgl . tgl . tgl .

304 5 Beton Plint

tgl . tgl . tgl . tgl .

304 6 Beton Plint

tgl . tgl . tgl . tgl .

304 7 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

304 8 Beton Plint

tgl . tgl . tgl . tgl .

304 9 Beton Plint

tgl . tgl . tgl . tgl .

304 10 Beton Plint

tgl . tgl . tgl . tgl .

304 11 Beton Plint

tgl . tgl . tgl . tgl .

304 12 Beton Plint

tgl . tgl . tgl . tgl .

304 13 Beton Plint

tgl . tgl . tgl . tgl .

304 14 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

304 15 Beton Plint

tgl . tgl . tgl . tgl .

304 16 Beton Plint

tgl . tgl . tgl . tgl .

304 17 Beton Plint

tgl. tgl. tgl . tgl .

304 18 Beton Plint

tgl . tgl . tgl . tgl .

304 19 Beton Plint

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 305 (BETON BUNTING) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 305/LKP-ST/IV/2019 305 1 Beton Bunting

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
8 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

10

TGL= TGL= TGL= TGL=

11

TGL= TGL= TGL= TGL=

12

TGL= TGL= TGL= TGL=

13

TGL= TGL= TGL= TGL=

14

TGL= TGL= TGL= TGL=

15

TGL= TGL= TGL= TGL=

16

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
16

TGL= TGL= TGL= TGL=

17

TGL= TGL= TGL= TGL=

18

TGL= TGL= TGL= TGL=

19

TGL= TGL= TGL= TGL=

20

TGL= TGL= TGL= TGL=

21

TGL= TGL= TGL= TGL=

22

TGL= TGL= TGL= TGL=

23

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

24

TGL= TGL= TGL= TGL=

25

TGL= TGL= TGL= TGL=

26

TGL= TGL= TGL= TGL=

27

TGL= TGL= TGL= TGL=

28

TGL= TGL= TGL= TGL=

29

TGL= TGL= TGL= TGL=

30

TGL= TGL= TGL= TGL=

31

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
31 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

32

TGL= TGL= TGL= TGL=

33

TGL= TGL= TGL= TGL=

34

TGL= TGL= TGL= TGL=

35

TGL= TGL= TGL= TGL=

36

TGL= TGL= TGL= TGL=

37

TGL= TGL= TGL= TGL=

38

TGL= TGL= TGL= TGL=

39

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
39

TGL= TGL= TGL= TGL=

40

TGL= TGL= TGL= TGL=

41

TGL= TGL= TGL= TGL=

42

TGL= TGL= TGL= TGL=

43

TGL= TGL= TGL= TGL=

44

TGL= TGL= TGL= TGL=

45

TGL= TGL= TGL= TGL=

46

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

47

TGL= TGL= TGL= TGL=

48

TGL= TGL= TGL= TGL=

49

TGL= TGL= TGL= TGL=

50

TGL= TGL= TGL= TGL=

51

TGL= TGL= TGL= TGL=

52

TGL= TGL= TGL= TGL=

53

TGL= TGL= TGL= TGL=

54

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
54 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

55

TGL= TGL= TGL= TGL=

56

TGL= TGL= TGL= TGL=

57

TGL= TGL= TGL= TGL=

58

TGL= TGL= TGL= TGL=

59

TGL= TGL= TGL= TGL=

60

TGL= TGL= TGL= TGL=

61

TGL= TGL= TGL= TGL=

62

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
62

TGL= TGL= TGL= TGL=

63

TGL= TGL= TGL= TGL=

64

TGL= TGL= TGL= TGL=

65

TGL= TGL= TGL= TGL=

66

TGL= TGL= TGL= TGL=

67

TGL= TGL= TGL= TGL=

68

TGL= TGL= TGL= TGL=

69

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

70

TGL= TGL= TGL= TGL=

71

TGL= TGL= TGL= TGL=

72

TGL= TGL= TGL= TGL=

73

TGL= TGL= TGL= TGL=

74

TGL= TGL= TGL= TGL=

75

TGL= TGL= TGL= TGL=

76

TGL= TGL= TGL= TGL=

77

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
77 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

78

TGL= TGL= TGL= TGL=

79

TGL= TGL= TGL= TGL=

80

TGL= TGL= TGL= TGL=

81

TGL= TGL= TGL= TGL=

82

TGL= TGL= TGL= TGL=

83

TGL= TGL= TGL= TGL=

84

TGL= TGL= TGL= TGL=

85

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
85

TGL= TGL= TGL= TGL=

86

TGL= TGL= TGL= TGL=

87

TGL= TGL= TGL= TGL=

88

TGL= TGL= TGL= TGL=

89

TGL= TGL= TGL= TGL=

90

TGL= TGL= TGL= TGL=

91

TGL= TGL= TGL= TGL=

92

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

93

TGL= TGL= TGL= TGL=

94

TGL= TGL= TGL= TGL=

95

TGL= TGL= TGL= TGL=

96

TGL= TGL= TGL= TGL=

97

TGL= TGL= TGL= TGL=

98

TGL= TGL= TGL= TGL=

99

TGL= TGL= TGL= TGL=

100

TGL= TGL= TGL= TGL=


LKP NO 306 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
100 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 306/LKP-ST/IV/2019 306 1 Beton Keropos

tgl . tgl . tgl . tgl .

306 2 Beton Keropos

tgl . tgl . tgl . tgl .

306 3 Beton Keropos

tgl . tgl . tgl . tgl .

306 4 Beton Keropos

tgl . tgl . tgl . tgl .

306 5 Beton Keropos

tgl . tgl . tgl . tgl .

306 6 Beton Keropos

tgl . tgl . tgl . tgl .

306 7 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 8 Beton Keropos

tgl . tgl . tgl . tgl .

306 9 Beton Keropos

tgl . tgl . tgl . tgl .

306 10 Beton Keropos

tgl . tgl . tgl . tgl .

306 11 Beton Keropos

tgl . tgl . tgl . tgl .

306 12 Beton Keropos

tgl . tgl . tgl . tgl .

306 13 Beton Keropos

tgl . tgl . tgl . tgl .

306 14 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 15 Beton Keropos

tgl . tgl . tgl . tgl .

306 16 Beton Keropos

tgl . tgl . tgl . tgl .

306 17 Beton Keropos

tgl. tgl. tgl . tgl .

306 18 Beton Keropos

tgl . tgl . tgl . tgl .

306 19 Beton Keropos

tgl . tgl . tgl . tgl .

306 20 Beton Keropos

tgl . tgl . tgl . tgl .

306 21 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 22 Beton Keropos

tgl . tgl . tgl . tgl .

306 23 Beton Keropos

tgl . tgl . tgl . tgl .

306 24 Beton Keropos

tgl . tgl . tgl . tgl .

306 25 Beton Keropos

tgl . tgl . tgl . tgl .

306 26 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 306/LKP-ST/IV/2019 306 27 Beton Keropos

tgl . tgl . tgl . tgl .

306 28 Beton Keropos

tgl . tgl . tgl . tgl .

306 29 Beton Keropos

tgl . tgl . tgl . tgl .

306 30 Beton Keropos

tgl . tgl . tgl . tgl .

306 31 Beton Keropos

tgl . tgl . tgl . tgl .

306 32 Beton Keropos

tgl . tgl . tgl . tgl .

306 33 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 34 Beton Keropos

tgl . tgl . tgl . tgl .

306 35 Beton Keropos

tgl . tgl . tgl . tgl .

306 36 Beton Keropos

tgl . tgl . tgl . tgl .

306 37 Beton Keropos

tgl . tgl . tgl . tgl .

306 38 Beton Keropos

tgl . tgl . tgl . tgl .

306 39 Beton Keropos

tgl . tgl . tgl . tgl .

306 40 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 41 Beton Keropos

tgl . tgl . tgl . tgl .

306 42 Beton Keropos

tgl . tgl . tgl . tgl .

306 43 Beton Keropos

tgl. tgl. tgl . tgl .

306 44 Beton Keropos

tgl . tgl . tgl . tgl .

306 45 Beton Keropos

tgl . tgl . tgl . tgl .

306 46 Beton Keropos PG

tgl . tgl . tgl . tgl .

306 47 Beton Keropos PG

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 48 Beton Keropos

tgl . tgl . tgl . tgl .

306 49 Beton Keropos

tgl . tgl . tgl . tgl .

306 50 Beton Keropos

tgl . tgl . tgl . tgl .

306 51 Beton Keropos

tgl . tgl . tgl . tgl .

306 52 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 306/LKP-ST/IV/2019 306 53 Beton Keropos

tgl . tgl . tgl . tgl .

306 54 Beton Keropos

tgl . tgl . tgl . tgl .

306 55 Beton Keropos

tgl . tgl . tgl . tgl .

306 56 Beton Keropos

tgl . tgl . tgl . tgl .

306 57 Beton Keropos

tgl . tgl . tgl . tgl .

306 58 Beton Keropos

tgl . tgl . tgl . tgl .

306 59 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 60 Beton Keropos

tgl . tgl . tgl . tgl .

306 61 Beton Keropos

tgl . tgl . tgl . tgl .

306 62 Beton Keropos

tgl . tgl . tgl . tgl .

306 63 Beton Keropos

tgl . tgl . tgl . tgl .

306 64 Beton Keropos

tgl . tgl . tgl . tgl .

306 65 Beton Keropos

tgl . tgl . tgl . tgl .

306 66 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 67 Beton Keropos

tgl . tgl . tgl . tgl .

306 68 Beton Keropos

tgl . tgl . tgl . tgl .

306 69 Beton Keropos

tgl. tgl. tgl . tgl .

306 70 Beton Keropos

tgl . tgl . tgl . tgl .

306 71 Beton Keropos

tgl . tgl . tgl . tgl .

306 72 Beton Keropos

tgl . tgl . tgl . tgl .

306 73 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 74 Beton Keropos

tgl . tgl . tgl . tgl .

306 75 Beton Keropos

tgl . tgl . tgl . tgl .

306 76 Beton Keropos

tgl . tgl . tgl . tgl .

306 77 Beton Keropos

tgl . tgl . tgl . tgl .

306 78 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 306/LKP-ST/IV/2019 306 79 Beton Keropos

tgl . tgl . tgl . tgl .

306 80 Beton Keropos

tgl . tgl . tgl . tgl .

306 81 Beton Keropos

tgl . tgl . tgl . tgl .

306 82 Beton Keropos

tgl . tgl . tgl . tgl .

306 83 Beton Keropos

tgl . tgl . tgl . tgl .

306 84 Beton Keropos

tgl . tgl . tgl . tgl .

306 85 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 86 Beton Keropos

tgl . tgl . tgl . tgl .

306 87 Beton Keropos

tgl . tgl . tgl . tgl .

306 88 Beton Keropos

tgl . tgl . tgl . tgl .

306 89 Beton Keropos

tgl . tgl . tgl . tgl .

306 90 Beton Keropos

tgl . tgl . tgl . tgl .

306 91 Beton Keropos

tgl . tgl . tgl . tgl .

306 92 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 93 Beton Keropos

tgl . tgl . tgl . tgl .

306 94 Beton Keropos

tgl . tgl . tgl . tgl .

306 95 Beton Keropos

tgl. tgl. tgl . tgl .

306 96 Beton Keropos

tgl . tgl . tgl . tgl .

306 97 Beton Keropos

tgl . tgl . tgl . tgl .

306 98 Beton Keropos

tgl . tgl . tgl . tgl .

306 99 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

306 100 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
8 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

10

TGL= TGL= TGL= TGL=

11

TGL= TGL= TGL= TGL=

12

TGL= TGL= TGL= TGL=

13

TGL= TGL= TGL= TGL=

14

TGL= TGL= TGL= TGL=

15

TGL= TGL= TGL= TGL=

16

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
16

TGL= TGL= TGL= TGL=

17

TGL= TGL= TGL= TGL=

18

TGL= TGL= TGL= TGL=

19

TGL= TGL= TGL= TGL=

20

TGL= TGL= TGL= TGL=

21

TGL= TGL= TGL= TGL=

22

TGL= TGL= TGL= TGL=

23

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

24

TGL= TGL= TGL= TGL=

25

TGL= TGL= TGL= TGL=

26

TGL= TGL= TGL= TGL=

27

TGL= TGL= TGL= TGL=

28

TGL= TGL= TGL= TGL=

29

TGL= TGL= TGL= TGL=

30

TGL= TGL= TGL= TGL=

31

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
31 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

32

TGL= TGL= TGL= TGL=

33

TGL= TGL= TGL= TGL=

34

TGL= TGL= TGL= TGL=

35

TGL= TGL= TGL= TGL=

36

TGL= TGL= TGL= TGL=

37

TGL= TGL= TGL= TGL=

38

TGL= TGL= TGL= TGL=

39

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
39

TGL= TGL= TGL= TGL=

40

TGL= TGL= TGL= TGL=

41

TGL= TGL= TGL= TGL=

42

TGL= TGL= TGL= TGL=

43

TGL= TGL= TGL= TGL=

44

TGL= TGL= TGL= TGL=

45

TGL= TGL= TGL= TGL=

46

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

47

TGL= TGL= TGL= TGL=

48

TGL= TGL= TGL= TGL=

49

TGL= TGL= TGL= TGL=

50

TGL= TGL= TGL= TGL=

51

TGL= TGL= TGL= TGL=

52

TGL= TGL= TGL= TGL=

53

TGL= TGL= TGL= TGL=

54

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
54 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

55

TGL= TGL= TGL= TGL=

56

TGL= TGL= TGL= TGL=

57

TGL= TGL= TGL= TGL=

58

TGL= TGL= TGL= TGL=

59

TGL= TGL= TGL= TGL=

60

TGL= TGL= TGL= TGL=

61

TGL= TGL= TGL= TGL=

62

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP
62

TGL= TGL= TGL= TGL=

63

TGL= TGL= TGL= TGL=

64

TGL= TGL= TGL= TGL=

65

TGL= TGL= TGL= TGL=

66

TGL= TGL= TGL= TGL=

67

TGL= TGL= TGL= TGL=

68

TGL= TGL= TGL= TGL=

69

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

70

TGL= TGL= TGL= TGL=

71

TGL= TGL= TGL= TGL=

72

TGL= TGL= TGL= TGL=

73

TGL= TGL= TGL= TGL=

74

TGL= TGL= TGL= TGL=

75

TGL= TGL= TGL= TGL=

76

TGL= TGL= TGL= TGL=

77

TGL= TGL= TGL= TGL=


LKP NO 308 (BETON KEROPOS) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
77 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

78

TGL= TGL= TGL= TGL=

79

TGL= TGL= TGL= TGL=

80

TGL= TGL= TGL= TGL=


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 308/LKP-ST/IV/2019 308 1 Beton Keropos

tgl . tgl . tgl . tgl .

308 2 Beton Keropos

tgl . tgl . tgl . tgl .

308 3 Beton Keropos

tgl . tgl . tgl . tgl .

308 4 Beton Keropos

tgl . tgl . tgl . tgl .

308 5 Beton Keropos

tgl . tgl . tgl . tgl .

308 6 Beton Keropos

tgl . tgl . tgl . tgl .

308 7 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 8 Beton Keropos

tgl . tgl . tgl . tgl .

308 9 Beton Keropos

tgl . tgl . tgl . tgl .

308 10 Beton Keropos

tgl . tgl . tgl . tgl .

308 11 Beton Keropos

tgl . tgl . tgl . tgl .

308 12 Beton Keropos

tgl . tgl . tgl . tgl .

308 13 Beton Keropos

tgl . tgl . tgl . tgl .

308 14 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 15 Beton Keropos

tgl . tgl . tgl . tgl .

308 16 Beton Keropos

tgl . tgl . tgl . tgl .

308 17 Beton Keropos

tgl. tgl. tgl . tgl .

308 18 Beton Keropos

tgl . tgl . tgl . tgl .

308 19 Beton Keropos

tgl . tgl . tgl . tgl .

308 20 Beton Keropos

tgl . tgl . tgl . tgl .

308 21 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 22 Beton Keropos

tgl . tgl . tgl . tgl .

308 23 Beton Keropos

tgl . tgl . tgl . tgl .

308 24 Beton Keropos

tgl . tgl . tgl . tgl .

308 25 Beton Keropos

tgl . tgl . tgl . tgl .

308 26 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 308/LKP-ST/IV/2019 308 27 Beton Keropos

tgl . tgl . tgl . tgl .

308 28 Beton Keropos

tgl . tgl . tgl . tgl .

308 29 Beton Keropos

tgl . tgl . tgl . tgl .

308 30 Beton Keropos

tgl . tgl . tgl . tgl .

308 31 Beton Keropos

tgl . tgl . tgl . tgl .

308 32 Beton Keropos

tgl . tgl . tgl . tgl .

308 33 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 34 Beton Keropos

tgl . tgl . tgl . tgl .

308 35 Beton Keropos

tgl . tgl . tgl . tgl .

308 36 Beton Keropos

tgl . tgl . tgl . tgl .

308 37 Beton Keropos

tgl . tgl . tgl . tgl .

308 38 Beton Keropos

tgl . tgl . tgl . tgl .

308 39 Beton Keropos

tgl . tgl . tgl . tgl .

308 40 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 41 Beton Keropos

tgl . tgl . tgl . tgl .

308 42 Beton Keropos

tgl . tgl . tgl . tgl .

308 43 Beton Keropos

tgl. tgl. tgl . tgl .

308 44 Beton Keropos

tgl . tgl . tgl . tgl .

308 45 Beton Keropos

tgl . tgl . tgl . tgl .

308 46 Beton Keropos

tgl . tgl . tgl . tgl .

308 47 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 48 Beton Keropos

tgl . tgl . tgl . tgl .

308 49 Beton Keropos

tgl . tgl . tgl . tgl .

308 50 Beton Keropos

tgl . tgl . tgl . tgl .

308 51 Beton Keropos

tgl . tgl . tgl . tgl .

308 52 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 308/LKP-ST/IV/2019 308 53 Beton Keropos

tgl . tgl . tgl . tgl .

308 54 Beton Keropos

tgl . tgl . tgl . tgl .

308 55 Beton Keropos

tgl . tgl . tgl . tgl .

308 56 Beton Keropos

tgl . tgl . tgl . tgl .

308 57 Beton Keropos

tgl . tgl . tgl . tgl .

308 58 Beton Keropos

tgl . tgl . tgl . tgl .

308 59 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 60 Beton Keropos

tgl . tgl . tgl . tgl .

308 61 Beton Keropos

tgl . tgl . tgl . tgl .

308 62 Beton Keropos

tgl . tgl . tgl . tgl .

308 63 Beton Keropos

tgl . tgl . tgl . tgl .

308 64 Beton Keropos

tgl . tgl . tgl . tgl .

308 65 Beton Keropos

tgl . tgl . tgl . tgl .

308 66 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 67 Beton Keropos

tgl . tgl . tgl . tgl .

308 68 Beton Keropos

tgl . tgl . tgl . tgl .

308 69 Beton Keropos

tgl. tgl. tgl . tgl .

308 70 Beton Keropos

tgl . tgl . tgl . tgl .

308 71 Beton Keropos

tgl . tgl . tgl . tgl .

308 72 Beton Keropos

tgl . tgl . tgl . tgl .

308 73 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

308 74 Beton Keropos

tgl . tgl . tgl . tgl .

308 75 Beton Keropos

tgl . tgl . tgl . tgl .

308 76 Beton Keropos

tgl . tgl . tgl . tgl .

308 77 Beton Keropos

tgl . tgl . tgl . tgl .

308 78 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 308/LKP-ST/IV/2019 308 79 Beton Keropos

tgl . tgl . tgl . tgl .

308 80 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 309 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=


LKP NO 309 (BETON PLINT) LANTAI 19
CHIPPING PATCHING/GROUTING
NO
8 METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

10

TGL= TGL= TGL= TGL=

11

TGL= TGL= TGL= TGL=

12

TGL= TGL= TGL= TGL=

13

TGL= TGL= TGL= TGL=


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 309/LKP-ST/IV/2019 309 1 Beton Plint

tgl . tgl . tgl . tgl .

309 2 Beton Plint

tgl . tgl . tgl . tgl .

309 3 Beton Plint

tgl . tgl . tgl . tgl .

309 4 Beton Plint

tgl . tgl . tgl . tgl .

309 5 Beton Plint

tgl . tgl . tgl . tgl .

309 6 Beton Plint

tgl . tgl . tgl . tgl .

309 7 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

309 8 Beton Plint

tgl . tgl . tgl . tgl .

309 9 Beton Plint

tgl . tgl . tgl . tgl .

309 10 Beton Plint

tgl . tgl . tgl . tgl .

309 11 Beton Plint

tgl . tgl . tgl . tgl .

309 12 Beton Plint

tgl . tgl . tgl . tgl .

309 13 Beton Plint

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
LKP NO 310 (BETON GEMBUNG) LANTAI 19
CHIPPING PATCHING/GROUTING
NO METODE FOTO
TBP CP TBP CP

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=

TGL= TGL= TGL= TGL=


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 19
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metode
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 310/LKP-ST/IV/2019 310 1 Beton Gembung

tgl . tgl . tgl . tgl .

310 2 Beton Gembung

tgl . tgl . tgl . tgl .

310 3 Beton Gembung

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 251 1 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 2 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 3 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 4 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 5 Triplek tertinggal

tgl . tgl . tgl .

251 6 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 7 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 8 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 9 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 10 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 11 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 12 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 13 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 14 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 15 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 16 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 17 Triplek tertinggal

tgl. tgl. tgl . tgl .

251 18 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 19 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 20 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 21 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 22 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 23 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 24 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 25 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 26 Triplek tertinggal

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 251 27 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 28 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 29 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 30 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 31 Triplek tertinggal

tgl . tgl . tgl .

251 32 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 33 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 34 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 35 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 36 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 37 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 38 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 39 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 40 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 41 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 42 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 43 Triplek tertinggal

tgl. tgl. tgl . tgl .

251 44 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 45 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 46 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 47 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 48 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 49 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 50 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 51 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 52 Triplek tertinggal

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 251 53 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 54 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 55 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 56 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 57 Triplek tertinggal

tgl . tgl . tgl .

251 58 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 59 Triplek tertinggal

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

251 60 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 61 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 62 Triplek tertinggal

tgl . tgl . tgl . tgl .

251 63 Triplek tertinggal

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 252 1 Beton Keropos

tgl . tgl . tgl . tgl .

252 2 Beton Keropos

tgl . tgl . tgl . tgl .

252 3 Beton Keropos

tgl . tgl . tgl . tgl .

252 4 Beton Keropos

tgl . tgl . tgl . tgl .

252 5 Beton Keropos

tgl . tgl . tgl .

252 6 Beton Keropos

tgl . tgl . tgl . tgl .

252 7 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 8 Beton Keropos

tgl . tgl . tgl . tgl .

252 9 Beton Keropos

tgl . tgl . tgl . tgl .

252 10 Beton Keropos

tgl . tgl . tgl . tgl .

252 11 Beton Keropos

tgl . tgl . tgl . tgl .

252 12 Beton Keropos

tgl . tgl . tgl . tgl .

252 13 Beton Keropos

tgl . tgl . tgl . tgl .

252 14 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 15 Beton Keropos

tgl . tgl . tgl . tgl .

252 16 Beton Keropos

tgl . tgl . tgl . tgl .

252 17 Beton Keropos

tgl. tgl. tgl . tgl .

252 18 Beton Keropos

tgl . tgl . tgl . tgl .

252 19 Beton Keropos

tgl . tgl . tgl . tgl .

252 20 Beton Keropos

tgl . tgl . tgl . tgl .

252 21 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 22 Beton Keropos

tgl . tgl . tgl . tgl .

252 23 Beton Keropos

tgl . tgl . tgl . tgl .

252 24 Beton Keropos

tgl . tgl . tgl . tgl .

252 25 Beton Keropos

tgl . tgl . tgl . tgl .

252 26 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 252 27 Beton Keropos

tgl . tgl . tgl . tgl .

252 28 Beton Keropos

tgl . tgl . tgl . tgl .

252 29 Beton Keropos

tgl . tgl . tgl . tgl .

252 30 Beton Keropos

tgl . tgl . tgl . tgl .

252 31 Beton Keropos

tgl . tgl . tgl .

252 32 Beton Keropos

tgl . tgl . tgl . tgl .

252 33 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 34 Beton Keropos

tgl . tgl . tgl . tgl .

252 35 Beton Keropos

tgl . tgl . tgl . tgl .

252 36 Beton Keropos

tgl . tgl . tgl . tgl .

252 37 Beton Keropos

tgl . tgl . tgl . tgl .

252 38 Beton Keropos

tgl . tgl . tgl . tgl .

252 39 Beton Keropos

tgl . tgl . tgl . tgl .

252 40 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 41 Beton Keropos

tgl . tgl . tgl . tgl .

252 42 Beton Keropos

tgl . tgl . tgl . tgl .

252 43 Beton Keropos

tgl. tgl. tgl . tgl .

252 44 Beton Keropos

tgl . tgl . tgl . tgl .

252 45 Beton Keropos

tgl . tgl . tgl . tgl .

252 46 Beton Keropos

tgl . tgl . tgl . tgl .

252 47 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 48 Beton Keropos

tgl . tgl . tgl . tgl .

252 49 Beton Keropos

tgl . tgl . tgl . tgl .

252 50 Beton Keropos

tgl . tgl . tgl . tgl .

252 51 Beton Keropos

tgl . tgl . tgl . tgl .

252 52 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 252 53 Beton Keropos

tgl . tgl . tgl . tgl .

252 54 Beton Keropos

tgl . tgl . tgl . tgl .

252 55 Beton Keropos

tgl . tgl . tgl . tgl .

252 56 Beton Keropos

tgl . tgl . tgl . tgl .

252 57 Beton Keropos

tgl . tgl . tgl .

252 58 Beton Keropos

tgl . tgl . tgl . tgl .

252 59 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 60 Beton Keropos

tgl . tgl . tgl . tgl .

252 61 Beton Keropos

tgl . tgl . tgl . tgl .

252 62 Beton Keropos

tgl . tgl . tgl . tgl .

252 63 Beton Keropos

tgl . tgl . tgl . tgl .

252 64 Beton Keropos

tgl . tgl . tgl . tgl .

252 65 Beton Keropos

tgl . tgl . tgl . tgl .

252 66 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 67 Beton Keropos

tgl . tgl . tgl . tgl .

252 68 Beton Keropos

tgl . tgl . tgl . tgl .

252 69 Beton Keropos

tgl. tgl. tgl . tgl .

252 70 Beton Keropos

tgl . tgl . tgl . tgl .

252 71 Beton Keropos

tgl . tgl . tgl . tgl .

252 72 Beton Keropos

tgl . tgl . tgl . tgl .

252 73 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 74 Beton Keropos

tgl . tgl . tgl . tgl .

252 75 Beton Keropos

tgl . tgl . tgl . tgl .

252 76 Beton Keropos

tgl . tgl . tgl . tgl .

252 77 Beton Keropos

tgl . tgl . tgl . tgl .

252 78 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 12
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 251/LKP-ST/II/2019 252 79 Beton Keropos

tgl . tgl . tgl . tgl .

252 80 Beton Keropos

tgl . tgl . tgl . tgl .

252 81 Beton Keropos

tgl . tgl . tgl . tgl .

252 82 Beton Keropos

tgl . tgl . tgl . tgl .

252 83 Beton Keropos

tgl . tgl . tgl .

252 84 Beton Keropos

tgl . tgl . tgl . tgl .

252 85 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 12
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

252 86 Beton Keropos

tgl . tgl . tgl . tgl .

252 87 Beton Keropos

tgl . tgl . tgl . tgl .

252 88 Beton Keropos

tgl . tgl . tgl . tgl .

252 89 Beton Keropos

tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 12
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 12
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 255/LKP-ST/II/2019 255 1 Beton Gembung

tgl . tgl . tgl . tgl .

255 2 Beton Gembung

tgl . tgl . tgl . tgl .

255 3 Beton Gembung

tgl . tgl . tgl . tgl .

255 4 Beton Gembung

tgl . tgl . tgl . tgl .

254 5

tgl . tgl . tgl . tgl .

254 6

tgl . tgl . tgl . tgl .

254 7 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 8 Beton Plint

tgl . tgl . tgl . tgl .

254 9 Beton Plint

tgl . tgl . tgl . tgl .

254 10 Beton Plint

tgl . tgl . tgl . tgl .

254 11 Beton Plint

tgl . tgl . tgl . tgl .

254 12 Beton Plint

tgl . tgl . tgl . tgl .

254 13 Beton Plint

tgl . tgl . tgl . tgl .

254 14 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 15 Beton Plint

tgl . tgl . tgl . tgl .

254 16 Beton Plint

tgl . tgl . tgl . tgl .

254 17 Beton Plint

tgl. tgl. tgl . tgl .

254 18 Beton Plint

tgl . tgl . tgl . tgl .

254 19

tgl . tgl . tgl . tgl .

254 20

tgl . tgl . tgl . tgl .

254 21

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 22

tgl . tgl . tgl . tgl .

254 23

tgl . tgl . tgl . tgl .

254 24

tgl . tgl . tgl . tgl .

254 25

tgl . tgl . tgl . tgl .

254 26

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 255/LKP-ST/II/2019 255 1 Beton Gembung

tgl . tgl . tgl . tgl .

255 2 Beton Gembung

tgl . tgl . tgl . tgl .

255 3 Beton Gembung

tgl . tgl . tgl . tgl .

255 4 Beton Gembung

tgl . tgl . tgl . tgl .

254 5

tgl . tgl . tgl . tgl .

254 6

tgl . tgl . tgl . tgl .

254 7 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 8 Beton Plint

tgl . tgl . tgl . tgl .

254 9 Beton Plint

tgl . tgl . tgl . tgl .

254 10 Beton Plint

tgl . tgl . tgl . tgl .

254 11 Beton Plint

tgl . tgl . tgl . tgl .

254 12 Beton Plint

tgl . tgl . tgl . tgl .

254 13 Beton Plint

tgl . tgl . tgl . tgl .

254 14 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 15 Beton Plint

tgl . tgl . tgl . tgl .

254 16 Beton Plint

tgl . tgl . tgl . tgl .

254 17 Beton Plint

tgl. tgl. tgl . tgl .

254 18 Beton Plint

tgl . tgl . tgl . tgl .

254 19

tgl . tgl . tgl . tgl .

254 20

tgl . tgl . tgl . tgl .

254 21

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 22

tgl . tgl . tgl . tgl .

254 23

tgl . tgl . tgl . tgl .

254 24

tgl . tgl . tgl . tgl .

254 25

tgl . tgl . tgl . tgl .

254 26

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 254/LKP-ST/II/2019 254 1 Beton Plint

tgl . tgl . tgl . tgl .

254 2 Beton Plint

tgl . tgl . tgl . tgl .

254 3 Beton Plint

tgl . tgl . tgl . tgl .

254 4 Beton Plint

tgl . tgl . tgl . tgl .

254 5 Beton Plint

tgl . tgl . tgl . tgl .

254 6 Beton Plint

tgl . tgl . tgl . tgl .

254 7 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 8 Beton Plint

tgl . tgl . tgl . tgl .

254 9 Beton Plint

tgl . tgl . tgl . tgl .

254 10 Beton Plint

tgl . tgl . tgl . tgl .

254 11 Beton Plint

tgl . tgl . tgl . tgl .

254 12 Beton Plint

tgl . tgl . tgl . tgl .

254 13 Beton Plint

tgl . tgl . tgl . tgl .

254 14 Beton Plint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 15 Beton Plint √

tgl . tgl . tgl . tgl .

254 16 Beton Plint

tgl . tgl . tgl . tgl .

254 17 Beton Plint

tgl. tgl. tgl . tgl .

254 18 Beton Plint

tgl . tgl . tgl . tgl .

254 19

tgl . tgl . tgl . tgl .

254 20

tgl . tgl . tgl . tgl .

254 21

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

254 22

tgl . tgl . tgl . tgl .

254 23

tgl . tgl . tgl . tgl .

254 24

tgl . tgl . tgl . tgl .

254 25

tgl . tgl . tgl . tgl .

254 26

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 256/LKP-ST/II/2019 256 1 Beton Keropos

tgl . tgl . tgl . tgl .

256 2 Beton Keropos

tgl . tgl . tgl . tgl .

256 3 Beton Keropos

tgl . tgl . tgl . tgl .

256 4 Beton Keropos

tgl . tgl . tgl . tgl .

256 5 Beton Keropos

tgl . tgl . tgl . tgl .

256 6 Beton Keropos

tgl . tgl . tgl . tgl .

256 7 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 8 Beton Keropos

tgl . tgl . tgl . tgl .

256 9 Beton Keropos

tgl . tgl . tgl . tgl .

256 10 Beton Keropos

tgl . tgl . tgl . tgl .

256 11 Beton Keropos

tgl . tgl . tgl . tgl .

256 12 Beton Keropos

tgl . tgl . tgl . tgl .

256 13 Beton Keropos

tgl . tgl . tgl . tgl .

256 14 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 15 Beton Keropos

tgl . tgl . tgl . tgl .

256 16 Beton Keropos X

tgl . tgl . tgl . tgl .

256 17 Beton Keropos X

tgl. tgl. tgl . tgl .

256 18 Beton Keropos

tgl . tgl . tgl . tgl .

256 19 Beton Keropos

tgl . tgl . tgl . tgl .

256 20 Beton Keropos

tgl . tgl . tgl .

256 21 Beton Keropos X

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 22 Beton Keropos

tgl . tgl . tgl . tgl .

256 23 Beton Keropos

tgl . tgl . tgl . tgl .

256 24 Beton Keropos

tgl . tgl . tgl . tgl .

256 25 Beton Keropos

tgl . tgl . tgl . tgl .

256 26 Beton Keropos X

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 256/LKP-ST/II/2019 256 27 Beton Keropos

tgl . tgl . tgl . tgl .

256 28 Beton Keropos

tgl . tgl . tgl . tgl .

256 29 Beton Keropos

tgl . tgl . tgl . tgl .

256 30 Beton Keropos

tgl . tgl . tgl . tgl .

256 31 Beton Keropos

tgl . tgl . tgl . tgl .

256 32 Beton Keropos

tgl . tgl . tgl . tgl .

256 33 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 34 Beton Keropos

tgl . tgl . tgl . tgl .

256 35 Beton Keropos

tgl . tgl . tgl . tgl .

256 36 Beton Keropos

tgl . tgl . tgl . tgl .

256 37 Beton Keropos

tgl . tgl . tgl . tgl .

256 38 Beton Keropos

tgl . tgl . tgl . tgl .

256 39 Beton Keropos

tgl . tgl . tgl . tgl .

256 40 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 41 Beton Keropos

tgl . tgl . tgl . tgl .

256 42 Beton Keropos

tgl . tgl . tgl . tgl .

256 43 Beton Keropos

tgl. tgl. tgl . tgl .

256 44 Beton Keropos

tgl . tgl . tgl . tgl .

256 45 Beton Keropos

tgl . tgl . tgl . tgl .

256 46 Beton Keropos

tgl . tgl . tgl . tgl .

256 47 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 48 Beton Keropos

tgl . tgl . tgl . tgl .

256 49 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256 50 Beton Keropos

tgl . tgl . tgl . tgl .

256 51 Beton Keropos

tgl . tgl . tgl . tgl .

256 52 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 256/LKP-ST/II/2019 256 53 Beton Keropos

tgl . tgl . tgl . tgl .

256 54 Beton Keropos

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl. tgl. tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

256

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 267/LKP-ST/II/2019 267 1 Beton Keropos

tgl . tgl . tgl . tgl .

267 2 Beton Keropos

tgl . tgl . tgl . tgl .

267 3 Beton Keropos

tgl . tgl . tgl . tgl .

267 4 Beton Keropos

tgl . tgl . tgl . tgl .

267 5 Beton Keropos

tgl . tgl . tgl . tgl .

267 6 Beton Keropos

tgl . tgl . tgl . tgl .

267 7 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 8 Beton Keropos

tgl . tgl . tgl . tgl .

267 9 Beton Keropos

tgl . tgl . tgl . tgl .

267 10 Beton Keropos

tgl . tgl . tgl . tgl .

267 11 Beton Keropos

tgl . tgl . tgl . tgl .

267 12 Beton Keropos

tgl . tgl . tgl . tgl .

267 13 Beton Keropos

tgl . tgl . tgl . tgl .

267 14 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 15 Beton Keropos

tgl . tgl . tgl . tgl .

267 16 Beton Keropos

tgl . tgl . tgl . tgl .

267 17 Beton Keropos

tgl. tgl. tgl . tgl .

267 18 Beton Keropos

tgl . tgl . tgl . tgl .

267 19 Beton Keropos

tgl . tgl . tgl . tgl .

267 20 Beton Keropos

tgl . tgl . tgl .

267 21 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 22 Beton Keropos x

tgl . tgl . tgl . tgl .

267 23 Beton Keropos

tgl . tgl . tgl . tgl .

267 24 Beton Keropos

tgl . tgl . tgl . tgl .

267 25 Beton Keropos

tgl . tgl . tgl . tgl .

267 26 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 267/LKP-ST/II/2019 267 27 Beton Keropos

tgl . tgl . tgl . tgl .

267 28 Beton Keropos

tgl . tgl . tgl . tgl .

267 29 Beton Keropos

tgl . tgl . tgl . tgl .

267 30 Beton Keropos

tgl . tgl . tgl . tgl .

267 31 Beton Keropos

tgl . tgl . tgl . tgl .

267 32 Beton Keropos

tgl . tgl . tgl . tgl .

267 33 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 34 Beton Keropos x

tgl . tgl . tgl . tgl .

267 35 Beton Keropos x

tgl . tgl . tgl . tgl .

267 36 Beton Keropos

tgl . tgl . tgl . tgl .

267 37 Beton Keropos x

tgl . tgl . tgl . tgl .

267 38 Beton Keropos x

tgl . tgl . tgl . tgl .

267 39 Beton Keropos

tgl . tgl . tgl . tgl .

267 40 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 41 Beton Keropos

tgl . tgl . tgl . tgl .

267 42 Beton Keropos x

tgl . tgl . tgl . tgl .

267 43 Beton Keropos

tgl. tgl. tgl . tgl .

267 44 Beton Keropos x

tgl . tgl . tgl . tgl .

267 45 Beton Keropos

tgl . tgl . tgl . tgl .

267 46 Beton Keropos

tgl . tgl . tgl . tgl .

267 47 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 48 Beton Keropos √

tgl . tgl . tgl . tgl .

267 49 Beton Keropos

tgl . tgl . tgl . tgl .

267 50 Beton Keropos

tgl . tgl . tgl . tgl .

267 51 Beton Keropos

tgl . tgl . tgl . tgl .

267 52 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 267/LKP-ST/II/2019 267 53 Beton Keropos x

tgl . tgl . tgl . tgl .

267 54 Beton Keropos x

tgl . tgl . tgl . tgl .

267 55 Beton Keropos

tgl . tgl . tgl . tgl .

267 56 Beton Keropos

tgl . tgl . tgl . tgl .

267 57 Beton Keropos

tgl . tgl . tgl . tgl .

267 58 Beton Keropos

tgl . tgl . tgl . tgl .

267 59 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 60 Beton Keropos X

tgl . tgl . tgl . tgl .

267 61 Beton Keropos X

tgl . tgl . tgl . tgl .

267 62 Beton Keropos

tgl . tgl . tgl . tgl .

267 63 Beton Keropos √

tgl . tgl . tgl . tgl .

267 64 Beton Keropos

tgl . tgl . tgl . tgl .

267 65 Beton Keropos

tgl . tgl . tgl . tgl .

267 66 Beton Keropos X

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 67 Beton Keropos

tgl . tgl . tgl . tgl .

267 68 Beton Keropos

tgl . tgl . tgl . tgl .

267 69 Beton Keropos

tgl. tgl. tgl . tgl .

267 70 Beton Keropos

tgl . tgl . tgl . tgl .

267 71 Beton Keropos

tgl . tgl . tgl . tgl .

267 72 Beton Keropos

tgl . tgl . tgl .

267 73 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

267 74 Beton Keropos

tgl . tgl . tgl . tgl .

267 75 Beton Keropos

tgl . tgl . tgl . tgl .

267 76 Beton Keropos

tgl . tgl . tgl . tgl .

267 77 Beton Keropos

tgl . tgl . tgl . tgl .

267 78 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 267/LKP-ST/II/2019 267 79 Beton Keropos

tgl . tgl . tgl . tgl .

267 80 Beton Keropos

tgl . tgl . tgl . tgl .

267 81 Beton Keropos

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 268/LKP-ST/II/2019 268 1 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 2 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 3 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 4 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 5 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 6 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 7 Beton Ngeplint X

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

268 8 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 9 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 10 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 11 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 12 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 13 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 14 Beton Ngeplint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

268 15 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 16 Beton Ngeplint

tgl . tgl . tgl . tgl .

268 17 Beton Ngeplint

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 269/LKP-ST/II/2019 269 1 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 2 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 3 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 4 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 5 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 6 Beton Ngeplint √

tgl . tgl . tgl . tgl .

269 7 Beton Ngeplint

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

269 8 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 9 Beton Ngeplint

tgl . tgl . tgl . tgl .

269 10 Beton Ngeplint

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 13
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 271/LKP-ST/II/2019 271 1 Defect Shaft

tgl . tgl . tgl . tgl .

271 2 Defect Shaft

tgl . tgl . tgl . tgl .

271 3 Defect Shaft

tgl . tgl . tgl . tgl .

271 4 Defect Shaft

tgl . tgl . tgl . tgl .

271 5 Defect Shaft

tgl . tgl . tgl . tgl .

271 6 Defect Shaft

tgl . tgl . tgl . tgl .

271 7 Defect Shaft

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

271 8 Defect Shaft

tgl . tgl . tgl . tgl .

271 9 Defect Shaft

tgl . tgl . tgl . tgl .

271 10 Defect Shaft

tgl . tgl . tgl . tgl .

271 11 Defect Shaft

tgl . tgl . tgl . tgl .

271 12 Defect Shaft

tgl . tgl . tgl . tgl .

271 13 Defect Shaft

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 279/LKP-ST/II/2019 279 1 Beton Gembung

tgl . tgl . tgl . tgl .

279 2 Beton Gembung

tgl . tgl . tgl . tgl .

279 3 Beton Gembung

tgl . tgl . tgl . tgl .

279 4 Beton Gembung

tgl . tgl . tgl . tgl .

279 5 Beton Gembung

tgl . tgl . tgl . tgl .

279 6 Beton Gembung

tgl . tgl . tgl . tgl .

279 7 Beton Gembung

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

279 8 Beton Gembung

tgl . tgl . tgl . tgl .

279 9 Beton Gembung

tgl . tgl . tgl . tgl .

279 10 Beton Gembung

tgl . tgl . tgl . tgl .

279 11 Beton Gembung

tgl . tgl . tgl . tgl .

279 12 Beton Gembung

tgl . tgl . tgl . tgl .

279 13 Beton Gembung

tgl . tgl . tgl . tgl .

279 14 Beton Gembung

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

279 15 Beton Gembung

tgl . tgl . tgl . tgl .

279 16 Beton Gembung

tgl . tgl . tgl . tgl .

279 17 Beton Gembung

tgl. tgl. tgl . tgl .

279 18 Beton Gembung

tgl . tgl . tgl . tgl .

279 19 Beton Gembung

tgl . tgl . tgl . tgl .

279 20 Beton Gembung

tgl . tgl . tgl .

279 21 Beton Gembung

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

279 22 Beton Gembung

tgl . tgl . tgl . tgl .

279 23 Beton Gembung

tgl . tgl . tgl . tgl .

279 24 Beton Gembung

tgl . tgl . tgl . tgl .

279 25 Beton Gembung

tgl . tgl . tgl . tgl .

279 26 Beton Gembung

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 279/LKP-ST/II/2019 279 27 Beton Gembung

tgl . tgl . tgl . tgl .

279 28 Beton Gembung

tgl . tgl . tgl . tgl .

279 29 Beton Gembung

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl. tgl. tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl .

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 270/LKP-ST/III/2019 270 1 Beton Keropos

tgl . tgl . tgl . tgl .

270 2 Beton Keropos

tgl . tgl . tgl . tgl .

270 3 Beton Keropos

tgl . tgl . tgl . tgl .

270 4 Beton Keropos

tgl . tgl . tgl . tgl .

270 5 Beton Keropos

tgl . tgl . tgl . tgl .

270 6 Beton Keropos

tgl . tgl . tgl . tgl .

270 7 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 8 Beton Keropos

tgl . tgl . tgl . tgl .

270 9 Beton Keropos

tgl . tgl . tgl . tgl .

270 10 Beton Keropos

tgl . tgl . tgl . tgl .

270 11 Beton Keropos

tgl . tgl . tgl . tgl .

270 12 Beton Keropos

tgl . tgl . tgl . tgl .

270 13 Beton Keropos

tgl . tgl . tgl . tgl .

270 14 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 15 Beton Keropos

tgl . tgl . tgl . tgl .

270 16 Beton Keropos

tgl . tgl . tgl . tgl .

270 17 Beton Keropos

tgl. tgl. tgl . tgl .

270 18 Beton Keropos

tgl . tgl . tgl . tgl .

270 19 Beton Keropos

tgl . tgl . tgl . tgl .

270 20 Beton Keropos

tgl . tgl . tgl .

270 21 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 22 Beton Keropos

tgl . tgl . tgl . tgl .

270 23 Beton Keropos

tgl . tgl . tgl . tgl .

270 24 Beton Keropos

tgl . tgl . tgl . tgl .

270 25 Beton Keropos

tgl . tgl . tgl . tgl .

270 26 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 270/LKP-ST/III/2019 270 27 Beton Keropos

tgl . tgl . tgl . tgl .

270 28 Beton Keropos

tgl . tgl . tgl . tgl .

270 29 Beton Keropos

tgl . tgl . tgl . tgl .

270 30 Beton Keropos

tgl . tgl . tgl . tgl .

270 31 Beton Keropos

tgl . tgl . tgl . tgl .

270 32 Beton Keropos

tgl . tgl . tgl . tgl .

270 33 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 34 Beton Keropos

tgl . tgl . tgl . tgl .

270 35 Beton Keropos

tgl . tgl . tgl . tgl .

270 36 Beton Keropos

tgl . tgl . tgl . tgl .

270 37 Beton Keropos

tgl . tgl . tgl . tgl .

270 38 Beton Keropos

tgl . tgl . tgl . tgl .

270 39 Beton Keropos

tgl . tgl . tgl . tgl .

270 40 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 41 Beton Keropos

tgl . tgl . tgl . tgl .

270 42 Beton Keropos

tgl . tgl . tgl . tgl .

270 43 Beton Keropos

tgl. tgl. tgl . tgl .

270 44 Beton Keropos

tgl . tgl . tgl . tgl .

270 45 Beton Keropos

tgl . tgl . tgl . tgl .

270 46 Beton Keropos

tgl . tgl . tgl .

270 47 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 48 Beton Keropos

tgl . tgl . tgl . tgl .

270 49 Beton Keropos

tgl . tgl . tgl . tgl .

270 50 Beton Keropos

tgl . tgl . tgl . tgl .

270 51 Beton Keropos

tgl . tgl . tgl . tgl .

270 52 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 270/LKP-ST/III/2019 270 53 Beton Keropos

tgl . tgl . tgl . tgl .

270 54 Beton Keropos

tgl . tgl . tgl . tgl .

270 55 Beton Keropos

tgl . tgl . tgl . tgl .

270 56 Beton Keropos

tgl . tgl . tgl . tgl .

270 57 Beton Keropos

tgl . tgl . tgl . tgl .

270 58 Beton Keropos

tgl . tgl . tgl . tgl .

270 59 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 60 Beton Keropos

tgl . tgl . tgl . tgl .

270 61 Beton Keropos

tgl . tgl . tgl . tgl .

270 62 Beton Keropos

tgl . tgl . tgl . tgl .

270 63 Beton Keropos

tgl . tgl . tgl . tgl .

270 64 Beton Keropos

tgl . tgl . tgl . tgl .

270 65 Beton Keropos

tgl . tgl . tgl . tgl .

270 66 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 67 Beton Keropos

tgl . tgl . tgl . tgl .

270 68 Beton Keropos

tgl . tgl . tgl . tgl .

270 69 Beton Keropos

tgl. tgl. tgl . tgl .

270 70 Beton Keropos

tgl . tgl . tgl . tgl .

270 71 Beton Keropos

tgl . tgl . tgl . tgl .

270 72 Beton Keropos

tgl . tgl . tgl .

270 73 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 74 Beton Keropos

tgl . tgl . tgl . tgl .

270 75 Beton Keropos

tgl . tgl . tgl . tgl .

270 76 Beton Keropos

tgl . tgl . tgl . tgl .

270 77 Beton Keropos

tgl . tgl . tgl . tgl .

270 78 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 270/LKP-ST/III/2019 270 79 Beton Keropos

tgl . tgl . tgl . tgl .

270 80 Beton Keropos

tgl . tgl . tgl . tgl .

270 81 Beton Keropos

tgl . tgl . tgl . tgl .

270 82 Beton Keropos

tgl . tgl . tgl . tgl .

270 83 Beton Keropos

tgl . tgl . tgl . tgl .

270 84 Beton Keropos

tgl . tgl . tgl . tgl .

270 85 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 86 Beton Keropos

tgl . tgl . tgl . tgl .

270 87 Beton Keropos

tgl . tgl . tgl . tgl .

270 88 Beton Keropos

tgl . tgl . tgl . tgl .

270 89 Beton Keropos

tgl . tgl . tgl . tgl .

270 90 Beton Keropos

tgl . tgl . tgl . tgl .

270 91 Beton Keropos

tgl . tgl . tgl . tgl .

270 92 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 93 Beton Keropos

tgl . tgl . tgl . tgl .

270 94 Beton Keropos

tgl . tgl . tgl . tgl .

270 95 Beton Keropos

tgl. tgl. tgl . tgl .

270 96 Beton Keropos

tgl . tgl . tgl . tgl .

270 97 Beton Keropos

tgl . tgl . tgl . tgl .

270 98 Beton Keropos

tgl . tgl . tgl .

270 99 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 100 Beton Keropos

tgl . tgl . tgl . tgl .

270 101 Beton Keropos

tgl . tgl . tgl . tgl .

270 102 Beton Keropos

tgl . tgl . tgl . tgl .

270 103 Beton Keropos

tgl . tgl . tgl . tgl .

270 104 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

1 270/LKP-ST/III/2019 270 105 Beton Keropos

tgl . tgl . tgl . tgl .

270 106 Beton Keropos

tgl . tgl . tgl . tgl .

270 107 Beton Keropos

tgl . tgl . tgl . tgl .

270 108 Beton Keropos

tgl . tgl . tgl . tgl .

270 109 Beton Keropos

tgl . tgl . tgl . tgl .

270 110 Beton Keropos

tgl . tgl . tgl . tgl .

270 111 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 112 Beton Keropos

tgl . tgl . tgl . tgl .

270 113 Beton Keropos

tgl . tgl . tgl . tgl .

270 114 Beton Keropos

tgl . tgl . tgl . tgl .

270 115 Beton Keropos

tgl . tgl . tgl . tgl .

270 116 Beton Keropos

tgl . tgl . tgl . tgl .

270 117 Beton Keropos

tgl . tgl . tgl . tgl .

270 118 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 119 Beton Keropos

tgl . tgl . tgl . tgl .

270 120 Beton Keropos

tgl . tgl . tgl . tgl .

270 121 Beton Keropos

tgl. tgl. tgl . tgl .

270 122 Beton Keropos

tgl . tgl . tgl . tgl .

270 123 Beton Keropos

tgl . tgl . tgl . tgl .

270 124 Beton Keropos

tgl . tgl . tgl .

270 125 Beton Keropos

tgl . tgl . tgl . tgl .


10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP) Lantai 8
FOTO STATUS PIC Keterangan
NO NUMBER ITEM Metodh
Before Chipping PROSES FINISH PLAN ACTUAL TBP CP Status

270 126 Beton Keropos

tgl . tgl . tgl . tgl .

270 127 Beton Keropos

tgl . tgl . tgl . tgl .

270 128 Beton Keropos

tgl . tgl . tgl . tgl .

270 129 Beton Keropos

tgl . tgl . tgl . tgl .

270 130 Beton Keropos

tgl . tgl . tgl . tgl .

Keterangan : Belum dikerjakan C Chipping


Sedang dikerjakan PC Paching

Sign to Owner PG Preasure Grouting

Closed S Skimcoat
Menunggu Keputusan Owner
L
U
10/24/2023 11:37
M
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR Keterangan A
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN C
Chipping Metode Disetujui Finishing Status T
1 12-Dec-2018 084/LKP/XII/2018 honeycomb B2 (owner) On Progres, bobokan I
O
2 13-Dec-2018 085/LKP/XII/2018 beton keropos B2 (owner) On Progres, bobokan N

3 18-Dec-2018 122/LKP/XII/2018 grouting slab balok B2 (owner) On Progres

Keropos dan ada sisa bekisting pada


4 26-Dec-2018 134/LKP/XII/2018 Lantai B2 & B1 On Progres, bobokan
tangga #4 lt. B2-B1

Slab (Soffit) lantai Ngeplint di


5 27-Dec-2018 139/LKP/XII/2018 Lantai B1 & B2 On Progres, bobokan
Basement 2_Basement 1

Keterangan : Belum dikerjakan


Sedang dikerjakan
Sign to Owner
Closed
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN
Chipping Metode Disetujui Finishing

Slab (Soffit) lantai Ngeplint di


1 27-Dec-2018 139/LKP/XII/2018 Lantai B1 & B2
Basement 2_Basement 1

Keropos dan ada sisa bekisting pada


2 26-Dec-2018 134/LKP/XII/2018 Lantai B2 & B1
tangga #4 lt. B2-B1

3 14-Dec-2018 116/LKP/XII/2018 kolom separator miring Bsm 1

10

11
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN
Chipping Metode Disetujui Finishing

12

13

14

15

16

17

18

19

20
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN
Chipping Metode Disetujui Finishing

21

22

23

24

25

26

27

Keterangan : Belum dikerjakan


Sedang dikerjakan
Sign to Owner
Closed
Menunggu Keputusan Owner
L
U
M
N KETIDAKSESUAIAN PRODUK (LKP)
Keterangan A
C
Status T
I
On Progres, bobokan
O
N
On Progres, bobokan

On Progres, bobokan

On Progres, bobokan

On Progres, bobokan

On Progres, bobokan
L
U
M
N KETIDAKSESUAIAN PRODUK (LKP)
Keterangan A
C
Status T
I
O
N
L
U
M
N KETIDAKSESUAIAN PRODUK (LKP)
Keterangan A
C
Status T
I
O
N
L
U
10/24/2023 11:37
M
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
REPAIR Keterangan A
NO DATE NUMBER ITEM LOCATION Metodh PEKERJAAN C
Chipping Metode Disetujui Finishing Status T
1 6-Dec-2018 077/LKP/XII/2018 bunting dan bocor GF I
O
2 17-Dec-2018 118/LKP/XII/2018 cor bordes tangga 1 dgn chemset GF N

3 17-Dec-2018 120/LKP/XII/2018 pengecoran kolom separator GF

4 21-Dec-2018 127/LKP/XII/2018 Defect list area Ground Floor GF

Memperbaiki gap pertemuan slab


5 29-Dec-2018 145/LKP/XII/2018 GF
dengan pasangan bata

6 3-Jan-2019 162/LKP/I/2019 Beton keropos Lt. B1 - Lt. GF B1-GF

kolom separator tidak menumpu balok


7 7-Jan-2019 168/LKP/I/2019 GF
Lt. GF

Keterangan : Belum dikerjakan


Sedang dikerjakan
Sign to Owner
Closed
Menunggu Keputusan Owner
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3

39 3-May-2018 039/LKP/V/2018 tindakan perbaikan semua temuan lapangan all area jimmy submit 6 NOV 18 dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi
53 19-Oct-2018 053/LKP/X/2018 perbaikan area site visit all area nasri/eko/jimmy BELUM ACTION ###
54 20-Oct-2018 054/LKP/X/2018 perbaikan area EOS lt 3 & 4 as A dan J eko/jimmy BELUM ACTION ###
58 31-Oct-2018 058/LKP/X/2018 KOLOM MIRING K9 - B1 AS E'-9.1 Eko BELUM ACTION Sudah dikerjakan proses closing ke owner
59 1-Nov-2018 059/LKP/XI/2018 coring slab slab lt.4 zone A3 Jimmy BELUM ACTION Tunggu umur 28 hari tgl 26 Nop 2018
60 1-Nov-2018 060/LKP/XI/2018 perbaikan EOS LT 2,3,4 Eko/Jimmy BELUM ACTION Tunggu Approval Konsultan
61 1-Nov-2018 061/LKP/XI/2018 Dak beton gembung shaft no.18-B4 Eko submit 30 nov 18 Sudah dikerjakan proses closing ke owner
62 5-Nov-2018 062/LKP/XI/2018 dimensi balok tidak sesuai lt.3 B3 SW4 Eko BELUM ACTION ###
64 12-Nov-2018 064/LKP/XI/2018 6 item keropos,susut LT 2-3 Eko BELUM ACTION ###
65 13-Nov-2018 065/LKP/XI/2018 8 item keropos,sisa bekisting LT B1-3 Eko BELUM ACTION ###
66 19-Nov-2018 066/LKP/XI/2018 kolom keropos LT 5 Eko submit 21 nov 18 segera dikirim 21 nov 18
67 22-Nov-2018 067/LKP/XI/2018 balok keropos BSM 1 Jimmy BELUM ACTION segera
68 22-Nov-2018 068/LKP/XI/2018 Perapihan stek besi di shaft 16 Lt. B4 BSM 4 Jimmy BELUM ACTION segera
69 22-Nov-2018 069/LKP/XI/2018 Perbaikan slab di lt. Basement 3 BSM 3 Eko BELUM ACTION segera
70 22-Nov-2018 070/LKP/XI/2018 Perbaikan pekerjaan struktur di GF GF Eko-Jimmy BELUM ACTION segera
71 23-Nov-2018 071/LKP/XI/2018 6 item keberishan dan GA BSM 7 Eko-Jimmy revisi 27 nov 18 segera dikirim 26-11-18
73 27-Nov-2018 073/LKP/XI/2018 perbaikan area waterproof lt.GF Eko submit 30 nov 18 segera
74 30-Nov-2018 074/LKP/XI/2018 man hole area doble slab lt.3 Eko BELUM ACTION segera
75 1-Dec-2018 075/LKP/XII/2018 defect lt.3 lt.3 Eko/jimmy BELUM ACTION segera

1 4 75 56 0 14

TOTAL BELUM
REVISI SUBMIT OWNER TOTAL LKP BERJALAN
CLOSING ACTION
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3

39 3-May-2018 039/LKP/V/2018 tindakan perbaikan semua temuan lapangan all area jimmy DIKIRIM 6 NOV 18 dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi
dikembalikan owner 2
49 9-Jul-2018 049/LKP/VII/2018 SW3 B3-B4 keropos B3-B4 sudaryanto berjalan dikirim 9 juli 18
agustus 18 (berjalan)

dikembalikan owner
50 10-Sep-2018 050/LKP/IX/2018 hasil cor slab B2 B2 sudaryanto DIKIRIM 12 NOV 18 dikirim 12/11/18
3 okt 18 (revisi)

53 19-Oct-2018 053/LKP/X/2018 perbaikan area site visit all area nasri/eko/jimmy BELUM ACTION ###
54 20-Oct-2018 054/LKP/X/2018 perbaikan area EOS lt 3 & 4 as A dan J eko/jimmy BELUM ACTION ###
58 31-Oct-2018 058/LKP/X/2018 KOLOM MIRING K9 - B1 AS E'-9.1 Eko Sudah dikerjakan proses closing ke owner
59 1-Nov-2018 059/LKP/XI/2018 coring slab slab lt.4 zone A3 Jimmy BELUM ACTION Tunggu umur 28 hari tgl 26 Nop 2018
10/24/2023 11:37
LAPORAN KETIDAKSESUAIAN PRODUK (LKP)
NO DATE NUMBER ITEM LOCATION PIC STATUS TARGET CLOSED TINDAK LANJUT 1 TINDAK LANJUT 2 TINDAK LANJUT 3

60 1-Nov-2018 060/LKP/XI/2018 perbaikan EOS LT 2,3,4 Eko/Jimmy BELUM ACTION Tunggu Approval Konsultan
61 1-Nov-2018 061/LKP/XI/2018 Dak beton gembung shaft no.18-B4 Eko Sudah dikerjakan proses closing ke owner
62 5-Nov-2018 062/LKP/XI/2018 dimensi balok tidak sesuai lt.3 B3 SW4 Eko BELUM ACTION ###
64 12-Nov-2018 064/LKP/XI/2018 6 item keropos,susut LT 2-3 Eko BELUM ACTION ###
65 13-Nov-2018 065/LKP/XI/2018 8 item keropos,sisa bekisting LT B1-3 Eko BELUM ACTION ###
66 19-Nov-2018 066/LKP/XI/2018 kolom keropos LT 5 Eko submit 21 nov 18 segera dikirim 21 nov 18
67 22-Nov-2018 067/LKP/XI/2018 balok keropos BSM 1 Jimmy BELUM ACTION segera
68 22-Nov-2018 068/LKP/XI/2018 Perapihan stek besi di shaft 16 Lt. B4 BSM 4 Jimmy BELUM ACTION segera
69 22-Nov-2018 069/LKP/XI/2018 Perbaikan slab di lt. Basement 3 BSM 3 Eko BELUM ACTION segera
70 22-Nov-2018 070/LKP/XI/2018 Perbaikan pekerjaan struktur di GF GF Eko-Jimmy BELUM ACTION segera
71 23-Nov-2018 071/LKP/XI/2018 6 item keberishan dan GA BSM 7 Eko-Jimmy submit 26 nov 18 segera dikirim 26-11-18
72 23-Nov-2018 072/LKP/XI/2018 balok keropos BSM 1 AS G Eko revisi 27 nov 18 segera dikirim 27 nov 18

1 4 72 53 1 13

TOTAL BELUM
REVISI SUBMIT OWNER TOTAL LKP BERJALAN
CLOSING ACTION
STATUS LAPORAN KETIDAKSESUAIAN PRODUK
10/24/2023 11:37
NO ITEM LOCATION DATE NUMBER DATE CLOSED STATUS Tindak Lanjut 1 Tindak Lanjut 2 Tindak Lanjut 3 PIC

dikirim 3 mei 18, revisi tunggu tes 28dikirim


dan 567 juni 18 tbp kirim lagi
36 hasil tes beton yang tidak sesuai 28-Apr-18 036/LKP/IV/2018 berjalan sudaryanto
dalam standar spesifikasi teknis
matfound dan cor actual
dan pembongkaran bekisting dikembalika utk direvisi 3 juli
(buble kolom) 3 juli 18
18

39 tindakan perbaikan semua temuan 3-May-18 039/LKP/V/2018 open dikirim 7 mei 18 dikirim 15 mei 18 dikembalika utk direvisi jimmy
all area
lapangan tgl 3 juli 18

42 14-May-18 042/LKP/V/2018 berjalan dikirim 2 juni 18 eko


kolom bubble B4-B5
dikembalikan owner 28 jun
(berjalan)
43 30-May-18 043/LKP/V/2018 berjalan dikirim 2 juni 18 eko
lubang tie rod & kolom bubble B4-B5-B6
dikembalikan owner 28 jun
(berjalan)
44 30-May-18 044/LKP/V/2018 berjalan dikirim 2 juni 18 eko
kolom bubble dan ngeplin B4-B5-B6
dikembalikan owner 28 jun
(berjalan)
45 25-Jun-18 045/LKP/VI/2018 berjalan dikirim 3 juli 18 dikembalikan owner 2 jimmy
kolom bubble dan ngeplin B3-B4-B5-B6
agustus 18 (berjalan)

46 25-Jun-18 046/LKP/VI/2018 berjalan dikirim 4 juli 18 dikembalikan owner 2 nasri


finishing,MEP,dwal bocor,gridline all area
agustus 18 (berjalan)

47 Tanggapan, hasil inspeksi bersama 25-Jun-18 047/LKP/VI/2018 open dikirim 26 juni 18 dikembalika utk direvisi sudaryanto
all area
CP/02?02/032/VI/2018 tgl 3 juli 18

48 hammer test gagal, diminta 25-Jun-18 048/LKP/VI/2018 open dikirim 28 juni 18 sudaryanto
zone 2,3,5 B3
coredrill

49 9-Jul-18 049/LKP/VII/2018 berjalan dikirim 9 juli 18 dikembalikan owner 2 sudaryanto


SW3 B3-B4 keropos B3-B4
agustus 18 (berjalan)

Jumlah LKP : 10 submit owner berjalan belum action revisi


Status Open LKP : 3 1 7 0 2
Status Close LKP : 0 48 42,43,44,45.49,46,36 39.47
Status Continue : 7

Page 284 of 284