RENCANA ANGGARAN BIAYA (RAB)


BANTUAN JAMBAN DAN AKSES SANITASI LAYAK PEDESAAN
Nomor BNBA : 1
Nomor KTP : 6307080404800001
Nama Penerima Bantuan : MUHTAR
Alamat : Ilung RT.01
Desa : Ilung
Kecamatan : Ilung, Batang Alai Utara
Kabupaten : Hulu Sungai Tengah
Jenis Kegiatan : PKJS / PBJS *)
SUMBER DANA/BAHAN
SWADAYA
HARGA
TOTAL Memakai
NO URAIAN PEKERJAAN VOLUME SATUAN
HARGA (Rp) Dana Bantuan Bahan
(Rp) Dana Tunai
Bangunan
Lama
I PEKERJAAN BILIK JAMBAN
1 Batako 30.00 Bj 5,000 150,000 4,500,000
2 Semen PC 2.00 Zak 70,000 140,000
3 Pasir 1.00 M3 200,000 200,000
4 Tanah urug - M3 115,000 -
5 Baja ringan tipe C. 65.75 4.00 Btg 100,000 400,000
6 Reeng baja ringan R32.45 3.00 Btg 55,000 165,000 1,850,000
7 Seng metal 0,25 mm 10.00 Lbr 70,000 700,000
8 Baut baja ringan/100 bj 1.00 Bks 30,000 30,000
9 Baut sekrup/100 bj 1.00 Bks 20,000 20,000
10 Hendle / pegangan pintu 1.00 Bh 5,000 5,000
11 Engsel pintu 1.00 Bh 30,000 30,000
12 Grendel 1.00 Bh 10,000 10,000

II PEKERJAAN SANITASI
1 Kloset jongkok 1.00 bh 190,000 190,000
2 Gorong - gorong uk Ø 80 cm 5.00 bh 200,000 1,000,000
3 Tutup Gorong - gorong Ø 80 cm 2.00 bh 75,000 150,000 1,646,500
4 Pipa PVC 4 inc 1.00 btg 110,000 110,000
5 Sambungan PVC elbow 4 inc 1.00 bh 30,000 30,000
6 Pipa PVC penghawaan 1,5 inc - btg -
7 Pipa PVC floor drain 2 inc 1.00 Btg 65,000 65,000
8 Sambungan PVC elbow 2 inc 1.00 bh 10,000 10,000
9 Sambungan PVC tee 2 inc 1.00 bh 12,000 12,000
10 Floor drain 1.00 bh 15,000 15,000
11 Pipa PVC 0,5 inc 1.00 btg 20,000 20,000
12 Sambungan PVC elbow 0,5 inc 2.00 bh 3,000 6,000
13 Shock drat 0,5 inc 1.00 bh 3,500 3,500
14 Kran air stailess steel 0,5 inc 1.00 bh 20,000 20,000
15 Lem PVC 1.00 bh 15,000 15,000

III UPAH PEKERJAAN


1 Upah pembangunan bilik jamban 1.00 Ls 500,000 500,000
2 Upah instalasi sanitasi 1.00 Ls 500,000 500,000

JUMLAH 4,496,500 4,500,000 3,496,500 -

Ilung , ……………………….. 2023

Difasilitasi, Diajukan oleh,


Tenaga Fasilitator Lapangan (TFL) Ketua KPB Penerima Bantuan

(Norliani,ST) (Nurhidayah) (Muhtar)

Disahkan oleh, Diverifikasi oleh,


Tim Teknis Dinas Perkim Koordinator Fasilitator
Kab. Hulu Sungai Tengah Kabupaten/Kota

(Rahmi Yulianti, ST) ( Latifah Khairina, ST )


NIP. 19900930 201903 2 023
FORMAT I-15
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN JAMBAN DAN AKSES SANITASI LAYAK PEDESAAN
Nomor BNBA : 2
Nomor KTP : 6307086005760001
Nama Penerima Bantuan : NURHIDAYAH
Alamat : JL. H. Damanhuri RT.05
Desa : Ilung
Kecamatan : Ilung, Batang Alai Utara
Kabupaten : Hulu Sungai Tengah
Jenis Kegiatan : PKJS / PBJS *)
SUMBER DANA/BAHAN
HARGA TOTAL
SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp) Dana Bantuan Memakai Bahan
Dana Tunai
Bangunan Lama
I PEKERJAAN BILIK JAMBAN
1 Batako 20.00 Bj 5,000 100,000 4,500,000
2 Semen PC 1.00 Zak 70,000 70,000
3 Balok kayu kelas I 5/10 – 1 m (Uk. Pasar 4/9) 6.00 Btg 40,000 240,000
4 Balok kayu kelas I 5/3 – 4 m (Uk. Pasar 4/2,5) 3.00 Btg 70,000 210,000
5 Papan kayu kelas I 1,2 x 15 – 1,5 m (Uk. Pasar 1,1 x 14) 6.00 Kpg 50,000 300,000
6 Paku Ulin 1.02 Kg 30,000 30,500
7 Baja ringan tipe C. 65.75 3.00 Btg 100,000 300,000
8 Reeng baja ringan R32.45 4.00 Btg 55,000 220,000
9 Seng metal 0,25 mm 6.00 Lbr 70,000 420,000
10 Baut baja ringan/100 bj 1.00 Pcs 30,000 30,000
11 Baut sekrup/100 bj 1.00 Pcs 20,000 20,000
12 Hendle / pegangan pintu 1.00 Bh 5,000 5,000
13 Engsel pintu 1.00 Bh 30,000 30,000
14 Grendel 1.00 Bh 10,000 10,000

II PEKERJAAN SANITASI
1 Kloset jongkok 1.00 bh 190,000 190,000
2 Gorong - gorong uk Ø 80 cm 5.00 bh 200,000 1,000,000
3 Tutup Gorong - gorong Ø 80 cm 2.00 bh 75,000 150,000
4 Pipa PVC 4 inc 0.50 btg 110,000 55,000
5 Sambungan PVC elbow 4 inc 2.00 bh 30,000 60,000
6 Pipa PVC penghawaan 1,5 inc 1.00 btg -
7 Pipa PVC 2 inc (Penghawaan) 0.50 Btg 65,000 32,500
8 Sambungan PVC elbow 2 inc bh 10,000 -
9 Sambungan PVC tee 2 inc 1.00 bh 12,000 12,000
10 Floor drain bh 15,000 -
11 Pipa PVC 0,5 inc btg 20,000 -
12 Sambungan PVC elbow 0,5 inc bh 2,500 -
13 Shock drat 0,5 inc bh 2,500 -
14 Kran air stailess steel 0,5 inc bh 20,000 -
15 Lem PVC 1.00 bh 15,000 15,000

III UPAH PEKERJAAN


1 Upah pembangunan bilik jamban 1.00 Ls 500,000 500,000
2 Upah instalasi sanitasi 1.00 Ls 500,000 500,000
JUMLAH 4,500,000 4,500,000 - -

Ilung, , ……………………….. 2023


Difasilitasi, Diajukan oleh,
Tenaga Fasilitator Lapangan (TFL) Ketua KPB Penerima Bantuan

(Norliani,ST) (Nurhidayah) (Nurhidayah)

Disahkan oleh, Diverifikasi oleh,


Tim Teknis Dinas Perkim Koordinator Fasilitator
Kab. Hulu Sungai Tengah Kabupaten/Kota

(Rahmi Yulianti, ST) ( Latifah Khairina, ST )


NIP. 19900930 201903 2 023
FORMAT I-15
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN JAMBAN DAN AKSES SANITASI LAYAK PEDESAAN
Nomor BNBA : 3
Nomor KTP : 6307085506530001
Nama Penerima Bantuan : SURAH
Alamat : JL. H. Damanhuri RT.06
Desa : Ilung
Kecamatan : Ilung, Batang Alai Utara
Kabupaten : Hulu Sungai Tengah
Jenis Kegiatan : PKJS / PBJS *)
SUMBER DANA/BAHAN
SWADAYA
HARGA TOTAL
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA Dana Memakai
(Rp) (Rp) Bantuan Bahan
Dana Tunai
Bangunan
Lama
I PEKERJAAN BILIK JAMBAN
1 Batako 45.00 Bj 5,000 225,000 4,500,000
2 Semen PC 2.00 Zak 70,000 140,000
3 Pasir 1.00 M3 200,000 200,000
4 Tanah urug - M3 115,000 -
5 Baja ringan tipe C. 65.75 3.00 Btg 100,000 300,000
6 Reeng baja ringan R32.45 4.00 Btg 55,000 220,000
7 Seng metal 0,25 mm 10.00 Lbr 70,000 700,000
8 Baut baja ringan/100 bj 1.05 Pcs 30,000 31,500
9 Baut sekrup/100 bj 1.00 Pcs 20,000 20,000
10 Hendle / pegangan pintu 1.00 Bh 5,000 5,000
11 Engsel pintu 1.00 Psg 30,000 30,000
12 Grendel 1.00 Bh 10,000 10,000

II PEKERJAAN SANITASI
1 Kloset jongkok 1.00 bh 190,000 190,000
2 Gorong - gorong uk Ø 80 cm 5.00 bh 200,000 1,000,000
3 Tutup Gorong - gorong Ø 80 cm 2.00 bh 75,000 150,000
4 Pipa PVC 4 inc 0.50 btg 110,000 55,000
5 Sambungan PVC elbow 4 inc 2.00 bh 30,000 60,000
6 Pipa PVC penghawaan 1,5 inc 1.00 btg -
7 Pipa PVC floor drain 2 inc 1.00 Btg 65,000 65,000
8 Sambungan PVC elbow 2 inc 1.00 bh 10,000 10,000
9 Sambungan PVC tee 2 inc 1.00 bh 12,000 12,000
10 Floor drain 1.00 bh 15,000 15,000
11 Pipa PVC 0,5 inc 1.00 btg 20,000 20,000
12 Sambungan PVC elbow 0,5 inc 1.00 bh 3,000 3,000
13 Shock drat 0,5 inc 1.00 bh 3,500 3,500
14 Kran air 0,5 inc 1.00 bh 20,000 20,000
15 Lem PVC 1.00 bh 15,000 15,000

III UPAH PEKERJAAN


1 Upah pembangunan bilik jamban 1.00 Ls 500,000 500,000
2 Upah instalasi sanitasi 1.00 Ls 500,000 500,000

JUMLAH 4,500,000 4,500,000 - -

Ilung , ……………………….. 2023

Difasilitasi, Diajukan oleh,


Tenaga Fasilitator Lapangan (TFL) Ketua KPB Penerima Bantuan

(Norliani,ST) (Nurhidayah) (Surah)

Disahkan oleh, Diverifikasi oleh,


Tim Teknis Dinas Perkim Koordinator Fasilitator
Kab. Hulu Sungai Tengah Kabupaten/Kota

(Rahmi Yulianti, ST) ( Latifah Khairina, ST )


NIP. 19900930 201903 2 023
FORMAT I-15
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN JAMBAN DAN AKSES SANITASI LAYAK PEDESAAN
Nomor BNBA : 4
Nomor KTP : 6307080901710001
Nama Penerima Bantuan : MAKSID
Alamat : JLN. H. Damanhuri RT.06
Desa : Ilung
Kecamatan : Ilung, Batang Alai Utara
Kabupaten : Hulu Sungai Tengah
Jenis Kegiatan : PKJS / PBJS *)
SUMBER DANA/BAHAN
HARGA
TOTAL SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN Dana
HARGA (Rp) Memakai Bahan
(Rp) Bantuan Dana Tunai
Bangunan Lama
I PEKERJAAN BILIK JAMBAN
1 Batako 45.00 Bj 5,000 225,000 4,500,000
2 Semen PC 2.00 Zak 70,000 140,000
3 Pasir 1.00 M3 200,000 200,000
4 Tanah urug - M3 115,000 -
5 Baja ringan tipe C. 65.75 3.00 Btg 100,000 300,000
6 Reeng baja ringan R32.45 4.00 Btg 55,000 220,000
7 Seng metal 0,25 mm 10.00 Lbr 70,000 700,000
8 Baut baja ringan/100 bj 1.05 Pcs 30,000 31,500
9 Baut sekrup/100 bj 1.00 Pcs 20,000 20,000
10 Hendle / pegangan pintu 1.00 Bh 5,000 5,000
11 Engsel pintu 1.00 Psg 30,000 30,000
12 Grendel 1.00 Bh 10,000 10,000

II PEKERJAAN SANITASI
1 Kloset jongkok 1.00 bh 190,000 190,000
2 Gorong - gorong uk Ø 80 cm 5.00 bh 200,000 1,000,000
3 Tutup Gorong - gorong Ø 80 cm 2.00 bh 75,000 150,000
4 Pipa PVC 4 inc 0.50 btg 110,000 55,000
5 Sambungan PVC elbow 4 inc 2.00 bh 30,000 60,000
6 Pipa PVC penghawaan 1,5 inc 1.00 btg -
7 Pipa PVC floor drain 2 inc 1.00 Btg 65,000 65,000
8 Sambungan PVC elbow 2 inc 1.00 bh 10,000 10,000
9 Sambungan PVC tee 2 inc 1.00 bh 12,000 12,000
10 Floor drain 1.00 bh 15,000 15,000
11 Pipa PVC 0,5 inc 1.00 btg 20,000 20,000
12 Sambungan PVC elbow 0,5 inc 1.00 bh 3,000 3,000
13 Shock drat 0,5 inc 1.00 bh 3,500 3,500
14 Kran air 0,5 inc 1.00 bh 20,000 20,000
15 Lem PVC 1.00 bh 15,000 15,000

III UPAH PEKERJAAN


1 Upah pembangunan bilik jamban 1.00 Ls 500,000 500,000
2 Upah instalasi sanitasi 1.00 Ls 500,000 500,000

JUMLAH 4,500,000 4,500,000 - -

Ilung , ……………………….. 2023

Difasilitasi, Diajukan oleh,


Tenaga Fasilitator Lapangan (TFL) Ketua KPB Penerima Bantuan

(Norliani,ST) (Nurhidayah) (Maksid)

Disahkan oleh, Diverifikasi oleh,


Tim Teknis Dinas Perkim Koordinator Fasilitator
Kab. Hulu Sungai Tengah Kabupaten/Kota

(Rahmi Yulianti, ST) ( Latifah Khairina, ST )


NIP. 19900930 201903 2 023
FORMAT I-15
RENCANA ANGGARAN BIAYA (RAB)
BANTUAN JAMBAN DAN AKSES SANITASI LAYAK PEDESAAN
Nomor BNBA : 5
Nomor KTP : 6307080203690002
Nama Penerima Bantuan : SARIFUDIN
Alamat : JL. H. Damanhuri RT.06
Desa : Ilung
Kecamatan : Ilung, Batang Alai Utara
Kabupaten : Hulu Sungai Tengah
Jenis Kegiatan : PKJS / PBJS *)
SUMBER DANA/BAHAN
HARGA TOTAL
SWADAYA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp) Dana Bantuan Memakai Bahan
Dana Tunai
Bangunan Lama
I PEKERJAAN BILIK JAMBAN
1 Batako 45.00 Bj 5,000 225,000 4,500,000
2 Semen PC 2.00 Zak 70,000 140,000
3 Pasir 1.00 M3 200,000 200,000
4 Tanah urug - M3 115,000 -
5 Baja ringan tipe C. 65.75 3.00 Btg 100,000 300,000
6 Reeng baja ringan R32.45 4.00 Btg 55,000 220,000
7 Seng metal 0,25 mm 10.00 Lbr 70,000 700,000
8 Baut baja ringan/100 bj 1.05 Pcs 30,000 31,500
9 Baut sekrup/100 bj 1.00 Pcs 20,000 20,000
10 Hendle / pegangan pintu 1.00 Bh 5,000 5,000
11 Engsel pintu 1.00 Psg 30,000 30,000
12 Grendel 1.00 Bh 10,000 10,000

II PEKERJAAN SANITASI
1 Kloset jongkok 1.00 bh 190,000 190,000
2 Gorong - gorong uk Ø 80 cm 5.00 bh 200,000 1,000,000
3 Tutup Gorong - gorong Ø 80 cm 2.00 bh 75,000 150,000
4 Pipa PVC 4 inc 0.50 btg 110,000 55,000
5 Sambungan PVC elbow 4 inc 2.00 bh 30,000 60,000
6 Pipa PVC penghawaan 1,5 inc 1.00 btg -
7 Pipa PVC floor drain 2 inc 1.00 Btg 65,000 65,000
8 Sambungan PVC elbow 2 inc 1.00 bh 10,000 10,000
9 Sambungan PVC tee 2 inc 1.00 bh 12,000 12,000
10 Floor drain 1.00 bh 15,000 15,000
11 Pipa PVC 0,5 inc 1.00 btg 20,000 20,000
12 Sambungan PVC elbow 0,5 inc 1.00 bh 3,000 3,000
13 Shock drat 0,5 inc 1.00 bh 3,500 3,500
14 Kran air 0,5 inc 1.00 bh 20,000 20,000
15 Lem PVC 1.00 bh 15,000 15,000

III UPAH PEKERJAAN


1 Upah pembangunan bilik jamban 1.00 Ls 500,000 500,000
2 Upah instalasi sanitasi 1.00 Ls 500,000 500,000

JUMLAH 4,500,000 4,500,000 - -

Ilung , ……………………….. 2023

Difasilitasi, Diajukan oleh,


Tenaga Fasilitator Lapangan (TFL) Ketua KPB Penerima Bantuan

(Norliani,ST) (Nurhidayah) (Sarifudin)

Disahkan oleh, Diverifikasi oleh,


Tim Teknis Dinas Perkim Koordinator Fasilitator
Kab. Hulu Sungai Tengah Kabupaten/Kota

(Rahmi Yulianti, ST) ( Latifah Khairina, ST )


NIP. 19900930 201903 2 023