PT.

PRASETYA MITRA MUDA


KAHAYAN ESTATE

HM KM & COST ACTUAL JANUARI-JUNI 2023

KETERANGAN
HM/KM JAN- COST JAN S/D
NO UNIT TAHUN
JUNI JUNI
PEROLEHAN
1 Strada L-200 Triton (KH 8367 FR) 22,338 79,036,276.84 2017
2 Dump Truck-01 (KH8570LB) Baru 14,902 84,344,846.41 2023
3 Dump Truck-02 (KH8441FS) 21,105 155,616,020.40 2018
4 Dump Truck-03 (KH8231LA) 22,358 154,717,184.66 2022
5 Dump Truck-04 (KH8232LA) 27,933 177,002,863.72 2022
6 Dump Truck-05 (KH8571LB) Baru 17,292 105,745,659.00 2023
7 Dump Truck-06 (KH8996LB) 6,335 42,147,800.86 2023
8 Dump Truck-07 (KH8992LB) 6,825 41,608,050.35 2023
9 Dump Truck-08 (KH8991LB) 5,709 38,786,810.99 2023
10 Dump Truck-09 (KH8001LD) 5,945 36,713,388.20 2023
11 Dump Truck-10 (KH8087LB) 4,753 28,342,099.26 2023
12 Dump Truck-11 (KH8091LB) 3,803 30,023,108.06 2023
13 Dump Truck-12 (KH8551LB) 4,014 37,251,864.30 2023
14 Dump Truck-13 (KH8667LB) 2,587 15,440,123.41 2023
15 Bus Sekolah 737 2,619,168.20 2022
16 Traktor MF 440-01 1,170 105,213,625.51 2013
17 Traktor MF 440-02 714 106,211,405.96 2013
18 Traktor MF 440-03 714 90,730,952.84 2023
19 Traktor MF 440-04 519 47,784,957.55 2012
20 Traktor MF 440-05 668 68,050,083.94 2023
21 Backhoe Loader Case 570SV (TLB 01) 676 133,644,722.69 2022
22 LCT-01 KHYE 40 TON 655 122,475,584.48 2015
UNI 2023

KETERANGAN
STATUS WAKTU MUTASI

MUTASI NSRE PER MEI 2023


MUTASI NSRE PER MEI 2023
MUTASI NSRE PER MEI 2023
MUTASI JMRE PER JUNI 2023
PINJAM SRNE PER MEI 2023

MUTASI NSRE PER FEBRUARI 2023