Anda di halaman 1dari 2

10/24/23, 11:02 AM ProposalRoadshows

Proposal Roadshow
Cabang JYT - Wahana Jayanthi
No Proposal 009/WARIJYT/X/2023
Tanggal Pengajuan Proposal 23 Oct 2023
Tipe Roadshow Mini Roadshow
Target Penjualan :
♦ Cash 5
♦ Credit 30
Finco -
Program Bazzar Motor Honda
Tempat Acara POS SOLEAR
Tanggal Roadshow 29 Oct 2023 s/d 30 Oct 2023
Durasi 2 hari
Lokasi Jl.Raya Cangkudu-Cisoka, Solear
Status Approve Area Belum Approve

PERINCIAN BIAYA
Harga Satuan
No Perincian Biaya Qty Budget Keterangan
Rp Keterangan
I BIAYA EO
1. Jasa EO/Biaya
Keikutsertaan
PPh Penerima Jasa :
Badan Usaha NPWP
dgn Faktur Pajak
PPN :
Total Biaya Sewa 0
II BIAYA PROMOSI
1. Cetak biaya pricelist Rek BCA 3452213106
90.000 9 810.000
Flyer/Pricelist an Muhammad Faisal
Rek BCA 0020182351 an Er Afril
2. Cetak Spanduk 200.000 1 200.000
Hasan
Total Biaya Promosi 1.010.000
III KONSUMSI
1. Biaya Konsumsi
9 MO + 3 SPV ( 3 CABANG ) + 1 MC +
2 SOUND SYISTEM ( UNTUK 1 X HARI
- Makan Siang 25.000 15 375.000
MINGGU) Rek BCA : 0020182351 An Er
Afril Hasan
9 MO + 3 SPV ( 3 CABANG ) + 1 MC +
2 SOUND SYISTEM ( UNTUK 2 HARI )
- Makan Malam 25.000 45 1.125.000
Rek BCA : 0020182351 An Er Afril
Hasan
Rek BCA 0020182351 an Er Afril
2. Biaya Air Minum 30.000 5 150.000
Hasan
3. Biaya Snack
- Pagi 10.000
9 MO + 3 SPV ( 3 CABANG ) + 1 MC +
2 SOUND SYISTEM ( UNTUK 2 HARI )
- Siang 10.000 45 450.000
Rek BCA : 0020182351 An Er Afril
Hasan
9 MO + 3 SPV ( 3 CABANG ) + 1 MC +
4. Biaya Energi 2 SOUND SYISTEM ( UNTUK 2 HARI )
10.000 45 450.000
Drink Rek BCA : 0020182351 An Er Afril
Hasan
Total Biaya
2.550.000
Konsumsi
BIAYA HADIAH /
IV
SOUVENIR
Total Biaya Hadiah
0
/ Souvenir
V LAIN - LAIN
1. Insentif MO
2. Insentif Marko

https://warionline.wahanaartha.com/wari_onlines/ProposalRoadshows/print_proposal/6536703c-f7e8-42d9-8d14-2836c0a80042 1/2
10/24/23, 11:02 AM ProposalRoadshows
3. Perijinan / izin keramaian REK BCA 8880072863
500.000 1 500.000
Keamanan AN ROZI KALBAR
galon, plastik sampah, instalasi
4. PERLENGKAPAN 400.000 1 400.000 listrik, dll REK BCA 0020182351 AN
ER AFRIL HASAN
Biaya MC & Sound system untuk 2
5. MC & HIBURAN 1.500.000 1 1.500.000 hari Rek BCA 8670264263 an
Riswanto
Total Biaya Lain-
2.400.000
Lain
TOTAL BIAYA 5.960.000
VI SUBSIDI
1. AHM
2. MD
SOF (OTO) 3.000.000
A
TOTAL SUBSIDI 3.000.000
Total Biaya Setelah
2.960.000
Dipotong Subsidi

https://warionline.wahanaartha.com/wari_onlines/ProposalRoadshows/print_proposal/6536703c-f7e8-42d9-8d14-2836c0a80042 2/2

Anda mungkin juga menyukai