net
TCG 2020
Efciency straight down the line.
The TCG 2020. Top performance from MWM used successfully worldwide.
Brandenburg Cogeneration Plant, Germany
The City of Brandenburgs cogeneration plant produces 15,992 MWh of district heating and 15,920 MWh of cogenerated electricity each year. MWM supplied the powerful genset for commissioning in 2009, and assisted a partner company in designing and installing the entire cogeneration plant. Other MWM plants are at the planning stage, using the same, successful arrangement.
More profit
The TCG 2020 is highly efficient thanks to its optimized inlet duct, combustion chamber and spark plugs. Save as much as 15 % per annum on fuel costs and increase your plants profitability.
Flexible usage
The latest technology such as our gas-mixer and TEM allows you to use a wide variety of gases. Even the most problematic gases such as colliery gas, landfill gas and sewage gas can be used without difficulty.
Technical data 50 Hz
Engine type Bore/stroke Displacement Speed Mean piston speed Length Width Height Dry weight genset TCG 2020 V12 K1 1) mm dm
3
Technical data 60 Hz
V12 K1) 170/195 53.1 1500 9.8 5450 1870 2490 9920 V122) 170/195 53.1 1500 9.8 5450 1870 2490 9920 V16 K1) 170/195 70.8 1500 9.8 6170 1870 2490 12810 V162) 170/195 70.8 1500 9.8 6170 1870 2490 12810 V202) 170/195 88.5 1500 9.8 7820 2140 2620 17110 Engine type Bore/stroke Displacement Speed Mean piston speed Length Width Height Dry weight genset TCG 2020 V12 K 1) mm dm
3
V16 K1) 170/195 70.8 1500 9.8 7340 2010 2490 14780
min-1 m/s mm mm mm kg
min-1 m/s mm mm mm kg
dry exhaust manifolds TCG 2020 V12 K 1) kW bar 8 % kW % % % 1125 17.7 1291 40.4 46.4 86.8 V12 2) 1200 18.8 1210 43.1 43.5 86.6 V16 K1) 1500 17.7 1714 40.4 46,2 86.6 V162) 1550 18.2 1590 42.8 43.9 86.7 V202) 2000 18.8 2003 43.2 43.2 86.4
TCG 2020 V12 K1 1) kW bar 8 % kW % % % 1000 15.5 1177 40.0 47.0 87.0
Biogas applications
NOX 500 mg/mn3 Sewage gas (65 % CH4 / 35 % CO2) Biogas (60 % CH4 / 32 % CO2, rest N2) Landfill gas (50 % CH4 / 27 % CO2, rest N2) Engine type Electrical power Thermal output 4) Electrical efficiency Thermal efficiency Total efficiency
3)
Biogas applications
Minimum heating value (LHV) Hu = 5,0 kWh/mn3 dry exhaust manifolds NOX 500 mg/mn3 Sewage gas (65 % CH4 / 35 % CO2) Biogas (60 % CH4 / 32 % CO2, rest N2) Landfill gas (50 % CH4 / 27 % CO2, rest N2) Engine type Electrical power Thermal output 4) Electrical efficiency Thermal efficiency Total efficiency
3)
TCG 2020 V12 2) kW bar 8 % kW % % % 1200 18.6 1255 42.0 43.9 85.9
TCG 2020 V122) kW bar 8 % kW % % % 1200 18.8 1268 41.5 43.9 85.4
1) Optimized efficiency version. 2) Version optimized for standalone operation and load compensation. 3) Electrical output as defined in ISO 3046; cosphi = 1.0, generator voltage of U = 0.4 kV at 50 Hz or U = 0.48 kV
at 60 Hz and a minimum methane number of MN 80 (TCG 2020) or MN 70 (TCG 2020 K) for natural gas; minimum heating value of 5.0 kWh/m3 for biogas. 4) Exhaust gas cooled to 120 C with natural gas and 150 C with biogas.
Data for special gas and dual gas operation on request. The values given in this data sheet are for information purposes only and not binding. The information given in the offer is decisive.
1) Optimized efficiency version. 2) Version optimized for standalone operation and load compensation. 3) Electrical output as defined in ISO 3046; cosphi = 1.0, generator voltage of U = 0.4 kV at 50 Hz or U = 0.48 kV
at 60 Hz and a minimum methane number of MN 80 (TCG 2020) or MN 70 (TCG 2020 K) for natural gas; minimum heating value of 5.0 kWh/m3 for biogas. 4) Exhaust gas cooled to 120 C with natural gas and 150 C with biogas.
Data for special gas and dual gas operation on request. The values given in this data sheet are for information purposes only and not binding. The information given in the offer is decisive.
MWM GmbH Carl-Benz-Strae 1 DE-68167 Mannheim T +49 621 384-0 F +49 621 384-8800 info@mwm.net MWM Energy Hungaria Kft. Ezred u.1-3 HU-1044 Budapest T +43 5242 21300 F +43 5242 21300-600 info-hungaria@mwm.net MWM Latin America Solues Energticas Ltda. Av. Dr. Jos Bonifcio C. Nogueira 214 sala 418 BR-CEP 13091-611 Campinas/SP T +55 19 3396-5777 info-latin-america@mwm.net MWM (Beijing) Co. Ltd. CITIC Building Unit 2-02 Jianguomenwai Road 19, CN-100004 Beijing, P.R. China T +86 10 6528 5116 F +86 10 6528 9316 info-mwm-beijing@mwm.net
MWM Energy Australia Pty. Ltd. 21 McDonalds Lane AU-3170 Mulgrave, Victoria T +61 3 9262-3000 F +61 3 9262-3033 info-energy-australia@mwm.net MWM Austria GmbH Mnchner Strae 22 AT-6130 Schwaz T +43 5242 21300 F +43 5242 21300-600 info-austria@mwm.net MWM Canada Inc. 210 Willmott St., Unit 4B P.O. Box 1120 CA-K9A 4W5 Cobourg, Ontario T +1 905 377 1273 F +1 905 248 3168 info-canada@mwm.net MWM France SAS Pripark Gennevilliers 99/101 Avenue Louis Roche Bt E5 FR-92230 Gennevilliers T +33 14790 7780 F +33 14790 7781 info-france@mwm.net
MWM Benelux B.V. Soerweg 13 NL-3088 GR Rotterdam T +31 10 2992-666 F +31 10 2992-677 info-benelux@mwm.net MWM Energy Espaa S.A. Avda de los Artesanos, 50 ES-28950 Tres Cantos/Madrid T +34 91 80745-00 F +34 91 80745-47 info-energy-espana@mwm.net MWM of America, Inc. 1750 Breckinridge Parkway Suite 500 US-Duluth, GA 30096 T +1 770 279 6720 F +1 770 279 6719 info-america@mwm.net MWM Asia-Pacic Pte. Ltd. 11 Kian Teck Road SG-628768 Singapore T +65 6268 5311 F +65 6266 3039 info-asia-pacic@mwm.net
Version 05-11/EN