PAS. BATA
TRASRAM 15/30
PASIR URUG
BETON RAMBAT
SPESI
KERAMIK
SLOOF 15/20 ±0.00 ±0.00
PASIR URUG -0.05
-0.10
-0.20
-0.60
-0.95
PAS. BATU KOSONG
-110
PASIR URUG -115
50 50
60 60
15
PAS. BATA
-0.05
SPESI -0.10
SLOOF 15/20
-0.20
LAPISAN URUG
TANAH URUG
-0.60
-0.95
AANSTAMPING
-110
PASIR URUG -115
DETAIL PONDASI 50
60
SKALA 1:20