Anda di halaman 1dari 4

U

B T

S
1 2 3 4 5 6 7 8 OBYEK
6.000 6.000 5.000 8.000 5.000 6.000 6.000
PERENCANAAN
RENOVASI KANTOR

turun

LOKASI
TANDON AIR

Jl. Mastrip No. 862, Warugunung,


A
Karangpilang, Warugunung, Kec.
Ruang
Karangpilang, Kota SBY, Jawa
toilet toilet
Ruang
pria server Timur
Arsip wanita
3,0 X 3,3
print

PEMILIK BANGUNAN
9.000

FOYER
PT. KEDAWUNG SETIA
INDUSTRIAL T.bk
print print print print

print
print
print
print

print
15.250

print
print
print

NAIK
PENANGGUNG JAWAB
ARSITEKTUR 1
B

print
print

print
print

5 HP
6.250

(SUBHI JAMALUDIN NIZAM S.T.)


print print

R. Meeting
PENANGGUNG JAWAB
5 HP sample
tim Sales ARSITEKTUR 2
print print photo copy
PANTRY
C print print

print print

(SYAIFUDIN S.Ars)

PENANGGUNG JAWAB
KONSTRUKSI

6.000 6.000 5.000 8.000 5.000 6.000 6.000


42.000
(....................................)
1 2 3 4 5 6 7 8
PENANGGUNG JAWAB
PELAKSANA

(....................................)
DENAH LT.03
Skala 1 : 150 A3
KOP. SKTBL
U

B T

S
1 2 3 4 5 6 7 8 OBYEK
6.000 6.000 5.000 8.000 5.000 6.000 6.000
PERENCANAAN
RENOVASI KANTOR

turun

PLAFOND KAWAT RAM FRAME PLAT BESI PLAT BESI COVER PIPA ME PLAFOND KAWAT RAM FRAME PLAT BESI PLAT BESI COVER PIPA ME PLAFOND KAWAT RAM FRAME PLAT BESI
MODUL 75x90CM (EL+2.40) L=30CM (EL+2.50) MODUL 75x90CM (EL+2.40) L=30CM (EL+2.50) MODUL 75x90CM (EL+2.40) LOKASI

Jl. Mastrip No. 862, Warugunung,


A

580
613
388

388
Karangpilang, Warugunung, Kec.

1.775
1.500 0 750 1.500 1.500 1.500 1.500 1.500 1.500 Karangpilang, Kota SBY, Jawa
Plafond Plafond Plafond Plafond
Gypsum 9mm
625 4.600 625
Gypsum 9mm Gypsum 9mm Gypsum 9mm Timur

2.750

2.750

2.750
407 700 500 700 620 620 620 620 620 757
CH.+2.60 CH.+2.60 CH.+2.60 CH.+2.60

1.000 750
300 300 544

388

388
750 750 PEMILIK BANGUNAN

1.188
400

400

400
300

300

300

300

300
500

750 500

750 500

600 750 500

500
9.000

8.300
750

0750

750

750
375 4.600 375
PT. KEDAWUNG SETIA
400

600
600 500 4.600 500 4.600 500 INDUSTRIAL T.bk

1.200
1.400

1.400
403 3.675 103
300 300 300
300
2.900

750
2.750
750

750

750

2.750
1.000 750 750 750 750 750 1.000
15.250

600 1.000 750 300

4.600

2.225
NAIK
PENANGGUNG JAWAB

375

220
ARSITEKTUR 1
3.425

3.425

3.425
1.425

B
10.075

500 500 1.000 500

300
3.675

300

560 750 500


2.750
2.100 4.600 500 750 500 5.525
4.725 513 5.525 513 750 750 750
500 5.525 400

500 750 600


2.750
750

750

750
413 5.525 413

300
300
6.250

600
1.250

1.250

1.250
300
1.000

(SUBHI JAMALUDIN NIZAM S.T.)

750
300
4.600 500 4.600 413 5.525

400
250

750
375 4.600 375

400
700 1.000 750

475 1.000 750

475 1.000 750

1.000 750
600 500 300

550

750
300 300 500 4.600
PENANGGUNG JAWAB
675

475 750
Plafond Plafond 575 575 ARSITEKTUR 2

500
Gypsum 9mm Gypsum 9mm
300

300

300

300

300
375
CH.+2.60 CH.+2.60
C Plafond Plafond
Gypsum 9mm Gypsum 9mm
CH.+2.60 CH.+2.60

PLAFOND KAWAT RAM FRAME PLAT BESI


PLAFOND KAWAT RAM FRAME PLAT BESI PLAT BESI COVER PIPA ME MODUL 75x90CM (EL+2.40) (SYAIFUDIN S.Ars)
MODUL 75x90CM (EL+2.40) L=30CM (EL+2.50) PLAT BESI COVER PIPA ME
L=30CM (EL+2.50)
PLAFOND KAWAT RAM FRAME PLAT BESI
MODUL 75x90CM (EL+2.40) PENANGGUNG JAWAB
PLAT BESI COVER PIPA ME
L=30CM (EL+2.50)
KONSTRUKSI

6.000 6.000 5.000 8.000 5.000 6.000 6.000


42.000
(....................................)
1 2 3 4 5 6 7 8
PENANGGUNG JAWAB
PELAKSANA

KETERANGAN
Spesifikasi :
- Rangka Hollow 2x4 & 4x4 (Modul 60x80cm) (....................................)
RENCANA PLAFOND - Penutup Gypsum Board 9mm
- Plafond Kawat Ram Frame Plat Besi, Modul 75x90cm
Skala 1 : 150 A3 - Plat Besi Cover Pipa ME, L=30cm
KOP. SKTBL
U

B T

S
1 2 3 4 5 6 7 8 OBYEK
6.000 6.000 5.000 8.000 5.000 6.000 6.000
PERENCANAAN
RENOVASI KANTOR

turun

LOKASI

Jl. Mastrip No. 862, Warugunung,


A
Karangpilang, Warugunung, Kec.
Karangpilang, Kota SBY, Jawa
Timur

PEMILIK BANGUNAN
9.000

PT. KEDAWUNG SETIA


INDUSTRIAL T.bk
15.250

NAIK
PENANGGUNG JAWAB
ARSITEKTUR 1
B
6.250

(SUBHI JAMALUDIN NIZAM S.T.)

PENANGGUNG JAWAB
ARSITEKTUR 2

(SYAIFUDIN S.Ars)

PENANGGUNG JAWAB
KONSTRUKSI

6.000 6.000 5.000 8.000 5.000 6.000 6.000


42.000
(....................................)
1 2 3 4 5 6 7 8
PENANGGUNG JAWAB
PELAKSANA

KETERANGAN
= Lampu Down LED 6W
Panel Light (Black Collor) (....................................)
RENCANA CEILING PLAN = Lampu Down Light Outbow 3,5Inch Black
Skala 1 : 150 A3 LED MR16 DC 12V/5,5W
KOP. SKTBL
U

B T

S
1 2 3 4 5 6 7 8 OBYEK
6.000 6.000 5.000 8.000 5.000 6.000 6.000
PERENCANAAN
RENOVASI KANTOR

turun

LOKASI

Jl. Mastrip No. 862, Warugunung,


A
Karangpilang, Warugunung, Kec.
Karangpilang, Kota SBY, Jawa
Timur

PEMILIK BANGUNAN
9.000

PT. KEDAWUNG SETIA


INDUSTRIAL T.bk
15.250

NAIK
PENANGGUNG JAWAB
ARSITEKTUR 1
B
6.250

(SUBHI JAMALUDIN NIZAM S.T.)

PENANGGUNG JAWAB
ARSITEKTUR 2

(SYAIFUDIN S.Ars)

PENANGGUNG JAWAB
KONSTRUKSI

6.000 6.000 5.000 8.000 5.000 6.000 6.000


42.000
(....................................)
1 2 3 4 5 6 7 8
PENANGGUNG JAWAB
PELAKSANA
KETERANGAN
= Lampu Down LED 6W
Panel Light (Black Collor)
= Lampu Down Light Outbow 3,5Inch Black
(....................................)
LED MR16 DC 12V/5,5W
RENCANA INST. TITIK LAMPU = Saklar Seri Isi 1
Skala 1 : 150 A3 = Saklar Seri Isi 2
KOP. SKTBL

Anda mungkin juga menyukai