Detail Engineering Design

Shop Drawing
Pond Tempporary, Kapasitas 4630 m3
1 1
52

46

52
46 2
2
1

1
2,5

1
1,5 1
1,5

3 40 BY
INITIAL SIGN DATE

REV

SHEET
KAPASITAS BAK: 4630 M3

KAPASITAS BAK: 1080 M3

BY
INITIAL SIGN DATE

REV

SHEET
52

A 2
46 2
2,5

2,5

2,5

2,5
1
1,5 1
1,5

3 40

Konstruksi Tanggul Tanah

2 Slope Bidang Galian Tanah

1
1,5
Meterial Pelapis dan
Pelindung Tanah
3 Terpal/ Geomembrane
BY
INITIAL SIGN DATE

REV

SHEET
BY
INITIAL SIGN DATE

REV

SHEET
RENCANA ANGGARAN BIAYA REKONSTRUKSI HOLDING POND
(BILL OF QUANTITY)

KEGIATAN : KONSTRUKSI POND TEMPORARY DALAM AREA PLAN PLTGU - SENIPAH

PEKERJAAN : KONSTRUKSI TANGGUL & BAK POND TEMPORARY

LOKASI : PLTGU SENIPAH

HARGA SATUAN SUB TOTAL TOTAL


NO. URAIAN PEKERJAAN SAT. VOLUME
(Rp) (Rp) (Rp)
1 2 4 5 6 7 8
I PEKERJAAN PERSIAPAN - -
1 Pekerjaan Pengukuran & Pasangan Bouwplank m1 423,00 -
2 Pekerjaan Galian Bak Tampungan Pond Temporary, Slope Galian bak, kedalaman -1,5 meter m3 2.584,50 -
4 Pekerjaan Pembuatan Tanggul, Sekitar Bak Pond temporary, Tinggi 1 Meter m3 620,00 -
II PEKERJAAN INSTALASI PIPA IN DAN OUTPOND TEMPORARY - -
1 Pekerjaan Instalasi Pipa PVC 8" (Out ) m1 50,00 -
2 Pekerjaan Instalasi Pipa PVC 6" (In ) m1 65,00 -
3 Pekerjaan Instalasi Konstruksi Support Pipe, jarak per 2,5 Meter Unit 46,00 -

III PEKERJAAN FINISHING & INSTALASI PLASTIK / TERPAL - -

1 Instalasi terpal / plastik, konstruksi Soil Pond Temporary m2 3.326,48 -


2 Pembuatan Pemberat Bag Pasir pada bagian Atas Konstruksi tanggul, dan steel pengikat terpal/ Plastik bh 100,00 -
Pada bagian konstruksi bawah tanggul

3 Pembersihan Lokasi ls 1,00 -

REKAPITULASI
I PEKERJAAN PERSIAPAN -
II PEKERJAAN INSTALASI PIPA IN DAN OUTPOND TEMPORARY -
III PEKERJAAN FINISHING & INSTALASI PLASTIK / TERPAL -
Jumlah Total -
Dibulatkan -

Site PLTGU Senipah, 09 januari 2023


PT. KARTANEGARA ENERGI PERKASA