No.

Dokumen Revisi Ke Kaji Ulang tgl


Hal
01/RMK/ARF-
ENG.KSO/2023

ARAFAH – ENERGI KSO


Alamat : Jl. Samratulangi Gg. Gotong Royong RT. 05 No.
12BKel. Gunung Panjang, Kec. Samarinda Seberang
SAMARINDA

LEMBAR PENGESAHAN

PERSETUJUAN
URAIAN DISUSUN OLEH DIPERIKSA OLEH DISAHKAN OLEH

NAMA Iwan Sukendro,ST Ir.Suharto,ST,MT Dodik Arifianto,ST

JABATAN Project Manager Site Manager PPK

TANDA TANGAN

TANGGAL 15 Juli 2023 15 Juli 2023 15 Juli 2023

RENCANA MUTU KONTRAK


KEGIATAN PEMBANGUNAN PENANGANAN ABRASI PANTAI MUARA KUALA –
KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANEGARA
UNIT PENERIMA

1. PPK SDA DAN KELAUTAN 4.

DINAS PEKERJAAN UMUM KABUPATEN 5.

KUTAI KARTANEGARA 6.

2. KONSULTAN PENGAWAS

PT.MARANNU MARAYAN MAINDAN

3.
No. Dokumen Revisi Ke Kaji Ulang tgl
Hal
01/RMK/ARF-
ENG.KSO/2023

STATUS DOKUMEN
EDISI : 1 EDISI : EDISI :
Nomor : Nomor : Nomor :

Tanggal : 12 Mei 2017 Tanggal : Tanggal :


No. Dokumen Revisi Ke Kaji Ulang tgl
Hal
01/RMK/ARF-
ENG.KSO/2023

SEJARAH DOKUMEN

TANGGAL CATATAN PERUBAHAN KETERANGAN


No. Dokumen Revisi Ke Kaji Ulang tgl
Hal
01/RMK/ARF-
ENG.KSO/2023

KATA PENGANTAR

Sebagai realisasi kontrak kerja antara PPK/PA dengan PT. ARAFAH –ENERGI ,KSO
mengenai pekerjaan Pembangunan Penanganan Abrasi Pantai Muara Kuala –
Kecamatan Samboja sebagai Kontraktor Pelaksana PT. Arafah – Energi ,KSO
berkewajiban menyusun Laporan Rencana Mutu Kontrak (RMK).
Laporan Rencana Mutu Kontrak (RMK) meliputi penjelasan tentang semua kegiatan yang
akan dilakukan oleh Kontraktor, termasuk metoda pelaksanaan, sarana yang
dipergunakan dan jadwal pelaksanaan pekerjaan. Tujuan dari Laporan ini untuk evaluasi
dan pengawasan pelaksanaan pekerjaan yang akan dilakukan oleh Kontraktor.

Demikian Laporan Rencana Mutu Kontrak (RMK) disusun dengan harapan dapat
digunakan untuk kemajuan pekerjaan secara keseluruhan, sehingga pekerjaan dapat
diselesaikan dengan baik dan tepat waktu.

Tengarong , 14 Juli 2023


PT. Arafah – Energi ,KSO

Iwan Sukendro, ST
Project Manager
No. Dokumen Revisi Ke Kaji Ulang tgl
Hal 1 - 20

DAFTAR ISI
PENGESAHAN ..................................................................................................................................i
KATA PENGANTAR .........................................................................................................................ii
DAFTAR ISI ......................................................................................................................................1
BAB I ................................................................................................................................................4
LATAR BELAKANG .........................................................................................................................4
BAB II ...............................................................................................................................................5
INFORMASI KEGIATAN ..................................................................................................................5
2.1 Uraian Pengadaan .................................................................................................................. 5
2.2 Data Pengguna Jasa Dan Penyedia Jasa.................................................................................... 5
2.3 Data Kontrak ......................................................................................................................... 6
2.4 Lokasi Proyek .......................................................................................................................... 7
2.5 Lingkup Pekerjaan ................................................................................................................... 8
BAB III ..............................................................................................................................................9
SASARAN MUTU .............................................................................................................................9
BAB IV ............................................................................................................................................10
STRUKTUR ORGANISASI DAN TUGAS & TANGGUNG JAWAB ...............................................10
4.1 Struktur Organisasi Pengguna Jasa......................................................................................... 10
4.2 Uraian Tugas Unsur Pengguna Jasa ........................................................................................ 11
4.3 Struktur Organisasi Penyedia Jasa .......................................................................................... 14
4.4 Uraian Tugas Unsur Penyedia Jasa ......................................................................................... 15
4.5 Struktur Organisasi Keterkaitan Pengguna Jasa dan Penyedia Jasa ............................................ 17
BAB V ................................................................................................... Error! Bookmark not defined.
BAGAN ALIR PELAKSANAAN PEKERJAAN ..............................................................................18
BAB VI ............................................................................................................................................20
PERSYARATAN TEKNIS DAN ADMINISTRASI ...........................................................................20
BAB VII ...........................................................................................................................................23
JADWAL PELAKSANAAN PEKERJAAN......................................................................................23
BAB VIII ..........................................................................................................................................24
JADWAL PERALATAN ..................................................................................................................24
BAB IX ............................................................................................................................................25
JADWAL MATERIAL .....................................................................................................................25
BAB X .................................................................................................................................................
JADWAL PERSONIL ..........................................................................................................................
BAB XI ................................................................................................................................................
JADWAL ARUS KAS .....................................................................................................................26
BAB XII ...........................................................................................................................................27
RENCANA METODA PELAKSANAAN .........................................................................................27
Daftar Inspeksi dan Cek/Tes.........................................................................................................27
BAB XIII ..........................................................................................................................................28
KRITERIA PENERIMAAN ..............................................................................................................28
Prosedur Instruksi Kerja .................................................................................................................. 33
BAB XIV ..........................................................................................................................................35
DAFTAR INDUK DOKUMEN SISTEM MUTU ................................................................................35
BAB XV ...........................................................................................................................................36
DAFTAR INDUK REKAMAN ..........................................................................................................36
No. Dokumen Revisi Ke Kaji Ulang tgl
Hal 1 - 20

DAFTAR ISI

BAB U R A I A N HAL

Cover
Persetujuan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Daftar Distribusi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Daftar isi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Sejarah Dokumen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Bab I Latar Belakang . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Bab II Sasaran Mutu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Bab III Informasi dan Ruang Lingkup Kegiatan . . . . . . . . . . . . . . . . . . . . . . .
3.1 Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.2 Peta/lokasi kegiatan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
3.3 Ploting kegiatan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
3.4 Ruang Lingkup Kegiatan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Bab IV Struktur Organisasi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Bab V Tugas dan Tanggung Jawab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Bab VI Bagan Alir Pelaksanaan Kegiatan . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Bab VII Persyaratan Teknis dan Administrasi . . . . . . . . . . . . . . . . . . . . . . . . . 30
Bab VIII Kebutuhan Sumber Daya . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Bab IX Jadual Pelaksanaan Kegiatan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Bab X Jadwal Keterlibatan Personil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Bab XI Jadwal Penggunaan Sarana dan Prasarana . . . . . . . . . . . . . . . . . . . . . 38
Bab XII Rencana Metoda verifikasi, validasi, monitoring, evaluasi dan inspeksi 40
Serta pengujian dan kriteria penerimaannya.
Bab XIII Daftar Induk Dokumen Sistem Mutu . . . . . . . . . . . . . . . . . . . . . . . . . . 41
9.1 Daftar Induk Dokumen Eksternal . . . . . . . . . . . . . . . . . . . . . . . . . 42
9.2 Daftar Induk Dokumen Internal . . . . . . . . . . . . . . . . . . . . . . . . . . 44
9.3 Daftar Induk Dokumen Sistem Mutu (PP) . . . . . . . . . . . . . . . . . . . 46
Bab XIV Daftar Induk Rekaman . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Bab XV Kriteria Penerimaan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
No. Dokumen Revisi Ke Kaji Ulang tgl
Hal 1 - 20

LAMPIRAN GAMBAR TEKNIS


No. Dokumen Revisi Ke Kaji Ulang tgl
Hal 1 - 20

BAB I
LATAR BELAKANG

Dalam rangka usaha menjaga dan meningkatkan kualitas pekerjaan, maka


diperlukan suatu panduan pengendalian mutu proses serta persyaratan-
persyaratan yang harus dilaksanakan dalam pelaksanaan pekerjaan, yaitu berupa
Rencana Mutu Kontrak (RMK).

Rencana Mutu Kontrak adalah suatu pedoman jaminan mutu dalam pelaksanaan
pekerjaan agar produk akhir pekerjaan sesuai dengan syarat teknis yang
tercantum dalam kontrak.

Rencana Mutu Kontrak (RMK) ini digunakan untuk memonitor dan menilai
pelaksanaan / penerapan spesifikasi teknik yang melekat pada kontrak kerja
konstruksi antara PPK/PA dengan Penyedia Jasa PT. ARAFAH-ENERGI,KSO .

Rencana Mutu Kontrak (RMK) dimaksudkan untuk menerapkan lingkup prosedur


jaminan mutu pelaksanaan kontrak pekerjaan dan dijadikan sebagai acuan untuk
menguraikan secara rinci, lengkap dan jelas tentang tata cara melaksanakan
pekerjaan secara benar sesuai dengan tahapan kegiatan yang disyaratkan dalam
dokumen pelaksanaan (dokumen kontrak).

Sedangkan tujuannya adalah sebagai alat kontrol/pengendali terhadap mutu suatu


pekerjaan, apakah semua item pekerjaan dilaksanakan sesuai dengan spesifikasi
atau kriteria yang berlaku, sehingga apabila terjadi suatu penyimpangan, maka
dengan adanya Rencana Mutu Kontrak (RMK) dapat diketahui dari awal dan
kesalahan yang lebih fatal dapat dihindari, serta kualitas pekerjaanpun dapat
dipertanggungjawabkan sesuai dengan yang diharapkan.