MC - Nol - Sanggar Seni
MC - Nol - Sanggar Seni
TOTAL HARGA
NO. URAIAN PEKERJAAN (Rp)
I PEKERJAAN PERSIAPAN 4,891,668.00
II PENGADAAN & PEMASANGAN INSTALASI AIR BERSIH #NAME?
III PEKERJAAN BANGUNAN RUMAH ALAT #NAME?
IV PEKERJAAN AKHIR 1,000,000.00
TOTAL #NAME?
PPN 11 % (TOTAL) #NAME?
GRAND TOTAL #NAME?
DIBULATKAN #NAME?
TERBILANG : #NAME?
Unaaha, 2022
MENGETAHUI : DIBUAT :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PERENCANA
BIDANG PELAYANAN KESEHATAN CV. DINDING JELAJAH
DINAS KESEHATAN KABUPATEN KONAWE
MENYETUJUI :
KEPALA DINAS KESEHATAN
KABUPATEN KONAWE
B. Pekerjaan Beton
1 Pek. Pas. Sloof 15/20
- Cor Beton 0.42 m³ #NAME? #NAME?
- Besi Beton 73.82 Kg 26,392.50 1,948,294.35
- Bekisting Sloof 5.52 m² 172,186.05 950,467.00
2 Pekerjaan Pas. Kolom Praktis 11/11
- Cor Beton, Besi Beton, Bekisting 13.82 m' 132,687.00 1,833,734.34
3 Pekerjaan Pas. Balok Latey 10/15
- Cor Beton, Besi Beton, Bekisting 7.70 m' 159,109.51 1,225,143.23
4 Pekerjaan Pas. Ringbalk 10/15
- Cor Beton, Besi Beton, Bekisting 14.00 m' 159,109.51 2,227,533.14
C. Pekerjaan Dinding
1 Pekerjaan Pasangan Dinding 1/2 Bata Adukan 1PC : 5PS 38.17 m² 152,126.71 5,806,676.52
2 Pekerjaan Plasteran Dinding Adukan 1PC : 5PS 76.34 m² 75,038.74 5,728,457.41
3 Pekerjaan Plasteran Beton Adukan 1PC : 2PS 5.35 m² #NAME? #NAME?
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp) (Rp)
4 Pekerjaan Plasteran Pondasi Adukan 1PC : 5PS 8.44 m² 75,038.74 633,326.97
5 Pekerjaan Acian Pasta Semen Plesteran Dinding dan Plesteran Beton 90.13 m² 45,307.12 4,083,530.73
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp) (Rp)
D. Pekerjaan Kusen, Pintu, Ventilasi dan Kaca
1 Pek. Kusen Pintu, Jendela dan Ventilasi Kayu Klas II 0.13 m³ #NAME? #NAME?
2 Pas. Daun Pintu Panil Kayu Klas I (pintu 2 daun) 3.36 m² #NAME? #NAME?
3 Pek. Pas. Kaca Bening T. 5 mm 1.30 m² #NAME? #NAME?
F. Pekerjaan Lantai
1 Pek. Urugan Tanah Bawah Lantai 4.48 m³ #NAME? #NAME?
2 Pek. Urugan Pasir Bawah Lantai 0.50 m³ 199,525.00 99,762.50
3 Pek. Pas. Rabat Lantai Adukan (Slab Beton K-100) 1.15 m³ #NAME? #NAME?
4 Pek. Pas. Tegel Keramik 60x60 cm, anti sliip 16.64 m² #NAME? #NAME?
G. Pekerjaan Plafond
1 Pek. Pas. Rangka Plafond besi hollow 1x40.40.2mm, modul 60 x 60 cm 24.15 m² #NAME? #NAME?
2 Pek. Pas. Plafond Kalsiboard t=3 mm 24.15 m² #NAME? #NAME?
3 Pek. Pas. List Plafond profil kayu 27.80 m' #NAME? #NAME?
I. Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Dinding, Kolom, dan Balok 83.39 m² #NAME? #NAME?
2 Pekerjaan Pengecatan Kusen, Pintu dan Ventilasi 12.39 m² #NAME? #NAME?
3 Pekerjaan Pengecatan Plafond 24.15 m² #NAME? #NAME?
J. Pekerjaan Listrik
1 Pekerjaan Pas. Titik Instalasi (Inc. Kabel 1x2.5 + Pipa Instalasi/Acc) 5.00 Titik #NAME? #NAME?
2 Pekerjaan Pas. Lampu Philips LED 19 Watt + Fitting Lampu 2.00 Bh #NAME? #NAME?
3 Pekerjaan Pas. Saklar ganda ex. Philips 1.00 Bh #NAME? #NAME?
4 Pekerjaan Pas. Stop Kontak ex. Philips 4.00 Bh #NAME? #NAME?
5 Biaya Penyambungan Daya 3500 VA + SLO + Stroom Awal + Biaya PPJ 1.00 Titik 4,000,000.00 4,000,000.00
Sub Jumlah III #NAME?
IV PEKERJAAN AKHIR
1 Pek. Pembersihan sisa-sisa pekerjaan 1.00 Ls 1,000,000.00 1,000,000.00
SATAP 2 KONSEL
Data Opname Dimensi Pondasi
Panjang Pondasi Lebar Bawah = 0.60 m¹
P. Pondasi Pagar Depan Kanan = 20.00 m¹ Lebar Atas = 0.25 m¹
P. Pondasi Pagar Depan Kiri = 64.00 m¹ Tinggi Pondasi = 0.70 m¹
P. Pondasi Pagar Samping Kanan = m¹ Tinggi Galian = 0.55 m¹
P. Pondasi Pagar Samping Kiri = m¹ 84.00 m¹ Tebal Aanstamping = 0.20 m¹
Jumlah Grid
Jumlah Grid Pagar Depan Kanan = 6.00 Unit = 2.80 m¹ Panjang
Jumlah Grid Pagar Depan Kiri = 21.00 Unit = 2.80 m¹ Panjang
2 Pek.Plesteran 1 Pc : 5 Psr
RUMUS = P X T X Jml. Grid
Pagar Depan Kanan = 1.14 X 0.75 X 6.00 = 10.26 m²
= 3.10 X 0.85 X 6.00 = 31.62 m²
1,063.09 863.10706
(199.98)
REKAPITULASI
RINCIAN ANGGARAN BIAYA
Terbilang : Seratus Delapan Puluh Juta Seratus Enam Puluh Ribu Rupiah,--
Dibuat Oleh :
CV. SYAFIKA TIGA PUTRA
Dibuat Oleh :
CV. SYAFIKA TIGA PUTRA
VII ###
- ### #NAME?
- ### #NAME?
- ### #NAME?
- #NAME? #NAME?
- #NAME? #NAME?
IX ###
- #NAME? #NAME?
- ### #NAME?
X ###
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
XI ###
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- #NAME? #NAME?
XII ###
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
XIII ###
- #NAME? #NAME?
- #NAME? #NAME?
- #NAME? #NAME?
- ### #NAME?
- A.4.7.1.10. Pengecetan 1 m² tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penut Rp. 36,647.62
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
XV ###
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
- ### #NAME?
Unaaha, 2022
DIBUAT OLEH
KONSULTAN PERENCANA
CV. DINDING JELAJAH
Dibuat Oleh :
#NAME?
Rp -
Rp -
RINCIAN HARGA BIAYA PENERAPAN
SISTEM MANAJEMEN KESELAMATAN & KESEHATAN KERJA (SMK3)
Dibuat Oleh :
CV. SYAFIKA TIGA PUTRA
D JUMLAH(A+B+C) 211,600.00
E Overhead dan Profit 15% xD 31,740.00
F Harga Suatu pekerjaan (D+E) 243,340.00
D JUMLAH(A+B+C) 71,860.00
E Overhead dan Profit 15% xD 10,779.00
F Harga Suatu pekerjaan (D+E) 82,639.00
A.2.3.1.1. HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m³ Tanah Biasa Sedalam 1 m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 90,800.00 68,100.00
Mandor L.04 OH 0.025 106,000.00 2,650.00
JUMLAH TENAGA KERJA 70,750.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D JUMLAH(A+B+C) 70,750.00
E Overhead dan Profit 15% xD 10,612.50
F Harga Suatu pekerjaan (D+E) 81,362.50
D JUMLAH(A+B+C) 50,700.00
E Overhead dan Profit 15% xD 7,605.00
F Harga Suatu pekerjaan (D+E) 58,305.00
D JUMLAH(A+B+C) 173,500.00
E Overhead dan Profit 15% xD 26,025.00
F Harga Suatu pekerjaan (D+E) 199,525.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.3. Pemas.1 m³ Pondasi Batu Gunung camp. 1SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 90,800.00 136,200.00
Tukang Batu L.02 OH 0.750 128,000.00 96,000.00
Kepala Tukang L.03 OH 0.075 130,000.00 9,750.00
Mandor L.04 OH 0.075 106,000.00 7,950.00
JUMLAH TENAGA KERJA 249,900.00
B BAHAN
Batu Gunung m³ 1.200 286,000.00 343,200.00
Semen Portland Kg 136.000 1,870.00 254,320.00
Pasir Pasang m³ 0.544 214,500.00 116,688.00
JUMLAH HARGA BAHAN 714,208.00
C PERALATAN
A.4.7.1.10. Pengecetan 1 m² tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 90,800.00 1,816.00
Tukang cat L.02 Oh 0.063 111,500.00 7,024.50
Kepala Tukang L.03 OH 0.006 130,000.00 819.00
mandor L.04 OH 0.003 106,000.00 318.00
JUMLAH TENAGA KERJA 9,977.50
B BAHAN
Plamuur Kg 0.100 20,900.00 2,090.00
Cat dasar Kg 0.100 55,000.00 5,500.00
Cat penutup Kg 0.260 55,000.00 14,300.00
JUMLAH HARGA BAHAN 21,890.00
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH(A+B+C) 31,867.50
E Overhead dan Profit 15% xD 4,780.13
F Harga Suatu pekerjaan (D+E) 36,647.62
Dibuat Oleh :
CV. SYAFIKA TIGA PUTRA
MEREK/
NO. N A M A / JENIS BARANG SATUAN HARGA
TYPE
Dibuat Oleh :
#NAME?
Rp -
#NAME?
UPAH KERJA DAN HARGA BAHAN
Dibuat Oleh :
CV. SYAFIKA TIGA PUTRA
ANDI RANTE PATTOLA, S.Pd., M.Pd. ANDI RANTE PATTOLA, S.Pd., M.Pd. ARHAM KAMALUDDIN, S.T. EKO SUSILO HARTONO
Nip. 19830419 200701 2 006 Nip. 19830419 200701 2 006 Direktur Direktur
RENCANA PENGGUNAAN UANG MUKA 50%
Mengetahui / Menyetujui
ANDI RANTE PATTOLA, S.Pd., M.Pd. ANDI RANTE PATTOLA, S.Pd., M.Pd.
Nip. 19830419 200701 2 006 Nip. 19830419 200701 2 006
Andoolo, Agustus 2023
Nomor :
Lampiran : Rincian Penggunaan Uang Muka
Perihal : Permohonan Uang Muka
Kepada Yth.
Maka dengan ini kami mengajukan permohonan kiranya perusahaan kami dapat diberikan uang muka sebesar 50% dari
Nilai Kontrak atau dengan perhitungan sebagai berikut :
Demikian permohonan ini kami ajukan, atas perkenaanya diucapkan terima kasih.
Hormat kami
UPAH KERJA
NO JENIS JABATAN
HARGA SATUAN HARGA SATUAN
1 Pekerja 100,000 OH 14,286.00 Jam
2 Tukang Kayu 120,000 OH 17,143.00 Jam
3 Tukang Batu 120,000 OH 17,143.00 Jam
4 Tukang Besi 120,000 OH 17,143.00 Jam
5 Tukang Las 120,000 OH 17,143.00 Jam
6 Tukang Cat 120,000 OH 17,143.00 Jam
7 Tukang Pipa 120,000 OH 17,143.00 Jam
8 Kepala Tukang 125,000 OH 17,858.00 Jam
9 Mandor 125,000 OH 17,858.00 Jam
HARGA BAHAN
NO JENIS BAHAN
HARGA SATUAN HARGA SATUAN
A Bahan Pasir, Batu dan Timbunan
1 Timbunan Biasa (didatangkan) 49,000 M3
2 Pasir Urug 90,000 M3
3 Pasir Pasangan 180,000 M3
4 Pasir Beton 180,000 M3
Berat isi Beton = 1400 Kg/M3 128.57 Kg
5 Batu Pecah/Suplit 1/2 270,000 M3
Berat isi Batu Pecah = 1800 Kg/M3 150.00 Kg
6 Batu Gunung 240,000 M3
7 Batu Bata 800 Bh
B Bahan Semen
1 Portland Cemen ( PC ) 1,600 Kg 80,000 Zak
C Bahan Kayu
1 Balok Kayu Kalapi 4,600,000 M3
2 Balok Kaso 5/7 Kls II Isi 1 M3 Balok Kaso 5/7 = 72 Batang 1,400,000 M3 20,000 Btg
3 Papan Kayu Kls I (Jati) 4,600,000 M3
4 Balok/Papan bekisting Kayu Kelas III 1,300,000 M3
5 List Plafond Kayu Profil 4,500 M1 18,000 Btg
6 List Plank Kalsiplank/Woodplank 20 Cm x 8 mm 25,000 M1
7 Kalsiboard 240x120x0,3 cm 75,000 Lbr
D Bahan Keramik
1 Tegel Keramik 60 x 60 Cm Warna, anti sliip 48,500 Bh
E Bahan Penutup Atap
1 Atap Metal Zincalume (Spandek) Tebal = 0,3 mm 52,000 Lembar
2 Nok Bubungan Atap Metal Zincalume (Spandek) lebar 50 cm 22,500 M1
3 Paku Sakura Roof/Spandek 30,000 Kg
F Bahan Besi
1 Besi Beton 18,000 Kg
2 Kawat Bindrat 20,000 Kg
3 Paku Campur 20,000 Kg
4 Paku sekrup/Baut Srew Steel /Perlengkapan Isi dalam 1 Kg = 800 pcs 560,000 Kg 700 Bh
700 bh
5 Besi Hollow Hitam 40x40x2 mm 25,000 M1
6 Besi Hollow Hitam 40x60x2 mm 35,000 M1
7 Besi Hollow Galvalume (Zinc-Aluminium) 40/40/2 9,000 M1 36,000 Batang
8 Main Truss C.75-75 25,000 M1
9 Roof Bottom/Reng R.33 - 0.45 16,000 M1
UPAH KERJA
NO JENIS JABATAN
HARGA SATUAN HARGA SATUAN
10 Self Drilling Screw dia 6 x 20 mm( Truss Screw) 350 Bh
11 Self Drilling Screw dia 4 x 16 mm( Roof Bottom Screw) 250 Bh
12 Dynabolt 2,500 Bh
H Bahan Cat/Finishing
1 Cat Meni Besi 28,000 Kg
2 Kuas Rol 30 cm 30,000 Bh
3 Kuas Biasa 6,500 Bh
4 Cat Vernis Kayu 60,000 Ltr
5 Amplas Kayu 3,000 Lbr
6 Dempul Kayu 25,000 Kg
7 Cat Dasar Tembok/Plafond 30,000 Kg
8 Cat Penutup Tembok/Plafond 30,000 Kg
9 Cat Tembok/Water Proof/Anti Bocor/Anti Lumut setara No Drop 91,000 Kg
10 Lem Kayu Merk Fox 30,000 Kg
K Bahan Lainnya
1 Air 50 Liter
2 Bahan Bakar Solar (Industri) 10,500 Liter
3 Minyak Pelumas 35,000 Liter
4 Kawat Las 15,000 Kg
Unaaha, 2022
DIBUAT OLEH
KONSULTAN PERENCANA
CV. DINDING JELAJAH
UPAH KERJA
NO JENIS JABATAN
HARGA SATUAN HARGA SATUAN
dr. H. Abd. RAZAK, S.Ked., M.Kes M. FAHRI USMAN, S. Ars.
19620407 198103 2 002 Direktur
Back Up Data
PEKERJAAN : REHABILITASI GEDUNG BENGKEL INSTALASI PSRS
RUMAH SAKIT JIWA
TAHUN ANGGARAN : 2019
LOKASI : KOTA KENDARI PROVINSI SULAWESI TENGGARA
I. PEKERJAAN PERSIAPAN
1. Papan Nama Proyek
Volume = 1.00 Ls
2. Pek. Pembongkaran
Volume = 1.00 Ls
Volume = LA + LB x T x P
2
Bangunan = 0.2 + 0.45 x 0.6 x 14.00 = 2.71 M3
2
Volume = P x L x T
Teras = 4.50 x 0.20 x 0.60 = 0.54 M3
Tangga = 2.90 x 0.40 x 0.20 = 0.23 M3
Jumlah = 5.18 M3
B. Pekerjaan Beton
1. Pek Sloof 15/20
- Cor Beton
Volume = P x L x T
= 14.00 x 0.15 x 0.20 = 0.42 M3
- Besi Beton
Dik : Panjang Sloof = 14.00 m'
Jumlah Titik Besi (Pot. Sloof) Ø 12 = 4.00 Titik
Volume Besi = Kg
Koefisien Besi Ø 12 = 0.006165 x 12 x 12 = 0.88776
= 0.88776 x 56 = 49.71 Kg
- Bekisting Sloef
Volume = P x T x Jml sisi
Sisi Luar = 14.40 x 0.20 x 1.00 = 2.88 M2
Sisi Dalam = 13.20 x 0.20 x 1.00 = 2.64 M2
Jumlah = 5.52 M2
C. Pekerjaan Dinding
1. Pekerjaan Pasangan Dinding 1/2 Bata Adukan 1PC : 5PS
Volume = P x T
= 13.20 x 3.46 = 45.61 M2
Jumlah = 5.35 M2
F. Pekerjaan Lantai
1. Pek. Penimbunan Tanah
Volume = P x L x T
Ruangan = 3.80 x 2.80 x 0.28 = 3.00 M3
Teras = 2.50 x 0.90 x 0.20 = 0.45 M3
Rg. Tandon = 1.90 x 1.90 x 0.28 = 1.02 M3
Jumlah = 4.47 M3
Jumlah = 0.49 M3
Jumlah = 1.15 M3
G. Pekerjaan Plafond
1. Pek. Pas. Rangka Plafond besi hollow 1x40.40.2mm, modul 60 x 60 cm
Volume = P x L
Ruangan = 3.80 x 2.80 = 10.64 M2
Luar = 16.80 x 0.70 = 11.76 M2
3.50 x 0.50 = 1.75 M2
Jumlah = 24.15 M2
Jumlah = 24.70 M1
F. Pekerjaan Pengecatan
1. Pekerjaan Pengecatan Dinding, Kolom, Balok & Plat Atap
Volume = P x T
Dinding Dalam = 13.20 x 3.30 = 43.56 M2
Dinding Luar = 14.40 x 3.10 = 44.64 M2
Dinding Pondasi = 15.50 x 0.50 = 7.75 M2
Jumlah = 95.95 M2
Jumlah = 12.56 M2
Luas Pengecatan
Back Up Data
PEKERJAAN : REHABILITASI GEDUNG BENGKEL INSTALASI PSRS
RUMAH SAKIT JIWA
TAHUN ANGGARAN : 2019
LOKASI : KOTA KENDARI PROVINSI SULAWESI TENGGARA
Jumlah = 12.39 M2
Dibuat Oleh :
Konsultan Perencana
CV. FIKRINDO KONSULTAN
…………………….
Staf Teknis