KABUPATEN KAMPAR
CATATAN
REVISI
Kolom Bangunan Eksisting
REV
75 75
Taman Taman
±0.00 R. ±0.00
397 Penghubung 397
+0.25
Selasar Selasar
78 +0.10 +0.10 78
R. Tunggu R. Tunggu
A 1350 +0.60 +0.60 1350 DIBUAT OLEH : CV. ALAM ANUGRAH
400 400
Teras
400 +0.60
Drop OFF
±0.00
400
R. Tunggu R. Tunggu
+0.60 +0.60
DIREKTUR
Selasar KONSULTAN PENGAWAS : VC. ANDIKA PENTA MANDIRI
107 +0.10
4251
B Supervisi Engineer
TERTERA TERTERA
ARSITEKTUR
SURVEYOR
AS BUILT DRAWING DENAH MPP BANGKINANG ESTIMATOR
Skala 1 : 200 DRAFTER
KODE GAMBAR NOMOR GAMBAR
ARC
DATABASE