Denah Air Bersih 6 X 12
Denah Air Bersih 6 X 12
120
120
KAMAR TIDUR 2 -0.15 VOID KT KRAN TAMAN
±0.00
POMPA AIR
STOP KRAN
280
280
VALVE
Ø3"
BAK KONTROL
160
160
R. KELUARGA STATUS GAMBAR DAN REVISI
±0.00
No. Tanggal Keterangan Paraf
FD
Ø3"
130
130
305
305
Ø4"
DAPUR R. MAKAN
±0.00 ±0.00
1000
1000
1000
1000
175
175
PROYEK No. 15.021
PERENCANAAN
Ø3"
RUMAH TINGGAL
"
Ø3
PEMBERI TUGAS
Ø4"
195
195
HALIMA FAHRIANI
Ø3"
280
280
KONSULTAN PERENCANA
R. TAMU
KAMAR TIDUR 1 ±0.00
±0.00
Ø3"
85
85
TERAS
-0.05 PROJECT DIRECTOR CHIEF ARCHITECT
VOID
Ø3"
135
135
135
135
PROJECT ARCHITECT JOB CAPTAIN DRAFTER/OPERATOR CAD
-0.10 -0.15
NAMA BANGUNAN
280 105 215 280 105 215
Ø3"
TYPE 48/50
Ø4"
NAMA GAMBAR
AR DENAH RENCANA TYPE 50 AIR KOTOR AR DENAH RENCANA ATAP TYPE 50 AIR BERSIH SKALA NO. GAMBAR KODE GAMBAR
SKALA 1 : 60 SKALA 1 : 60
1 : 60 03 M&E
A3
NOTES :
1. KONTRAKTOR WAJIB MELAKUKAN PENGECEKAN
TERHADAP SEMUA UKURAN DAN KETINGGIAN
SEBELUM MELAKUKAN PELAKSANAAN PEKERJAAN.
2. HARUS ADA PERSETUJUAN TERTULIS ARSITEK
SEBELUM MELANGSUNGKAN SETIAP PEKERJAAN
TERMASUK PEMBUATAN GAMBAR PELAKSANAAN
DAN VARIASINYA.
3. TIDAK DIPERBOLEHKAN MENGAMBIL SKALA DARI
GAMBAR.
DEAGAM DESAIN