Paket Pekerjaan Pembangunan Rumah Dinas Pegawai PUPR
Paket Pekerjaan Pembangunan Rumah Dinas Pegawai PUPR
II PEKERJAAN TANAH
6.1 A. Galian Tanah Biasa sedalam 1 m (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.400 36,000.00
Mandor Oh 0.040 40,000.00
Sub Total
6.9 B. Urugan Kembali (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.192 36,000.00
Mandor Oh 0.019 40,000.00
Sub Total
6.11 C. Urugan Pasir Bawah Pondasi (m³)
SNI 03-2835-2002 Bahan
Pasir Urug M³ 1.200 250,000.00
Tenaga
Pekerja Oh 0.300 36,000.00
Mandor Oh 0.010 40,000.00
Sub Total
IV PEKERJAAN DINDING
6.11 A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m²)
SNI 03-2835-2002 Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 2,200.00
Semen Portland Kg 11.500 1,875.00
Pasir Pasang M³ 0.043 325,000.00
Tenaga
Pekerja Oh 0.320 36,000.00
Tukang Batu Oh 0.100 42,500.00
Kepala Tukang Oh 0.010 45,000.00
Mandor Oh 0.015 40,000.00
Sub Total
6.15 B. Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps (m²)
SNI 03-2835-2002 Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 2,200.00
Semen Portland Kg 4.500 1,875.00
Pasir Pasang M³ 0.050 325,000.00
Kapur Padam M³ 0.015 45,000.00
Tenaga
Pekerja Oh 0.320 36,000.00
Tukang Batu Oh 0.100 42,500.00
Kepala Tukang Oh 0.010 45,000.00
Mandor Oh 0.015 40,000.00
Sub Total
VI PEKERJAAN KAYU
6.1 A. Pasang Kusen Pintu dan Jendela Kayu Ulin (m³)
SNI 03-2835-2002 Bahan
Kayu ulin, balok M³ 1.100 15,000,000.00
Tenaga
Pekerja Oh 6.000 36,000.00
Tukang Kayu Oh 20.000 47,500.00
Kepala Tukang Oh 2.000 45,000.00
Mandor Oh 0.300 40,000.00
Sub Total
6.7 B. Pasang Pintu Panel Kayu ulin (m²)
SNI 03-2835-2002 Bahan
Kayu ulin, papan M³ 0.040 18,000,000.00
Tenaga
Pekerja Oh 1.000 36,000.00
Tukang Kayu Oh 2.500 47,500.00
Kepala Tukang Oh 0.250 45,000.00
Mandor Oh 0.050 40,000.00
Sub Total
ALS C. Pasang Nook, Gording, Murplat, Nook Kayu Bengkirai (m³)
Bahan
Kayu Bengkirai, balok M³ 1.100 8,500,000.00
Tenaga
Pekerja Oh 2.000 36,000.00
Tukang Kayu Oh 8.000 47,500.00
Kepala Tukang Oh 1.200 45,000.00
Mandor Oh 0.200 40,000.00
Sub Total
6.35 D. Pasang Kaso+Reng Genteng Beton Kayu Ulin (m²)
SNI 03-2835-2002 Bahan
Kayu Ulin, balok M³ 0.014 8,500,000.00
Paku Biasa 2"-5" Kg 0.150 7,500.00
Tenaga
Pekerja Oh 0.100 36,000.00
Tukang Kayu Oh 0.100 47,500.00
Kepala Tukang Oh 0.010 45,000.00
Mandor Oh 0.005 40,000.00
Sub Total
6.53 E. Pasang Listplank, Reuter 2X (2X20) cm, kayu borneo (m³)
SNI 03-2835-2002 Bahan
Kayu Ulin,Papan M³ 0.009 10,000,000.00
Paku Biasa 2"-5" Kg 0.060 7,500.00
Tenaga
Pekerja Oh 0.100 36,000.00
Tukang Kayu Oh 0.100 47,500.00
Kepala Tukang Oh 0.010 45,000.00
Mandor Oh 0.050 40,000.00
Sub Total
6.40 F. Pasang Rangka Langit-langit 1X1 m Kayu Ulin (m²)
SNI 03-2835-2002 Bahan
Kayu ulin, balok M³ 0.012 8,500,000.00
Paku biasa 2"-5" Kg 0.100 7,500.00
Tenaga
Pekerja Oh 0.150 36,000.00
Tukang Kayu Oh 0.250 47,500.00
Kepala Tukang Oh 0.025 45,000.00
Mandor Oh 0.075 40,000.00
Sub Total
IX PEKERJAAN PLAFON
6.19 A. Pasang List Langit-langit Kayu Profil (m¹)
SNI 03-2835-2002 Bahan
Kayu Profil M¹ 1.100 15,000.00
Paku plafon Kg 0.010 65,000.00
Tenaga
Pekerja Oh 0.050 36,000.00
Tukang Kayu Oh 0.050 47,500.00
Kepala Tukang Oh 0.005 45,000.00
Mandor Oh 0.003 40,000.00
Sub Total
6.1 B. Langit-langit Asbes (m²)
SNI 03-2835-2002 Bahan
Pelat Asbes tebal 6mm M² 1.100 55,000.00
Paku plafon Kg 0.010 65,000.00
Tenaga
Pekerja Oh 0.030 36,000.00
Tukang Kayu Oh 0.070 47,500.00
Kepala Tukang Oh 0.007 45,000.00
Mandor Oh 0.002 40,000.00
Sub Total
3,600.00
2,000.00
5,600.00
93,750.00
4,687.50
2,625.00
5,715.00
122,400.00
450.00
34,000.00
9,500.00
14,400.00
900.00
800.00
289,227.50
20,400.00
150.00
17,791.66
4,750.00
3,600.00
450.00
200.00
47,341.66
129,045.00
4,500.00
133,000.00
97,500.00
31,500.00
14,175.00
26,035.00
47,500.00
765.00
42,500.00
75,600.00
40,200.00
642,320.00
93,750.00
306,000.00
6,375.00
26,400.00
65,625.00
48,750.00
52,500.00
95,250.00
66,000.00
23,750.00
25,000.00
6,000.00
11,250.00
9,000.00
95,000.00
42,500.00
72,000.00
36,000.00
2,000.00
1,083,150.00
14,400.00
1,600.00
16,000.00
6,912.00
760.00
7,672.00
300,000.00
10,800.00
400.00
311,200.00
203,500.00
255,000.00
176,800.00
54,000.00
25,500.00
2,700.00
3,000.00
720,500.00
154,000.00
21,562.50
13,975.00
11,520.00
4,250.00
450.00
600.00
206,357.50
154,000.00
8,437.50
16,250.00
675.00
11,520.00
4,250.00
450.00
600.00
196,182.50
20,250.00
8,450.00
9,000.00
8,500.00
900.00
500.00
47,600.00
3,450.00
270.00
4,550.00
7,200.00
6,375.00
675.00
400.00
22,920.00
16,500,000.00
216,000.00
950,000.00
90,000.00
12,000.00
17,768,000.00
720,000.00
36,000.00
118,750.00
11,250.00
2,000.00
888,000.00
9,350,000.00
72,000.00
380,000.00
54,000.00
8,000.00
9,864,000.00
119,000.00
1,125.00
3,600.00
4,750.00
450.00
200.00
129,125.00
88,000.00
450.00
3,600.00
4,750.00
450.00
2,000.00
99,250.00
102,000.00
750.00
5,400.00
11,875.00
1,125.00
3,000.00
124,150.00
675,000.00
15,000.00
27,000.00
6,400,000.00
1,050,000.00
605,625.00
273,000.00
495,300.00
174,600.00
14,875.00
74,100.00
63,000.00
14,895.00
6,800.00
9,889,195.00
1,000,000.00
30,000.00
90,000.00
9,600,000.00
1,575,000.00
605,625.00
273,000.00
495,300.00
1,275,000.00
402,500.00
1,500,000.00
262,800.00
14,875.00
156,750.00
94,500.00
25,650.00
10,000.00
17,411,000.00
9,000.00
150.00
1,260,000.00
17,500.00
10,312.50
4,725.00
9,525.00
3,600.00
1,402.50
1,567.50
1,485.00
450.00
200.00
1,319,917.50
9,000.00
150.00
1,260,000.00
17,500.00
10,312.50
4,725.00
9,525.00
3,600.00
1,402.50
1,567.50
1,485.00
450.00
200.00
1,319,917.50
435,000.00
273,000.00
495,300.00
59,400.00
10,625.00
1,125.00
3,200.00
1,277,650.00
33,600.00
5,250.00
252.00
315.00
31.50
12.00
39,460.50
100,000.00
3,000.00
9,000.00
127,500.00
40,250.00
450,000.00
11,520.00
15,675.00
1,485.00
240.00
758,670.00
47,500.00
15,000.00
10,400.00
14,400.00
9,500.00
900.00
80.00
97,780.00
82,500.00
225.00
7,200.00
4,750.00
450.00
400.00
95,525.00
16,500.00
1,800.00
2,375.00
225.00
120.00
21,020.00
60,500.00
1,080.00
3,325.00
315.00
60.00
65,280.00
300,000.00
10,800.00
-
-
400.00
311,200.00
166,111.11
21,337.50
13,650.00
34,500.00
22,320.00
14,875.00
1,575.00
1,200.00
275,568.61
713,888.89
21,337.50
13,650.00
34,500.00
22,320.00
14,875.00
1,575.00
1,200.00
823,346.39
156,055.56
19,500.00
4,387.50
9,720.00
5,525.00
585.00
540.00
196,313.06
24,357.00
2,925.00
975.00
2,160.00
1,275.00
135.00
120.00
31,947.00
75,000.00
360.00
23,750.00
450.00
200.00
99,760.00
22,000.00
180.00
23,750.00
225.00
10.00
46,165.00
22,000.00
360.00
4,750.00
450.00
20.00
27,580.00
35,000.00
1,800.00
23,750.00
2,250.00
100.00
62,900.00
82,500.00
-
-
-
-
82,500.00
209,000.00
540.00
7,125.00
675.00
30.00
217,370.00
11,600.00
9,200.00
5,700.00
7,650.00
16,900.00
5,250.00
850.00
2,520.00
382.50
270.00
100.00
60,422.50
1,750.00
23,000.00
7,500.00
24,700.00
720.00
2,677.50
270.00
100.00
60,717.50
2,000,000.00
30,000.00
17,500.00
12,500.00
17,500.00
12,500.00
490,000.00
11,250.00
3,250.00
36,000.00
63,750.00
67,500.00
6,400.00
678,150.00
550,000.00
225,000.00
97,500.00
8,100,000.00
93,000.00
216,000.00
127,500.00
13,500.00
12,000.00
9,434,500.00
45,000.00
3,750.00
360.00
4,250.00
450.00
200.00
54,010.00
34,874.40
12,206.04
2,916.00
5,737.50
607.50
164.00
56,505.44
55,500.00
19,425.00
2,916.00
5,737.50
607.50
164.00
84,350.00
550.00
144,375.00
42,250.00
10,500.00
832,000.00
47,250.00
51,120.00
20,102.50
2,115.00
2,840.00
1,153,102.50
Rencanana Anggaran Biaya
Pekerjaan : Pembangunan Rumah Dinas PUPR
Lokasi : Panajam Paser Utara ( PPU )
Tahun : 2023
SUMBER DANA : APBN
Stok di pasaran
40kg/holcim 75,000.00
4m 250,000.00 0.024
41.666666666667
10,416,666.67
3m 45,000.00