SMTTBM 07-11-22 K3L
SMTTBM 07-11-22 K3L
Mengetahui,
2
PT. WIJAYA KARYA (PERSERO) TBK
3
9.2b
piran
No. Dok.: WIKA-SHE-PM-02.04
No. Rev. :03 Amd. 01
PenyampaianMateri
Quality
Safety
Condra pemovetouan dan pehgolotosn (gku
Health
Environment
Security
LamnyA***********
*********************
**********************
Pengarahan Manajeman
Pemberian Reward
Pengumuman/Sosialisasi
Doa
Maroier HSE
nc
Petugas HSE
aha,
Lampiran 9.2c
No.
Dok.: WIKA-SHE-PM-02.04
No. Rev. :03 Amd. 01
DAFTAR HADIR
wiNA SHE MORNING TALK (SMT)
Unit Kerja
wli MeoTAN
Hari/Tanggal An 07 Nov 2e27
Waktu
WANOLTL
Z
ieil
12
13Nur
MCh
nMal
14 lum lne
15
16 MU MF
17 AaM4AL CSu
19
204U orD
21USMN
22 APD
23 KUO DVl:S|
24
25 N DS.
Lampiran 9.2c
:
No. Dok. WIKA-SHE-PM-02.04
No. Rev. 03Amd. 01
:
DAFTAR HADIR
winA SHE MORNING TALK (SMT)
Unit Kerja
Hari/Tanggal
Waktu
Hawel
RENO
4 uh
7 ted Sleste
9 Coc
efeep
10 e
Unun
ETIAO
CwiC
6P2
Kek
17
COucang
18
Zorda ptra HsE
19 MtRSAYO PriVe
20 SE-
Lampiran 9.3
No. Dok. :WIKA-SHE-PM-02.04
No. Rev. :03Amd. 01
Waktu :o97os/d
Metode Kerja/ IK yang
dibahas :
JSA yang dibacakan :
Kerja Umum GKerja Penggalian Kerja Listrik Berenergi
IzinKerja yang Aerja Panas O Kerja Sandblasting Kerja Memasuki Ruang
berlaku:
O Kerja RadiografiKerja Pengangkatan Kerja di Ketinggian
Alat berat & alat Hs cone miter Olour C OIMTSor
berfenaga
listrik
yang cnst recinda Gor esin
digunakan
Penjelasan lain
.
ny 14. CI
15. KeNo
6. ANOK 16.714h h
ta
|17.
LAPORANTOOLBOX MEETINNG
Nama PPU: LokasiKerja
Tanggal:
/ 20 Waktu: s/d
Memasuki Ruang
Izin Kerja yang Kerja Panas O Kerja Sandblasting Kerja
berlaku:
O Kerja Radiografi Kerja Pengangkatan 0 Kerja di
Ketinggian
Penjelasan lain:
eo@66
APD yang dibutuhkanuntuk bekerja
2.
AT
3.Sen
4. pa
5. U Oucong
20.
Petugas Pengawas/Engineer/Mandor/SHE
Nama Jabatan Tanda angan Nama Jabatan Tanda Tangan
AA W
42gnd paa
10.