Anda di halaman 1dari 1

CATATAN

1 2 3 4 5 UP

10.00
3.00 4.00 3.00

PROGRAM

C C
PENATAAN BANGUNAN GEDUNG

KEGIATAN
3.50

PERENCANAAN PEMBANGUNAN
UP TPQ MASJID BAITUL MAGHFIROH
PERUMAHAN MUKA KUNING
PERMAI I, RW. 10, BATUAJI

LOKASI
7.00

B B
Floor Drain Air Kotor Floor Drain Air Kotor PERUMAHAN MUKA KUNING
PERMAI I, RW. 10, BATUAJI
Floor Drain Air Kotor
DIBUAT OLEH
Floor Drain Air Kotor
3.50

2.80
KONSULTAN PERENCANA
CV. FAQIH BERSAUDARA

Floor Drain Air Kotor


Floor Drain Air Kotor
Floor Drain Air Kotor
Floor Drain Air Kotor
A A ZULPENEDI, ST.
DIREKTUR

1.50
Floor Drain Air Kotor Floor Drain Air Kotor DIPERIKSA OLEH

Floor Drain Air Kotor KETUA PEMBANGUNAN


MASJID BAITUL MAGHFIROH

Floor Drain Air Kotor

ASMARDI, ST.

1.20 1.20 MENGETAHUI

1.20 1.20 KETUA DEWAN KEMAKMURAN


MASJID BAITUL MAGHFIROH
1.20 0
1.20 7.2
Keterangan :
Simbol Keterangan

Pipa Ø4" H. TUKIMAN, SE.


1 3 5 NAMA GAMBAR SKALA
Pipa Ø2,5"

Pipa Ø3"

Pipa Ø3/4"
DENAH PIPA AIR KOTOR LANTAI I TANGGAL
NO. JUMLAH KODE
GAMBAR LEMBAR
Pipa Ø3/4''
(pada krant 1/2 ")
Meteran Air

Anda mungkin juga menyukai