APICAL Kutai Refinary Nusantara (KRN)

Engineering Service Housing Masterplan Development Plant APICAL


Kutai - East Kalimantan

Rekapitulasi Rencana Anggaran Biaya

PEKERJAAN DETAIL DISAIN rev.K - 27/11/2023

NO URAIAN SATUAN JUMLAH HARGA


No Description Unit Amount
( Rp. )

A. TOTAL PERSYARATAN UMUM Lsm #REF!

BANGUNAN
I. INDOOR SPORT HALL
PEKERJAAN STRUKTURAL Lsm -
PEKERJAAN ARSITEKTURAL Lsm -
PEKERJAAN MEKANIKAL Lsm -
PEKERJAAN ELEKTRIKAL Lsm -

JUMLAH HARGA #REF!


PPn 11% #REF!

TOTAL KESELURUHAN PROYEK #REF!


Dibulatkan #REF!

Rekap 1 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

BANGUNAN
I. INDOOR SPORT HALL

PEKERJAAN STRUKTUR -

B. PEKERJAAN KONSTRUKSI LAHAN


B.2 Pekerjaan Tanah -
1 Pengukuran & Pas. Bouwplank m' 172.40 - - - - -
2 Galian tanah m3 387.95 - - - - -
3 Timbunan kembali dan dipadatkan m3 230.63 - - - - -
4 Buangan tanah m3 157.32 - - - - -
5 Urugan pasir dipadatkan t = 100 mm m3 375.63 - - - - -
B.4 Pekerjaan Pondasi -
1 Pondasi Borepile dia. 350 mm L = 10 m
1.1 Pekerjaan boring borepile dia. 350mm m' 520.00 - - - - -
1.2 Pekerjan beton bertulan pondasi borepile dia. 350 mm
- Beton fc"=25 Mpa (K-300) m3 52.00 - - - - -
- Baja Tulangan kg
6,283.16 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg
3,007.68 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg
- Casing Sementara m' 20.00 - - - - -
1.3 Cut of Bore pile titik 52.00 - - - - -
1.4 Buangan tanah bor pile m3 52.00 - - - - -

C. PEKERJAAN BETON
C.1 Beton Struktural -
1 FT, Pondasi Pile cap 2000x2000x500 mm - - - - -
1.1 Beton Readymix mutu f'c = 25 Mpa m3 10.00 - - - - -
1.2 kg 1,262.40 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm)
1.3 Cetakan Beton m2 20.00 - - - - -
2 F2, Pondasi Pile cap 1350x2100x650 mm - - - - -
2.1 Beton Readymix mutu f'c = 25 Mpa m3 35.10 - - - - -
2.2 kg 3,560.90 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm)
2.3 kg 252.37 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 13 mm)
2.4 Cetakan Beton m2 87.20 - - - - -
3 F3, Pile cap (lihat gambar detail) - - - - -
3.1 Beton Readymix mutu f'c = 25 Mpa m3 8.19 - - - - -
3.2 kg 808.52 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm)
3.3 kg 67.57 - - - - -
Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 13 mm)
3.4 Cetakan Beton m2 18.72 - - - - -
4 TB1, Sloof Beton 300x500 mm - - - - -
4.1 Beton Readymix mutu f'c = 25 Mpa m3 13.47 - - - - -
4.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 752.03 - - - - -

4.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 856.96 - - - - -
4.4 Cetakan Beton m2 90.25 - - - - -
5 TB2, Sloof Beton 400x600 mm - - - - -
5.1 Beton Readymix mutu f'c = 25 Mpa m3 4.37 - - - - -
5.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 192.63 - - - - -

5.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 19 mm) kg 246.91 - - - - -
5.4 Cetakan Beton m2 21.85 - - - - -
6 TB3, Sloof Beton 300x600 mm - - - - -
6.1 Beton Readymix mutu f'c = 25 Mpa m3 8.48 - - - - -
6.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 421.47 - - - - -

6.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 19 mm) kg 366.80 - - - - -
6.4 Cetakan Beton m2 56.52 - - - - -
7 S1, Plat Beton t = 150 mm - - - - -
7.1 Beton Readymix mutu f'c = 25 Mpa m3 682.49 - - - - -

ISH 2 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

7.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 63,065.46 - - - - -

7.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 11,258.89 - - - - -
7.4 Cetakan Beton m2 193.86 - - - - -
8 Pelat dan undakan entrance beton bertulang - - - - -
8.1 Beton Readymix mutu f'c = 25 Mpa m3 5.41 - - - - -
8.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 225.44 - - - - -
8.3 Cetakan Beton m2 36.08 - - - - -
9 Lean Concrete - - - - -
9.1 Beton Readymix mutu f'c = 15 Mpa m3 19.18 - - - - -
9.2 Cetakan Beton m2 12.08 - - - - -
10 PD1 kolom beton 850x1150 mm - - - - -
10.1 Beton Readymix mutu f'c = 25 Mpa m3 9.68 - - - - -
10.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 13 mm) kg 1,098.78 - - - - -

10.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 25 mm) kg 2,272.19 - - - - -
10.4 Cetakan Beton m2 39.69 - - - - -
11 PD2 kolom beton 900x900 mm - - - - -
10.1 Beton Readymix mutu f'c = 25 Mpa m3 24.06 - - - - -
11.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 13 mm) kg 2,408.89 - - - - -

11.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 25 mm) kg 5,788.84 - - - - -
11.4 Cetakan Beton m2 105.86 - - - - -
12 C1 kolom beton 450x450 mm - - - - -
12.1 Beton Readymix mutu f'c = 25 Mpa m3 2.89 - - - - -
12.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 161.72 - - - - -

12.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 430.38 - - - - -
12.4 Cetakan Beton m2 25.72 - - - - -
13 C2 kolom beton 400x400 mm - - - - -
13.1 Beton Readymix mutu f'c = 25 Mpa m3 3.43 - - - - -
13.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 215.03 - - - - -

13.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 468.30 - - - - -
13.4 Cetakan Beton m2 34.30 - - - - -
14 C3 kolom beton 350x350 mm - - - - -
14.1 Beton Readymix mutu f'c = 25 Mpa m3 12.91 - - - - -
14.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 921.52 - - - - -

14.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 2,230.33 - - - - -
14.4 Cetakan Beton m2 147.17 - - - - -
15 C4 kolom beton 200x200 mm - - - - -
15.1 Beton Readymix mutu f'c = 25 Mpa m3 2.86 - - - - -
15.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 273.38 - - - - -
15.3 Cetakan Beton m2 57.20 - - - - -
Lantai Tribun - - - - -
15 B1, Balok beton 200x300 mm - - - - -
15.1 Beton Readymix mutu f'c = 25 Mpa m3 10.64 - - - - -
15.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 918.34 - - - - -

15.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 1,122.95 - - - - -
15.4 Cetakan Beton m2 141.51 - - - - -
16 Pelat beton Tribun
16.1 Beton Readymix mutu f'c = 25 Mpa m3 89.14 - - - - -
16.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 7,875.15 - - - - -
16.3 Cetakan Beton m2 685.49 - - - - -
MAB +4.000
16 RB1, Ring Balok beton 250x400 mm
16.1 Beton Readymix mutu f'c = 25 Mpa m3 11.70 - - - - -
16.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 791.39 - - - - -

16.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 835.26 - - - - -

ISH 3 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

16.3 Cetakan Beton m2 122.85 - - - - -


17 RB2, Ring Balok beton 200x300 mm
17.1 Beton Readymix mutu f'c = 25 Mpa m3 3.58 - - - - -
17.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 308.99 - - - - -

17.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 377.83 - - - - -
17.3 Cetakan Beton m2 47.61 - - - - -
16 S2, Plat Beton t = 120 mm
16.1 Beton Readymix mutu f'c = 25 Mpa m3 27.21 - - - - -
16.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 4,178.37 - - - - -
16.3 Cetakan Beton m2 226.66 - - - - -
MABJ +5.600
17 RB1, Ring Balok beton 250x400 mm
17.1 Beton Readymix mutu f'c = 25 Mpa m3 4.28 - - - - -
17.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 289.50 - - - - -

17.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 305.55 - - - - -
17.3 Cetakan Beton m2 44.94 - - - - -
18 RB2, Ring Balok beton 200x300 mm
18.1 Beton Readymix mutu f'c = 25 Mpa m3 1.08 - - - - -
18.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 93.21 - - - - -

18.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 16 mm) kg 113.98 - - - - -
18.3 Cetakan Beton m2 14.36 - - - - -
19 RB3, Ring Balok beton 400x600 mm
19.1 Beton Readymix mutu f'c = 25 Mpa m3 2.05 - - - - -
19.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 90.36 - - - - -

19.3 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 19 mm) kg 115.83 - - - - -
19.3 Cetakan Beton m2 13.74 - - - - -
17 S2, Plat Beton t = 120 mm
17.1 Beton Readymix mutu f'c = 25 Mpa m3 14.17 - - - - -
17.2 Tulangan Fy= 4200 kg/cm2 (BJTS 420A tulangan ulir untuk diameter tulangan 10 mm) kg 2,175.95 - - - - -
17.3 Metal deck termasuk stud connection m2 118.04 - - - - -

C.2 Beton Non Struktural -


1 Lantai kerja t = 50 mm m3 187.82 - - - - -
2 Grouting t = 25 mm pada tangga type 2 m3 1.02 - - - - -
3 CJ-Construction Joint m' 462.56 - - - - -

E. PEKERJAAN METAL
E.1 Metal Struktural -
1 Kolom Baja - - - - -
1.1 SC1, Kolom baja WF 588 x 300 x 12 x 20 kg 11,563.53 - - - - -
1.2 SC2, Kolom baja H 350 x 350 x 12 x 19 kg 19,259.46 - - - - -
2 Balok Baja - - - - -
2.1 SB1, Balok Baja H 150 x 150 x 7 x 10 kg 6,426.00 - - - - -
2.2 SB2, Balok Baja H 200 x 200 x 8 x 12 kg 4,790.40 - - - - -
3 Rangka Atap Baja - - - - -
3.1 R1, Rafter Baja WF 450 x 200 x 9 x 14 kg 10,142.62 - - - - -
3.2 R2, Rafter Baja WF 200 x 100 x 5.5 x 8 kg 612.70 - - - - -
3.3 P1, Purlin Baja C 150 x 65 x 20 x 3.2 kg 13,788.36 - - - - -
3.4 BR1, Bracing Baja Rod dia. 19 mm kg 948.72 - - - - -
3.5 SG1, Sagrod Baja Rod dia. 16 mm kg 1,395.83 - - - - -
3.6 Plat sambung, Base plat, stiffener, mur baut, baut angkur dll kg 10,339.14 - - - - -

Sub Total C -

PEKERJAAN ARSITEKTUR -

C. PEKERJAAN BETON
C.3 Beton Arsitektural -
1 Meja beton wastafel m3 0.37 - - - - -
2 Parapet beton t=100 mm m3 2.22 - - - - -

ISH 4 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

D PEKERJAAN PASANGAN
D.1 Pelesteran -
1 Plesteran mortar instan, setara MU m2 4,557.56 - - - - -
2 Acian halus mortar instan, setara MU m2 4,557.56 - - - - -
3 Acian beton m2 1,009.65 - - - - -
D.3 Pasangan Batu Bata Beton -
1 Pasangan batu bata ringan (ACC) t=100 mm, termasuk kolom dan balok praktis m2 2,278.78 - - - - -

E. PEKERJAAN METAL
E.4 Metal Arsitektural -
1 Tangga servis baja tinggi 4,30 m unit 1.00 - - - - -
2 Tangga servis baja tinggi 1,50 m unit 1.00 - - - - -

G. PEKERJAAN PERLINDUNGAN PANAS & LEMBAB


G.1 Lapisan Kedap Air -
1 Lapisan kedap air kamar mandi (lantai dan dinding) m2 427.63 - - - - -
2 Lapisan kedap air atap beton diplester + wiremesh m2 436.28 - - - - -
G.3 Isolasi Panas -
1 Insulasi di bawah atap metal, setara zeltec m2 1,785.00 - - - - -
G.4 Penutup Atap ,Talang Datar & Talang Tegak -
1 Atap metal gelombang berwarna, setara bluescope m2 1,785.00 - - - - -
2 Nok bubung metal berwarna, setara bluescope m' 51.00 - - - - -
3 Metal flashing berwarna, setara bluescope m' 172.00 - - - - -
4 Metal listplank berwarna, setara bluescope m2 86.00 - - - - -
5 Talang atap metal, setara bluescope m' 102.00 - - - - -
6 Saringan talang dia. 4", setara san ei bh 25.00 - - - - -
7 Talang tegak pipa PVC dia. 4" + klem m' 164.34 - - - - -
8 Ornamen bubung kayu solid bengkirai set 1.00 - - - - -
G.5 Penutup Dinding -
1 Listplank aluminium composit panel m2 102.22 - - - - -
2 Ornamen ACP laser cut pada kolom jalan masuk utama m2 43.55 - - - - -
3 Ornamen papan GRC lasercut - - - - -
- ukuran 4100x950 mm bh 2.00 - - - - -
- ukuran 4830x950 mm bh 2.00 - - - - -
Kalsium silikat t=10 mm + rangka hollow, dicat luar, pembungkus kolom beton dan
52.32 - - - - -
4 kolom palsu. m2

H. PEKERJAAN PINTU DAN JENDELA


H.1 Pintu -
1 Pintu tipe D1, pintu baja setara Metalido unit 4.00 - - - - -
2 Pintu tipe D2, kusen aluminium setara YKK, pintu engineering, dan asesoris Kend unit 2.00 - - - - -
3 Pintu tipe D3, kusen aluminium setara YKK, pintu engineering, dan asesoris Kend unit 4.00 - - - - -
4 Pintu tipe D4, Kusen dan pintu UPVC, asesoris Kend unit 7.00 - - - - -
5 Pintu tipe D5, Kusen dan pintu UPVC, asesoris Kend unit 1.00 - - - - -
6 Pintu tipe D6, pintu baja setara Metalido unit 2.00 - - - - -
7 Pintu tipe D7, pintu baja tahan api setara Metalido unit 1.00 - - - - -
8 Pintu tipe D8, pintu baja setara Metalido unit 2.00 - - - - -
9 Pintu tipe D9, pintu baja setara Metalido unit 1.00 - - - - -
10 Pintu jendela tipe DW1, kusen dan pintu aluminium setara YKK, dan asesoris Kend unit 1.00 - - - - -
H.2 Jendela dan Bukaan -
1 Jendela tipe W1, kusen aluminium setara YKK unit 2.00 - - - - -
2 Jendela tipe W2, kusen dan jendela aluminium setara YKK, dan asesoris Kend unit 2.00 - - - - -
3 Bouvenlight tipe BV1, kusen aluminium setara YKK unit 5.00 - - - - -
4 Bouvenlight tipe BV2, kusen aluminium setara YKK unit 12.00 - - - - -
5 Bouvenlight tipe BV3, kusen aluminium setara YKK unit 3.00 - - - - -
6 Bouvenlight tipe BV4, kusen aluminium setara YKK unit 17.00 - - - - -
7 Jalusi tipe LV1, kusen dan jalusi aluminium setara YKK unit 2.00 - - - - -

I. PEKERJAAN PENYELESAIAN
I.1 Lantai -
1 Lantai homogenous tile 600x600 mm, setara Roman Granit m2 153.07 - - - - -
2 Plat beton diaci dan ditrowel m2 1,089.48 - - - - -
3 Plat beton diaci, ditrowel dan di cat epoxy (untuk lapangan) m2 571.42 - - - - -
4 Keramik anti slip 300x300 mm m2 106.43 - - - - -
5 Keramik berglasur 600x600 mm m2 78.61 - - - - -
6 Rabat beton m2 239.61 - - - - -
I.2 Dinding -
1 Keramik dinding 300x600 mm m2 321.20 - - - - -
2 Solid surface lapisan atas meja wastafel m2 13.97 - - - - -
3 Plint lantai homogenous tile 100x600 mm m' 59.48 - - - - -
4 Plint lantai keramik tile 100x600 mm m' 27.69 - - - - -
5 Plint lantai keramik tile 100x600 mm m' 75.75 - - - - -
6 Pasangan batu templek dilapis anti jamur m2 39.28 - - - - -

ISH 5 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

I.3 Langit-langit / Plafon -


1 Langit-langit papan gypsum t=9 mm + rangka metal dicat m2 211.08 - - - - -
2 Langit-langit papan kalsium silikat t=4 mm + rangka metal dicat m2 237.87 - - - - -
3 Langit-langit beton diaci dan dicat m2 65.77 - - - - -
I.4 Pengecatan dan Pelapisan -
1 Cat dinding dalam m2 3,540.17 - - - - -
2 Cat dinding luar m2 1,705.84 - - - - -
3 Cat langit-langit m2 514.72 - - - - -

J. PEKERJAAN BIDANG KHUSUS


J.1 Bilik -
1 Kubikal toilet bahan phenolic m2 68.51 - - - - -
J.8 Partisi -
1 Partisi kalsium silikat satu lapis + rangka metal, dicat m2 13.20 - - - - -
J.9 Aksesori Kamar Mandi / Daerah Basah -
1 Gantungan pakaian bh 23.00 - - - - - tx704aes
2 Tempat sabun cair bh 10.00 - - - - - Supply by others
3 Tempat tisu bh 12.00 - - - - - Supply by others
4 Dispenser tisu bh 7.00 - - - - - Supply by others
5 Pengering tangan bh 7.00 - - - - - krisbow ak2630tk
6 Cermin m2 7.56 - - - - -

O. PEKERJAAN SANITAIR
O.2 Perlengkapan Plambing -
1 Kloset duduk unit 8.00 - - - - - CW421J-SW420JP
2 Kloset duduk untuk difabel dengan ecowasher unit 1.00 - - - - -
3 Kloset jongkok unit 3.00 - - - - -
4 Wastafel meja unit 10.00 - - - - - LW647CJT1-TX108LJ
5 Wastafel dinding unit 1.00 - - - - -
6 Urinoir unit 7.00 - - - - - UW58JM
7 Partisi urinoir bh 6.00 - - - - - AW115J
8 Toilet spray bh 7.00 - - - - - TX 403 SB
9 Keran dinding bh 4.00 - - - - -
10 Head shower set bh 7.00 - - - - -
11 Floor drain bh 23.00 - - - - - TX1EBV1
12 Grab bar bh 1.00 - - - - -
13 Grab bar railing bh 1.00 - - - - -

Sub Total L.1 -

PEKERJAAN MEKANIKAL -

A. PEKERJAAN KONSTRUKSI KHUSUS


A.1 Sistem Penangkal Kebakaran -
1 Hydrant
1.1 Fire Extinguisher ABC Dry Chemical Kap.5 kg unit 18.00 - - - - -
1.2 Fire Extinguisher Tipe CO2 Kap.5 kg unit 18.00 - - - - -

Sub Total A -

B. PEKERJAAN MEKANIKAL
B.1 Sistem Plambing -
1 Sistem Distribusi Air Bersih
1.1 Pompa
P1 - Reservoir/Rumah Pompa set 1.00 - - - -
Flow : 7 m3/h
Head : 25 m
Type : Package Booster Pump Vertical Inline w/ VSD

1.2 Pemipaan
(a)Pemipaan di dalam bangunan
Pipa PPR PN-10 incl.fitting, support & accessories
- dia.15 mm m' 65.00 - - - - -
- dia.20 mm m' 63.00 - - - - -
- dia.25 mm m' 44.00 - - - - -
- dia.32 mm m' 15.00 - - - - -
- dia.40 mm m' 34.00 - - - - -
- dia.50 mm m' 10.00 - - - - -

(b)Pemipaan di ruang pompa & reservoir


Pipa GIP incl.fitting, support & accessories

ISH 6 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

- dia.32 mm m' 3.00 - - - - -


- dia.50 mm m' 5.00 - - - - -
- dia.100 mm m' 4.00 - - - - -

1.3 Valve & Aksesoris


(a) Valve dan Aksesoris di dalam bangunan
- Gate Valve dia.20 mm bh 1.00 - - - - -
- Gate Valve dia.25 mm bh 2.00 - - - - -
- Gate Valve dia.32 mm bh 2.00 - - - - -

(b) Valve dan Aksesoris di ruang pompa & reservoir


- Gate Valve dia.32 mm bh 2.00 - - - - -
- Gate Valve dia.40 mm bh 1.00 - - - - -
- Gate Valve dia.50 mm bh 1.00 - - - - -
- Gate Valve dia.100 mm bh 2.00 - - - - -
- Foot Valve dia.32 mm bh 2.00 - - - - -
- Float Valve dia.32 mm bh 1.00 - - - - -

2 Sistem Instalasi Air Buangan


2.1 Pemipaan
(a) Pipa Air Kotor
Pipa PVC 10kg/cm2 incl. galian, urugan pasir, pemadatan tanah, fitting & aksesoris
- dia.50 mm m' 11.00 - - - - -
- dia.65 mm m' 1.00 - - - - -
- dia.80 mm m' 4.00 - - - - -
- dia.100 mm m' 124.00 - - - - -

(b) Pipa Air Bekas


Pipa PVC 10kg/cm2 incl. galian, urugan pasir, pemadatan tanah, fitting & aksesoris
- dia.50 mm m' 87.00 - - - - -
- dia.65 mm m' 8.00 - - - - -
- dia.80 mm m' 12.00 - - - - -
- dia.100 mm m' 12.00 - - - - -

(b) Pipa Vent


Pipa PVC 5 kg/cm2 incl. galian, urugan pasir, pemadatan tanah, fitting & aksesoris
- dia.40 mm m' 86.00 - - - - -
- dia.50 mm m' 21.00 - - - - -
- dia.65 mm m' 9.00 - - - - -

2.2 Clean Out


- Clean Out dia.50 mm bh 7.00 - - - - -
- Clean Out dia.100 mm bh 7.00 - - - - -

Testing & Commissioning Sistem Plambing ls 1.00 - - - - -

B.2 Sistem Tata Udara (HVAC) -


1 Sistem Ventilasi -
1.1 Peralatan -
Exhaust Fan termasuk Kabel Power, Aksesoris & Instalasi,
Exhaust Fan :
EF.01A-01B, (Ruang Peralatan Indoor dan Outdoor) unit 2.00 - - - - -
Tipe : Wall Fan
Kapasitas : 663 Cmh x _ Pa

EF.02, (Toilet dan Shower Pria) unit 1.00 - - - - -


Tipe : Inline Centrifugal
Kapasitas : 850 Cmh x 125 Pa

EF.03, (Toilet dan Shower Wanita) unit 1.00 - - - - -


Tipe : Inline Centrifugal
Kapasitas : 425 Cmh x 125 Pa

EF.04, (Loker Pria dan Wanita) unit 1.00 - - - - -


Tipe : Inline Centrifugal
Kapasitas : 816 Cmh x 100 Pa

EF.05, (Ruang Panel) unit 1.00 - - - - -


Tipe : Centrifugal Sirrocco
Kapasitas : 255 Cmh x 50 Pa

EF.06, (Ruang Janitor) unit 1.00 - - - - -

ISH 7 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

Tipe : Centrifugal Sirrocco


Kapasitas : 119 Cmh x 50 Pa

EF.07, (Difable Toilet) unit 1.00 - - - - -


Tipe : Centrifugal Sirrocco
Kapasitas : 85 Cmh x 50 Pa

EF.08, (Toilet Wanita) unit 1.00 - - - - -


Tipe : Inline Centrifugal
Kapasitas : 340 Cmh x 125 Pa

EF.09, (Toilet Pria) unit 1.00 - - - - -


Tipe : Inline Centrifugal
Kapasitas : 680 Cmh x 125 Pa

EF.10, (Ruang Rias Pria) unit 1.00 - - - - -


Tipe : Centrifugal Sirrocco
Kapasitas : 68 Cmh x 50 Pa

EF.11, (Toilet Pria) unit 1.00 - - - - -


Tipe : Centrifugal Sirrocco
Kapasitas : 170 Cmh x 50 Pa

EF.12, (Back Stage dan Ruang Tunggu) unit 1.00 - - - - -


Tipe : Wall Fan
Kapasitas : 765 Cmh x _ Pa

EF.13, (Toilet Wanita) unit 1.00 - - - - -


Tipe : Centrifugal Sirrocco
Kapasitas : 841 Cmh x 50 Pa

EF.14, (Ruang Rias Wanita) unit 1.00 - - - - -


Tipe : Centrifugal Sirrocco
Kapasitas : 51 Cmh x 50 Pa

EF.15A-15C, (Sport Arena) unit 3.00 - - - - -


Tipe : Wall Fan
Kapasitas : 2667 Cmh x _ Pa

Intake Fan :
IF.01, (Lobby) unit 1.00 - - - - -
Tipe : Inline Centrifugal
Kapasitas : 425 Cmh x 150 Pa
Ket.; Dilengkapi Filter G4

IF.02, (Loker Pria dan Wanita) unit 1.00 - - - - -


Tipe : Inline Centrifugal
Kapasitas : 816 Cmh x 150 Pa
Ket.; Dilengkapi Filter G4

IF.03, (Ruang Peralatan Indoor dan Outdoor) unit 1.00 - - - - -


Tipe : Wall Fan
Kapasitas : 1325 Cmh x _ Pa

OF.01, (Ruang Rias Pria) unit 1.00 - - - - -


Tipe : Oscillating Fan Wall Mounted
Kapasitas : 3789 Cmh x _ Pa

OF.02, (Ruang Rias Wanita) unit 1.00 - - - - -


Tipe : Oscillating Fan Wall Mounted
Kapasitas : 3789 Cmh x _ Pa

CF.01A~01B, (Back Stage dan Ruang Tunggu) unit 2.00 - - - - -


Tipe : Ceiling Fan
Kapasitas : 9735 Cmh x _ Pa

1.2 Ducting & Aksesoris -


a) Ducting -
Ducting Exhaust :
Galvanized steel sheet (Bjls), termasuk instalasi & aksesoris,
Exhaust Fan :
Bjls 0.6 m² 3.00 - - - - -
Bjls 0.5 m² 51.00 - - - - -

ISH 8 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

Duct PVC :
Duct PVC 10 kg/m2, termasuk instalasi & aksesoris,
Duct. PVC,dia. 150 mm (6") m 2.00 - - - - -
Duct. PVC,dia. 100 mm (4") m 27.00 - - - - -

Ducting Intake :
Galvanized steel sheet (Bjls), termasuk instalasi & aksesoris,
Bjls 0.6 m² 6.00 - - - - -
Bjls 0.5 m² 22.00 - - - - -

Pre Filter (PF),


Pre Filter bh 2.00 - - - - -

Flexible Duct :
termasuk instalasi & aksesoris,
Flexible Duct, dia. 100 mm (4") m 3.00 - - - - -

b) Aksesoris -
termasuk instalasi & alat bantu,
Exhaust Air Grille (EAG),
EAG, 400 x 200 mm bh 1.00 - - - - -
EAG, 200 x 200 mm bh 7.00 - - - - -
EAG, 150 x 150 mm bh 11.00 - - - - -

Fresh Air Diffuser (FAD),


FAD, 300 x 300 mm bh 2.00 - - - - -

Volume Damper (VD),


VD, 350 x 200 mm bh 1.00 - - - - -
VD, 225 x 200 mm bh 1.00 - - - - -
VD, 200 x 200 mm bh 2.00 - - - - -

Exhaust Grille (EG),


termasuk insect screen
EG, 400 x 300 mm bh 4.00 - - - - -
EG, 300 x 200 mm bh 1.00 - - - - -
EG, 200 x 200 mm bh 3.00 - - - - -
EG, 150 x 150 mm bh 4.00 - - - - -

Fresh Air Grille (FAG),


termasuk insect screen
FAG, 400 x 300 mm bh 1.00 - - - - -
FAG, 400 x 200 mm bh 1.00 - - - - -

1.3 Testing & Commissioning Sistem Ventilation, ls 1.00 - - - - -

2 Sistem Air Conditioning -


2.1 Peralatan -
Sistem Air Conditioning Single Split (Inverter), Refrigerant R-32/ R-410A termasuk
Kabel Power, Instalasi & Aksesoris,
FCU/CU.01A~01B, (Lobby) unit 2.00 - - - - -
Tipe : Ceiling Cassette
Kap. Pendingin : 42,500 Btuh

FCU/CU.02, (Ruang Rias Pria) unit 1.00 - - - - -


Tipe : Wall Mounted
Kap. Pendingin : 11,900 Btuh

FCU/CU.03, (Ruang Rias Wanita) unit 1.00 - - - - -


Tipe : Wall Mounted
Kap. Pendingin : 11,900 Btuh

2.2 Aksesoris Sistem Air Conditioning, -


a) Pipa Refrigerant
Pipa Copper dengan isolasi termasuk metal support (Liquid & Gas) lot 1.00 - - - - -
b) Pipa Drain
Pipa PVC 10 kg/cm2 termasuk Support, Fitting & Aksesoris, lot 1.00 - - - - -

2.3 Testing & Commissioning Sistem Air Conditioning, ls 1.00 - - - - -

Sub Total B -

ISH 9 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

PEKERJAAN ELEKTRIKAL -

A. PEKERJAAN KONSTRUKSI KHUSUS


A.1 Sistem Penangkal Petir dan Pembumian -
1 Peralatan - - - - -
1,1 Earthing Bound Bar bh 6.00 - - - - -
1,2 Ubolt Clamp bh 26.00 - - - - -
1,3 Test Point 1 Hole bh 26.00 - - - - -
1,4 Cadweld Test Point bh 26.00 - - - - -
1,5 Cadweld T BC 70 mm2 bh 28.00 - - - - -
1,6 Exothermic Welding Connection bh 3.00 - - - - -
1,7 Spark GAP (PEC) bh 1.00 - - - - -
1,8 Grounding Pit 300 x 300 x 300 mm unit 15.00 - - - - -
1,9 Grounding 2 Ohm : - - - - -
- Pit PVC + Busbar bh 15.00 - - - - -
- Clamp Rod bh 15.00 - - - - -
- Rod 5/8 CU Bonded bh 60.00 - - - - -
- Coupling bh 45.00 - - - - -
- Kabel BC 70 mm2 bh 450.00 - - - - -
- - - - -
2 Kabel - - - - -
2.1 Kabel BC 70 mm2, termasuk galian tanah, urugan tanah, bata, pasir & pemadatan m'
219.00 - - - - -

A.2 Sistem Pengamat / CCTV 1.00 -


1 Peralatan - - - - -
1,1 Indoor Zoom Dome Camera 45IP bh 9.00 - - - - -
1,2 HUB / Switch 16 Port POE + SFP unit 1.00 - - - - -
- - - - -
2 Kabel - - - - -
2,1 Kabel dari HUB / Switch ke Camera, UTP Cat 6, termasuk Conduit Metal dia. 20 mm m'
314.00 - - - - -
(3/4")
- - - - -
3 Testing & Commisioning ls 1.00 - - - - -
- - - - -
A.3 Sistem Tanda Kebakaran -
1 Perlengkapan - - - - -
1,1 Photo Electric Smoke Detector bh 18.00 - - - - -
1,2 Manual Break Glass bh 3.00 - - - - -
1,3 Flash Light bh 3.00 - - - - -
1,4 Alarm Bell bh 3.00 - - - - -
1,5 Conventiopnal Zone Module bh 1.00 - - - - -
1,6 Output Module for alarm device bh 1.00 - - - - -
1,7 TB - FA. unit 1.00 - - - - -
1,8 MCFA, termasuk Battery, Network Module, Surge Protector, Relay Module, Power unit
Supply, Alarm Bell, Siren, Manual Call Point, Output Modules ke Sound System & Fire 1.00 - - - - -
Hydrant
1,9 Annunciator unit 1.00 - - - - -
- - - - -
2 Kabel - - - - -
2.1 Instalasi Fire Alarm ttk 29.00 - - - - -
Kabel dari MCFA ke TB - FA, FRC 2 x 1,5 mm2, termasuk conduit metal dia. 20 mm m'
20.00 - - - - -
2.2 (3/4")
- - - - -
3 Testing & Commisioning ls 1.00 - - - - -
- - - - -
Sub Total A -

B. PEKERJAAN ELEKTRIKAL
B.1 Sistem Distribusi Daya -
1 Panel - - - - -
1.1 Panel SDP - ISH unit 1.00 - - - - -
1.2 Panel LP / PP - ISH unit 1.00 - - - - -
1.3 Panel PP - AC unit 1.00 - - - - -
1.4 Panel PP - EQ (Equipment) unit 1.00 - - - - -
- - - - -
2 Kabel - - - - -
2.1 Kabel dari Panel MDP - ISH ke Panel LP / PP - ISH, NYY 4 x 6 mm2 + NYA 6 mm2 m'
8.00 - - - - -
2.2 Kabel dari Panel MDP - ISH ke Panel PP - AC, NYY 4 x 6 mm2 + NYA 6 mm2 m' 8.00 - - - - -
2.3 Kabel dari Panel MDP - ISH ke Panel PP - EQ (Equipment), NYY 4 x 6 mm2 + NYA 6 m'
8.00 - - - - -
mm2

ISH 10 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

2.4 Instalasi Stop Kontak 1 Phasa ttk 29.00 - - - - -


2.5 Instalasi Stop Kontak 3 Phasa ttk 2.00 - - - - -
- - - - -
3 Kabel Tray & Ladder termasuk Support & Aksessoris - - - - -
3.1 Kabel Tray Elektrikal 300 x 100 mm2 m' 83.00 - - - - -
3.2 Kabel Tray Elektronik 150 x 100 mm2 m' 83.00 - - - - -
3.3 Kabel Ladder Elektrikal 300 x 100 mm2 m' 12.00 - - - - -
3.4 Kabel Ladder Elektronik 150 x 100 mm2 m' 9.00 - - - - -
- - - - -
4 Stop Kontak - - - - -
4.1 Stop Kontak 16 A, 1 phasa bh 20.00 - - - - -
4.2 Stop Kontak 16 A, 1 phasa Hand Dryer bh 6.00 - - - - -
4.3 Stop Kontak 16 A, 1 phasa Cover bh 3.00 - - - - -
4.4 Stop Kontak 16 A, 3 phasa Cover bh 2.00 - - - - -
- - - - -
5 Testing & Commisioning ls 1.00 - - - - -
- - - - -
B.2 Sistem Penerangan -
1 Perlengkapan Lampu - - - - -
1.1 Lampu TBS 318 LED Tube 2 x 18 w, (Lovre Allumunium) Recessed Mounted bh 25.00 - - - - -
1.2 TMS TL LED Tube 2 x 18 w, Surface Mounted bh 36.00 - - - - -
1.3 Green Perform Highbay 150 w bh 29.00 - - - - -
1.4 Downlihgt LED 14,5 w bh 62.00 - - - - -
1.5 Downlihgt LED 7 w bh 34.00 - - - - -
1.6 Exit Lamp LED 1 x 3 w bh 3.00 - - - - -
- - - - -
2 Saklar - - - - -
2.1 Saklar Tunggal bh 6.00 - - - - -
2.2 Saklar Ganda bh 16.00 - - - - -
2.3 Saklar Grid 6 Gang bh 1.00 - - - - -
- - - - -
3 Kabel - - - - -
3.1 Instalasi Penerangan ttk 189.00 - - - - -
- - - - -
B.3 Sistem Telekomunikasi -
1 Peralatan - - - - -
1.1 Socket Outlet Telephone bh 1.00 - - - - -
1.2 Handset bh 1.00 - - - - -
- - - - -
2 Kabel - - - - -
2.1 Instalasi Telephone ttk 1.00 - - - - -
- - - - -
3 Testing & Commisioning ls 1.00 - - - - -
- - - - -
B.4 Sistem Data -
1 Peralatan - - - - -
1.1 Socket Outlet Data bh 2.00 - - - - -
1,2 HUB / Switch 8 Port POE + SFP unit 1.00 - - - - -
1,3 Router unit 1.00 - - - - -
1,4 Rack unit 1.00 - - - - -
- - - - -
2 Kabel - - - - -
2.1 Instalasi Data ttk 2.00 - - - - -
- - - - -
3 Testing & Commisioning ls 1.00 - - - - -
- - - - -
B.5 Sistem Tata Suara -
1 Peralatan - - - - -
1,1 Ceiling Speaker 3 w bh 12.00 - - - - -
1,2 Wall Speaker 6 w bh 8.00 - - - - -
1,3 Wall Speaker 3 w bh 3.00 - - - - -
1,4 TB - TS bh 1.00 - - - - -
1,5 MDF - SS unit 1.00 - - - - -
1,6 Remote Paging Microphone unit 1.00 - - - - -
1,7 Digital Matrix Mixer w/ Equalizer Program unit 1.00 - - - - -
1,8 Power Amplifier 240 w unit 1.00 - - - - -
1,9 Speaker Selector 10 Ch unit 1.00 - - - - -
1,10 Digital Voice Evacuation unit 1.00 - - - - -
1,11 Network Audio Adapter unit 1.00 - - - - -
1,12 Cabinet Rack w/ Acc. unit 1.00 - - - - -

2 Kabel
2.1 Instalasi Tata Suara ttk 23.00 - - - - -

ISH 11 dari 12
APICAL Kutai Refinary Nusantara (KRN)
Engineering Service Housing Masterplan Development Plant APICAL
Kutai - East Kalimantan

PEKERJAAN DISAIN DETAIL rev.K - 27/11/2023

No. Uraian Unit Volume Harga Satuan (IDR) Jumlah (IDR) Keterangan
Material Alat Upah Total Material Alat Upah Total

2.2 Kabel dari MDF - SS ke TB - SS, NYYHY 3 x 2,5 mm2, termasuk conduit metal dia. 20 m m' 12.00 - - - - -

3 Testing & Commisioning ls 1.00 - - - - -

Sub Total B -

Total Bangunan -

ISH 12 dari 12