DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAM


KELURAHAN BUANGIN KECAMATAN RANTEBUA
LOKASI : KEC. RANTEBUA
KABUPATEN/PROVINSI : TORAJA UTARA / SULAWESI SELATAN
TAHUN ANGGARAN : 2022

NO URAIAN SATUAN VOLUME


A B C D
1 PEKERJAAN PENDAHULUAN
1 Pengukuran, pematokan dan pembersihan Ls 1.00
2 Pek. Papan Proyek Ls 1.00
3 SMK3
Pembuatan Dokumen Rencana Keselamatan Konstruksi Set 1.00
Spanduk Bh 1.00
Papan Informasi K3 Bh 1.00
Topi Pelindung (Safety Helmet) Bh 5.00
Sarung Tangan (Safety Gloves) Bh 5.00
Sepatu Keselamatan (Safety Shoes) Bh 5.00
Rompi Keselamatan Bh 5.00
Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, Dll) Set 1.00
Petugas K3 OB 3.00
Masker Bh 24.00
Hand Sanitaser Bh 5.00

2 PEKERJAAN REHABILITASI RESERVOAR


1 Pipa GIP Medium A ∅1 1/2" (Pipa Outlet) M' 2.00
2 Gate Valve GIP ∅1 1/2" (Pipa Outlet) Bh 1.00
3 Box Valve Unit
4 Knee HDPE Coplier 50 mm Bh 1.00
5 Elbow 90 GIP ∅ 1 1/2" Bh 2.00

3 PENGADAAN/PEMASANGAN PIPA DAN ACCESSORIES


1 Pekerjaan Galian Tanah M3 271.85
2 Urugan Kembali M 3
177.47
3 Pek. Bongkaran Beton M3 0.54
4 Pek. Rabat Beton (Mutu K-225) M 3
0.54
5 Pas. Pipa HDPE PN - SNI ∅ 50 mm M' 2,730.00
6 Pas. Pipa HDPE PN - SNI ∅ 25 mm M' 200.00
7 Pas. Pipa HDPE PN - SNI ∅ 32 mm M' 1,150.00
8 Clam Sadle PN 16 ∅ 50 mm - ∅ 25 mm Bh 1.00
9 Ferulle Cutter PE ∅25 mm Bh 1.00
10 Dop HDPE ∅ 50 mm Bh 1.00

4 PEK. PEMBANGUNAN SAMBUNGAN RUMAH (SR)


1 Pekerjaan Galian Tanah M3 71.20
2 Urugan Kembali M 3
53.40
3 Pek. Dudukan Meteran Beton (Mutu K-225) M 3
2.24
4 Pas. Pipa HDPE PN - SNI ∅ 20 mm M' 1,780.00
5 Pas. Pipa GIP ∅ 1/2" M' 145.55
6 Kran Air GIP ∅ 1/2" Bh 71.00
7 Double Nepple ∅ 1/2" Bh 213.00
8 Plug Kran ∅ 1/2" Bh 71.00
9 Gate Valve Kuningan ∅1/2" Bh 71.00
10 Katup Searah Kuningan ∅ 1/2" Bh 71.00
11 Water Meter Kuningan ∅ 1/2" (Setara Bestini) Bh 71.00
12 Elbow 90 GIP ∅ 1/2" Bh 285.00
13 Tee GIP ∅ 1/2" Bh 71.00
14 Dop GIP ∅ 1/2" Bh 71.00
15 Clam Sadle PN 16 ∅ 50 mm - ∅ 20 mm Bh 28.00
16 Ferulle Cutter PE ∅20 mm Bh 28.00
17 knee HDPE Coplier ∅ 20 mm Bh 71.00
18 Tee HDPE Coplier ∅ 20 mm Bh 18.00
19 Tee HDPE Coplier ∅ 25 mm - ∅ 20 mm Bh 5.00
20 Tee HDPE Coplier ∅ 32 mm - ∅ 20 mm Bh 19.00
21 Reduce HDPE Coplier ∅ 25 mm - ∅ 20 mm Bh 1.00
22 Reduce HDPE Coplier ∅ 32 mm - ∅ 20 mm Bh 1.00
23 Box Meter Bh 71.00
24 Seal Tape (Isolasi Pipa) Bh 71.00

5 PEKERJAAN FINISHING
1 Pengetesan Jaringan Ls 1.00
2 Pembersihan Sisa Jaringan Ls 1.00
HARGA

GAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH


BUANGIN KECAMATAN RANTEBUA

RA / SULAWESI SELATAN

HARGA SATUAN JUMLAH


E F=DxC

Rp 1,000,000.00 Rp 1,000,000.00
Rp 2,500,000.00 Rp 2,500,000.00

Rp 150,000.00 Rp 150,000.00
Rp 25,000.00 Rp 25,000.00
Rp 30,000.00 Rp 30,000.00
Rp 30,000.00 Rp 150,000.00
Rp 15,000.00 Rp 75,000.00
Rp 50,000.00 Rp 250,000.00
Rp 20,000.00 Rp 100,000.00
Rp 100,000.00 Rp 100,000.00
Rp 1,500,000.00 Rp 4,500,000.00
Rp 10,000.00 Rp 240,000.00
Rp 5,000.00 Rp 25,000.00
Rp 9,145,000.00

Rp 222,105.22 Rp 444,210.44
Rp 521,070.00 Rp 521,070.00
Rp -
Rp 149,677.00 Rp 149,677.00
Rp 38,500.00 Rp 77,000.00
Rp 1,191,957.44

Rp 124,987.50 Rp 33,977,851.88
Rp 90,475.00 Rp 16,056,598.25
Rp 355,534.30 Rp 191,988.52
Rp 1,774,098.77 Rp 958,013.34
Rp 45,826.00 Rp 125,104,980.00
Rp 22,715.00 Rp 4,543,000.00
Rp 28,099.50 Rp 32,314,425.00
Rp 51,260.00 Rp 51,260.00
Rp 88,330.00 Rp 88,330.00
Rp 62,315.00 Rp 62,315.00
Rp 213,348,761.98

Rp 124,987.50 Rp 8,899,110.00
Rp 90,475.00 Rp 4,831,365.00
Rp 1,774,098.77 Rp 3,973,981.24
Rp 17,875.00 Rp 31,817,500.00
Rp 76,710.33 Rp 11,165,188.53
Rp 61,270.00 Rp 4,350,170.00
Rp 11,000.00 Rp 2,343,000.00
Rp 56,628.00 Rp 4,020,588.00
Rp 126,456.00 Rp 8,978,376.00
Rp 93,500.00 Rp 6,638,500.00
Rp 440,000.00 Rp 31,240,000.00
Rp 11,000.00 Rp 3,135,000.00
Rp 10,450.00 Rp 741,950.00
Rp 5,082.00 Rp 360,822.00
Rp 51,260.00 Rp 1,435,280.00
Rp 88,330.00 Rp 2,473,240.00
Rp 18,150.00 Rp 1,288,650.00
Rp 24,865.50 Rp 447,579.00
Rp 41,140.00 Rp 205,700.00
Rp 54,780.00 Rp 1,040,820.00
Rp 24,224.20 Rp 24,224.20
Rp 33,141.90 Rp 33,141.90
Rp 82,500.00 Rp 5,857,500.00
Rp 5,500.00 Rp 390,500.00
Rp 135,692,185.88

Rp 500,000.00 Rp 500,000.00
Rp 500,000.00 Rp 500,000.00
Rp 1,000,000.00

JUMLAH Rp 360,377,905.30
PEKERJAAN : PENGEMBANGAN JARINGAN
KELURAHAN BUANGIN KECA
LOKASI : KEC. RANTEBUA
KABUPATEN/PROVINSI : TORAJA UTARA / SULAWESI
TAHUN ANGGARAN : 2022

NO URAIAN TOTAL HARGA BOBOT

I PEKERJAAN PENDAHULUAN Rp 9,145,000.00 2.54

II PEKERJAAN REHEBILITASI RESERVOAR Rp 1,191,957.44 0.33

III PENGADAAN/PEMASAANGAN PIPA DAN ACCESORIS Rp 213,348,761.98 59.20

IV PEK. SAMBUNGAN DARI RUMAH Rp 135,692,185.88 37.65

V PEK. FINISHING Rp 1,000,000.00 0.28

TOTAL HARGA Rp 360,377,905.30 100.00


-
BOBOT PERENCANAAN KOMULATIF (%)
BOBOT REALISASI KOMULATIF (%) -

DEVIASI (-/+) -
GEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH
URAHAN BUANGIN KECAMATAN RANTEBUA
RANTEBUA
AJA UTARA / SULAWESI SELATAN

BULAN KE-1 BULAN KE-2 BULAN KE-3


MINGGU KE MINGGU KE MINGGU KE
1 2 3 4 5 6 7 8 9 10
1.27 1.27

0.07 0.07 0.07 0.07 0.07

7.40 7.40 7.40 7.40 7.40 7.40 7.40 7.40

5.38 5.38 5.38 5.38 5.38 5.38 5.38

0.07 0.07

8.67 8.74 7.47 12.85 12.85 12.85 12.78 12.78 5.45 5.45

8.67 17.40 24.87 37.72 50.56 63.41 76.19 88.96 94.41 99.86
5 15 20 33 48 67 77 88 95 98

-3.67 -2.40 -4.87 -4.72 -2.56 3.59 0.81 -0.96 0.59 -1.86
BULAN KE-3
MINGGU KE
11 12
100%

50%

0.07 0.07

0%

0.07 0.07

99.93 100.00
99 100

-0.93 0.00
GG KK
#VALUE!
0
0