CV ADHI TEKNIK MANDIRI

No Deskripsi Qty Unit Price Total price the goods


1 Batter Charger FBC-1224-10(10A) 1 Pcs Rp 2,000,000 Rp 2,000,000
2 Socket Relay PTF08A-E Ly 2 8 Pcs Rp 19,000 Rp 152,000
3 LY2 220 VAC-24DC-12VDC 10 Pcs Rp 20,000 Rp 200,000
4 Autmatic Transfer Switch ( ATS ) GGLD-250/4 4 Pole Rp 5,554,500 Rp 5,554,500
5 Stop Kontak 1 Pcs Rp 100,000 Rp 100,000
6 Kabel 2x1.5 NYM 4 Meter Rp 9,660 Rp 38,640
7 Box Panel Indoor ( 50x70x20 ) 1 Pcs Rp 740,000 Rp 740,000
8 Sistem ATS 1 Lot Rp 15,000,000 Rp 15,000,000
9 Jasa Pemasangan Panel ATS 1 Set Rp 3,500,000 Rp 3,500,000
Total Keseluruhan Rp 27,285,140

PT.UNIPLAN TEKNIK MANDIRI


No Deskripsi Qty Unit Price Total price the goods
1 Panel ATS 1 Pcs Rp 20,500,000 Rp 20,500,000
2 Charger Accu+Wiring Control 1 Lot Rp 5,750,000 Rp 5,750,000
3 Kabel 4x16 NYY 10 Meter Rp 220,000 Rp 2,200,000
Jasa Pemasangan Panel ATS, Charger Accu &
4 Wirring Kabel Nyy 4x16mm 1 Set Rp 3,500,000 Rp 3,500,000
SUBTOTAL Rp 31,950,000
Diskon 30 % Rp 9,585,000
Total Rp 22,365,000

Kesimpulan :
1 Harga penawaran dan perbandingan terlalu tinggi
2 Team GA bisa melakukan secara manual untuk menyalakan genset
3 Harga sudah tidak bisa di nego kembali
CV ADHI TEKNIK MANDIRI
No Deskripsi Qty Unit Price Total price the goods
1 Deepsea Genset Parkins 1 Pcs Rp 7,000,000 Rp 7,000,000
2 Bongkar + Pasang dan test Commisioning 1 Lot Rp 1,500,000 Rp 1,500,000
Total Keseluruhan Rp 8,500,000

PT.UNIPLAN TEKNIK MANDIRI


No Deskripsi Qty Unit Price Total price the goods
1 Deepsea Genset Parkins 1 Pcs Rp 8,000,000 Rp 8,000,000
2 Bongkar + Pasang dan test Commisioning 1 Lot Rp 1,800,000 Rp 1,800,000
SUBTOTAL Rp 9,800,000
Diskon 20 % Rp 2,000,000
Total Rp 7,800,000

Kesimpulan :
1 Team GA Memilih Vendor PT Uniplan ( point 2 ) karena terdapat diskon
2 Team GA harus melakukan Maintenance Genset karena setiap 15 detik menyala, mati kembali
3 Harga sudah tidak bisa di nego kembali
Mandor Heri
No Deskripsi Qty Unit Price
Pekerjaan Renovasi Canoopy HO
Plat Strip 4x6
Baut Riper 150 mm
1 Baut Ropping 3 Cm 1 Lot Rp 2,500,000
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Total Keseluruhan

PT.UNIPLAN TEKNIK MANDIRI


No Deskripsi Qty Unit Price
Pekerjaan Renovasi Canoopy HO
Plat Strip 4x6
Baut Riper 150 mm
1 Baut Ropping 3 Cm 1 Lot Rp 3,000,000
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Total Keseluruhan

Vendor Pak Kisto


No Deskripsi Qty Unit Price
Pekerjaan Renovasi Canoopy HO
Plat Strip 4x6
Baut Riper 150 mm
1 Baut Ropping 3 Cm 1 Lot Rp 2,500,000
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Total Keseluruhan
Mandor Dika
Total price the goods No Deskripsi Qty Unit Price
1 Pekerjaan Renovasi Canoopy HO 1 Lot Rp 2,700,000
Plat Strip 4x6
Baut Riper 150 mm
Rp 2,500,000 Baut Ropping 3 Cm
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Rp 2,500,000 Total Keseluruhan

CV MANDIRI LOGAM JAYA


Total price the goods No Deskripsi Qty Unit Price
1 Pekerjaan Renovasi Canoopy HO 1 Lot Rp 2,900,000
Plat Strip 4x6
Baut Riper 150 mm
Rp 3,000,000 Baut Ropping 3 Cm
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Rp 3,000,000 Total Keseluruhan

Total price the goods

Rp 2,500,000

Rp 2,500,000
Total price the goods
Rp 2,700,000

Rp 2,700,000

Total price the goods


Rp 2,900,000

Rp 2,900,000
Kebutuhan Utilities Sendok Garpu Jumlah Karyawan Kebutuhan
Piring 13 48 -35
Mangkok 2 48 -46
Lantai 1 Pantry Sendok 2 48 -46
Garpu 2 48 -46
Gelas 2 48 -46
Piring 10 83 -73
Mangkok 3 83 -80
Lantai 2 Pantry Sendok 3 83 -80
Garpu 5 83 -78
Gelas 13 83 -70
Piring 10 141 -131
Lantai 3 Pantry dan MRP Mangkok 3 141 -138
Garpu 3 141 -138
Piring 41 30 11
Mangkok 7 30 -23
Lantai 3 Kongkow Sendok 3 30 -27
Garpu 7 30 -23
Gelas 5 30 -25
Total
140

120

100

80 Sum of 1
Piring Sum of 13
Garpu 14 60
Garpu 3
40
Gelas 20
Mangkok 15 20
Piring 61 0
Sendok 8 Garpu Garpu Gelas Mangkok Piring Sendok Total
Result
Total Result 121
Sum of 13

Sendok Total
Result
Kursi Meja Kosong 2024 Lantai
31 31 1 19 Lantai 1 Purchasing
12 17 6 10 Lantai 1 Inventory
5 5 0 3 Lantai 1 Faktur
10 10 0 6 Lantai 2 QA Data
10 13 3 10 Lantai 2 Marketing Lantai Total Kursi
21 23 3 19 Lantai 2 HR Service Lantai 3 Accounting 43
12 12 5 9 Lantai 2 Training Lantai 3 Audit 6
6 6 0 4 Lantai 2 ECC Lantai 3 Finance 28
6 6 2 4 Lantai 2 Koperasi Lantai 3 IT 24
6 6 2 4 Lantai 2 POD Lantai 3 MRP 16
9 10 3 6 Lantai 2 Legal Lantai 3 Tax 24
3 3 0 2 Lantai 2 GA Total Result 141
27 30 4 23 Lantai 3 Accounting
24 24 0 19 Lantai 3 IT
8 9 1 6 Lantai 3 Accounting
8 8 2 6 Lantai 3 Accounting
6 6 0 4 Lantai 3 Audit
24 25 3 14 Lantai 3 Tax
16 16 0 10 Lantai 3 MRP
28 31 3 19 Lantai 3 Finance
272 291 38 197
Total Meja Total Kosong Sum of 2024
47 7 35
6 0 4
31 3 19
24 0 19
16 0 10
25 3 14
149 13 101
No Deskripsi Qty Unit Mandor Heri
Pekerjaan Renovasi Canoopy HO
Plat Strip 4x6
Baut Riper 150 mm
1 Baut Ropping 3 Cm 1 Lot Rp 2,500,000
Alat Bantu Kerja 1 Lot
Silent 2 Tube

PT.UNIPLAN TEKNIK MANDIRI


No Deskripsi Qty Unit Price
Pekerjaan Renovasi Canoopy HO
Plat Strip 4x6
Baut Riper 150 mm
1 Baut Ropping 3 Cm 1 Lot Rp 3,000,000
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Total Keseluruhan

Vendor Pak Kisto


No Deskripsi Qty Unit Price
Pekerjaan Renovasi Canoopy HO
Plat Strip 4x6
Baut Riper 150 mm
1 Baut Ropping 3 Cm 1 Lot Rp 2,500,000
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Total Keseluruhan
PT.UNIPLAN TEKNIK MANDIRI Vendor Pak Kisto

Rp 3,000,000 Rp 2,500,000

Total price the goods

Rp 3,000,000

Rp 3,000,000

Total price the goods

Rp 2,500,000

Rp 2,500,000
Mandor Dika
Mandor Dika CV MANDIRI LOGAM JAYA No
1

Rp 2,700,000 Rp 2,900,000

CV MANDIRI LOGAM JAYA


No
1

Total Keseluru
Mandor Dika
Deskripsi Qty Unit Price Total price the goods
Pekerjaan Renovasi Canoopy HO 1 Lot Rp 2,700,000 Rp 2,700,000
Plat Strip 4x6
Baut Riper 150 mm
Baut Ropping 3 Cm
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport

CV MANDIRI LOGAM JAYA


Deskripsi Qty Unit Price Total price the goods
Pekerjaan Renovasi Canoopy HO 1 Lot Rp 2,900,000 Rp 2,900,000
Plat Strip 4x6
Baut Riper 150 mm
Baut Ropping 3 Cm
Alat Bantu Kerja 1 Lot
Silent 2 Tube
Transport
Total Keseluruhan Rp 2,900,000
No Deskripsi Qty Unit
AC SPLIT GREE ( GWC12M005A) Non Inverter Non Inverter ( 1,5 Pk ) 1 Ùnit
1
AC SPLIT DAIKIN (FTC35NV14) Non Inverter ( 1,5 Pk ) 1 Ùnit
PT.EBEN HAEZER ANUGRAH LIGHT COOLING Vendor HARI