Uii - PSTS - MTC 3.0 - Ded
Uii - PSTS - MTC 3.0 - Ded
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA
STR 01 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
KAMPUS
1. DOKUMEN INI HARUS DIGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI DAN EMASANGAN
TULANGANDARI PEKERJAAN BETON BERTULANG. CONDONG CATUR
( THIS DOCUMENT SHALL BE USED AS A STANDARD FOR THE FABRICATION AND FIXING OF
EINFORCEMENT IN REINFORCED CONCRETE WORKS. )
DISETUJUI:
2. TUJUAN DARI DOKUMEN INI HARUS DIGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI DAN
PENAMPANG KRITIS
PEMASANGAN TULANGANDARI PEKERJAAN BETON BERTULANG. db
( CRITICAL SECTION )
( THE INSTRUCTIONS IN THIS DOCUMENT GIVE DIRECTIONS AND INSTRUCTION FOR WORKS
OF A GENERAL NATURE, WORKS THAT HAVE A SPECIFIC PURPOSE IN THE STRUCTURE ARE
DESCORIBED IN THE DRAWINGS AND / OR INSTRUCTIONS ISSUED THE DESIGNER. )
3. BILA TIDAK ADA KESESUAIAN ANTARA DETAIL STANDARD INI DENGAN GAMBAR - GAMBAR ld
RENCANA MAKA GAMBAR RENCANA HARUS DIPAKAI SEBAGAI PEDOMAN. MENGETAHUI:
PELINDUNG BETON UNTUK TULANGAN 8 600 600 600 600 600 600
PERENCANA:
(CONCRETE COVER FOR REINFORCEMENT) BJTP - 24 10 600 600 600 600 600 600
12 600 600 600 600 600 600
BALOK DAN
TIDAK BERHUBUNGAN DENGAN CUACA
(NOT EXPOSED TO THE WEATHER)
40 29 1245 1680 1190 1540 1420 1330
KOLOM 32 1365 1855 1295 1700 1575 1470
(BEAMS AND
BERHUBUNGAN DENGAN CUACA
COLUMNS)
(EXPOSED TO THE WEATHER) 50 36 1525 2085 1455 1910 1770 1645
JUDUL GAMBAR SKALA
BETON
BERHUBUNGAN
DICOR TIDAK LANGSUNG DIATAS TANAH
(NOT CAST DIRECTLY ON THE GROUND)
50 STANDAR DETAIL NTS
DENGAN TANAH 1. THE DEVELOPMENT LENGHT ld FOR STRAIGHT BSTR IS 3.5 X ldh FOR DEFORMED
(CONCRETE IN BSTR, AND 50 db FOR PLAIN BSTR, IN ACCORDANCE WITH THE CURRERNT
DICOR LANGSUNG DIATAS TANAH
CONTACT WITH
GROUND)
(CAST DIRECTLY ON THE GROUND) 70 INDONESIAN
2. DOKUMEN INI HARUS DIGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI DAN
PEMASANGAN TULANGANDARI PEKERJAAN BETON BERTULANG.
KODE NO.LMBR JUMLAH
STR 02 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
PANJANG PENJANGKARAN MINIMUM TULANGAN DENGAN KAIT STANDAR SAMBUNGAN LEWATAN TULANGAN
( MIN ANCHORAGE LENGTH OF REINFORCEMENT WITH A STANDARTD HOOK ) (LAP SPLICING OF REINFORCEMENT) PROYEK:
db 1 db 2 KAMPUS
PENAMPANG KRITIS
db PENAMPANG KRITIS
db l 0.5 l l
CONDONG CATUR
( CRITICAL SECTION ) ( CRITICAL SECTION )
KOLOM
( COLUMN ) 45 db
DISETUJUI:
ldh ldh
2w
>3 > 50 mm >2 > 50 mm
db 1 db 2
3w
w w
5db ~ 10 db 45 db
STR 03 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
PROYEK:
KAIT STANDAD UNTUK TULANGAN UTAMA KAIT STANDARD UNTUK SENGKANG DAN KAIT PENGIKAT
(STANDARD HOOK FOR MAIN REINFORCEMENT) (STANDARD HOOK FOR LIGATURES AND TIE HOOKS) GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
DIAMETER DIAMETER DIAMETER DIAMETER EKONOMIKA
KAIT ILUSTRASI TULANGAN BENGKOKAN KAIT ILUSTRASI TULANGAN BENGKOKAN
(HOOK) (SHAPE) (DIA.OF MINIMUM lt (HOOK) (SHAPE) (DIA.OF MINIMUM lt KAMPUS
REINF.) (MIN.BEN MINIMUM REINF.) (MIN.BEN MINIMUM CONDONG CATUR
DIA.) D DIA.) D
db db
DISETUJUI:
10 - 25 mm 6 db 8 - 16 mm 4 db
yang terbesar yang terbesar
antara (the 135 A antara (the
180 A db 1 D larger of) 4 db 135 A db 1 D larger of) 6 db
29 - 36 mm 8 db atau (or) 60 atau (or) 75
lt mm mm
lt 19 - 25 mm 6 db
40 - 55 mm 10 db
MENGETAHUI:
10 - 25 mm 6 db 8 - 16 mm 4 db
yang terbesar 8 db atau (OR)
135 A antara (the 90 A 75 mm
135 A db 1 D larger of) 6 db 90 A db 1 D
29 - 36 mm 8 db atau (or) 75 lt
mm
lt 19 - 25 mm 6 db
12 db PERENCANA:
40 - 55 mm 10 db
10 - 25 mm 6 db
90 A
90 A db 1 D 6 db
29 - 36 mm 8 db KETERANGAN:
lt
40 - 55 mm 10 db
STR 04 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
PROYEK:
2. BALOK (BEAMS)
GEDUNG EKSTENSI
PEMUTUSAN TULANGAN UNTUK BALOK INDUK DAN BALOK ANAK PEMUTUSAN TULANGAN UNTUK TIE BEAM FAKULTAS BISNIS DAN
(TERMINATION OF REINF.FOR MAIN BEAMS AND SECONDARY BEAMS) (TERMINATION OF REINF.FOR TIE BEAMS) EKONOMIKA
ln
ln /4 ln /2 ln /4 DISETUJUI:
> 12.db
ldh tumpuan lapangan tumpuan ldh
hb (support) (span) (support)
0.125 ln 0.125 ln
hb
ln /4 ln /2 ln /4
tumpuan lapangan ( SPAN) tumpuan
(support) (support)
ln 0.125 ln 0.125 ln
l
muka pile cap
(FACE OF PILE CAP)
LIHAT DETAIL PENJANGKARAN SEBAGAI
MODIFIKASI DETAIL INI
(REFER TO ANCHORAGE DETAILS FOR
THIS DETAIL)
BALOK ANAK MENGETAHUI:
(SECONDARY BEAM)
> 12.db hb
0.125 ln 0.125 ln
ln /4 ln /2 ln /4 mukakolom
tumpuan lapangan ( SPAN) tumpuan
(FACE OF COLUMN)
(support) (support)
ln
l PERENCANA:
ln
ln /4 ln /2 ln /4
ldh tumpuan lapangan tumpuan ldh
LIHAT DETAIL PENJANGKARAN SEBAGAI
MODIFIKASI DETAIL INI
(support) (span) (support)
(REFER TO ANCHORAGE DETAILS FOR
THIS DETAIL)
BALOK ANAK
(SECONDARY BEAM)
hb
0.125 ln 0.125 ln
> 12.db hb
pondasi / pile cap pondasi / pile cap
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP) KETERANGAN:
0.125 ln 0.125 ln
0.125 ln 0.125 ln
ln /4 ln /2 ln /4
tumpuan lapangan ( SPAN) tumpuan
(support) (support)
ln
KODE NO.LMBR JUMLAH
l
STR 05 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
PROYEK:
LETAK SAMBUNGAN LEWATAN UNTUK TULANGAN BALOK PENGATURAN SENGKANG UNTUK BALOK GEDUNG EKSTENSI
(LOCATION OF LAP SPLICE FOR BEAM REINFORCEMENT) (REQUIREMENTS FOR TIES IN BEAMS) FAKULTAS BISNIS DAN
EKONOMIKA
penampang kritis
(CRITICAL SECTION)
1. TULANGAN BALOK UMUM
1. REINFORCEMENT OF BEAMS GENERALLY ≤ 50 MM KAMPUS
CONDONG CATUR
penampang kritis
(CRITICAL SECTION)
hb
DISETUJUI:
ln /4 ln /2 ln /4
tumpuan lapangan ( SPAN) tumpuan
(support) (support)
hb
ln
l
≥ 2 hb * * ≥ 2 hb
ln penampang kritis
(CRITICAL SECTION)
l
≤ 50 MM
ln /2
penampang kritis tumpuan jepit
(CRITICAL SECTION)
(fixed end)
ln
l
muka kolom
(FACE OF COLUMN
≥ 2 hb * * ≥ 2 hb
ln /4 ln /2 ln /4 PERENCANA:
tumpuan lapangan ( SPAN) tumpuan
pondasi / pile cap
ln pondasi / pile cap ldh (support) (support)
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP)
muka pile cap
(FACE OF PILE CAP)
l hb
ln
pondasi / pile cap pondasi / pile cap ln /4 ln /2 ln /4
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP) tumpuan lapangan ( SPAN) tumpuan
muka pile cap (support) (support)
(FACE OF PILE CAP) JUDUL GAMBAR SKALA
PROYEK:
6d 6d 6d
KAMPUS
CONDONG CATUR
b1
DISETUJUI:
1. b1 = JARAK BERSIH ANTARA TULANGAM
(CLEAR DISTANCE BETWEN REINFORCEMENT)
H > 1.5 d
6d
> 1.25 d DARI UKURAN AGREGAT MAKSIMUM
(OF THE MAXIMUM AGREGATE SIZE)
b1 > 25 MM
UMUM 2. DIPAKAI TULANGAN TAMBAHAN SEBAGAI KAIT UNTUK
MENJAGA JARAK ANTARA BATANG TULANGAN DIBAWAH INI
(GENERAL) b1 b1 (USE OF ADDITIONAL REINFORCEMENT AS HOOKS TO
MAINTAIN THE SPACING BETWEEN THE LAYER OF
REINFORCEMENT BELOW THIS ONE) MENGETAHUI:
x x x
PERENCANA:
DUA SENGKANG DAPAT DIPASANG PADA b1
PENAMPANG MELINTANG BALOK BILA
DIPERLUKAN
(DOUBLE TIES TO BE FIXED IN
A BEAM SECTION IF REQUIRED)
KETERANGAN:
8 d MIN
STR 07 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
PROYEK:
PEMUTUSAN TULANGAN UNTUK BALOK CANTILEVER PERBEDAAN KETINGGIAN DAN AS BALOK GEDUNG EKSTENSI
9TERMINATION OF REINF. FOR CANTILEVER BEAMS) (STEPS IN ELEVATION AND AXIS OF BEAMS) FAKULTAS BISNIS DAN
EKONOMIKA
1. PERBEDAAN KETINGGIAN
(STEP IN ELEVATION)
12 KAMPUS
penampang kritis 2 dc/3 min 200 MAX CONDONG CATUR
(CRITICAL SECTION)
12
8d MIN
8d MIN
hb
2 + 5d
ln /2 ln /2 12 12
tumpuan jepit
Ujung bebas(FREE END)
(fixed end)
ln
l
12
50 MM 50 MM MENGETAHUI:
1
6 MIN
A A/Dc < 1/6 PERENCANA:
Dc
2. PERBEDAAN AS
(STEP IN AXIS)
KETERANGAN:
TAMPAK ATAS
(PLAN VIEW
PENJANGKARAN KE KOLOM
(ANCHORAGE TO COLUMN) JUDUL GAMBAR SKALA
TAMPAK ATAS
(PLAN VIEW) STANDAR DETAIL NTS
1
6 MIN
3. KOLOM (COLUMNS)
PROYEK:
LETAK SAMBUNGAN LEWATAN UNTUK TULANGAN KOLOM PENGATURAN SENGKANG UNTUK KOLOM GEDUNG EKSTENSI
(LOCATION OF LAP SPLICES FOR COLUMN REINFORCEMENT) (REQUIREMENTS FOR COLUMN TIES) FAKULTAS BISNIS DAN
EKONOMIKA
≥ 12 db
≤ ≤
hk ≥ bk KAMPUS
CONDONG CATUR
tinggi balok terbesar pada kolom tersebut
BALOK (DEPTH OF LARGEST BEAM WHICH IS
SUPPORTED BY THE COLUMN)
(BEAMS)
≤
DISETUJUI:
(SUPPORT)
(SUPPORT)
tumpuan
tumpuan
Sisi Bawah Balok Terbesar Yang Menumpu
Hn/4
Hn/4
≥ Pada Kolom tsb
(BOTTOM EDGE OF LARGEST BEAM WHICH
IS SUPPORTED BY THE COLUMN)
45 db
lapangan
lapangan
(SPAN)
(SPAN)
Hn/2
Hn/2
Hn
Hn
MENGETAHUI:
(SUPPORT)
jika tidak ditentukan, maka dipasang
tumpuan
tumpuan
Hn/4
Hn/4
sengkang seperti sengkang tumpuan
kolom )
≤
pertemuan balok kolom pertemuan balok kolom
(BEAM COLUMN JOINT) (BEAM COLUMN JOINT) BALOK
BALOK (BEAMS)
(BEAMS) PERENCANA:
≤
(SUPPORT)
(SUPPORT)
tumpuan
tumpuan
Sisi Bawah Balok Terbesar Yang Menumpu
Hn/4
Hn/4
Pada Kolom tsb
(BOTTOM EDGE OF LARGEST BEAM WHICH
IS SUPPORTED BY THE COLUMN)
45 db
Hn
Hn
lapangan
lapangan
KETERANGAN:
(SPAN)
(SPAN)
Hn/2
Hn/2
(SUPPORT)
(SUPPORT)
Pile Cap / Pondasi
tumpuan
tumpuan
(PILE CAP/FOUNDATION)
Hn/4
hk ≥ bk ≥ Hn/4
≤ ≤
≥ ≥
KODE NO.LMBR JUMLAH
STR 09 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)
PROYEK:
KAMPUS
KOLOM DENGAN TULANGAN PENGEKANG CONDONG CATUR
(COLUMNS WITH CONFINEMENT REINFORCEMENT)
DISETUJUI:
MENGETAHUI:
PERENCANA:
135A0'0
KETERANGAN:
STR 10 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA
+16.00 KAMPUS
ATAP
CONDONG CATUR
+12.00 DISETUJUI:
LANTAI 4
+8.00
LANTAI 3
+4.00 MENGETAHUI:
LANTAI 2
±0.00
LANTAI 1
PERENCANA:
1 2 3 4 5 6 7 8
PORTAL 1:200
STRUKTUR
PORTAL STRUKTUR
SKALA 1 : 200 KODE NO.LMBR JUMLAH
STR 11 27
PROYEK:
F2 F2 F2 F2 F2 F2 F2 F2 GEDUNG EKSTENSI
F4 FAKULTAS BISNIS DAN
C EKONOMIKA
KAMPUS
CONDONG CATUR
12000
F4 DISETUJUI:
F2 F2 F2 F2 F2 F2 F2 F2
F4
B
MENGETAHUI:
5500
F4 F3 F3 F3 F3 F3 F3 F3 F3
A
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
FONDASI
RENCANA FONDASI
SKALA 1 : 200 KODE NO.LMBR JUMLAH
STR 12 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
K6 K1 K1 K1 K1 K1 K1 K1 K1
KAMPUS
CONDONG CATUR
12000
DISETUJUI:
K6
B
K6 K1 K1 K1 K1 K1 K1 K1 K1
MENGETAHUI:
5500
A
K6 K3 K3 K3 K3 K3 K3 K3 K3
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
KOLOM LANTAI 1
STR 13 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
K6 K2 K2 K2 K2 K2 K2 K2 K2
KAMPUS
CONDONG CATUR
12000
DISETUJUI:
K6
B
K6 K2 K2 K2 K2 K2 K2 K2 K2
MENGETAHUI:
5500
A
K6 K3 K3 K3 K3 K3 K3 K3 K3
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
KOLOM LANTAI 1
STR 14 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
K6 K2 K2 K2 K2 K2 K2 K2 K2
KAMPUS
CONDONG CATUR
12000
DISETUJUI:
K6
B
K6 K2 K2
MENGETAHUI:
5500
A
K6 K3 K3 K3 K3 K3 K3 K3 K3
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
KOLOM LANTAI 2
STR 15 27
PROYEK:
GEDUNG EKSTENSI
S4 S3 S3 S3 S3 S3 S3 S3 FAKULTAS BISNIS DAN
C EKONOMIKA
KAMPUS
S4
CONDONG CATUR
S4
12000
DISETUJUI:
1800
S2
S2
S2
S2
S2
S2
S2
S2
S4
5000
S4
S4 S3 S3 S3 S3 S3 S3 S3
B
MENGETAHUI:
5500
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S3 S3 S3 S3 S3 S3 S3
A
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
SLOOF
RENCANA SLOOF
SKALA 1 : 200 KODE NO.LMBR JUMLAH
STR 16 27
PROYEK:
GEDUNG EKSTENSI
B12 FAKULTAS BISNIS DAN
C B9 B9 B9 B9 B9 B9 B9 EKONOMIKA
KAMPUS
B7 B7 B7 B7 B7 B7 B7
CONDONG CATUR
B12
B14
B2
B2
B2
B2
B2
B2
B2
B2
B7 B7 B7 B7 B7 B7 B7
12000
DISETUJUI:
1800
B12
B7 B7 B7 B7 B7 B7 B7
5000
B12
B12 B9 B9 B9 B9 B9 B9 B9
B
MENGETAHUI:
B12
B7 B7 B7 B7 B7 B7 B7
B8
B8
B8
B8
B8
B8
B8
B8
5500
B12 B9 B9 B9 B9 B9 B9 B9
A
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
BALOK +4.00
STR 17 27
PROYEK:
GEDUNG EKSTENSI
B12 FAKULTAS BISNIS DAN
C B9 B9 B9 B9 B9 B9 B9 EKONOMIKA
KAMPUS
B13 B13 B13 B13 B13 B13 B13
CONDONG CATUR
B12
B14
B2
B2
B2
B2
B2
B2
B2
B2
B13 B13 B13 B13 B13 B13 B13
12000
DISETUJUI:
1800
B12
B12
B12 B9 B9 B9 B9 B9 B9 B9
B
MENGETAHUI:
B12
B8
B8
B8
B8
B8
B8
B8
5500
B12 B9 B9 B9 B9 B9 B9 B9
A
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
BALOK +4.00
STR 18 27
PROYEK:
GEDUNG EKSTENSI
B12 FAKULTAS BISNIS DAN
C B25 B25 B25 B25 B25 B25 B25 EKONOMIKA
KAMPUS
CONDONG CATUR
B12
B2
B2
12000
DISETUJUI:
B12
5000
B12
B12
B
MENGETAHUI:
B12
B8
B8
5500
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
RING BALOK +8.00
STR 19 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
A2 A2 A2 A2 A2 A2 A2 KAMPUS
TANGGA CONDONG CATUR
A2 A2 A2 A2 A2 A2 A2
12000
DISETUJUI:
1800
A1
A2 A2 A2 A2 A2 A2 A2
5000
A1
A2 A2 A2 A2 A2 A2 A2
B
A2 A2 A2 A2 A2 A2 A2 MENGETAHUI:
5500
A1
A2 A2 A2 A2 A2 A2 A2
A
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
PLAT +4.00
STR 20 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
A1 A1 A1 A1 A1 A1 A1 KAMPUS
TANGGA CONDONG CATUR
A1 A1 A1 A1 A1 A1 A1
12000
DISETUJUI:
1800
A1
A1 A1 A1 A1 A1 A1 A1
5000
A1
A1 A1 A1 A1 A1 A1 A1
B
A1 A1 A1 A1 A1 A1 A1 MENGETAHUI:
5500
A1
A1 A1 A1 A1 A1 A1 A1
A
PERENCANA:
1 2 3 4 5 6 7 8
KETERANGAN:
RENCANA 1:200
PLAT +4.00
STR 21 27
PROYEK:
DISETUJUI:
2400
2400
2400
D10 - 100
D10 - 150 D10 - 100
D16 - 100
D16 - 150 D13 - 100
800
600
600
500
400
400
MENGETAHUI:
KOLOM PERENCANA:
KOLOM
D13 - 100
D10 - 100
D16 - 150
D10 - 150
1800
KOLOM
2200
D10 - 100
D10 - 150
D10 - 100
D16 - 100
KETERANGAN:
3000
D13 - 100
D16 - 150
FONDASI F3
JUDUL GAMBAR SKALA
FONDASI F2
DETAIL FONDASI
SKALA 1 : 50 KODE NO.LMBR JUMLAH
STR 22 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA
TYPE
KAMPUS
KOLOM K1 KOLOM K2 CONDONG CATUR
LANTAI
TUMPUAN LAPANGAN TUMPUAN LAPANGAN
DISETUJUI:
BASEMENT
700
700
700
700
700 700 700 700
TYPE
KOLOM K3 KOLOM K6
LANTAI
TUMPUAN LAPANGAN TUMPUAN LAPANGAN
PERENCANA:
BASEMENT
600
600
700
700
600 600
700 700
DETAIL KOLOM
SKALA 1 : 50 KODE NO.LMBR JUMLAH
STR 23 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA
KAMPUS
CONDONG CATUR
DISETUJUI:
500
500
500
POTONGAN
600
600
600
700
700
700
MENGETAHUI:
TUL. ATAS 5 D19 5 D19 5 D19 4 D19 4 D19 4 D19 3 D19 3 D19 3 D19
TUL. BAWAH 5 D19 5 D19 5 D19 4 D19 4 D19 4 D19 3 D19 3 D19 3 D19
PERENCANA:
SENGKANG 2 D10 - 100 D10 - 200 2 D10 - 100 D10 - 100 D10 - 200 D10 - 100 D10 - 100 D10 - 200 D10 - 100
KETERANGAN:
DETAIL SLOOF
SKALA 1 : 50 KODE NO.LMBR JUMLAH
STR 24 27
TYPE BALOK B2 500x800 BALOK B7 300x600 BALOK B8 400x600
POSISI TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN
POTONGAN
600
600
600
600
600
600
800
800
800
PROYEK:
DISETUJUI:
500
500
500
POTONGAN
600
600
600
600
600
600
MENGETAHUI:
300 300 300
400 400 400 300 300 300
TUL. ATAS 5 D25 2 D25 5 D25 3 D25 3 D25 3 D25 6 D16 2 D16 6 D16
TUL. BAWAH 2 D25 3 D25 2 D25 3 D25 3 D25 3 D25 3 D16 6 D16 3 D16
PERENCANA:
SENGKANG D10 - 100 D10 - 150 D10 - 100 D10 - 100 D10 - 150 D10 - 100 D10 - 100 D10 - 150 D10 - 100
500
500
POTONGAN
700
700
700
300 300 300
SENGKANG D10 - 100 D10 - 100 D10 - 100 D10 - 100 D10 - 150 D10 - 100
STR 25 27
PROYEK:
GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA
KAMPUS
CONDONG CATUR
0.25 x S
0.3 x S
D10 - 400
D10 - 125 MENGETAHUI:
D10 - 400
D10 - 400
D10 - 200
D10 - 200
PERENCANA:
0.25 x S
0.3 x S
D10 - 400
DETAIL PLAT
SKALA 1 : 50 KODE NO.LMBR JUMLAH
STR 26 27
BALOK TANGGA BT 150x400
BORDES BORDES
D13-200
PROYEK:
D13-200 D13-200 D13-200
GEDUNG EKSTENSI
BALOK BT 150x400
FAKULTAS BISNIS DAN
D13-200
EKONOMIKA
10
D10-200 KAMPUS
9 11 CONDONG CATUR
TEBAL PLAT 150mm
8 12
15
0
DISETUJUI:
7 13
6 14
D13-200
5 15
D10-200
16
TEBAL PLAT 150mm MENGETAHUI:
UP
15
17
0
DETIL PLAT TANGGA
TEBAL PLAT 150mm
18
D13-200
19
D10-200 PERENCANA:
20 LANTAI
DOWN
DETIL TANGGA
SLOOF S4
KETERANGAN:
400
400
POTONGAN
DETAIL TANGGA 1:30
150 150 150
SENGKANG D10 - 100 D10 - 100 D10 - 100 DETAIL TANGGA ±0.00 s/d +16.00
SKALA 1 : 50 KODE NO.LMBR JUMLAH
TUL. PINGGANG -
STR 27 27