Anda di halaman 1dari 27

PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA

NO. LBR. JUDUL GAMBAR KODE GAMBAR KAMPUS


CONDONG CATUR
1 DAFTAR GAMBAR STR-01
2 STANDAR GAMBAR UMUM STR-02
DISETUJUI:
3 STANDAR GAMBAR UMUM STR-03
4 STANDAR GAMBAR UMUM STR-04
5 STANDAR GAMBAR BALOK STR-05
6 STANDAR GAMBAR BALOK STR-06
7 STANDAR GAMBAR BALOK STR-07
8 STANDAR GAMBAR BALOK STR-08
9 STANDAR GAMBAR KOLOM STR-09
10 STANDAR GAMBAR KOLOM STR-10
MENGETAHUI:
11 PORTAL STRUKTUR STR-11
12 RENCANA FONDASI STR-12
13 RENCANA KOLOM LANTAI 1 STR-13
14 RENCANA KOLOM LANTAI 1 & 2 STR-14
15 RENCANA KOLOM LANTAI 3 STR-15
16 RENCANA SLOOF STR-16
17 RENCANA BALOK +4.00 STR-17 PERENCANA:
18 RENCANA BALOK +8.00 & +12.00 STR-18
19 RENCANA RING BALOK +16.00 STR-19
20 RENCANA PLAT +4.00 STR-20
21 RENCANA PLAT +8.00 & +12.00 STR-21
22 DETAIL FONDASI STR-22
23 DETAIL KOLOM STR-23
24 DETAIL SLOOF STR-24 KETERANGAN:
25 DETAIL BALOK STR-25
26 DETAIL PLAT STR-26
27 DETAIL TANGGA STR-27

JUDUL GAMBAR SKALA

DAFTAR GAMBAR NTS

KODE NO.LMBR JUMLAH

STR 01 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

1. UMUM (GENERAL) PROYEK:

LINGKUP DOKUMEN PANJANG PENYALURAN MINIMUM TULANGAN GEDUNG EKSTENSI


(SCOPE OF DOCUMENT) ( MAX. ANCHORAGE LENGHT F REINFORCEMENT ) FAKULTAS BISNIS DAN
EKONOMIKA

KAMPUS
1. DOKUMEN INI HARUS DIGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI DAN EMASANGAN
TULANGANDARI PEKERJAAN BETON BERTULANG. CONDONG CATUR
( THIS DOCUMENT SHALL BE USED AS A STANDARD FOR THE FABRICATION AND FIXING OF
EINFORCEMENT IN REINFORCED CONCRETE WORKS. )
DISETUJUI:

2. TUJUAN DARI DOKUMEN INI HARUS DIGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI DAN
PENAMPANG KRITIS
PEMASANGAN TULANGANDARI PEKERJAAN BETON BERTULANG. db
( CRITICAL SECTION )
( THE INSTRUCTIONS IN THIS DOCUMENT GIVE DIRECTIONS AND INSTRUCTION FOR WORKS
OF A GENERAL NATURE, WORKS THAT HAVE A SPECIFIC PURPOSE IN THE STRUCTURE ARE
DESCORIBED IN THE DRAWINGS AND / OR INSTRUCTIONS ISSUED THE DESIGNER. )

3. BILA TIDAK ADA KESESUAIAN ANTARA DETAIL STANDARD INI DENGAN GAMBAR - GAMBAR ld
RENCANA MAKA GAMBAR RENCANA HARUS DIPAKAI SEBAGAI PEDOMAN. MENGETAHUI:

( IF THERE IS NO CONFORMITY BETWEEN THESE STANDARD DETAILS AND THE PROJECT


DRAWINGS ARE TO BE USED AS THE GUIDE. ) MUTU PANJANG PENYALURAN (ANCHORAGE LENGHT) ld ( mm )
TULANGAN db
(GRADE OF ( mm ) MUTU BETON (CONCRETE GRADE)
CONCRETE)
K - 450 K - 250 K - 500 K - 300 K - 350 K - 400

PELINDUNG BETON UNTUK TULANGAN 8 600 600 600 600 600 600
PERENCANA:
(CONCRETE COVER FOR REINFORCEMENT) BJTP - 24 10 600 600 600 600 600 600
12 600 600 600 600 600 600

ELEMEN KONDISI TEBAL SELIMUT BETON


8 525 525 525 525 525 525
STRUKTUR (CONDITION) (THICKNESS OF CONCRETE
(STRUCTURAL COVER) BJTD - 40 10 525 580 525 525 525 525
ELEMENT) (mm)
12 525 700 525 630 595 545
13 550 755 525 685 630 595
PELAT DAN TIDAK BERHUBUNGAN DENGAN CUACA
(NOT EXPOSED TO THE WEATHER)
20 16 685 930 665 640 790 735 KETERANGAN:
DINDING
(SLABS AND 19 805 1105 770 1000 930 875
BERHUBUNGAN DENGAN CUACA
WALLS)
(EXPOSED TO THE WEATHER) 50 22 945 1280 895 1175 1085 1015
25 1070 1455 1015 1330 1225 1140

BALOK DAN
TIDAK BERHUBUNGAN DENGAN CUACA
(NOT EXPOSED TO THE WEATHER)
40 29 1245 1680 1190 1540 1420 1330
KOLOM 32 1365 1855 1295 1700 1575 1470
(BEAMS AND
BERHUBUNGAN DENGAN CUACA
COLUMNS)
(EXPOSED TO THE WEATHER) 50 36 1525 2085 1455 1910 1770 1645
JUDUL GAMBAR SKALA

BETON
BERHUBUNGAN
DICOR TIDAK LANGSUNG DIATAS TANAH
(NOT CAST DIRECTLY ON THE GROUND)
50 STANDAR DETAIL NTS
DENGAN TANAH 1. THE DEVELOPMENT LENGHT ld FOR STRAIGHT BSTR IS 3.5 X ldh FOR DEFORMED
(CONCRETE IN BSTR, AND 50 db FOR PLAIN BSTR, IN ACCORDANCE WITH THE CURRERNT
DICOR LANGSUNG DIATAS TANAH
CONTACT WITH
GROUND)
(CAST DIRECTLY ON THE GROUND) 70 INDONESIAN
2. DOKUMEN INI HARUS DIGUNAKAN SEBAGAI STANDARD UNTUK FABRIKASI DAN
PEMASANGAN TULANGANDARI PEKERJAAN BETON BERTULANG.
KODE NO.LMBR JUMLAH

STR 02 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PANJANG PENJANGKARAN MINIMUM TULANGAN DENGAN KAIT STANDAR SAMBUNGAN LEWATAN TULANGAN
( MIN ANCHORAGE LENGTH OF REINFORCEMENT WITH A STANDARTD HOOK ) (LAP SPLICING OF REINFORCEMENT) PROYEK:

BALOK GEDUNG EKSTENSI


( BEAM ) FAKULTAS BISNIS DAN
EKONOMIKA

db 1 db 2 KAMPUS
PENAMPANG KRITIS
db PENAMPANG KRITIS
db l 0.5 l l
CONDONG CATUR
( CRITICAL SECTION ) ( CRITICAL SECTION )
KOLOM
( COLUMN ) 45 db
DISETUJUI:

ldh ldh
2w
>3 > 50 mm >2 > 50 mm
db 1 db 2
3w
w w
5db ~ 10 db 45 db

MUTU PANJANG LEWATAN (LAP LENGTH) l ( mm )


TULANGAN db
(GRADE OF ( mm ) MUTU BETON (CONCRETE GRADE)
MUTU PANJANG PENYALURAN (ANCHORAGE LENGHT) ldh ( mm )
CONCRETE)
TULANGAN db K - 450 K - 250 K - 500 K - 300 K - 350 K - 400
(GRADE OF ( mm ) MUTU BETON (CONCRETE GRADE) MENGETAHUI:
CONCRETE) 8 780 780 780 780 780 780
K - 450 K - 250 K - 500 K - 300 K - 350 K - 400
BJTP - 24 10 780 780 780 780 780 780
8 300 300 300 300 300 300
12 780 780 780 780 780 780
BJTP - 24 10 300 300 300 300 300 300
12 300 300 300 300 300 300 8 683 683 683 683 683 683

BJTD - 40 10 683 754 683 683 683 683


8 150 150 150 150 150 150
12 683 910 683 819 774 709 PERENCANA:
BJTD - 40 10 150 165 150 150 150 150
13 725 982 683 891 819 774
12 150 200 150 180 170 155
16 890 1209 685 1092 1027 956
13 160 215 150 195685 180 170
19 1047 1437 1001 1300 1209 1136
16 195 365 190 240 225 210
22 1228 1664 1164 1528 1411 1320
19 230 315 220 285 265 250
25 1391 1892 1320 1728 1593 1482
22 270 365 275 335 310 290
29 1619 2184 1547 2002 1846 1729
25 305 415 290 380 350 290 KETERANGAN:
32 1775 2412 1684 2210 2048 1911
29 355 480 340 440 405 380
36 1983 2711 1852 2483 2301 2139
32 390 530 370 485 450 420
36 435 595 415 545 505 470
CATATAN (NOTES) :
1. JUMLAH SAMBUNGAN YANG DISAMBUNG PADA SUATU TEMPAT TIDAK BOLEH MELEBIHI
50 % DARI JUMLAH TULANGAN TOTAL.
1. THE DEVELOPMENT LENGHT ldh FOR BSTR WITH STANSARD COGS OR HOOKS IS 2. PANJANG SAMBUNGAN LEWATAN PADA TABEL DIATAS HARUS DITAMBAH 20%
THE CREATER OF, Bdb, 150 mm AND fy.db/ (5.4 SQRT(f'c)) FOR DEFORMED BSTR, UNTUK SUATU BERKAS TIGA BATANG DAN DITAMBAH 33 % UNTUK SUATU
AND 20 db FOR PLAIN BSTR, IN ACCORDANCE WITH THE CURRERNT INDONESIAN BERKAS EMPAT BATANG. (THE SPLICE LENGTHS USTED IN THE TABLE SHALL BE JUDUL GAMBAR SKALA
CONCRETE CODE d. 3.14.6.2 INCREASED BY 20 % FOR A 3 BAR BUNDLE AND 33 % FOR A 4 BAR BUNDLE)
3. SAMBUNGAN TULANGAN DENGAN DIAMETER > 36 mm HARUS DILAKUKAN STANDAR DETAIL NTS
2. APPROXIMATE CONVERSION FROM CUBE STRENGTH TO CYLINDER STRENGTH f'c
DENGAN SAMBUNGAN MEKANIS ATAU SAMBUNGAN LAS.
= 0.85 f'cu
(SPLICES FOR BSTR WITH A DIAMETER > 36 mm SHALL BE MECHANICAL OF
WELDET SPLICES)
4. BILA db1 = db2 MAKA PANJANG l MINIMUM DITETAPKAN BERDASARKAN DIAMETER
TERKECIL.
(IF db1 = db2 THEN THE MINIMUM LENGTH l SHALL BE BASED ON THE SMALLER
DIAMETER) KODE NO.LMBR JUMLAH

STR 03 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PROYEK:

KAIT STANDAD UNTUK TULANGAN UTAMA KAIT STANDARD UNTUK SENGKANG DAN KAIT PENGIKAT
(STANDARD HOOK FOR MAIN REINFORCEMENT) (STANDARD HOOK FOR LIGATURES AND TIE HOOKS) GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
DIAMETER DIAMETER DIAMETER DIAMETER EKONOMIKA
KAIT ILUSTRASI TULANGAN BENGKOKAN KAIT ILUSTRASI TULANGAN BENGKOKAN
(HOOK) (SHAPE) (DIA.OF MINIMUM lt (HOOK) (SHAPE) (DIA.OF MINIMUM lt KAMPUS
REINF.) (MIN.BEN MINIMUM REINF.) (MIN.BEN MINIMUM CONDONG CATUR
DIA.) D DIA.) D
db db
DISETUJUI:

10 - 25 mm 6 db 8 - 16 mm 4 db
yang terbesar yang terbesar
antara (the 135 A antara (the
180 A db 1 D larger of) 4 db 135 A db 1 D larger of) 6 db
29 - 36 mm 8 db atau (or) 60 atau (or) 75
lt mm mm
lt 19 - 25 mm 6 db
40 - 55 mm 10 db
MENGETAHUI:

10 - 25 mm 6 db 8 - 16 mm 4 db
yang terbesar 8 db atau (OR)
135 A antara (the 90 A 75 mm
135 A db 1 D larger of) 6 db 90 A db 1 D
29 - 36 mm 8 db atau (or) 75 lt
mm
lt 19 - 25 mm 6 db
12 db PERENCANA:
40 - 55 mm 10 db

10 - 25 mm 6 db
90 A
90 A db 1 D 6 db
29 - 36 mm 8 db KETERANGAN:
lt

40 - 55 mm 10 db

JUDUL GAMBAR SKALA

STANDAR DETAIL NTS

KODE NO.LMBR JUMLAH

STR 04 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PROYEK:
2. BALOK (BEAMS)
GEDUNG EKSTENSI
PEMUTUSAN TULANGAN UNTUK BALOK INDUK DAN BALOK ANAK PEMUTUSAN TULANGAN UNTUK TIE BEAM FAKULTAS BISNIS DAN
(TERMINATION OF REINF.FOR MAIN BEAMS AND SECONDARY BEAMS) (TERMINATION OF REINF.FOR TIE BEAMS) EKONOMIKA

LIHAT DETAIL PENJANGKARAN SEBAGAI


KAMPUS
MODIFIKASI DETAIL INI
(REFER TO ANCHORAGE DETAILS FOR
THIS DETAIL) mukakolom
CONDONG CATUR
(FACE OF COLUMN)

ln
ln /4 ln /2 ln /4 DISETUJUI:
> 12.db
ldh tumpuan lapangan tumpuan ldh
hb (support) (span) (support)

0.125 ln 0.125 ln
hb
ln /4 ln /2 ln /4
tumpuan lapangan ( SPAN) tumpuan
(support) (support)
ln 0.125 ln 0.125 ln

l
muka pile cap
(FACE OF PILE CAP)
LIHAT DETAIL PENJANGKARAN SEBAGAI
MODIFIKASI DETAIL INI
(REFER TO ANCHORAGE DETAILS FOR
THIS DETAIL)
BALOK ANAK MENGETAHUI:
(SECONDARY BEAM)

> 12.db hb

0.125 ln 0.125 ln

ln /4 ln /2 ln /4 mukakolom
tumpuan lapangan ( SPAN) tumpuan
(FACE OF COLUMN)
(support) (support)
ln
l PERENCANA:
ln
ln /4 ln /2 ln /4
ldh tumpuan lapangan tumpuan ldh
LIHAT DETAIL PENJANGKARAN SEBAGAI
MODIFIKASI DETAIL INI
(support) (span) (support)
(REFER TO ANCHORAGE DETAILS FOR
THIS DETAIL)
BALOK ANAK
(SECONDARY BEAM)
hb

0.125 ln 0.125 ln

> 12.db hb
pondasi / pile cap pondasi / pile cap
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP) KETERANGAN:
0.125 ln 0.125 ln

ln /4 ln /2 ln /4 muka pile cap


tumpuan lapangan ( SPAN) tumpuan (FACE OF PILE CAP)
(support) (support)
ln
l

LIHAT DETAIL PENJANGKARAN SEBAGAI


MODIFIKASI DETAIL INI
(REFER TO ANCHORAGE DETAILS FOR
THIS DETAIL)
BALOK ANAK
(SECONDARY BEAM)
JUDUL GAMBAR SKALA

STANDAR DETAIL NTS


> 12.db hb

0.125 ln 0.125 ln

ln /4 ln /2 ln /4
tumpuan lapangan ( SPAN) tumpuan
(support) (support)
ln
KODE NO.LMBR JUMLAH
l

STR 05 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PROYEK:

LETAK SAMBUNGAN LEWATAN UNTUK TULANGAN BALOK PENGATURAN SENGKANG UNTUK BALOK GEDUNG EKSTENSI
(LOCATION OF LAP SPLICE FOR BEAM REINFORCEMENT) (REQUIREMENTS FOR TIES IN BEAMS) FAKULTAS BISNIS DAN
EKONOMIKA
penampang kritis
(CRITICAL SECTION)
1. TULANGAN BALOK UMUM
1. REINFORCEMENT OF BEAMS GENERALLY ≤ 50 MM KAMPUS
CONDONG CATUR
penampang kritis
(CRITICAL SECTION)
hb

DISETUJUI:
ln /4 ln /2 ln /4
tumpuan lapangan ( SPAN) tumpuan
(support) (support)
hb
ln
l
≥ 2 hb * * ≥ 2 hb

ln penampang kritis
(CRITICAL SECTION)
l
≤ 50 MM

* JARAK SENGKANG ADALAH TERKECIL ANTARA hb/4 DAN 100 MM


hb
(THE SPACING TO BE THE SMALLER OF hb/4 AND 100 MM)
MENGETAHUI:

ln /2
penampang kritis tumpuan jepit
(CRITICAL SECTION)
(fixed end)
ln
l

muka kolom
(FACE OF COLUMN
≥ 2 hb * * ≥ 2 hb
ln /4 ln /2 ln /4 PERENCANA:
tumpuan lapangan ( SPAN) tumpuan
pondasi / pile cap
ln pondasi / pile cap ldh (support) (support)
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP)
muka pile cap
(FACE OF PILE CAP)

l hb

* JARAK SENGKANG ADALAH TERKECIL ANTARA hb/4 DAN 100 MM < 50 MM


(THE SPACING TO BE THE SMALLER OF hb/4 AND 100 MM) pondasi / pile cap pondasi / pile cap
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP)
muka pile cap
penampang kritis
(CRITICAL SECTION)
(FACE OF PILE CAP)
KETERANGAN:
l
ln
≥ 2 hb * * ≥ 2 hb
jarak maksimum
sengkang 1/2 hb
MAX/MIN TIE
SPACING 1/2 hb

ln
pondasi / pile cap pondasi / pile cap ln /4 ln /2 ln /4
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP) tumpuan lapangan ( SPAN) tumpuan
muka pile cap (support) (support)
(FACE OF PILE CAP) JUDUL GAMBAR SKALA

hb STANDAR DETAIL NTS

* JARAK SENGKANG ADALAH TERKECIL ANTARA hb/4 DAN 100 MM < 50 MM


(THE SPACING TO BE THE SMALLER OF hb/4 AND 100 MM)
muka pile cap
CATATAN :
(FACE OF PILE CAP)
JIKA LETAK SAMBUNGAN BERBEDA DARI DETAIL STANDARD INI DAN ATAU TIDAK SESUAI
pondasi / pile cap pondasi / pile cap
DENGAN GAMBAR MAKA SEGALA PERUBAHAN HARUS MELALUI PERSETUJUAN PERENCANA.
(FOUNDATION/PILE CAP) (FOUNDATION/PILE CAP) KODE NO.LMBR JUMLAH
(IF THE SPUCE LOCATION DEFERS FROM THIS STANDARD DETAIL AND OR IS NOT IN
ACCORDANCE WITH THE DESIGN DRAWING THEN ALL CGANGES SHALL BE A ACCORDANCE
WITH THE DESIGN INSTRUCTIONS). STR 06 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PROYEK:

DETAIL SENGKANG JARAK ANTARA TULANGAN UTAMA GEDUNG EKSTENSI


(TIE DETAILS) (GAP BETWEEN MAIN REINFORCEMENT) FAKULTAS BISNIS DAN
EKONOMIKA

6d 6d 6d
KAMPUS
CONDONG CATUR

b1
DISETUJUI:
1. b1 = JARAK BERSIH ANTARA TULANGAM
(CLEAR DISTANCE BETWEN REINFORCEMENT)
H > 1.5 d
6d
> 1.25 d DARI UKURAN AGREGAT MAKSIMUM
(OF THE MAXIMUM AGREGATE SIZE)
b1 > 25 MM
UMUM 2. DIPAKAI TULANGAN TAMBAHAN SEBAGAI KAIT UNTUK
MENJAGA JARAK ANTARA BATANG TULANGAN DIBAWAH INI
(GENERAL) b1 b1 (USE OF ADDITIONAL REINFORCEMENT AS HOOKS TO
MAINTAIN THE SPACING BETWEEN THE LAYER OF
REINFORCEMENT BELOW THIS ONE) MENGETAHUI:

TULANGAN TAMBAHAN (SENGKANG)


b1 (ADDITIONAL REINFORCEMENT TIES)

x x x

PERENCANA:
DUA SENGKANG DAPAT DIPASANG PADA b1
PENAMPANG MELINTANG BALOK BILA
DIPERLUKAN
(DOUBLE TIES TO BE FIXED IN
A BEAM SECTION IF REQUIRED)

TULANGAN TAMBAHAN (SENGKANG)


6d 8 d MIN 8 d MIN (ADDITIONAL REINFORCEMENT TIES)

KETERANGAN:
8 d MIN

JUDUL GAMBAR SKALA

STANDAR DETAIL NTS

ALTERNATIF DENGAN PELAT DIATAS BALOK


(ALTENATIVE FOR SLAB ON OP OF BEAM)

KODE NO.LMBR JUMLAH

STR 07 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PROYEK:

PEMUTUSAN TULANGAN UNTUK BALOK CANTILEVER PERBEDAAN KETINGGIAN DAN AS BALOK GEDUNG EKSTENSI
9TERMINATION OF REINF. FOR CANTILEVER BEAMS) (STEPS IN ELEVATION AND AXIS OF BEAMS) FAKULTAS BISNIS DAN
EKONOMIKA

1. PERBEDAAN KETINGGIAN
(STEP IN ELEVATION)
12 KAMPUS
penampang kritis 2 dc/3 min 200 MAX CONDONG CATUR
(CRITICAL SECTION)
12

50 MM 2 dc/3 min 200 MAX


DISETUJUI:

8d MIN

8d MIN
hb

2 + 5d
ln /2 ln /2 12 12
tumpuan jepit
Ujung bebas(FREE END)
(fixed end)
ln
l
12
50 MM 50 MM MENGETAHUI:

1
6 MIN
A A/Dc < 1/6 PERENCANA:

Dc

2. PERBEDAAN AS
(STEP IN AXIS)
KETERANGAN:
TAMPAK ATAS
(PLAN VIEW

PENJANGKARAN KE KOLOM
(ANCHORAGE TO COLUMN) JUDUL GAMBAR SKALA
TAMPAK ATAS
(PLAN VIEW) STANDAR DETAIL NTS
1
6 MIN

KODE NO.LMBR JUMLAH


PENJANGKARAN KE KOLOM
(ANCHORAGE TO COLUMN)
STR 08 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

3. KOLOM (COLUMNS)
PROYEK:

LETAK SAMBUNGAN LEWATAN UNTUK TULANGAN KOLOM PENGATURAN SENGKANG UNTUK KOLOM GEDUNG EKSTENSI
(LOCATION OF LAP SPLICES FOR COLUMN REINFORCEMENT) (REQUIREMENTS FOR COLUMN TIES) FAKULTAS BISNIS DAN
EKONOMIKA

≥ 12 db
≤ ≤
hk ≥ bk KAMPUS
CONDONG CATUR
tinggi balok terbesar pada kolom tersebut
BALOK (DEPTH OF LARGEST BEAM WHICH IS
SUPPORTED BY THE COLUMN)
(BEAMS)

DISETUJUI:
(SUPPORT)

(SUPPORT)
tumpuan

tumpuan
Sisi Bawah Balok Terbesar Yang Menumpu
Hn/4

Hn/4
≥ Pada Kolom tsb
(BOTTOM EDGE OF LARGEST BEAM WHICH
IS SUPPORTED BY THE COLUMN)

lokasi penyambungan tulangan


(LOCATION OF REINF.SPLICE)
45 db

45 db
lapangan

lapangan
(SPAN)

(SPAN)
Hn/2

Hn/2
Hn

Hn
MENGETAHUI:

Sengkang dalam join balok-kolom (


(SUPPORT)

(SUPPORT)
jika tidak ditentukan, maka dipasang
tumpuan

tumpuan
Hn/4

Hn/4
sengkang seperti sengkang tumpuan
kolom )

pertemuan balok kolom pertemuan balok kolom
(BEAM COLUMN JOINT) (BEAM COLUMN JOINT) BALOK
BALOK (BEAMS)
(BEAMS) PERENCANA:

(SUPPORT)

(SUPPORT)
tumpuan

tumpuan
Sisi Bawah Balok Terbesar Yang Menumpu
Hn/4

Hn/4
Pada Kolom tsb
(BOTTOM EDGE OF LARGEST BEAM WHICH
IS SUPPORTED BY THE COLUMN)

lokasi penyambungan tulangan


(LOCATION OF REINF.SPLICE)
45 db

45 db
Hn

Hn
lapangan

lapangan
KETERANGAN:
(SPAN)

(SPAN)
Hn/2

Hn/2
(SUPPORT)

(SUPPORT)
Pile Cap / Pondasi
tumpuan

tumpuan
(PILE CAP/FOUNDATION)
Hn/4

hk ≥ bk ≥ Hn/4

JUDUL GAMBAR SKALA

pondasi / pile cap


(FOUNDATION/PILE CAP)
STANDAR DETAIL NTS
jarak maksimum sengkang hb/2
(MAXIMUM TIE SPACING)

≤ ≤

≥ ≥
KODE NO.LMBR JUMLAH

STR 09 27
STANDARD DETAIL PEKERJAAN KONSTRUKSI BETON
(STANDARD DETAILS FOR CONCRETE CONSTRUCTION)

PROYEK:

ALTERNATIF SENGKANG DAN PENGEKANG GEDUNG EKSTENSI


(ALTERNATIVE TIES & CONFINEMENT REINFORCEMENT) FAKULTAS BISNIS DAN
EKONOMIKA

KAMPUS
KOLOM DENGAN TULANGAN PENGEKANG CONDONG CATUR
(COLUMNS WITH CONFINEMENT REINFORCEMENT)

DISETUJUI:

MENGETAHUI:

(TYPE A) (TYPE B) (TYPE C)

PERENCANA:

135A0'0

KETERANGAN:

UNTUK KOLOM PERSEGI BOLEH DIGUNAKAN


SALAH SATU TYPE SENGKANG INI
(FOR SQUARE COLUMNS ONLY ONE TYPE JUDUL GAMBAR SKALA
OF TIE MAY BE USED)
STANDAR DETAIL NTS

KODE NO.LMBR JUMLAH

STR 10 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA

+16.00 KAMPUS
ATAP
CONDONG CATUR

+12.00 DISETUJUI:
LANTAI 4

+8.00
LANTAI 3

+4.00 MENGETAHUI:
LANTAI 2

±0.00
LANTAI 1

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000 KETERANGAN:

1 2 3 4 5 6 7 8

JUDUL GAMBAR SKALA

PORTAL 1:200
STRUKTUR

PORTAL STRUKTUR
SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 11 27
PROYEK:

F2 F2 F2 F2 F2 F2 F2 F2 GEDUNG EKSTENSI
F4 FAKULTAS BISNIS DAN
C EKONOMIKA

KAMPUS
CONDONG CATUR
12000

F4 DISETUJUI:

F2 F2 F2 F2 F2 F2 F2 F2
F4
B

MENGETAHUI:
5500

F4 F3 F3 F3 F3 F3 F3 F3 F3
A

PERENCANA:

8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
FONDASI

RENCANA FONDASI
SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 12 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
K6 K1 K1 K1 K1 K1 K1 K1 K1
KAMPUS
CONDONG CATUR
12000

DISETUJUI:

K6

B
K6 K1 K1 K1 K1 K1 K1 K1 K1
MENGETAHUI:
5500

A
K6 K3 K3 K3 K3 K3 K3 K3 K3
PERENCANA:

8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
KOLOM LANTAI 1

RENCANA KOLOM LANTAI 1


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 13 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
K6 K2 K2 K2 K2 K2 K2 K2 K2
KAMPUS
CONDONG CATUR
12000

DISETUJUI:

K6

B
K6 K2 K2 K2 K2 K2 K2 K2 K2
MENGETAHUI:
5500

A
K6 K3 K3 K3 K3 K3 K3 K3 K3
PERENCANA:

8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
KOLOM LANTAI 1

RENCANA KOLOM LANTAI 2 dan 3


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 14 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA
K6 K2 K2 K2 K2 K2 K2 K2 K2
KAMPUS
CONDONG CATUR
12000

DISETUJUI:

K6

B
K6 K2 K2
MENGETAHUI:
5500

A
K6 K3 K3 K3 K3 K3 K3 K3 K3
PERENCANA:

8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
KOLOM LANTAI 2

RENCANA KOLOM LANTAI 4


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 15 27
PROYEK:

GEDUNG EKSTENSI
S4 S3 S3 S3 S3 S3 S3 S3 FAKULTAS BISNIS DAN
C EKONOMIKA

KAMPUS
S4

CONDONG CATUR

S4
12000

DISETUJUI:
1800

S2

S2

S2

S2

S2

S2

S2

S2
S4
5000

S4

S4 S3 S3 S3 S3 S3 S3 S3
B

MENGETAHUI:
5500

S4

S4

S4

S4

S4

S4

S4

S4

S4
S4 S3 S3 S3 S3 S3 S3 S3
A

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
SLOOF

RENCANA SLOOF
SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 16 27
PROYEK:

GEDUNG EKSTENSI
B12 FAKULTAS BISNIS DAN
C B9 B9 B9 B9 B9 B9 B9 EKONOMIKA

KAMPUS
B7 B7 B7 B7 B7 B7 B7
CONDONG CATUR
B12

B14

B2

B2
B2

B2

B2

B2

B2
B2
B7 B7 B7 B7 B7 B7 B7
12000

DISETUJUI:
1800

B12

B7 B7 B7 B7 B7 B7 B7
5000

B12

B12 B9 B9 B9 B9 B9 B9 B9
B

MENGETAHUI:
B12

B7 B7 B7 B7 B7 B7 B7
B8

B8

B8

B8

B8

B8

B8

B8
5500

B12 B9 B9 B9 B9 B9 B9 B9
A

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
BALOK +4.00

RENCANA BALOK +4.00


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 17 27
PROYEK:

GEDUNG EKSTENSI
B12 FAKULTAS BISNIS DAN
C B9 B9 B9 B9 B9 B9 B9 EKONOMIKA

KAMPUS
B13 B13 B13 B13 B13 B13 B13
CONDONG CATUR
B12

B14

B2

B2
B2

B2

B2

B2

B2
B2
B13 B13 B13 B13 B13 B13 B13
12000

DISETUJUI:
1800

B12

B13 B13 B13 B13 B13 B13 B13


5000

B12

B12 B9 B9 B9 B9 B9 B9 B9
B

MENGETAHUI:
B12

B13 B13 B13 B13 B13 B13 B13


B8

B8

B8

B8

B8

B8

B8

B8
5500

B12 B9 B9 B9 B9 B9 B9 B9
A

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
BALOK +4.00

RENCANA BALOK +8.00 dan +12.00


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 18 27
PROYEK:

GEDUNG EKSTENSI
B12 FAKULTAS BISNIS DAN
C B25 B25 B25 B25 B25 B25 B25 EKONOMIKA

KAMPUS
CONDONG CATUR
B12

B2
B2
12000

DISETUJUI:
B12
5000

B12

B12
B

MENGETAHUI:
B12

B8

B8
5500

B12 B25 B25 B25 B25 B25 B25 B25


A

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
RING BALOK +8.00

RENCANA RING BALOK +16.00


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 19 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA

A2 A2 A2 A2 A2 A2 A2 KAMPUS
TANGGA CONDONG CATUR

A2 A2 A2 A2 A2 A2 A2
12000

DISETUJUI:
1800

A1
A2 A2 A2 A2 A2 A2 A2
5000

A1
A2 A2 A2 A2 A2 A2 A2
B
A2 A2 A2 A2 A2 A2 A2 MENGETAHUI:
5500

A1
A2 A2 A2 A2 A2 A2 A2
A

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
PLAT +4.00

RENCANA PLAT +4.00


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 20 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
C EKONOMIKA

A1 A1 A1 A1 A1 A1 A1 KAMPUS
TANGGA CONDONG CATUR

A1 A1 A1 A1 A1 A1 A1
12000

DISETUJUI:
1800

A1
A1 A1 A1 A1 A1 A1 A1
5000

A1
A1 A1 A1 A1 A1 A1 A1
B

A1 A1 A1 A1 A1 A1 A1 MENGETAHUI:
5500

A1
A1 A1 A1 A1 A1 A1 A1
A

PERENCANA:

2850 8000 8000 8000 8000 8000 8000 8000

1 2 3 4 5 6 7 8

KETERANGAN:

JUDUL GAMBAR SKALA

RENCANA 1:200
PLAT +4.00

RENCANA PLAT +8.00 dan +12.00


SKALA 1 : 200 KODE NO.LMBR JUMLAH

STR 21 27
PROYEK:

MUKA TANAH / BASEMENT MUKA TANAH / BASEMENT MUKA TANAH / BASEMENT


GEDUNG EKSTENSI
SLOOF SLOOF SLOOF FAKULTAS BISNIS DAN
EKONOMIKA

KOLOM KOLOM KOLOM


KAMPUS
CONDONG CATUR

DISETUJUI:

2400

2400

2400
D10 - 100
D10 - 150 D10 - 100
D16 - 100
D16 - 150 D13 - 100

800

600

600
500

400

400
MENGETAHUI:

3000 2200 1800

KOLOM PERENCANA:

KOLOM

D13 - 100
D10 - 100
D16 - 150
D10 - 150

1800
KOLOM

2200
D10 - 100

D10 - 150
D10 - 100

D16 - 100

KETERANGAN:
3000

D13 - 100

D16 - 150

D10 - 100 FONDASI F4

FONDASI F3
JUDUL GAMBAR SKALA

D16 - 100 DETAIL FONDASI 1:30

FONDASI F2
DETAIL FONDASI
SKALA 1 : 50 KODE NO.LMBR JUMLAH

STR 22 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA

TYPE
KAMPUS
KOLOM K1 KOLOM K2 CONDONG CATUR
LANTAI
TUMPUAN LAPANGAN TUMPUAN LAPANGAN

DISETUJUI:

BASEMENT

700

700

700

700
700 700 700 700

TUL. UTAMA 26 D25 26 D25 16 D25 16 D25

SENGKANG D10 - 100 D10 - 150 D10 - 100 D10 - 150

DIMENSI 700 x 700 700 x 700 MENGETAHUI:

TYPE
KOLOM K3 KOLOM K6
LANTAI
TUMPUAN LAPANGAN TUMPUAN LAPANGAN

PERENCANA:

BASEMENT

600

600
700

700

600 600
700 700

TUL. UTAMA 20 D19 20 D19 16 D19 16 D19

SENGKANG D10 - 100 D10 - 150 D10 - 100 D10 - 150


KETERANGAN:

DIMENSI 700 x 700 600 x 600

JUDUL GAMBAR SKALA

DETAIL KOLOM 1:30

DETAIL KOLOM
SKALA 1 : 50 KODE NO.LMBR JUMLAH

STR 23 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA

KAMPUS
CONDONG CATUR

DISETUJUI:

TYPE SLOOF S2 300x700 SLOOF S3 300x600 SLOOF S4 300x500


POSISI TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN

500

500

500
POTONGAN

600

600

600
700

700

700
MENGETAHUI:

300 300 300


300 300 300
300 300 300

TUL. ATAS 5 D19 5 D19 5 D19 4 D19 4 D19 4 D19 3 D19 3 D19 3 D19

TUL. BAWAH 5 D19 5 D19 5 D19 4 D19 4 D19 4 D19 3 D19 3 D19 3 D19
PERENCANA:
SENGKANG 2 D10 - 100 D10 - 200 2 D10 - 100 D10 - 100 D10 - 200 D10 - 100 D10 - 100 D10 - 200 D10 - 100

TUL. PINGGANG 4 D10 2 D10 2 D10

KETERANGAN:

JUDUL GAMBAR SKALA

DETAIL SLOOF 1:30

DETAIL SLOOF
SKALA 1 : 50 KODE NO.LMBR JUMLAH

STR 24 27
TYPE BALOK B2 500x800 BALOK B7 300x600 BALOK B8 400x600
POSISI TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN

POTONGAN

600

600

600

600

600

600
800

800

800
PROYEK:

300 300 300 400 400 400


GEDUNG EKSTENSI
500 500 500
FAKULTAS BISNIS DAN
EKONOMIKA
TUL. ATAS 13 D25 5 D25 13 D25 6 D19 3 D19 6 D19 5 D25 3 D25 5 D25
TUL. BAWAH
KAMPUS
5 D25 10 D25 5 D25 3 D19 6 D19 3 D19 3 D25 3 D25 3 D25
CONDONG CATUR
SENGKANG 2 D10 - 100 1.5 D10 - 100 2 D10 - 100 D10 - 100 D10 - 150 D10 - 100 D10 - 100 D10 - 150 D10 - 100

TUL. PINGGANG 4 D10 2 D10 2 D10

DISETUJUI:

TYPE BALOK B9 400x600 BALOK B12 300x500 BALOK B13 300x600


POSISI TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN

500

500

500
POTONGAN
600

600

600

600

600

600
MENGETAHUI:
300 300 300
400 400 400 300 300 300

TUL. ATAS 5 D25 2 D25 5 D25 3 D25 3 D25 3 D25 6 D16 2 D16 6 D16
TUL. BAWAH 2 D25 3 D25 2 D25 3 D25 3 D25 3 D25 3 D16 6 D16 3 D16
PERENCANA:
SENGKANG D10 - 100 D10 - 150 D10 - 100 D10 - 100 D10 - 150 D10 - 100 D10 - 100 D10 - 150 D10 - 100

TUL. PINGGANG 2 D10 2 D10 2 D10

TYPE BALOK B14 300x500 BALOK B25 300x700


POSISI TUMPUAN KIRI LAPANGAN TUMPUAN KANAN TUMPUAN KIRI LAPANGAN TUMPUAN KANAN KETERANGAN:
500

500

500

POTONGAN
700

700

700
300 300 300

300 300 300

JUDUL GAMBAR SKALA

DETAIL BALOK 1:30


TUL. ATAS 3 D16 3 D16 3 D16 3 D25 3 D25 3 D25

TUL. BAWAH 3 D16 3 D16 3 D16 3 D25 3 D25 3 D25

SENGKANG D10 - 100 D10 - 100 D10 - 100 D10 - 100 D10 - 150 D10 - 100

TUL. PINGGANG 2 D10 4 D10


DETAIL BALOK
SKALA 1 : 50 KODE NO.LMBR JUMLAH

STR 25 27
PROYEK:

GEDUNG EKSTENSI
FAKULTAS BISNIS DAN
EKONOMIKA

KAMPUS
CONDONG CATUR

PLAT LANTAI T = 120 MM PLAT LANTAI T = 120 MM


A1 TULANGAN ATAS TULANGAN BAWAH A2 PLAT LANTAI T = 150 MM DISETUJUI:
D10 - 400

0.25 x S
0.3 x S

D10 - 400
D10 - 125 MENGETAHUI:
D10 - 400

D10 - 400 D10 - 400 L D10 - 400 L D10 - 125 L


D10 - 400
D10 - 400

D10 - 400

D10 - 200

D10 - 200
PERENCANA:

0.25 x S
0.3 x S
D10 - 400

0.3 x S 0.3 x S 0.25 x S 0.25 x S


S S S KETERANGAN:

S = BENTANG PENDEK S = BENTANG PENDEK


L = BENTANG PANJANG L = BENTANG PANJANG

JUDUL GAMBAR SKALA

DETAIL PLAT 1:30

DETAIL PLAT
SKALA 1 : 50 KODE NO.LMBR JUMLAH

STR 26 27
BALOK TANGGA BT 150x400
BORDES BORDES
D13-200

PROYEK:
D13-200 D13-200 D13-200

GEDUNG EKSTENSI
BALOK BT 150x400
FAKULTAS BISNIS DAN
D13-200
EKONOMIKA
10
D10-200 KAMPUS
9 11 CONDONG CATUR
TEBAL PLAT 150mm
8 12

15
0
DISETUJUI:

7 13

6 14
D13-200

5 15
D10-200
16
TEBAL PLAT 150mm MENGETAHUI:
UP

15
17

0
DETIL PLAT TANGGA
TEBAL PLAT 150mm
18
D13-200
19
D10-200 PERENCANA:
20 LANTAI
DOWN

DETIL TANGGA
SLOOF S4
KETERANGAN:

TYPE BALOK TANGGA BT 150x400


POSISI TUMPUAN KIRI LAPANGAN TUMPUAN KANAN

JUDUL GAMBAR SKALA


400

400

400

POTONGAN
DETAIL TANGGA 1:30
150 150 150

TUL. ATAS 2 D16 2 D16 2 D16


TUL. BAWAH 2 D16 2 D16 2 D16

SENGKANG D10 - 100 D10 - 100 D10 - 100 DETAIL TANGGA ±0.00 s/d +16.00
SKALA 1 : 50 KODE NO.LMBR JUMLAH
TUL. PINGGANG -

STR 27 27

Anda mungkin juga menyukai