Client Project Title Package Doc.title. Doc No.

: : : : :

PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of BFW, Daerator & Condensate

Revision Prep. By Checked Approved Date

28/03/2011

BILL OF MATERIAL
N0 86 87

DESCRIPTION
ORIFICE FLANGE ORIFICE FLANGE 4" 3"

SIZE
300#, Sch.Std, WN-RF, FS, A-105 300#, WN-RF, SCH.40, Forged Steel, A105

SPECIFICATION

UNIT
Pcs Pcs

Q'TY
4 2

Page 2 of 15

Client Project Title Package Doc.title. Doc No.

: : : : :

PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Dummy Quench & charge System (Stage 1, Material Tambahan)

Revision Prep. By Checked Approved Date

23/05/2011

BILL OF MATERIAL
NO DESCRIPTION SIZE SPECIFICATION UNIT QT'Y

Page 3 of 15

Client Project Title Package Doc.title. Doc No.

: PT. Krakatau Steel (Persero) : Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant : Mechanical And Piping : Bill Of Material Modification of ECW Cooling Tower :

Revision Prep. By Checked Approved Date

24/05/2011

BILL OF MATERIAL
NO 93 94 DESCRIPTION ORIFICE FLANGE ORIFICE FLANGE 6" 28" SIZE A105, 300#, WN-RF, FS, ANSI B16.36 A105, 300#, WN-RF, FS, SCH.40, ANSI B16.36 SPECIFICATION UNIT Pcs Pcs QT'Y 2 2

Page 4 of 15

Client Project Title Package Doc.title. Doc No.

: : : : :

PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Heat Recuperator & Outlet Duct

Revision Prep. By Checked Approved Date

27/04/2011

BILL OF MATERIAL
NO DESCRIPTION SIZE SPECIFICATION UNIT Q'TY

Page 5 of 15

Client Project Title Package Doc.title. Doc No.

: PT. Krakatau Steel (Persero) : Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant : Mechanical And Piping : Bill Of Material Modification of Medium Pressure System :

Revision Prep. By Checked Approved Date

21/04/2011

BILL OF MATERIAL
No

Description

Size (inc)

Remarks

Unit

Quantity

Page 6 of 15

Client Project Title Package Doc.title. Doc No.

: PT. Krakatau Steel (Persero) : Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant : Mechanical And Piping : Bill Of Material Modification of Medium Pressure System (Tambahan) :

Revision Prep. By Checked Approved Date

11/05/2011

BILL OF MATERIAL
No Description Size (inc) Remarks Unit Quantity

Page 7 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of N2 Skid & Discharge Solid Cut off Valve / Sealing Revision Prep. By Checked Approved Date

BILL OF MATERIAL
No Description Size (inch) Specification Unit

Page 8 of 15
2

11/05/2011

QT'Y

Page 9 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Quench Gas Reduction Revision Prep. By Checked Approved Date

BILL OF MATERIAL
No Description Size (inc) Remarks Unit

Page 10 of 15
2

31/03/2011

Quantity

Page 11 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Recycle Gas Revision Prep. By Checked Approved Date

BILL OF MATERIAL
N0 32

DESCRIPTION
ORIFICE FLANGE 24"

SIZE
300#, WN-RF, FS, A105, ANSI B16.36

SPECIFICATION

UNIT
Pcs

Page 12 of 15
1

28/03/2011

Q'TY
4

Page 13 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification Of Steam Drum 221 F1 & F2 Revision Prep. By Checked Approved Date

BILL OF MATERIAL
No

Description

Size (inc)

Remarks

Unit

Page 14 of 15
1

02/05/2011

Quantity

Page 15 of 15

Client Project Title Package Doc.title. Doc No.

: : : : :

PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of BFW, Daerator & Condensate

Revision Prep. By Checked Approved Date

28/03/2011

BILL OF MATERIAL
N0

DESCRIPTION
ORIFICE FLANGE ORIFICE FLANGE ORIFICE FLANGE ORIFICE FLANGE ORIFICE FLANGE 3" 4" 6" 24" 28"

SIZE
300#, WN-RF, SCH.40, Forged Steel, A105 300#, Sch.Std, WN-RF, FS, A-105 A105, 300#, WN-RF, FS, ANSI B16.36 300#, WN-RF, FS, A105, ANSI B16.36 A105, 300#, WN-RF, FS, SCH.40, ANSI B16.36

SPECIFICATION

UNIT
Pcs Pcs Pcs Pcs Pcs

Q'TY
2 4
2 4 2

87 86 93 32 94