Anda di halaman 1dari 14

LEGENDA

15.00 m

2.00 m 11.00 m 2.00 m

TAHUN ANGGARAN
2024
PEMBERI TUGAS

3.00 m
4.50 m

NAMA KEGIATAN

1.50 m
...

KONSULTAN PERENCANA :

4.50 m
4.50 m

PENANGGUNG JAWAB :
1.25 m
19.00 m

19.00 m
...

2.50 m
DIREKTUR
1.25 m

...
TEAM LEADER

2.50 m
2.50 m

DIPERIKSA OLEH :
...
DIGAMBAR OLEH :
...
REVISI
5.00 m

5.00 m
NAMA GAMBAR

3.00 m 3.00 m 2.00 m 2.00 m 5.00 m

15.00 m
SKALA KODE NO.GBR
LEGENDA

15.00 m

2.00 m 3.00 m 3.00 m 3.50 m 3.50 m

TAHUN ANGGARAN
2024
PEMBERI TUGAS

3.00 m
4.50 m

NAMA KEGIATAN

1.50 m
2.25 m

...

KONSULTAN PERENCANA :

4.50 m
2.25 m

PENANGGUNG JAWAB :
19.00 m

19.00 m
...
2.50 m

DIREKTUR

5.00 m
...
TEAM LEADER
2.50 m

DIPERIKSA OLEH :
...
DIGAMBAR OLEH :
...
REVISI
5.00 m

5.00 m
0.60 m

NAMA GAMBAR

5.00 m 5.00 m 5.00 m

15.00 m
SKALA KODE NO.GBR
HARGA SATUAN TOTAL
NO. URAIAN PEKERJAAN VOLUME
(Rp.) HARGA (Rp.)

A PEKERJAAN BACKDROP HPL


1 PEKERJAAN PEMBUATAN BACKDROP LOBBY 21.755 M2 Rp 1,600,000.00 Rp 34,808,000.00
2 PEKERJAAN PEMBUATAN BACKDROP KANIT RESKRIM 9.405 M2 Rp 1,600,000.00 Rp 15,048,000.00
3 PEKERJAAN PEMBUATAN BACKDROP RUANG RAPAT 28.38 M2 Rp 1,600,000.00 Rp 45,408,000.00
SUB JUMLAH A Rp95,264,000.00

B PEKERJAAN DINDING PARTISI


1 PEKERJAAN DINDING PARTISI 86.922 M2 Rp 300,000.00 Rp 26,076,600.00
2 PEKERJAAN DINDING PARTISI WC 6.65 M2 Rp 300,000.00 Rp 1,995,000.00
3 PEKERJAAN DINDING PARTISI TANGGA 4.05 M2 Rp 300,000.00 Rp 1,215,000.00
SUB JUMLAH B Rp26,076,600.00

C PEKERJAAN MEJA DAN RAK GANTUNG


1 PEKERJAAN RAK GANTUNG 16.5 M Rp 1,600,000.00 Rp 26,400,000.00
2 PEKERJAAN PEMBUATAN MEJA KERJA 28 bh Rp 2,880,750.00 Rp 80,661,000.00
3 PEKERJAAN PEMBUATAN MEJA RAPAT 1 bh Rp 14,403,750.00 Rp 14,403,750.00
4 PEKERJAAN PEMBUATAN LEMARI ARSIP 1 bh Rp 5,942,625.00 Rp 5,942,625.00
5 PEKERJAAN PEMBUATAN MEJA LOBBY 1 bh Rp 7,632,550.00 Rp 7,632,550.00
6 PEKERJAAN PEMBUATAN MEJA L 2 bh Rp 3,331,837.50 Rp 6,663,675.00
SUB JUMLAH C Rp135,039,925.00

D PEKERJAAN LAIN LAIN


1 PEKERJAAN PEMBUATAN HURUF 148 CM Rp 35,000.00 Rp 5,180,000.00
2 JASA PEMBUATAN GAMBAR 1 LS Rp 2,500,000.00 Rp 2,500,000.00
SUB JUMLAH C Rp7,680,000.00

SUB TOTAL JUMLAH Rp264,060,525.00


PPN 10% Rp26,406,052.50
JUMLAH AKHIR Rp290,466,577.50
TOTAL
NO. URAIAN PEKERJAAN
HARGA (Rp.)
A PEKERJAAN BACKDROP HPL Rp95,264,000.00
B PEKERJAAN DINDING PARTISI Rp26,076,600.00
C PEKERJAAN MEJA DAN RAK GANTUNG Rp135,039,925.00
D PEKERJAAN LAIN LAIN Rp7,680,000.00
SUB TOTAL Rp264,060,525.00
PPN 10% Rp26,406,052.50
TOTAL Rp290,466,577.50
DIBULATKAN Rp290,470,000.00

TERBILANG :
"DUA RATUS SEMBILAN PULUH JUTA EMPAT RATUS TUJUH PULUH RIBU RUPIAH"
FOTO DOKUMENTASI

MEJA KERJA

MEJA KERJA L

MEJA RAPAT
MEJA RESEPSIONIS

BACKDROP LOBBY

BACKDROP RUANG RESKRIM


BACKDROP RUANG RAPAT

Anda mungkin juga menyukai