pit pot mounted ok

P L H
84 X 8.4 2.4 2 unit

API pump ok
P L H
35 X 10.8 4 1 unit

BOG kondenser ok
P L H
19 X 8 4 1 unit

Substation
P L H
35 X 15 2 1 unit 2 lantai
4

EDG
P L H
17 X 15 4 1 unit
Pot mounted

P L H
84 X 8.4 2.4 2 unit

ALAT BERAT
volume galian 86 10.4 3.05 2,727.92 m3 1 lokasi
produktifitas batu
38.97 hari 1 alat

19.49 hari 2 alat

DURASI PEKERJAAN
volume beton
LC 84.2 8.6 724.12 m2
slab 84 8.4 0.6 423.36 m3
wall 84 8.4 0.5 2.4 221.76 m3

volume besi
slab 65,439.36 kg
18.70 hari 1 grup
9.35 hari 2 grup

wall 11,975.04 kg
3.42 hari 1 grup
1.71 hari 2 grup

formwork
slab 84 8.4 0.6 110.88 m2
7.39 hari 1 grup
3.70 hari 2 grup

wall 84 8.4 2.4 887.04 m2


73.92 hari 1 grup
36.96 hari 2 grup
24.64 hari 3 grup
18.48 hari 4 grup
14.78 hari 5 grup
KEBUTUHAN MATERIAL PENDUKUNG
support vetikal
slab 84 8.4
jack base sisi 84 280.00 pcs 1 sisi
jack base sisi 8.4 28.00 pcs 1 sisi
wall 84 8.4
jack base sisi 84 112.00 pcs 1 sisi
jack base sisi 8.4 12.00 pcs 1 sisi
SC5 84 56.00 pcs 1 sisi
SC3 84 56.00 pcs 1 sisi
SC4 84 56.00 pcs 1 sisi
SC5 8.4 12.00 pcs 1 sisi
SC3 8.4 12.00 pcs 1 sisi
SC4 8.4 12.00 pcs 1 sisi

sabuk horizontal
wall 84 8.4
SC1 sisi 84 14 112.00 btg 1 sisi
SC1 sisi 8.4 2 16.00 btg 1 sisi
full drat sisi 84 0.5 35 140.00 m 1 sisi
sisi 8.4 0.5 4 16.00 m 1 sisi
plastikon sisi 84 2 35 560.00 m 1 sisi
sisi 8.4 2 4 64.00 m 1 sisi
wing nut sisi 84 2 35 560.00 m 1 sisi
sisi 8.4 2 4 64.00 m 1 sisi

akses kerja
vertikal 84 8.4
SC1 84 42 84.00 pcs 1 sisi
SC1 8.4 5 10.00 pcs 1 sisi
SC4 84 84 84.00 pcs 1 sisi
SC4 8.4 9 9.00 pcs 1 sisi
SC1 84 21 42.00 pcs 1 sisi
SC1 8.4 3 6.00 pcs 1 sisi
horizontal
SC1 84 14 70.00 pcs 1 sisi
SC1 8.4 2 10.00 pcs 1 sisi

asiba 84 42 126.00 pcs 1 sisi


asiba 8.4 5 15.00 pcs 1 sisi

asiba 564
full drat 560
jack base 1728
plastikon 2240
SC1 1400
SC3 272
SC4 644
SC5 272
wing nut 2240
SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT
2 breaker
2 exca
8 DT

5 orang
10 orang 15 orang untuk satu lokasi pit pot mounted

5 orang
10 orang

4 orang 16 orang
8 orang

62 orang untuk dua lokasi pit pot mounted

4 orang
8 orang
12 orang
16 orang
20 orang

560.00 pcs 2 sisi


56.00 pcs 2 sisi
224.00 pcs 2 sisi
24.00 pcs 2 sisi
112.00 pcs 2 sisi
112.00 pcs 2 sisi
112.00 pcs 2 sisi
24.00 pcs 2 sisi
24.00 pcs 2 sisi
24.00 pcs 2 sisi

224.00 pcs 2 sisi


32.00 pcs 2 sisi
280.00 m 2 sisi
32.00 m 2 sisi
1,120.00 pcs 2 sisi
128.00 pcs 2 sisi
1,120.00 pcs 2 sisi
128.00 pcs 2 sisi

168.00 pcs 2 sisi


20.00 pcs 2 sisi
168.00 pcs 2 sisi
18.00 pcs 2 sisi
84.00 pcs 2 sisi
12.00 pcs 2 sisi

140.00 pcs 2 sisi


20.00 pcs 2 sisi

252.00 pcs 2 sisi


30.00 pcs 2 sisi

282 pcs
280 m
864 pcs
1120 pcs
700 btg
136 pcs
322 pcs
136 pcs
1120 pcs
pot mounted

pot mounted
Unit pompa

P L H
3X 3 1.5 11

ALAT BERAT
volume galian 5 5 1.25 31.25 m3 1 lokasi
produktifitas batu
0.45 hari 1 alat

0.22 hari 2 alat

DURASI PEKERJAAN
volume beton
LC 3.2 3.2 10.24 m2
slab 3 3 0.6 5.40 m3
wall 2.7 2.7 0.6 0.9 3.32 m3

volume besi
slab 648.00 kg
0.19 hari 1 grup
0.09 hari 2 grup

wall 398.52 kg
0.11 hari 1 grup
0.06 hari 2 grup

formwork
slab 3 3 0.6 7.20 m2
0.48 hari 1 grup
0.24 hari 2 grup

wall 2.7 2.7 0.9 19.44 m2


1.62 hari 1 grup
0.81 hari 2 grup
0.54 hari 3 grup
0.41 hari 4 grup
0.32 hari 5 grup

formwork yang digunakan


SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT
2 breaker
2 exca
8 DT

5 orang 24 orang untuk satu lokasi pit pot mo


10 orang
15

5 orang 48 orang untuk dua lokasi pit pot mo


10 orang
15

4 orang
8 orang
12

4 orang
8 orang
12 orang
16 orang
20 orang
12

3 unit 4 x berjalan
untuk satu lokasi pit pot mounted

untuk dua lokasi pit pot mounted


API Pump

P L H
35 X 10.8 4 1 unit

ALAT BERAT
volume galian 37 12.8 4.65 2,202.24 m3 1 lokasi
produktifitas batu
31.46 hari 1 alat

15.73 hari 2 alat

DURASI PEKERJAAN
volume beton
LC 35.2 11 387.20 m2
slab 35 10.8 0.6 226.80 m3
wall 35 10.8 0.5 4 183.20 m3

volume besi
slab 27,216.00 kg
7.78 hari 1 grup
3.89 hari 2 grup

wall 21,984.00 kg
6.28 hari 1 grup
3.14 hari 2 grup

formwork
slab 35 10.8 0.6 54.96 m2
4.58 hari 1 grup
2.29 hari 2 grup

wall 35 10.8 4 732.80 m2


61.07 hari 1 grup
30.53 hari 2 grup
20.36 hari 3 grup
15.27 hari 4 grup
12.21 hari 5 grup
KEBUTUHAN MATERIAL PENDUKUNG
support vetikal
slab 35 10.8
jack base sisi 35 118.00 pcs 1 sisi
jack base sisi 10.8 36.00 pcs 1 sisi
wall 35 10.8
jack base sisi 35 48.00 pcs 1 sisi
jack base sisi 10.8 15.00 pcs 1 sisi
SC1 35 24.00 pcs 1 sisi
SC5 35 24.00 pcs 1 sisi
SC3 35 24.00 pcs 1 sisi
SC1 10.8 15.00 pcs 1 sisi
SC5 10.8 15.00 pcs 1 sisi
SC3 10.8 15.00 pcs 1 sisi

sabuk horizontal
wall 35 10.8
SC1 sisi 35 6 48.00 btg 1 sisi
SC1 sisi 10.8 2 16.00 btg 1 sisi
full drat sisi 35 0.5 15 105.00 m 1 sisi
sisi 10.8 0.5 5 35.00 m 1 sisi
plastikon sisi 35 2 15 420.00 pcs 1 sisi
sisi 10.8 2 5 140.00 pcs 1 sisi
wing nut sisi 35 2 15 420.00 pcs 1 sisi
sisi 10.8 2 5 140.00 pcs 1 sisi

akses kerja
vertikal 35 10.8
SC1 35 18 36.00 pcs 1 sisi
SC1 10.8 6 12.00 pcs 1 sisi
SC4 35 35 35.00 pcs 1 sisi
SC4 10.8 11 11.00 pcs 1 sisi
SC1 35 9 18.00 pcs 1 sisi
SC1 10.8 3 6.00 pcs 1 sisi
horizontal
SC1 35 6 42.00 pcs 1 sisi
SC1 10.8 2 14.00 pcs 1 sisi

asiba 35 18 108.00 pcs 1 sisi


asiba 10.8 6 36.00 pcs 1 sisi

asiba
full drat
jack base
plastikon
SC1
SC3
SC4
SC5
wing nut
SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT
2 breaker
2 exca
8 DT

5 orang
10 orang

5 orang
10 orang

4 orang
8 orang

4 orang
8 orang
12 orang
16 orang
20 orang

236.00 pcs 2 sisi


72.00 pcs 2 sisi
96.00 pcs 2 sisi
30.00 pcs 2 sisi
48.00 pcs 2 sisi
48.00 pcs 2 sisi
48.00 pcs 2 sisi
30.00 pcs 2 sisi
30.00 pcs 2 sisi
30.00 pcs 2 sisi

96.00 pcs 2 sisi


32.00 pcs 2 sisi
210.00 m 2 sisi
70.00 m 2 sisi
840.00 m 2 sisi
280.00 m 2 sisi
840.00 m 2 sisi
280.00 m 2 sisi

72.00 pcs 2 sisi


24.00 pcs 2 sisi
70.00 pcs 2 sisi
22.00 pcs 2 sisi
36.00 pcs 2 sisi
12.00 pcs 2 sisi

84.00 pcs 2 sisi


28.00 pcs 2 sisi

216.00 pcs 2 sisi


72.00 pcs 2 sisi

288 pcs
210 m
434 pcs
840 pcs
462 pcs
78 pcs
92 pcs
78 pcs
840 pcs
compressor konsole lube oil console

7.80 4.00 3.10 2.10 2.20 3.20


9.80 6.00 4.10 4.10 3.70 4.70
2.40 4.40 1.00
water fan cooler cooling water console
6.20 4.00 5.40 4.00
1.00 1.00

compressor
9.50 5.00
1.00

compressor konsole 3.00 unit dur

galian
11.80 8.00 2.45 231.28
5.10 6.10 2.45 76.22
307.50 m3 2.00

beton
lc 10.00 6.20 62.00
4.30 4.30 18.49
80.49 m2

slab 9.80 6.00 2.40 58.80


4.10 4.10 2.40 16.81
75.61 m3
wall 4.10 4.10 2.00 16.81 m3

besi
slab 9073.20 kg
wall 2017.20 kg

FW
slab 75.84
29.52
105.36 m2
wall 24.60 m2

water fan cooler 1.00 unit

galian
8.20 6.00 0.75 36.90 m3
beton
lc 6.40 4.20 26.88 m2

slab
6.20 4.00 1.00 24.80 m3

besi
slab 2976.00 kg

FW
slab 20.40 m2

lube oil console 3.00 unit

galian
11.50 7.00 0.75 60.38 m3

beton
lc 9.70 5.20 50.44 m2

slab
9.50 5.00 1.00 47.50 m3

besi
slab 5700.00 kg

FW
slab 29.00 m2
3.00 unit

1.00 unit

3.00 unit

lube oil console 3.00 unit

galian
5.70 6.70 0.75 28.64 m3

beton
lc 3.90 4.90 19.11 m2

slab
3.70 4.70 1.00 17.39 m3

besi
slab 2086.80 kg

FW
slab 16.80 m2

cooling water console 1.00 unit

galian
7.40 6.00 0.75 33.30 m3
beton
lc 5.60 4.20 23.52 m2

slab
5.40 4.00 1.00 21.60 m3

besi
slab 2592.00 kg

FW
slab 18.80 m2
BoG Kondensat
panggung
P L H panggung
19 X 8 4 1 unit

pondasi
Pedestal pondasi
1.2 0.5 1 2 6 unit

slab
3.6 5.4 0.5 1 6 unit

1 Unit PONDASI
ALAT BERAT
volume galian 5.6 7.4 0.8 1 33.15 m3 1 lokasi
produktifitas batu
0.47 hari 1 alat

DURASI PEKERJAAN
volume beton
LC 3.8 5.6 1 21.28 m2
slab 3.6 5.4 0.5 1 9.72 m3
wall 1.2 0.5 1 2 2.40 m3

volume besi
slab 1,166.40 kg
0.33 hari 1 grup

wall 288.00 kg
0.08 hari 1 grup

formwork
slab 3.6 5.4 0.5 1 9.00 m2
0.60 hari 1 grup

wall 1.2 0.5 1 6.80 m2


0.57 hari 1 grup
KEBUTUHAN MATERIAL PENDUKUNG
PONDASI
support vetikal
slab 3.6 5.4
jack base sisi 3.6 12.00 pcs 1 sisi
jack base sisi 5.4 18.00 pcs 1 sisi

wall 1.2 0.5


jack base sisi 1.2 4.00 pcs 1 sisi
jack base sisi 0.5 2.00 pcs 1 sisi
SC4 1.2 4.00 pcs 1 sisi
SC4 0.5 2.00 pcs 1 sisi

sabuk horizontal
wall 1.2 0.5
SC4 sisi 1.2 1 8.00 btg 1 sisi
SC4 sisi 0.5 1 8.00 btg 1 sisi
full drat sisi 1.2 0.5 1 2.00 m 1 sisi
sisi 0.5 0.5 1 - m 1 sisi
plastikon sisi 1.2 2 1 8.00 m 1 sisi
sisi 0.5 2 1 - m 1 sisi
wing nut sisi 1.2 2 1 8.00 m 1 sisi
sisi 0.5 2 1 - m 1 sisi

full drat
jack base
plastikon
SC4
wing nut
SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT

5 orang

5 orang

5 orang

5 orang
72.00 pcs 2 sisi 3 set
108.00 pcs 2 sisi 3 set

24.00 pcs 2 sisi 3 set


12.00 pcs 2 sisi 3 set
24.00 pcs 2 sisi 3 set
12.00 pcs 2 sisi 3 set

48.00 pcs 2 sisi 3 set


48.00 pcs 2 sisi 3 set
12.00 m 2 sisi 3 set
- m 2 sisi 3 set
48.00 m 2 sisi 3 set
- m 2 sisi 3 set
48.00 m 2 sisi 3 set
- m 2 sisi 3 set

12 m
216 pcs
48 pcs
132 pcs
48 pcs
BoG Kondensat
panggung
P L H panggung
19 X 8 4 1 unit

pondasi
Pedestal pondasi
1.2 0.5 1 2 6 unit

slab
3.6 5.4 0.5 1 6 unit

1 Unit Mezanine
ALAT BERAT
volume galian 135 m2 0.8 1 108.00 m3 1 lokasi
produktifitas batu
1.54 hari 1 alat

DURASI PEKERJAAN
volume beton
LC 73.02 m2
slab 4.84 8 38.72
tie beam 1 3.99 4 15.96
tie beam 2 3.057 6 18.34
slab 2 2 0.5 8 16.00 m3
tie beam 1 2.75 0.5 4 5.50 m3
tie beam 2 2.1 0.5 6 6.30 m3
kolom 0.25 4.3 8 8.60 m3
beam 1 3.5 0.5 10 17.50 m3
beam 2 2.833 0.5 12 17.00 m3
top slab 152 0.3 1 45.60 m3

volume besi
slab 1,920.00 kg 0.96
tie beam 1 660.00 kg 0.33
tie beam 2 756.00 kg 0.38
kolom 1,032.00 kg 0.52
beam 1 2,100.00 kg 1.05
beam 2 2,039.76 kg 1.02
top slab 5,472.00 kg 2.74

formwork
slab 8 0.5 8 32.00 m2 3.20
tie beam 1 15 0.5 4 30.00 m2 3.00
tie beam 2 12.33 0.5 6 36.99 m2 3.70
kolom 2 4.3 8 68.80 m2 6.88
beam 1 15 0.5 10 75.00 m2 7.50
beam 2 12.33 0.5 12 73.98 m2 7.40
top slab 152 1 152.00 m2 15.20
top slab 54 0.5 27.00 m2 2.70

KEBUTUHAN MATERIAL PENDUKUNG


MEZANIN

pondasi & tie beam


slab 2 2
jack base sisi 2 8.00 pcs 1 sisi
jack base sisi 2 7.00 pcs 1 sisi
tie beam 5.5
4.167
jack base sisi 5.5 12.00 pcs 1 sisi
jack base sisi 4.167 9.00 pcs 1 sisi

kolom
support vertikal
SC1 1 4 4.00 pcs
SC5 1 4 4.00 pcs
SC3 1 4 4.00 pcs
support horizontal
SC4 4.3 4 2 32.00 pcs 4 sisi

akses
akses kerja
vertikal 19 8
SC1 19 10 20.00 pcs 1 sisi
SC1 8 4 8.00 pcs 1 sisi
SC4 19 19 19.00 pcs 1 sisi
SC4 8 8 8.00 pcs 1 sisi
SC1 19 5 10.00 pcs 1 sisi
SC1 8 2 4.00 pcs 1 sisi
horizontal
SC1 19 4 28.00 pcs 1 sisi
SC1 8 2 14.00 pcs 1 sisi

asiba 19 10 60.00 pcs 1 sisi


asiba 8 4 24.00 pcs 1 sisi

deck mezanine
vertikal
19 32
8 14
jack base 448.00 pcs 1 sisi
SC2 448.00 pcs

horizontal
SC1 19 11 4 44.00 pcs 1 tingkat
SC1 8 5 2 10.00 pcs 1 tingkat

asiba
jack base
SC1
SC2
SC3
SC4
SC5
SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT

2 6 orang
2 6 orang
2 6 orang
2 6 orang
4 6 orang
4 6 orang
5 6 orang

3 1 grup 5 orang
3 1 grup 5 orang
4 1 grup 5 orang
7 1 grup 5 orang
8 1 grup 5 orang
8 1 grup 5 orang
15 1 grup 5 orang
3 1 grup 5 orang

128.00 pcs 2 sisi 8 set


112.00 pcs 2 sisi 8 set

96.00 pcs 2 sisi 4 set


108.00 pcs 2 sisi 6 set

32.00 pcs 8 set


32.00 pcs 8 set
32.00 pcs 8 set

256.00 pcs 8 set

40.00 pcs 2 sisi


16.00 pcs 2 sisi
38.00 pcs 2 sisi
16.00 pcs 2 sisi
20.00 pcs 2 sisi
8.00 pcs 2 sisi

56.00 pcs 2 sisi


28.00 pcs 2 sisi

120.00 pcs 2 sisi


48.00 pcs 2 sisi
896.00 pcs 2 sisi
448.00 pcs

132.00 pcs 3 tingkat


30.00 pcs 3 tingkat

168 pcs
1340 pcs
362 pcs
448 pcs
32 pcs
310 pcs
32 pcs
substatiun building

P L H
35 X 15 3
1.8
pondasi
slab
37 17 0.4

kolom
0.5 0.5 1.8 32

panggung
tie beam
0.5 0.5 14.5 8
0.5 0.5 34.5 4

slab
35 15 0.25

dek
kolom
0.5 0.5 3 32

tie beam
0.5 0.5 14.5 8
0.5 0.5 34.5 4

dek
35 15 0.25

1 Unit Mezanine
ALAT BERAT
volume galian 39 19 0.85 1 33.15 m3 1 lokasi
produktifitas batu
0.47 hari 1 alat

DURASI PEKERJAAN
volume beton
LC 37.2 17.2 1 37.20 m2
pondasi
slab 37 17 0.4 251.60 m3
kolom 0.5 0.5 1.8 32 14.40 m3
panggung
tie beam 0.5 0.5 14.5 8 29.00 m3
tie beam 0.5 0.5 34.5 4 34.50 m3
slab 35 15 0.25 131.25 m3
dek
kolom 0.5 0.5 3 32 24.00 m3
tie beam 0.5 0.5 14.5 8 29.00 m3
tie beam 0.5 0.5 34.5 4 34.50 m3
slab 35 15 0.25 131.25 m3

volume besi
pondasi
slab 30,192.00 kg 10.06
kolom 1,728.00 kg 0.86
panggung - -
tie beam 3,480.00 kg 1.74
tie beam 4,140.00 kg 2.07
slab 15,750.00 kg 5.25
dek - -
kolom 2,880.00 kg 1.44
tie beam 3,480.00 kg 1.74
tie beam 4,140.00 kg 2.07
slab 15,750.00 kg 5.25

formwork
pondasi
slab 43.20 m2 4.32
kolom 115.20 m2 7.20
panggung
tie beam 174.00 m2 8.70
tie beam 207.00 m2 10.35
slab 550.00 m2 13.75
dek
kolom 192.00 m2 12.00
tie beam 174.00 m2 8.70
tie beam 207.00 m2 10.35
slab 550.00 m2 13.75

KEBUTUHAN MATERIAL PENDUKUNG


MEZANIN

pondasi
slab 37 17
jack base sisi 37 124.00 pcs 1 sisi
jack base sisi 17 57.00 pcs 1 sisi

kolom
support vertikal
SC3 1 4 4.00 pcs
SC4 1 4 4.00 pcs
SC4 1 4 4.00 pcs
support horizontal
SC4 3 3 2 24.00 pcs 4 sisi

akses
akses kerja
vertikal 35 15
SC1 35 18 36.00 pcs 1 sisi
SC1 15 8 16.00 pcs 1 sisi
SC4 35 35 35.00 pcs 1 sisi
SC4 15 15 15.00 pcs 1 sisi
SC1 35 9 18.00 pcs 1 sisi
SC1 15 4 8.00 pcs 1 sisi
horizontal
SC1 35 6 42.00 pcs 1 sisi
SC1 15 3 21.00 pcs 1 sisi

asiba 35 18 108.00 pcs 1 sisi


asiba 15 8 48.00 pcs 1 sisi

deck mezanine
vertikal
35 59
15 25
jack base 1,475.00 pcs 1 sisi
SC2 1,475.00 pcs

horizontal
SC1 35 20 6 120.00 pcs 1 tingkat
SC1 15 9 3 27.00 pcs 1 tingkat

asiba
jack base
SC1
SC2
SC3
SC4
SC5
SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT
6 12 orang
4 8 orang

4 8 orang
4 8 orang
6 12 orang

4 8 orang
4 8 orang
4 8 orang
6 12 orang

5 5 orang
8 8 orang

10 10 orang
10 10 orang
20 20 orang

8 8 orang
10 10 orang
10 10 orang
20 20 orang

248.00 pcs 2 sisi


114.00 pcs 2 sisi

64.00 pcs 16
64.00 pcs 16
64.00 pcs 16
384.00 pcs 16

1 set saja

72.00 pcs 2 sisi


32.00 pcs 2 sisi
70.00 pcs 2 sisi
30.00 pcs 2 sisi
36.00 pcs 2 sisi
16.00 pcs 2 sisi

84.00 pcs 2 sisi


42.00 pcs 2 sisi

216.00 pcs 2 sisi


96.00 pcs 2 sisi

1 set saja

2,950.00 pcs 2 sisi


1,475.00 pcs

360.00 pcs 3 tingkat


81.00 pcs 3 tingkat

312 pcs
3312 pcs
723 pcs
1475 pcs
64 pcs
612 pcs
0 pcs
substatiun building

P L H
17 X 15 3
1.8
pondasi
slab
19 17 0.4

kolom
0.5 0.5 1.8 16

panggung
tie beam
0.5 0.5 14.5 4
0.5 0.5 16.5 4

slab
17 15 0.25

dek
kolom
0.5 0.5 3 16

tie beam
0.5 0.5 14.5 4
0.5 0.5 34.5 4

dek
17 15 0.25

1 Unit Mezanine
ALAT BERAT
volume galian 21 19 0.85 1 17.85 m3 1 lokasi
produktifitas batu
0.26 hari 1 alat

DURASI PEKERJAAN
volume beton
LC 19.2 17.2 1 19.20 m2
pondasi
slab 19 17 0.4 129.20 m3
kolom 0.5 0.5 1.8 16 7.20 m3
panggung
tie beam 0.5 0.5 14.5 4 14.50 m3
tie beam 0.5 0.5 16.5 4 16.50 m3
slab 17 15 0.25 63.75 m3
dek
kolom 0.5 0.5 3 16 12.00 m3
tie beam 0.5 0.5 14.5 4 14.50 m3
tie beam 0.5 0.5 34.5 4 34.50 m3
slab 17 15 0.25 63.75 m3

volume besi
pondasi
slab 15,504.00 kg 5.17
kolom 864.00 kg 0.43
panggung - -
tie beam 1,740.00 kg 0.87
tie beam 1,980.00 kg 0.99
slab 7,650.00 kg 2.55
dek - -
kolom 1,440.00 kg 0.72
tie beam 1,740.00 kg 0.87
tie beam 4,140.00 kg 2.07
slab 7,650.00 kg 2.55

formwork
pondasi
slab 28.80 m2 2.88
kolom 57.60 m2 3.60
panggung
tie beam 87.00 m2 4.35
tie beam 99.00 m2 4.95
slab 271.00 m2 6.78
dek
kolom 96.00 m2 6.00
tie beam 87.00 m2 4.35
tie beam 207.00 m2 10.35
slab 271.00 m2 6.78

KEBUTUHAN MATERIAL PENDUKUNG


MEZANIN

pondasi
slab 19 17
jack base sisi 19 64.00 pcs 1 sisi
jack base sisi 17 57.00 pcs 1 sisi

kolom
support vertikal
SC3 1 4 4.00 pcs
SC4 1 4 4.00 pcs
SC4 1 4 4.00 pcs
support horizontal
SC4 3 3 2 24.00 pcs 4 sisi

akses
akses kerja
vertikal 17 15
SC1 17 9 18.00 pcs 1 sisi
SC1 15 8 16.00 pcs 1 sisi
SC4 17 17 17.00 pcs 1 sisi
SC4 15 15 15.00 pcs 1 sisi
SC1 17 5 10.00 pcs 1 sisi
SC1 15 4 8.00 pcs 1 sisi
horizontal
SC1 17 3 21.00 pcs 1 sisi
SC1 15 3 21.00 pcs 1 sisi

asiba 17 9 54.00 pcs 1 sisi


asiba 15 8 48.00 pcs 1 sisi

deck mezanine
vertikal
17 29
15 25
jack base 725.00 pcs 1 sisi
SC2 725.00 pcs

horizontal
SC1 17 10 3 30.00 pcs 1 tingkat
SC1 15 9 3 27.00 pcs 1 tingkat

asiba
jack base
SC1
SC2
SC3
SC4
SC5
SC1 6m
SC2 4m
SC3 2m
SC4 1m
SC5 3m

1 breaker
1 exca
4 DT
6 12 orang
4 8 orang

4 8 orang
4 8 orang
6 12 orang

4 8 orang
4 8 orang
4 8 orang
6 12 orang

5 5 orang
8 8 orang

10 10 orang
10 10 orang
20 20 orang

8 8 orang
10 10 orang
10 10 orang
20 20 orang

128.00 pcs 2 sisi


114.00 pcs 2 sisi

64.00 pcs 16
64.00 pcs 16
64.00 pcs 16
384.00 pcs 16

1 set saja

36.00 pcs 2 sisi


32.00 pcs 2 sisi
34.00 pcs 2 sisi
30.00 pcs 2 sisi
20.00 pcs 2 sisi
16.00 pcs 2 sisi

42.00 pcs 2 sisi


42.00 pcs 2 sisi

108.00 pcs 2 sisi


96.00 pcs 2 sisi

1 set saja

1,450.00 pcs 2 sisi


725.00 pcs

90.00 pcs 3 tingkat


81.00 pcs 3 tingkat

204 pcs
1692 pcs
359 pcs
725 pcs
64 pcs
576 pcs
0 pcs
asiba
full drat
jack base
plastikon
SC1
SC3
SC4
SC5
wing nut
asiba
full drat
jack base
plastikon
SC1
SC3
SC4
SC5
wing nut
full drat
jack base
plastikon
SC4
wing nut
asiba
jack base
SC1
SC2
SC3
SC4
SC5
asiba
jack base
SC1
SC2
SC3
SC4
SC5
asiba
jack base
SC1
SC2
SC3
SC4
SC5

resume darat

asiba
jack base
SC1
SC2
SC3
SC4
SC5
wing nut
full drat
plastikon
klem

resume pipe rack

SC1
SC2
SC3
SC4
SC5
jack base
klem
asiba

Resume Total

asiba
full drat
jack base
klem
plastikon
SC1
SC2
SC3
SC4
SC5
wing nut
564 pcs
560 m
1728 pcs
2240 pcs
1400 btg
272 pcs
644 pcs
272 pcs
2240 pcs
288 pcs
210 m
434 pcs
840 pcs
462 pcs
78 pcs
92 pcs
78 pcs
840 pcs
12 m
216 pcs
48 pcs
132 pcs
48 pcs
168 pcs
1340 pcs
362 pcs
448 pcs
32 pcs
310 pcs
32 pcs
312 pcs
3312 pcs
723 pcs
1475 pcs
64 pcs
612 pcs
0 pcs
204 pcs
1692 pcs
359 pcs
725 pcs
64 pcs
576 pcs
0 pcs

1536 pcs
8722 pcs
3306 pcs
2648 pcs
510 pcs
2366 pcs
382 pcs
3128 pcs
782 m
3128 pcs
18424 pcs

19,167 pcs
9,888 pcs
3,456 pcs
10,896 pcs
4,968 pcs
17,484 pcs
26,448 pcs
648 pcs

2,184 pcs
782 m
26,206 pcs
44,872 pcs
3,128 pcs
22,473 pcs
12,536 pcs
3,966 pcs
13,262 pcs
5,350 pcs
3,128 pcs
Remarks
Jam Kerja 8.00 jam Asumsi Jam Kerja (08.00-17.00)
ACCESS BRIDGE
PREPARED FOR BOREPILE
Asumsi Durasi untuk persiapan Sebelum pekerjaan Bore Pile Asumsi penimbunan, peralihan jalur air laut dan juga
90.00 hari
dimulai pemasangan gorong2 akses temporary
Asumsi Volume mengikuti Durasi, berdasarkan produktifitas
Volume Tanah Timbunan for access & etc 32,561.70 m3 Excavator PC200 dan Juga ketersediaan tanah timbunan by PT.
Nursejatin Andika
Luas Area 32,561.70 m2
1 Excavator PC 200
Volume excavation 32,561.70 m3
Bucket Capacity 0.93 m3
Faktor Bucket 1.00
Faktor efesiensi Alat 0.70 Alat lebih dari 5 tahun kerja
Condition of work 0.90 Kondisi site dengan curah hujan tinggi
Swell 0.90
Swing and depth 0.90 Kondisi pengambilan material normal
Equipment management 0.90 management equipment baik
Laoding time 0.25 menit
Swing 0.12 menit
Unloading time 0.08 menit
Siklus Time 0.57 menit
Cycle Per Hour 105.88 cycle/jam
Produktifitas per hour 45.22 m3/jam
Unit Exca PC 200 2.00 Unit
durasi pekerjaan 41.00 hari

2 Dump truck 20T


Maximum hauling distance 30 km Pengambilan tanah material asumsi 30 km atau sejam
Hauling Speed (loaded) 30 km/hour Asumsi
Hauling Speed (empty) 40 km/hour Asumsi

Loading Time
- Hauling Capacity : 4.65 m3 (Dump Truck 5 T)
- Number of Bucket : 5 Bucket (Excavator PC 200)
- Swing Duration per bucket : 0.57 minute (Excavator PC 200) 34 detik dari siklus time atau 0.57menit
- Loading Duration : 2.83 minute

Cycle Time:
Hauling (empty) 0.750 Hour = 45.0 minute
Manuver Loading 0.008 Hour = 0.5 minute 30 detik
Loading 0.047 Hour = 2.8 minute
Hauling (loaded) 1.000 Hour = 60 minute
Manuver Dumping 0.008 Hour = 0.5 minute 30 detik
Dumping 0.008 Hour = 0.5 minute 30 detik
Total Cycle Time 1.822 Hour = 109.3 minute

Working Hour 8.00 Hour/day


Number of trip 4 trip/day
Hauling Capacity 4.65 m3 per trip
Dump Truck Productivity 18.60 m3/day 2 m3/hour
Vol Site Cutting 32,561.70 M3
Jumlah Unit DT 20T 29.00 unit
Durasi 60.00 hari

3 Perataan By Dozzer Asumsi Ada alat Doozer


Streppid distance 30.00 m
Lebar area kerja 15.00 m
Faktor Blade 0.80
Faktor Efisiensi alat 0.90
Blade grade 0.70
Lebar Blade 3.98 m
Tinggi Blade 1.55 m
Work efisiensi 0.67
Push Time 0.60 Menit
Reverse Time 0.45 Menit
Manuver Time 0.10 Menit
Waktu Siklus 1.15 menit
Push Speed 3.00 km/jam
Reverse Speed 4.00 km/jam
Faktor Kemiringan pisau grade 1.00
Lebar overlap 0.30 m
Jumlah stripping passes 3.00
Jumlah lane 3.00
Lebar Efektif 10.00 m
Produktifitas per jam 268.44 m2/jam
Total Produktifitas per day 2,147.50 m2/day
Kebutuhan Alat 1.00 Alat
Durasi 11.00 Hari

SITE FILLING
Volume Soil B1 32,561.70 M3
Durasi 40.00 hari

1 Excavator PC 200

Jumlah Volume Resources 32,561.70 m3


Asusmsi sumber reosurces berasal dari laydown 4
Bucket Capacity 0.93 m3
Faktor Bucket 0.93
Faktor efesiensi Alat 1.00 Alat baru dengan spesifikasi BP alat maksimal 2 tahun
Condition of work 0.70 Kondisi site dengan curah hujan tinggi
Swell 0.90
Swing and depth 0.90 Kondisi pengambilan material normal
Equipment management 0.90 management equipment baik
Laoding time 0.90 menit
Swing 0.12 menit
Unloading time 0.08 menit
Siklus Time 1.22 menit
Cycle Per Hour 49.32 cycle/jam
Produktifitas per hour 21.77 m3/jam
Unit Exca PC 300 3.00 Unit
durasi pekerjaan 71.00 hari

2 Dump truck 20T


Maximum hauling distance 30 km
Hauling Speed (loaded) 30 km/hour Safety Regulation
Hauling Speed (empty) 40 km/hour Safety Regulation

Loading Time
- Hauling Capacity : 4.65 m3 (Dump Truck 20 T)
- Number of Bucket : 5 Bucket (Excavator PC 200)
- Swing Duration per bucket : 0.57 minute (Excavator PC 200) 34 detik dari siklus time atau 0.57menit
- Loading Duration : 2.83 minute

Cycle Time:
Hauling (empty) 0.750 Hour = 45.0 minute
Manuver Loading 0.008 Hour = 0.5 minute 30 detik
Loading 0.047 Hour = 2.8 minute
Hauling (loaded) 1.000 Hour = 60 minute
Manuver Dumping 0.008 Hour = 0.5 minute 30 detik
Dumping 0.008 Hour = 0.5 minute 30 detik
Total Cycle Time 1.822 Hour = 109.3 minute

Working Hour 8.00 Hour/day


Number of trip 4 trip/day
Hauling Capacity 4.65 m3 per trip
Dump Truck Productivity 18.6 m3/day 2 m3/hour

Vol Site Cutting 32,561.70 m3


Jumlah Unit DT 20T 29.00 unit
Durasi 60.00 hari

3 Perataan By Dozzer
Streppid distance 30.00 m
Lebar area kerja 15.00 m
Faktor Blade 0.80
Faktor Efisiensi alat 0.90
Blade grade 0.70
Lebar Blade 3.98 m
Tinggi Blade 1.55 m
Work efisiensi 0.67
Push Time 0.60 Menit
Reverse Time 0.45 Menit
Manuver Time 0.10 Menit
Waktu Siklus 1.15 menit
Push Speed 3.00 km/jam
Reverse Speed 4.00 km/jam
Faktor Kemiringan pisau grade 1.00
Lebar overlap 0.30 m
Jumlah stripping passes 3.00
Jumlah lane 3.00
Lebar Efektif 10.00 m
Produktifitas per jam 268.44 m2/jam
Produktifitas per Hari 2,147.50 m2/day
Kebutuhan Alat 1.00 Alat
Durasi 11.00 Hari

BORE PILE FFOUNDATION


1 Jumlah Titik Borepile 48.00 Titik

Produktifitas 1 alat perhari per team 2.00 Titik/Hari Berdasarkan produktifitas aktual di site tuban dengan resources
dan equipment yang tersedia 1 team =
team 1.00 Team
Durasi 24.00 Hari Durasi tidak include PDA Test dan CSL

POURING CONCRETE ABUTMENT FOUNDATION


1 Volume Lean Concrete 23.48 m3 2 Titik Abutmen
Produktifitas pouring concrete 7.00 m3/hari asumsi dikerjakan oleh mapower lokal tuban 1 team =
Produktifitas Pouting Concrete 1.00 Team
Durasi 3.00 Hari

2 Volume Concrete Abutmen (SISI A) 439.22 m3


Luasan Area 147.57 m2
Produktifitas install rebar, formwork, concrete/ perteam 6.00 m3/Hari/ team 1 team =
400 = produktifitas instalasi besi, 120 perbandingan besi dan
cncrete 1: 120
Produktifitas install 1.00 Team asumsi 6 M3 perhari perteam dikarenakan ada 3 stage
Durasi 49.00 Hari pengecoran dan dikerjakan oleh orang lokan tuban

3 Volume Concrete Abutmen (SISI B) 439.22 m3


Luasan Area 147.57 m2
Produktifitas install rebar, formwork, concrete/ perteam 6.00 m3/Hari/ team 1 team =
1.00 Team 400 = produktifitas instalasi besi, 120 perbandingan besi dan
Produktifitas install
cncrete 1: 120
Durasi 49.00 Hari asumsi 6 M3 perhari perteam dikarenakan ada 3 stage
pengecoran dan dikerjakan oleh orang lokan tuban
ASSESSORIES

ERECTION PRECAST GIRDER

ERECTION STEEL STRUCTURE

INSTALL DIAFRAGMA

SLAB INSITU
8 orang

8 Orang

11

11 Orang

11

11 Orang

11

11