Anda di halaman 1dari 1

S

C C
T B
A B D E F A B D E F

U
6.200 6.200
1.500 1.500 1.700 1.500 3.000 3.200

1 1
KM/WC

2.150

2.150

2.150

2.150
KM/WC R. CCUCI/JEMUR FFL -0.20
FFL -0.05 FFL -0.15
VOID PROJECT NAME

2 2 PERENCANAAN RUMAH MEZZANINE


KAK ASHA - PURWODADI
K.TIDUR UTAMA K.TIDUR 2 K.TIDUR 3
FFL +0.00 FFL +2.60 FFL +2.60

LEGEND
3.000

3.000

3.000
DAPUR 1. Semua satuan menggunakan satuan mm
FFL +0.00
kecuali ditentukan lain.

4.800
2. Asumsi Elevasi muka lantai ±0.00
3. Tebal dinding 15 cm termasuk plesteran dan
MINIBAR acian
3 3

1.000
925
MUSHOLLA SIMBOL BAHAN:
1.800

FFL +0.10
PAS. 1/2 BATA 1PC:5PS
PAS. TRASSRAM 1PC:3PS

475 875
PARTISI
4 4
15.000

15.000

15.000

15.000
SIMBOL KUSEN:
ROSTER

3.850
K.TIDUR 1 R TENGAH VOID
3.050

3.050
FFL +0.00 FFL +0.00

5 5

5.575
6 6 ROOFTOP
FFL +4.00
3.000

RUANG USAHA
FFL +0.00

CARPORT DRAWNED BY :
5.000

5.000
FFL -0.10

MOH. ROHUL NANDA S.


7 7
CHECKED BY ARCHITECT :
2.000

2.000

TERAS M. TONY ARDIANSYAH


FFL -0.05

DRAWING TITLE SCALA


3.000 3.200 3.000 3.200
6.200 6.200 RENCANA DENAH 1:80

DRAWING CODE SHEET NUMBER TOTAL SHEET


DENAH LANTAI DASAR DENAH LT. MEZZANINE
SKALA 1:80 SKALA 1:80
ARS 01 01

Anda mungkin juga menyukai