SPESIFIKASI PEKERJAAN SUMBARALEK

NO. URAIAN SATUAN VOL SPESIFIKASI


1 KARPET MERAH METER/KEGIATAN 100 - KARPET LANTAI TERPASANG SEPANJANG AREA VVIP KONDISI BERSIH
2 PANGGUNG METER/HARI 180 - STAGE DENGAN UKURAN 6X10 UNTUK 3 HARI
- BERBAHAN BESI BERBENTUK RIGGING
- BERLAPIS KARPET
3 KURSI UNIT/HARI 100 - KURSI BESI/STAINLESS BUSA
- BERLAPIS SKRTING PUTIH
4 LED METER/HARI 54 - LED P 3,9 OUTDOOR
- TERMASUK INSTALASI DAN OPERATOR
- 18 METER / HARI UNTUK 3 HARI
5 GENSET UNIT/HARI 3 - GENSET 100 KVA
- TERMASUK OPERATOR DAN BBM
- 1 UNIT X 3 HARI
6 LIGHTING SYSTEM PAKET/HARI 1 - PERALATAN YANG DIGUNAKAN ADALAH BUILT UP TERMASUK INSTALASI TERDIRI DARI
BEAM 20 UNIT, PAR LED 24 UNIT, FRESHNELL 6 UNIT, MINIBRUT 4 UNIT, FOLLOW SPOT 1
UNIT DAN SMOKE 2 UNIT
7 SOUND SYSTEM PAKET/HARI 3 - DAYA 20.000 WATT
- INSTALASI
- CHECK SOUND DAN SOUNDMAN
- 3 HARI
8 SARNAVILE SET/HARI 6 - TENDA BERBENTUK KERUCUT
- UKURAN 3X3 M UNTUK 3 HARI
9 TIM KESENIAN / ARTIS KALI/KEGIATAN 2 - TIM KESENIAN / ARTIS SUMATERA BARAT
10 PETUGAS LAPANGAN ORANG/HARI 36 - PETUGAS / KRU ACARA
- 12 ORANG UNTUK 3 HARI
11 PEMBAWA ACARA ORANG/HARI 6 - PEMBAWA ACARA
- 2 ORANG UNTUK 3 HARI

PADANG, 21 SEPTEMBER 2023

KUASA PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS KEGIATAN

YULITRI SUSANTI, S.Pi. ASRIL, S.Sos, M.Pd.


NIP. 19740722 199903 2 003 NIP. 19710217 200212 1 003