Anda di halaman 1dari 23

Page 1

S C H E D U L E 'A'

NAME OF WORK:- IMPROVEMENTS TO WORK SHOP SHED AND MECHANICAL SUB- DIVISION OFFICE SHED TO ESTABLISHMENT ON
21st CENTURY GURUKULAM INSTITUTE IN T.G.P. CAMP COLONY AT K.R.DAM.
S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in
figures & words figures & words calculations in figures &
(Rs.) figures & words words (Rs.)

1 2 3 4 5 6 7
1 22.5 Cum Brick Masonry in CM 1:5 using country S.S.504 & 2515.00 1Cum 56587.00
(Twenty Two point Five bricks including cost and conveyance of all Suppl. (Rupees Two (Rupees Fifty
cubic metres only) material and labour charges and all other Specification thousand Five (One Cubic metre Six thousand
operations necessary to complete the hundred and only) Five hundred
finished item of work as directed by the Fifteen only) and Eighty
Department. Seven only)

2 273 Sqm Plastering the exposed faces of brick S.S.901 & 69.00 1Sqm 18837.00
(Two hundred and masonry in CM 1:4, 12mm thick including 904 and (Rupees Sixty (Rupees
Seventy Three Square cost and conveyance of all material and Suppl. Nine only) (One Square Eighteen
metres only) labour charges etc., and all other operations Specification metre only) thousand Eight
necessary to complete the finished item of hundred and
work as directed by the Department. Thirty Seven
only)

3 9 Nos. Suplying and fixing of door of size 3, Suppl. 7240.00 1No. 65160.00
(Nine numbers only) 31/2'-"x6'-6"(1mx2m) made up of country (Rupees Seven (One number (Rupees Sixty
wood frame (Vepa) and plywood door with Specification thousand Two only) Five thousand
decolam on both faces including frame with hundred and Forty One hundred
necessry accessories like hinges, aldrops, only) and Sixty only)
tower bolt, doors stoppers, hydraulic wood
classes etc., complete and all other
operations necessary to complete the
finished item of work as directed by the
Department.

CONTRACTOR EXECUTIE ENGINEER


Page 2

4 5 Nos. Supplying and fixing of door of size 3, 3 1/2'- Suppl. 2550.00 Each 12750.00
(Five numbers only) "x6'-6"(1mx2m) with country wood frame (Rupees Two (Each one only) (Rupees
(vepa) and shutter, including fixing of all Specification thousand Five Twelve
necessary accessories like hinges, aldrops, hundred and Fifty thousand
tower bolts, door stoppers etc., complete only) Seven hundred
including cost and conveyance of all and Fifty only)
material and labour charges etc., complete
and all other operations necessary to
complete the finished item of work as
directed by the Department.

5 27 Nos. Supplying and fixing of windows of size 3'-4" Suppl. 2763.00 1No. 74601.00
(Twenty Seven with country wood frame and teak wood Specification (Rupees Two (Rupees
numbers only) shutters with glased including fixing of all thousand Seven Seventy Four
(One number
accessories like hinges, tower bolts,friction hundred and Sixty thousand Six
only)
stag hinges etc., complete and all other Three only) hundred and
operations necessary to complete the One only)
finished item of work as directed by the
Department.

6 78 Sqm Painting of Doors and windows with best Suppl. 84.00 1Sqm 6552.00
(Seventy Eight Square enamel paint in two coats over the finished Specification (Rupees Eighty (Rupees Six
metres only) coat of wood primary coat including cost and Four only) thousand Five
conveyance of all material and labour (One Square hundred and
charges etc., complete and all other metre only) Fifty Two only)
operations necessary to complete the
finished item of work as directed by the
Department.

CONTRACTOR EXECUTIE ENGINEER

7 1880 Sqm White washing one coat with best shell lime 908 & 5.20 1Sqm 9776.00
(One thousand Eight of approved quality including cost and Suppl., (Rupees Five and (Rupees Nine
hundred and Eighty conveyance of all material, bushes, Ganjee Specification paise Twenty (One Square thousand
Square metres only) powder(or) Gum, watering the wall before only) Metre only) Seven hundred
whole washing etc., complete and all other and Seventy
operations necessary to complete the Six only)
finished item of work as directed by the
Department.
White washing one coat with best shell lime
of approved quality including cost and (Rupees Five and (Rupees Nine
conveyance of all material, bushes, Ganjee paise Twenty thousand
powder(or) Gum, watering the wall Page
before3
only) Seven hundred
whole washing etc., complete and all other and Seventy
operations necessary to complete the Six only)
finished item of work as directed by the
Department.

8 2.50 Cum Dismantling of brick masonry ever Suppl., 244.00 1Cum 610.00
(Two point Five Zero necessary for operning of windows and Specification (Rupees Two (Rupees Six
cubic metres only) doors and convey the debris to out side the hundred and Forty hundred and
work shop yard with a average lead of 1KM Four only) (One Cubic Ten only)
including cost of conveyance and labour metres only)
charges etc., complete and all other
operations necessary to complete the
finished item of work as directed by the
Department.

Total : Rs. 244873.00


(Rupees Two lakh Forty Four thousand Eight hundred and Seventy Three only)

The Agreement is accepted with Estimated rates i.e., total amount of Rs.244873/-(Rupees Two
lakh Forty Four thousand Eight hundred and Seventy Three only)

CONTRACTOR EXECUTIVE ENGINEER.


Page 4

S C H E D U L E 'A'
NAME OF WORK:- DISMANTLING AND REPACKING OF DISTURBED REVETMENT FROM KM.9.500 TO 9.700 ON U/S OF K.R.DAM.
S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in
figures & words figures & words calculations in figures &
(Rs.) figures & words words (Rs.)

1 2 3 4 5 6 7
1 52 cUM Dismantling of disturbed revetment and Suppl. 299/1Cum 1Cum 15548.00
(Fifty Two cubic metres repacking with same stone including labour Specification (Rupees Two (Rupees
only) charges etc., to the original profle thickness hundred and (One Cubic metre Fifteen
of 0.45m including all other operations Ninety Nine only) only) thousand Five
necessary including seigniorage charges hundred and
and VAT and all other charges etc., Forty Eight
complete for the finished item of work as only)
directed by the Engineer-in-Charge.

1 16 Cum Providing filters with 20 to 80mm size field Suppl. 273.00/1Cum 1Cum 4368.00
(Sisteen Cubic metres picked metal including laying of filters and Specification (Rupees Two (Rupees Four
only) cost and conveyance of all material hundred and (One Cubic metre thousand Three
including seigniorage charges and VAT and Seventy Three only) hundred and
all other operations necessary to complete only) Sixty Eight
the finished item of work as directed by the only)
Engineer-in-Charge.

Total : Rs. 19916.00


(Rupees Nineteen thousand Nine hundred and Sixteen only)

The Agreement is accepted with Estimated rates i.e., total amount of Rs.19,916/-
(Rupees Nineteen thousand Nine hundred and Sixteen only).

Sd/- Sd/-
CONTRACTOR //T.C.F.// EXECUTIVE ENGINEER.
Page 5

Divisional Accounts Officer (W)


Page 6

S C H E D U L E 'A'

NAME OF WORK:- IMPROVEMENTS TO WORK SHOP SHED AND MECHANICAL SUB- DIVISION OFFICE SHED TO ESTABLISHMENT ON 21st CENTURY
GURUKULAM INSTITUTE IN T.G.P. CAMP COLONY AT K.R.DAM.

S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in
figures & words figures & words calculations in figures &
(Rs.) figures & words words (Rs.)

1 2 3 4 5 6 7
1 522 Sqm Supplying and fixing of thermocoal False Ceiling in 2' x 2' 403.00 1Sqm 210366.00
(Five hundred and (609.6mm x 609.6mm) Gide fixing anodized alluminimum "L" (Rupees Four (Rupees Two
Twenty Two Square angle of size 24X24X1mm far perimeter cross "T" of sixe hundred and (One Square lakh Ten
metres only) 24X38X1mm including with all necessory fittings for finished Three only) metre only) thousand Three
item of work for 25mm thick cealing including seaffolding hundred and
Charges etc. complete and all other operations necessary to Sixty Six only)
complete for the finished item of work and as directed by the
Engineer-in-Charge.

2 45 Sqm Providing tarfelting roof repairs duly appling one coat of 187.00 1Sqm 8415.00
(Forty Five Square appropriate grade of bitumen in hot condition @ 1.2 kg/ 1 (Rupees One (Rupees Eigh
metres only) Sqm of roof area fixing tar felt (manfaturers to IS 1322/1972 hundred and (One Square thousand Four
spcification) appling second coat of appropriate grade of hot Eighty Seven metre only) hundred and
bitmin @ 1.20 Kg/1 Sqm of roof area and spreading course only) Fifteen only)
aggregate(Sand) @0.063Cum/1 Sqm of roof area finished
item to a width of 0.90m and repairs to G.I Sheet roofing
holes with bolts and nuts and washers includng cost and
converyance of all meterials and labour charges
etc.complecte and all other operations necessary to
complete for the finished item of work and as directed by the
Engineer-in-Charge.

3(a) 22 Nos Painting to roof trushes with Metal Primary Coat and over 1500.00 Each Trusher 33000.00
that two coats of best enamel paint including cast and
conveyance of all materials and labour charges, Centring,
Scaffolding etc, complecte and all other operations
necessary to complete for the finished item of work and as
directed by the Engineer-in-Charge.
Page 7

Painting to roof trushes with Metal Primary Coat and over


(Twenty Two numbers that two coats of best enamel paint including cast and (Rupees One (Each Trusher (Rupees Thirty
only) conveyance of all materials and labour charges, Centring, thousand and Five only) Three Five
Scaffolding etc, complecte and all other operations hundred only) thousands only)
necessary to complete for the finished item of work and as
directed by the Engineer-in-Charge.

3(b) 400 Rmt For Perlins. 15.00 Rmt 6000.00


(Four hundred Running (Rupees Fifteen (One Running (Rupees Six
Metres only) only) metre only) thousands
only)

4 2 Nos Supplying and fixing of W.C Orissa pan white glazed W.C Ist 977.00 1No. 1954.00
(Two numbers only) Qulity ISI marcked, conforming to IS 2556-43- (Rupees Nine (One number (Rupees One
1981with"P"OR "S" Trap of standard company and all other hundred and only) thousand Nine
operations necessary to complete for the finished item of Seventy Seven hundred and
work and as directed by the Engineer-in-Charge. only) Fifty Four only)
5 2 Nos Supplying and fixcing of European water closet of Ist Qulity 976.00 1No. 1952.00
(Two numbers only) ISI marcked, conforming to IS 2556-43-1981with"P"OR "S" (Rupees Nine (Rupees One
Trap of standard company and all other operations hundred and thousand Nine
(One number
necessary to complete for the finished item of work and as Seventy Six only) hundred and
only)
directed by the Engineer-in-Charge. Fifty Two only)
6 2 Nos Supplyign and fixing best indian make plastic seat with lid for 308.00 1No. 616.00
(Twp numbers only) European water closet with rubber or plastic buffers as per IS (Rupees Three (Rupees Six
2548- 1996 and all other operations necessary to complete hundred and Eight (One number hundred and
for the finished item of work and as directed by the Engineer- only) only) Sixteen only)
in-Charge

7 4 Nos Supplying and fixcing of P.V.C Lowlevel cistern parry weare 1392.00 1No. 5568.00
(Four numbers only) slim line with internal componetes and short bend 10 L (Rupees One (Rupees Five
capasity single flush and all other operations necessary to thousand Three (One number thousand Five
complete for the finished item of work and as directed by the hundred and only) hundred and
Engineer-in-Charge. Ninety Two only) Sixty Eight
only)
Supplying and fixcing of P.V.C Lowlevel cistern parry weare
slim line with internal componetes and short bend 10 L (Rupees One (Rupees Five
capasity single flush and all other operations necessary to thousand Three thousand Five
complete for the finished item of work and as directed by the hundred and hundred and
Page 8
Engineer-in-Charge. Ninety Two only) Sixty Eight
only)

8 4 Nos Supplying abnd fixcing of white glayed flat Back boul urinals 515.00 1No. 2060.00
(Four numbers only) of size 440mmx 265mmx315mm with integral flushing rim (Rupees Five (Rupees Two
fixed with scross complete Indian make conforming to IS hundred and thousand and
2556-1995 and all other operations necessary to complete Fifteen only) (One number Sixty only)
for the finished item of work and as directed by the Engineer- only)
in-Charge.

9 2 Nos. 1344.00 1No. 2688.00


(Two numbers only) (Rupees One (Rupees Two
thousand Three (One number thousand Six
hundred and Forty only) hundred and
Four only) Eighty Eight
only)

10 68 Rmt 191.00 1Rmt 12988.00


(Sixty Eight Running (Rupees One (Rupees
metres only) hundred and (One Running Twelve
Ninety One only) metre only) thousand Nine
hundred and
Eighty Eight
only)
11 21 Rmt 131.00 1Rmt 2751.00
(Twenty One running (Rupees One (Rupees Two
metre only) hundred and (One running thousand
Thirty One only) metre only) Seven hundred
and Fifty One
only)
and Fifty One
only)

Page 9

12 12 Rmt 85.00 1Rmt 1020.00


(Twelve running metre (Rupees Eighty (Rupees One
only) Five only) (One running thousand and
metre only) Twenty only)

13 14 Nos 223.00 1No. 3122.00


(Fourteen numbers (Rupees Two (Rupees Three
only) hundred and (One number thousand One
Twenty Three only) hundred and
only) Twenty Two
only)

14 8 Nos 303.00 1Rmt 2424.00


(Eight numbers only) (Rupees Three (Rupees Two
hundred and (One running thousand Four
Three only) metre only) hundred and
Twenty Four
only)

15 6 Nos 162.00 1No. 972.00


(Six numbers only) (Rupees One (Rupees Nine
hundred and Sixty (One number hundred and
Two only) only) Seventy Two
only)

16 2.38 Cum 2515.00 1Cum 5986.00


(Two point Three Eight (Rupees Two (Rupees Five
cubic metres only) thousand Five (One cubic metre thousand Nine
hundred and only) hundred and
Fifteen only) Eighty Six only)
Page 10

(Two point Three Eight (Rupees Two (Rupees Five


cubic metres only) thousand Five (One cubic metre thousand Nine
hundred and only) hundred and
Fifteen only) Eighty Six only)

17 1500 Ltr 6.50 1Ltr 9750.00


(One thousand and (Rupees Six and (Rupees Nine
Five hundred Letres paise Fifty only) thousand
only) (One Letre only) Seven hundred
and Fiftyonly)

Total : Rs. 311632.00


(Rupees Two lakh Forty Four thousand Eight hundred and Seventy Three only)
-3.00

CONTRACTOR EXECUTIVE ENGINEER.

S C H E D U L E 'A'
NAME OF WORK:- DISMANTLING AND REPACKING OF DISTURBED REVETMENT FROM KM.9.500 TO 9.700 ON U/S OF K.R.DAM.
Page 11

S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in
figures & words figures & words calculations in figures &
(Rs.) figures & words words (Rs.)

1 2 3 4 5 6 7
1 52 cUM Dismantling of disturbed revetment and repacking with same Suppl. 299/1Cum 1Cum 15548.00
(Fifty Two cubic metres stone including labour charges etc., to the original profle Specification (Rupees Two (Rupees
only) thickness of 0.45m including all other operations necessary hundred and (One Cubic metre Fifteen
including seigniorage charges and VAT and all other charges Ninety Nine only) only) thousand Five
etc., complete for the finished item of work as directed by the hundred and
Engineer-in-Charge. Forty Eight
only)

1 16 Cum Providing filters with 20 to 80mm size field picked metal Suppl. 273.00/1Cum 1Cum 4368.00
(Sisteen Cubic metres including laying of filters and cost and conveyance of all Specification (Rupees Two (Rupees Four
only) material including seigniorage charges and VAT and all other hundred and (One Cubic metre thousand Three
operations necessary to complete the finished item of work Seventy Three only) hundred and
as directed by the Engineer-in-Charge. only) Sixty Eight
only)

Total : Rs. 19916.00


(Rupees Nineteen thousand Nine hundred and Sixteen only)

The Agreement is accepted with Estimated rates i.e., total amount of Rs.19,916/-(Rupees Nineteen
thousand Nine hundred and Sixteen only).

Sd/- Sd/-
CONTRACTOR //T.C.F.// EXECUTIVE ENGINEER.

Divisional Accounts Officer (W)


SCHEDULE-A
PART-II

NAME OF WORK:-PROTECTION WORKS TO O.T. SLUICE AT KM.0.990 OF K.R.DAM.

S.No. Description Estimate amount in Figures and Words

1 2 3
1) Insurance for the work during the contract period and maintenance Rs. 919 (Rupees Nine hundred and Nineteen only)
charges during defective liability period.

2) Supervision charges (Technical Personnel). Rs. 4375 (Rupees Four thousand Three hundred and Seventy Five only)

Total: Rs. 5294 (Rupees Five thousand Two hundred and Ninety Four only)

Note:- The premium or discount quoted by the contractor will be applicable only for working items in Schedule-A (Part-I). However the provisions contained in
Schedule-‘A’ (Part-II) above will be reimbursed to the Contractor not exceeding the amounts noted above against each on production of the Insurance
policies. Copies of appointment/Orders with payment of vouchers, failing to comply with the above reimbursement shall not be allowed but suitable
penality shall be imposed for not engaging technical personnel and Engineer-in-Charge shall take insurance policy at the cost of Contractor duly
deducting the premium from the Contractor bill.

CONTRACTOR EXECUTIVE ENGINEER.


S C H E D U L E 'A'
NAME OF WORK:- Formation of Ramp from Km.5.250 of K.R.Dam.
S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in figures &
figures & words figures & words calculations in words (Rs.)
(Rs.) figures & words
1 2 3 4 5 6 7
1 5800 Cum Earth Work Excavation in H.G.Soils and borrowed from approved S.S. 115.00 1Cum 667000.00
(Five thousand and quarry including conveyance of earth including loading and unloading 301 (Rupees One (One Cubic metre (Rupees Six lakh and
Eight hundred Cubic charges, Seigniorage charges and all other operations necessary to hundred and only) Sixty Seven thousand
metres only) complete the finished item of work as per drawings or as directed by Fifteen only) only)
the Engineer-in-charge.
2 5800 Cum. Watering and Consolidation of Ramp with 8 to 10Tonne Power Roller S.S. 303 24.00 1Cum 139200.00
(Five thousand and to 98% proctors density and all other operations necessary to and (Rupees Twenty (One Cubic metre (Rupees One lakh Thirty
Eight hundred Cubic complete the finished item of work as per drawings or as directed by Suppl. Four only) only) Nine thousand and Two
metres only) the Engineer-in-charge. Specification hundred only)
3 4 Cum V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm machine S.S.402 & 2530.00 1Cum 10120.00
(Four Cubic Metres crushed hard broken granite metal of approved quality including cost 403 I.S. (Rupees Two (One Cubic metre (Rupees Ten thousand
only) and conveyance of all material and labour charges, machine mixing 456-78 thousand Five only) One hundred and
charges, Vibrating charges, seigniorage charges curing and all Suppl. hundred and Twenty only)
incidental charges etc., complete for foundation of Catch drain and Specification Thirty only)
under R.C.C.hume pipe for the finished item of work as per drawings
or as directed by the Engineer-in-Charge.

4 3 Cum V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm machine S.S.402 & 3095.00 1Cum 9285.00
(Three Cubic Metres crushed hard broken granite metal of approved quality including cost 403 I.S. (Rupees Three (One Cubic metre (Rupees Nine thousand
only) and conveyance of all material and labour charges machine mixing 456-78 thousand and only) Two hundred and Eighty
charges, Centering, Vibrating charges, Seigniorage charges, curing Suppl. Ninety Five only) Five only)
and all incidental charges etc., complete for super structure of catch Specification
drain and for head wall of R.C.C. hume pipe for the finished item of
work as per drawings or as directed by the Engineer-in-Charge.

CONTRACTOR EXECUTIVE ENGINEER.


5 5 Cum Providing Rough Stone dry packing for revetment for toe wall of 619 689.00 1Cum 3445.00
(Five Cubic Metres ramp using rough stone of size 225mm thick with approved quality and (Rupees Six (One Cubic metre (Rupees Three thousand
only) including cost and conveyance of all material loading and unloading, Suppl. hundred and only) Four hundred and Forty
leads and lifts charges and seigniorage charges complete with all Specification Eighty Nine only) Five only)
incidental charges and all other operations necessary for the finished
item of work as per drawings or as directed by the Engineer-in-
Charge.
6 30 Cum Providing Rough Stone dry packing for revetment for side slopes of 619 690.00 1Cum 20700.00
(Thirty Cubic Metres ramp using rough stone of size 225mm thick stone with approved and (Rupees Six (One Cubic metre (Rupees Twenty
only) quality including cost and conveyance of all material, leads and lifts Suppl. hundred and only) thousand and Seven
loading and unloading charges and seigniorage charges complete Specification Ninety only) hundred only)
with all incidental charges and all other operations necessary for the
finished item of work as per drawings or as directed by the Engineer-
in-Charge.
7 15 Rmt Supplying Laying and fixing of the R.C.C. Hume pipes of 600mm dia 1665.00 1Rmt. 24975.00
(Fifteen Running NP3 class pipes laying them carefully in the trench true to alignment Suppl. (Rupees One (One Running (Rupees Twenty Four
metres only) and gradient joining R.C.C.Hume pipes with Cement joints hump yarn Specification thousand Six metre only) thousand and Nine
etc., and twisting including filling and wiring and all material, labour hundred and Sixty hundred and Seventy
charges including all other operations necessary to complete the Five only) Five only)
work as per drawings or as directed by the Engineer-in-Chief.
Total : Rs. 874725.00

(Rupees Eight lakh Seventy Four thousand Seven hundred and Twenty Five only)

CONTRACTOR EXECUTIVE ENGINEER.


The Agreement is accepted with Estimated rates i.e., total amount of Rs.14,262/-(Rupees
fourteen thousand two hundred and sixty two only)
NAME OF WORK:- Providing Ballast weights and rubber seals to the service gates of Low Level Sluice at Km.7.550 of K.R.Dam.

Est.Rs 6,71,500 LAKHS DR.NO: 13/2007-08 Agt: No: 5EE /2007-08


N/C: M/S HAZARTH FRABICTION, PRO HAZARATH LS AND PART BILL ABSTRACT

S.No. Deduct previsous bill


Description of work Up to date bill amount Since last measurement
UNIT Ref amount Remarks
Qty Rate Amount Qty Rate Amount Qty Rate Amount

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Disassembling of gear boxes and stem
rods and other links to service gates
including cost of welding ,skilled labour
etc and all other operations required to
complete the finished item of work as
directed by the Engineer-in-Charge.

2 Lifting of screw rods ,stem rods ,service


gate including cost of labour ,scoffolding
charges,hire charges of crane etc
operations required for finished item of
work as directed by the Engineer-in-
Charge.

3 Disassembling of side rollers,bearings, M


S plates and other links including cost of
welding ,skilled labour etc and all other
operations required to complete the
finished item of work as directed by the
Engineer-in-Charge.
4 Supply and fixing of SKF ball bearings
including cost and conveyance ,cost of
labour and all other operations necessary
to complete the finished item or work as
directed by the Engineer-in-Charge.

5 Erection of side rollers with replaced


bearings, M S Plates for extention of lip
angle including cost of welding ,skilled
labour etc and all other operations
required to complete the finished item of
work as directed by the Engineer-in-
Charge.

Supply and fixing of rubber seals


including aligning cost and conveyance,
6 cost of labour and all other operations
necessary to complete the finished item
or work as directed by the Engineer- in -
Charge

(a) Bottom Seal

(b) Top Seal


(c) Side Seal
7 Checking and fixing alignment of service
gate including cost skilled labour
,instruments etc required to complete the
finished item of work as directed by the
Engineer-in-Charge.

8 Providing ballast weights of required


quantity using cast iron including cost of
transportion fixing in position etc all other
operations necessary to complete the
finished item or work as directed by the
Engineer-in-Charge.

9 Providing two coats of epoxy black paint


including cleaning and removal of rust ,
cost of paints ,labour , transportion etc
all other operations necessary to
complete the finished item or work as
directed by the Engineer-in-Charge.
10 Erection of service gates,screw rods,stem
rods with replaced bearings, M S Plates
,rubber seals etc including cost of cutting
and rewelding of MS plates,flanges, MS
angulars , cost of skilled labour etc and
all other operations required to complete
the finished item of work as directed by
the Engineer-in-Charge.

11 Assembling of gear boxes and stem rods


and other links to service gates including
cost of welding ,skilled labour etc and all
other operations required to complete the
finished item of work as directed by the
Engineer-in-Charge.

12 Replacement of damaged service wire


and reconnection to motors of gear boxes
including cost of materials, labour etc
and all other operations required to
complete the finished item or work as
directed by the Engineer-in-Charge.
13 Labour chargers for linking up of the stop log
gate ( right vent ) to Stem road requiring
divers inculuding the required equipment like
masks Oxygen hoses and consumabul items
like ropes wooden planks for staging and
lighting arrangement at below water during
the operation for removal of damaged bottom
link etc, including the cost of hire charges for
generator for unentrepted power suppy and
compreseres for oxigen foar the day
operation for the removing the bottom road
and conveyed the damaged link to the work
shop and rectified the same to the good
condition including frabication of cottor pin to
the required size and the same is to be
convyed to works spot and refixing the same
in positon with second operation as above
per linking up to the stop log gate with
required men for assistence to diverser
complete and all other opration necessary to
complete the finished item of work

14 Servicing the Gare boxes incuding


straightenning the gare worm shaft by
hydraulic press and revoing clenning,
greassing and fitted duly removal of wornout
washers and packing etc,including convyance
charges form workspot to the work shop and
back etc, complete and all other operation
necessary to complete the finished item of
work.
S C H E D U L E 'A'
Name of work:- Providing Deck Platform connecting existing Hoist Bridges and fixing of foundation bolts to existing Hoist Bridges in C.C. for
Kandaleru Left Canal Sluice at Km.0.990 of K.R.Dam.

S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in
figures & words figures & words calculations in figures & words
(Rs.) figures & words (Rs.)

1 2 3 4 5 6 7
1 438 Kgs. Supplying of 6mm thick M.S.Plate for Deck Platform Suppl. 35.30 1Kg. 15461.00
(Four hundred and Thirty over the encovered portions of the O.T.Sluice well as Specifications. (Rupees Thirty Five (One Kilogram (Rupees Fifteen
Eight Kilograms only) directed by the Department. and paise Thirty only) thousand Four
only) hundred and
Sixty One only)

2 12 Nos. Supplying and fixing of Base plates of size 6"x6" in Suppl., 172 1No. 2064.00
(Twelve Numbers only) 6mm thick plate included to platform and joint bolt of Specifications (One hundred and (One Number (Rupees Two
size 3/4"x1 foot long bolt including cost and Seventy Two only) only) thousand and
conveyance of all material and labour charges etc., Sixty Four only)
complete for finished item of work as directed by the
Department.

2 0.32 Cum., Laying of Cement Concrete (1:11/2:3) using 20mm S.S.402.5.2.2 2824 1Cum., 915.00
(Zero point Three Two HBG Metal for base plate pillers including cost and and (Rupees Two (One Cubic (Rupees Nine
Four Cubic metres only) conveyance of cement, sand and all other material Suppl., thousand Eight Metre only) hundred and
including labour charges and seigniorage charges Specifications hundred and Fifteen only)
etc., complete for finished item of work as directed by Twenty Four only)
the department.

TOTAL: Rs.18,440/-

(Rupees Eighteen thousand Four hundred and Forty only)


The Agreement is accepted with Estimated rates i.e., total amount of Rs.18,440/-(Rupees Eighteen
thousand Four hundred and Forty only)

CONTRACTOR EXECUTIVE ENGINEER


S C H E D U L E 'A'
NAME OF WORK:- Collection and supply of Sand Bags at Seepage points on D/S toe drain in between Km.9.455 to km.9.470 of K.R.Dam.

S.No. Approx.Quantity in Description of work APSS No. Estimate rates in Unit of Amount in
figures & words figures & words calculations in figures & words
(Rs.) figures & words (Rs.)

1 2 3 4 5 6 7
1 40 Cum Collection and supply of sand including cost and Suppl. 260.00 1Cum 10400.00
(Forty Cubic metres only) conveyance of sand, labour charges and seigniorage Specifications. (Rupees Two (One Cubic (Rupees Ten
chargea and all other operations necessary to hundred and Sixty metre only) thousand and
complete the finished item of work as directed by the only) Four hundred
Department. only)

2 568 Bags Supply of gunny bags to filling with sand and placed Suppl., 15.00 1Bag 8520.00
(Five hundred and Sixty at site in between Km.9.455 to Km.9.476 of K.R.Dam Specifications (Rupees Fifteen (One Bag only) (Rupees Eight
Eight bags only) including cost of gunny bags and all other operations only) thousand Five
necessary to complete the finished item of work as hundred and
directed by the Department. Twenty only)

Total: 18920.00
(Rupees Eighteen thousand Nine hundred and Twenty only)

The Agreement is accepted with Estimated rates i.e., total amount of Rs.18,920/-(Rupees Eighteen
thousand Nine hundred and Twenty only)

CONTRACTOR EXECUTIVE ENGINEER