Status:
FOR INFORMATION
Keyplan:
N
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE Section through vehicle canopy Section through warehouse Section through warehouse THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
RIVER WANDLE
Combined Electrical and Control Kiosk approximately 4.5m high ventilation column finished in brick work
LONG VEHICLE
LONG VEHICLE
LONG VEHICLE
VENTILATION COLUMN
10 m
10 m
y r Bo o Co s & W a d Bd r n t
CCL W
CCL W
Project Name:
THAMES TUNNEL
Mud
Mud
Purpose:
Mud
S o u t h E lv e a t in o
Drawing No.:
Scale:
110-DA-ARC-PWH7X-000372
c Thames Water Utilities Ltd 2008
1:400@ A3 1:200@ A1
5 0
1 0 0
1 0 5
2 0 m 0 m
FOR INFORMATION
Keyplan:
N
THIS DRAWING Existing wall and gate house to be demolished Building to be demolished for construction
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE Section through Panorama Antennas building Section through warehouse DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING Section through building MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
COMMERCIAL BUILDING
Proposed removable bollards around the Electrical and Control kiosk Combined Electrical and Control Kiosk and approximately 4.5m high ventilation column finished in brick work New proposed gate along Dormay Street by others Interception chamber ventilation column up to 6m high
10 m
10 m
Project Name:
THAMES TUNNEL
Purpose:
Ea s t El e v ai t o n
Drawing No.:
Scale:
110-DA-ARC-PWH7X-000373
c Thames Water Utilities Ltd 2008
1:400@ A3 1:200@ A1
5 0
1 0 0
1 0 5
2 0 m 0 m
l de n a rW e v Ri
Goods Shed
N
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
P M 5
Delta Park
FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
G s o e a Hl r d
V h lcn p e ie a o y c
Wae o s rh u e
105.59
000373
East Elevation
104.57
Wae o s rh u e
104.20
000372
Refuse compressor
South Elevation
I ut l n si d r a b ii ud g ln
WANDSWORTH
I u t l ud g n s i B ii d r a ln
104.14
10 m
40 m
Wok r s
Y YWA O R M U R A
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Project Name:
THAMES TUNNEL
Purpose:
Ri v r e Wa n l de
110-DA-ARC-PWH7X-000370
c Thames Water Utilities Ltd 2008
1:1000@ A3 1:500@ A1
5 0
1 0 0
1 0 5
2 0 m 0 m
Wae o s rh u e
Th eC
a s u e wa y
1 2 5 8
l de n a rW e v Ri
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU)
104.60
104.60
DO RM EET STR AY
O FR G M O RE
N
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR Proposed 6m high vent column 225mm diameter Frogmore Storm Relief Bell Lane Creek CSO THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
Ventilation column approximately 4.5m high Electrical and Control kiosk with Brown Roof or metal roof panel TBC Hard paving upstand area Removable bollards
KEY:
THAMES WATER ACCESS DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU)
000374
Section AA
104.60
104.59
000373
East Elevation
104.27 2 0 m 0 m
000372
South Elevation
104.45
RI VE RW AN D
Th eC
L E
a s u e wa y
10 m
10 m
1 0 G
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Stn 2S 104.572
Project Name:
THAMES TUNNEL
Purpose:
104.14
110-DA-ARC-PWH7X-000371
c Thames Water Utilities Ltd 2008
1:400@ A3 1:200@ A1
5 0
1 0 0
1 0 5
DO RM ET RE ST AY
FOR INFORMATION
Keyplan:
N
THIS DRAWING
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE Interception chamber ventilation column 6m high Existing flood defence wall Combined Electrical and Control Kiosk with approximately 4.5m high ventilation column finished in brick work Proposed removable bollards around the Electrical and Control Kiosk THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
LONG VEHICLE
LONG VEHICLE
LONG VEHICLE
Interception chamber
Valve Chamber
Proposed: Section AA
CSO drop shaft 12m internal diameter 2 0 m 0 m 1m
N
10 m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Project Name:
THAMES TUNNEL
Purpose:
A
FOR PHASE 2 CONSULTATION
Location / Site Name:
110-DA-ARC-PWH7X-000374
c Thames Water Utilities Ltd 2008
1:200@ A3 1:100@ A1
5 0
1 0 0
1 0 5