data order MATERIAL ASRI KOMERSIL

TYPE 36 / 72 2(dua )Unit


No. 001/PJT/GAP-KML/IV/23
Tanggal - 4/4/2023 Progres Target 30%
I

No Nama Barang Vol SATUAN KETERANGAN QT


1 Batu 1 Dum Setempat 2 Unit
2 Pasir 1 Dum Setempat 2 unit
3 Semen 16 ZK Gresik (Rajawali) 2 Unit
4 Benang 6 Roll Lokal 2 Unit
5 Papan 3x20 15 Ikat Lokal 2 Unit
6 kaso 5x5 10 ikat Lokal 2 Unit
7 Paku 5-7-10 10 Kg Lokal 2 Unit
8 Bambu 30 Btg Lokal 2 Unit
9 Beghel 10" Full 50 Btg SNI 2 Unit
10 Cincin 8" 8x12 420 bh Lokal 2 Unit
11 Kawat Bendrat 5 Kg Lokal 2 Unit
12 Hebel 2 DO Lokal 2 Unit
13 Mortart MU (Murah) 22 Zak Lokal 2 Unit
14 Paralon PVC 1/2" 6 Btg Lokal 2 Unit
15 Paralon PVC 2" 2 btg Lokal 2 Unit
16 Paralon PVC 4" 2 btg Lokal 2 Unit
17 Paralon PVC 3/4" 4 btg Lokal 2 Unit
18 Lem Paralon Isarflast 2 Tub Lokal 2 Unit

GRIYA ASRI PUNCAK SUBSIDI


1 Kloset duduk 12 set 12 Unit
2 Jet Shower 12 set 12 unit
3 BCP Single 12 set 12 Unit
4 Keramik Dd Km Mandi 25x40 4 Dust Tambahan Retur
5 Keramik Meja Dafur 32 Dust Sample ada

Sukabumi, 4/4/23

Idrus
ORDER MATERIAL PEMASANGAN PIPA AIR BERSIH SPK (Adendum)
TYPE 29 / 60 3 (tiga )Unit BLOK J-10
No. 002/ADM/GAP-KML/IV/23
Tgl. 6 Apr 2023 PROG 100% I
Nilai SPK. Rp. 6.991.600
No Nama Barang Vol SATUAN KETERANGAN QT
1 Paralon 2" 100 Ml ABS 25 Btg
2 Paralon 1/2" 24 Ml ABS 6 Btg
3 Stop Kran 2" 8 ttk ABS 8 Bh
4 Stop Kran 1/2" 12 ttk ABS 12 Ttk
5 Tee 2" » 1/2" 12 Ttk ABS 12 Ttk
6 Knee 1/2 " 24 Ttk ABS 24 Bh
7 Reduser 2" » 1" 1 Ttk ABS 1 Bh
8 Lem Paralon 1 ttk ABS 1 Klg
9 Isar Flas 5 Bh ABS 5 Bh

Untuk Pekerjaan Dwikert Subsidi Adendum


1 Besi 10" 3 Unit ABS 6 Btg
2 Kawat Tali 3 Unit ABS 1/2 Kg
3 Semen Biasa 3 Unit ABS 2 Zk

Untuk Order Droping Bisa Di gabungkan dengan order material Komersil.

ORDER MATERIAL TAMBAHAN BLOK J- 6 No 2 KOMERSIL SPK Adendum


Besi cakar Ayam 10 Full 60x60 1 Unit 12 Bh
Besi Beghel 10" Full 1 Unit 5 Btg
Kawat Tali 1 Unit 2Kg
Cincin Besi 8" Full 8X 20 1 Unit 28 Bh
Semen Gresik 1 Unit 6 Zk

Sukabumi, 6 - 4 - 23

Idrus