2 Fix
2 Fix
00
℄
+5.80
EXISTING TANAH
+5.60
GALIAN
+5.40
EL. RENCANA
+5.20
+5.00
+4.00
+4.20
4.90
Elev. +5.10
JARAK ( M )
5.35
5.25
5.25
5.35
5.5
5.5
5.1
5.1
5.1
5.5
5.5
ELEVASI ( M )
Timbunan :- m²
P8
Galian : 0.134 m²
+7.00
℄ +6.00
℄
+6.80 +5.80
EL. RENCANA
+6.20
EL. RENCANA +5.20
+6.00 +5.00
+5.00 +4.00
+5.20 +4.20
5.24
4.56
Elev. +5.34 Elev.
Elev.
+1609.00
+4.68
JARAK ( M ) JARAK ( M )
4.93
5.08
5.08
4.86
4.68
4.68
4.68
4.86
5.08
5.08
4.93
5.58
5.73
5.73
5.51
5.34
5.34
5.34
5.51
5.73
5.73
5.58
ELEVASI ( M ) ELEVASI ( M )
Timbunan :- m²
P7 Timbunan :- m²
P9
Galian : 0.217 m² Galian : -0.150 m²
+7.00
℄
+6.80
+6.60
EXISTING TANAH
+6.40 GALIAN
EL. RENCANA
+6.20
+6.00
+5.00
+5.20
5.35
Elev. +5.50
JARAK ( M )
5.74
5.89
5.89
5.67
5.67
5.89
5.89
5.74
5.5
5.5
5.5
ELEVASI ( M )
Timbunan :- m²
P6
Galian : 0.152 m²
2 2 2024