Anda di halaman 1dari 1

+6.

00

+5.80

EXISTING TANAH
+5.60

GALIAN
+5.40
EL. RENCANA

+5.20

+5.00

+4.00

+4.20

4.90
Elev. +5.10
JARAK ( M )

5.35

5.25

5.25

5.35
5.5

5.5

5.1

5.1

5.1

5.5

5.5
ELEVASI ( M )

Timbunan :- m²
P8
Galian : 0.134 m²

+7.00
℄ +6.00

+6.80 +5.80

+6.60 +5.60 EXISTING TANAH


EXISTING TANAH
GALIAN
+6.40 GALIAN +5.40

EL. RENCANA
+6.20
EL. RENCANA +5.20

+6.00 +5.00

+5.00 +4.00

+5.20 +4.20

5.24

4.56
Elev. +5.34 Elev.
Elev.
+1609.00
+4.68
JARAK ( M ) JARAK ( M )

4.93

5.08

5.08

4.86

4.68

4.68

4.68

4.86

5.08

5.08

4.93
5.58

5.73

5.73

5.51

5.34

5.34

5.34

5.51

5.73

5.73

5.58
ELEVASI ( M ) ELEVASI ( M )

Timbunan :- m²
P7 Timbunan :- m²
P9
Galian : 0.217 m² Galian : -0.150 m²

+7.00

+6.80

+6.60
EXISTING TANAH
+6.40 GALIAN
EL. RENCANA
+6.20

+6.00

+5.00

+5.20
5.35

Elev. +5.50
JARAK ( M )
5.74

5.89

5.89

5.67

5.67

5.89

5.89

5.74
5.5

5.5

5.5

ELEVASI ( M )

Timbunan :- m²
P6
Galian : 0.152 m²

KERJASAMA ANTARA DINAS TANAMAN PANGAN Propinsi :

DAN HORTIKULTURA DENGAN SULAWESI SELATAN

FAKULTAS TEKNIK UNIVERSITAS HASANUDDIN Pekerjaan :


SURVEY INVESTIGASI DAN
DESAIN OPTIMASI LAHAN RAWA
Kabupaten :
PERENCANAAN PENGGALIAN SALURAN PINRANG

Nomor Lembar Jumlah Lembar Tahun Anggaran

2 2 2024

Anda mungkin juga menyukai